TANK AND BILGE CLEANING CONTRACT 27 September 2015
COMMERCIAL INDUSTRIAL SERVICES:
TANK AND BILGE CLEANING SERVICES
SECTION C: DESCRIPTIONS AND SPECIFICATIONS
SCOPE:
The primary purpose of the Commercial Industrial Services (CIS) Tank and Bilge Cleaning Services contract is to provide labor, services, equipment, and materials for the cleaning of tanks, voids, and bilges onboard U.S. Navy ships and other Government vessels within a 50-mile radius of San Diego, CA, which may include Oceanside, CA.
The effort required hereunder shall be performed in accordance with the statement of work contained in Section C herein, attachments and in accordance with all other terms and conditions set forth herein.
C.1. REFERENCES:
C.1.1 The requirements of the following references and attachments shall be utilized in the execution of this contract unless otherwise stated herein. Whenever specifications, NAVSEA Standard Items, standards, drawings, publications or other documents undergo subsequent revisions, the Contractor shall use the latest revised version during contract execution. If future revisions result in a change to the Contractor’s price, the Contractor shall promptly notify the contract administration office of the revision details and the expected impact. The administrative contracting officer will then negotiate and incorporate the necessary changes via bilateral modification to the contract. When future revisions result in no change to the Contractor’s price, the Contractor shall utilize the latest version as soon as the change becomes known without a need for a contract modification.
(a) NAVSEA Standard Items
Category I NAVSEA STANDARD ITEMS (NSI) may be viewed on the internet at http://www.navsea.navy.mil/Home/RMC/CNRMC/OurPrograms/SSRAC.aspx and will be invoked on all delivery orders.
The following Category II NAVSEA STANDARD ITEMS (NSI) may be viewed on the internet at http://www.navsea.navy.mil/Home/RMC/CNRMC/OurPrograms/SSRAC.aspx and will be invoked on all delivery orders as required:
009-09 Process Control Procedure (PCP); provide and accomplish 009-11 Insulation and Lagging Requirements; accomplish 009-25 Structural Boundary Test, accomplish 009-26 Deck Covering Requirements, accomplish 009-32 Cleaning and Painting Requirements; accomplish 009-71 Testing Requirements for Piping Systems, accomplish 009-90 Technical Representative; provide
(b) OPNAVINST 5100.23G; Navy Safety and Occupational Health Program Manual
(c) Occupational Safety and Health Act (OSHA) of 1970
(d) Code of Federal Regulations (CFR) Title 29, Part 1910; Occupational Safety and Health Standards
(e) CFR Title 29, Part 1915; Occupational Safety and Health Standards for Shipyard Employment
(f) CFR Title 40, Part 63, Subpart II National Emission Standards for Shipbuilding and Ship Repair (Surface Coating)
(g) CFR Title 40, Part 260 through 279; Protection of Environment
(h) CFR Title 49, Part 171 through 177; Transportation
(i) United States Code (USC) Title 10, Section 7311, Repair or Maintenance of Naval Vessels:
Handling of Hazardous Waste
(j) California Code of Regulations (CCR), Title 22, Div. 4.5, Environmental Health Standards for the Management of Hazardous Waste.
(k) National Fire Protection Association (NFPA) Standard 312, Standards for Fire Protection of Vessels During Construction, Conversion, Repair and Lay-up.
(m) NFPA Standard 306, Standards for the Control of Gas Hazards on Vessels
(n) Resource Conservation and Recovery Act (RCRA)
(p) Commander Fleet Forces Command Instruction (COMFLTFORCOMINST) 4790.3 Work Authorization Form (WAF)
(q) Commander Navy Region Southwest (CNRSW) Water Quality Program (Revised July 2012) Storm Water Best Management Practices Policies and Procedures Manual Requirements for Working on Navy Piers, Wharves and Quay Wall Areas
(r) CNRSW Storm Water Best Management Practices Manual
(s) NAVSEA Standard Work Template 077-001; Hazardous Waste Produced on Naval Vessels; control
(t) San Diego Regional Oily Waste Transfer Manual. Regional Operations Manual for Oily Waste Collection and Treatment Facilities.
(u) Current Southwest Regional Maintenance Center (SWRMC) Approved Adhesive, Paint and Solvent Lists
(v) NAVFAC Southwest Environmental Services: CB&I Standard Operating Procedure IWOW-003. Transfer of Oily Waste from Vessel to the Pier Oily Waster Riser or Tanker Truck.
(w) NAVFAC Southwest Environmental Services: CB&I Standard Operating Procedure IWOW-008. Procedure for Offloading Trucked Oily Waste at Naval Base Coronado North Island and Naval Base San Diego and Oily Waste Treatment System.
(x) NAVFAC Southwest Environmental Services: CB&I Standard Operating Procedure IWOW-020. Waste Acceptance Criteria for Bilge and Oily Waste Treatment Systems.
(y) NAVFAC Southwest Environmental Services: CB&I Standard Operating Procedure IWOW-022. Waste Acceptance Form.
(z) S9086-T8-STM-010; Naval Ship’s Technical Manual (NSTM) Chapter 593; Pollutant Control.
(aa) S9086-SN-STM-010; NSTM Chapter 541; Ship Fuel and Fuel Systems
(ab) S9086-SP-STM-010; NSTM Chapter 542; Gasoline and JP-5 Fuel Systems.
(ac) NAVSEA 0900-LP-016-0010; MIL-HDBK-291; Military Handbook Cargo Tank Cleaning.
(ad) NAVFAC P-307, Management of Weight Handling Equipment.
(ae) Base Support Vehicles & Equipment (BSV&E) Standard Operating Procedure (SOP) #06-2, Naval Base Coronado Contractor Crane Oversight Plan
(af) BSV&E SOP #06-3, Naval Base San Diego Contractor Crane Oversight Plan.
(ag) BSV&E SOP #06-4, Naval Base Point Loma Contractor Crane Oversight Plan.
C.1.2 If the Contractor does not have copies of the referenced documents, technical manuals, military standards, procedures, and regulations etc., the Shipbuilding Specialist (SBS) shall be notified so that copies can be disseminated.
C.1.3 Other documents not listed above may also be invoked, as required, for individual delivery orders. Specific references and associated referenced technical documentation for individual delivery orders shall be identified on each delivery order.
C.2 GENERAL REQUIREMENTS:
C.2.1 The quality of all services rendered shall conform to the highest standard in the relevant profession, trade or field of endeavor. Without additional expense to the Government, the Contractor shall be responsible for obtaining any necessary insurance, licenses and permits, and for complying with all applicable laws, codes and regulations, in connection with the performance of the work. The Contractor is responsible for ensuring that proper safety and health precautions are taken to protect the workers and the property of others.
C.2.2 All work being performed in this contract shall be accomplished in accordance with (IAW) references C.1.1(a) through C.1.1(ag).
C.2.3 The Contractor shall provide all management, administrative services, materials, tools, equipment, labor, rigging, crane services, scaffolding, utilities (i.e. air, water and electricity, etc.) and required services/support to accomplish the work specified in this contract.
C.2.4 The Contractor shall provide all cranes necessary to accomplish the work under this contract, including floating cranes when required and cranes with a boom capacity great enough to reach ships berthed second ship out IAW references C.1.1(a) through C.1.1(ag).
C.2.5 The Contractor may utilize government utilities available at the pier. It is the Contractor’s responsibility to arrange for, coordinate with, meet the requirements of, and pay Naval Facilities Engineering Command, Southwest (NAVFAC-SW) for use of government utilities.
C.2.6 The Contractor shall comply with the Occupational Safety and Health Standard for Shipyard Employment (CFR, Title 29, Part 1915) promulgated under Public Law A85-742, Amended Section 41 of the Longshoremen’s and Harbor Workers Compensation Act (33 U.S.C.942) and adopted by the Department of Labor as Occupational Safety and Regulations, for all work being performed under this contract on the navigable waters of the United States including any dry-dock or marine railway. Nothing contained in this contract or any delivery order there under shall be construed as relieving the Contractor from any obligation, which it may have for compliance with the aforesaid regulations IAW references C.1.1(a) through C.1.1(ag).
C.2.7 The Contractor shall notify the Administrative Contracting Officer (ACO) and SBS verbally and in writing of difficulties that may jeopardize the completion of specified work.
C.2.8 The Government will not be responsible for work delays or stoppages caused by the Contractor’s failure to comply with registration and access requirements. Similarly, the Government shall monitor and take appropriate action against Contractor’s who repeatedly or egregiously violate access control requirements.
C.2.9 Work may be required outside normal working hours and on weekends. Normal working hours is defined as between 6:00 AM and 6:00 PM, Sunday through Saturday.
C.2.10 The Contractor shall notify the Ship’s Authorized Representative (SAR) prior to start of work noting equipment and systems that require isolation so that tag outs can be accomplished as required. The Contractor shall notify the SAR immediately when all work required by the delivery order are completed and the system is ready for activation and removal of tags.
C.2.11 The Contractor shall follow procedures for system tag-out IAW references C.1.1(a) and C.1.1(b).
C.2.12 Nothing in this contract shall relieve the Contractor from complying with applicable federal, state, and local laws, codes, ordinances, and regulations, including, but not limited to obtaining of licenses and permits, in connection with the use of hazardous material and the generation of hazardous waste in the performance of this contract.
C.2.13 The Contractor awarded a delivery order shall submit an electronic copy of the Test and Inspection Plan (TIP) and Production Schedule specific to each delivery order. The TIP and Production Schedule shall be submitted to the SBS and Quality Assurance Specialist (QAS) no later than one (1) day prior to the start of productive work for all delivery orders under this contract.
C.2.14 The Contractor shall submit (when required) electronics copies of the Process Control Procedure (PCP) to the SBS no later than one (1) day after the delivery order is issued for submission to the Southwest Regional Maintenance Center’s (SWRMC) Engineering Department for review and approval.
C.2.15 When required, the Contractor shall attend ship checks as specified by the SBS to identify the initial scope of work and to determine the preliminary repair requirements. In the event the Contractor shall be delayed, immediately contact the SBS.
C.2.16 The Contractor shall be responsible for the removal of all interferences necessary to accomplish the work specified on the delivery order. The Contractor shall reinstall all previously removed interferences/equipment upon completion of the work specified on the delivery order.
C.2.17 The Contractor shall coordinate with the SAR for the removal of and the re-installation of portable deck plates and gratings by ships force.
C.2.18 The Contractor is responsible for coordinating with SAR for the installation and the removal of cofferdams as required IAW Shipboard Operating Procedures (SOP) and references C.1.1(a) and C.1.1(b).
C.2.19 To ensure no delay the Contractor shall coordinate schedules of work-affected areas with ships force daily.
C.2.20 The Contractor shall ensure required engineering controls to prevent environmental pollutant discharges from work areas and safety boundaries are in place prior to the start of the tank and bilge cleaning services.
C.3 STATEMENT OF WORK:
C.3.1 Within 24 hours of start of the performance period, the Contractor shall submit one legible copy, in hard copy or approved transferrable media, a Condition Found Report (CFR) to the SBS identifying discrepancies associated with the equipment/areas specified in each delivery order. The Contractor shall be responsible for discrepancies or damages not noted in the initial CFR.
C.3.2 The Contractor shall submit one legible copy, in hard copy or approved transferrable media, of subsequent CFR’s identifying discrepancies or damages associated with the description of work to the SBS within 4 hours of conditions found.
C.3.3 Prior to the start of work under each delivery order the Contractor shall ensure that the required Work Authorization Form (WAF) is properly filled out and authorized IAW the ships WAF Program and references C.1.1.(a) and C.1.1(p). The authorized WAF shall be posted at the primary and secondary entrances to the location of work. In the event the ship does not have an established WAF program, the Contractor will provide the necessary documents.
C.3.4 The Contractor shall be responsible for cleanup of any spills and/or mitigation of hazards associated with the work being performed hereunder, from the ship and from the Naval Facility IAW all applicable regulations and references C.1.1(a) through C.1.1(ac).
C.3.5 The Contractor shall be responsible to gas free the space(s) IAW with C.1.1(a) through C.1.1(ad). The Contractor shall provide gas-free certification and maintain certification IAW 29 Code of Federal Regulations Part 1915. The Contractor shall post the gas free certificate on the job site during the performance period.
C.3.6 The Contractor shall be responsible for the cleanliness of the work area. All waste created by the Contractor as a result of the tank and bilge cleaning services specified herein, shall be removed from the ship at the end of each shift.
C.3.7 The Contractor shall be responsible for the removal and disposal of petroleum products, residual fuel, contaminated fuel, ballast water, bilge water, sewage contaminated liquids, oily water, fuel sludge and debris generated by the performance of work hereunder, from the ship and from the Naval Facility IAW all federal, state, and local laws, codes, ordinances, regulations and references C.1.1(a) through C.1.1(ac).
C.3.8 Prior to start of tank, void and bilge cleaning operations, the Contractor shall ensure that required safety boundaries and engineering controls are in place to prevent environmental pollutant discharges from work areas.
C.3.9 The Contractor may utilize the NAVFAC-SW Bilge and Oily Wastewater Treatment System (BOWTS) facilities located at Naval Base San Diego, Naval Base Coronado, and Naval Base Point Loma for disposal of ballast water, bilge water, and oily water IAW references C.1.1(a) through C.1.1(ac).
C.3.10 Bilge areas are defined as that portion of the interior hull shell plating, internal support structures, bilge wells and sumps, tank top plating and boundary bulkheads from keel to the red and white dividing line. Included are piping and piping supports, deck plate supports, and miscellaneous support structures and accessible surfaces of machinery foundations.
C.3.11 Bilges ordered to be cleaned hereunder shall be of various type machinery spaces such as, but not limited to, engine rooms, fire rooms, pump rooms, shaft alleys and auxiliary machinery spaces.
C.3.12 The Contractor shall comply with applicable federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
C.3.13 For work on Aircraft Carriers, the Contractor shall submit WAFs in sufficient detail so that the ship can provide proper work area isolation. The Contractor shall initiate WAFs in the Information Management System (IMS). Computer terminals will be made available by Newport News Shipbuilding (NNS) for maintenance providers to enter WAFs directly into this system. Once the WAF is entered in IMS, the Contractor shall print the WAF, sign the WAF and submit the WAF to the Work Test Control/Maintenance Support Center (WTC/MSC) on the ship for processing and authorization. The Contractor shall be responsible for updating status of the WAF in IMS as work is authorized and completed.
NOTE: Typical routing for ship’s force concurrences requires 3 days.
The Contractor shall establish an account in Electronic-Systems Operations Management System (E-SOMS) in order to produce an Electronic Work Authorization Form (E-WAF) to obtain ship departmental concurrences via routing on the vessel.
C.4 GAS FREE CERTIFICATION
C.4.1 The Contractor shall conduct a preliminary inspection of each compartment, bilge, tank and/or void to determine readiness for gas free certification prior to call out of a certified Marine Chemist.
(I) CHECK POINT (Gas Free Certification)
C.4.2 The Contractor shall empty, clean, gas free and certify as “SAFE FOR WORKERS” and/or “SAFE FOR HOT WORK” all designated of bilges, tanks, voids and associated piping including fill, transfer, overflow, vent piping and sounding tubes existing on Naval vessels IAW references C.1.1(a) through C.1.1(ac).
C.4.3 The Contractor shall submit two legible copies of the “Gas Free Certificate” to the SBS and the SAR for each tank, void and/or bilge area certified within 24 hours after certification.
C.4.4 The Contractor shall notify the SBS if gas free certification cannot be issued due to conditions beyond the Contractor control.
C.5 EMPTY, CLEAN AND GAS FREE TANK AND BILGE:
C.5.1 The Contractor shall clean bilge areas IAW the requirements of references C.1.1.(a) through C.1.1.(ac). Bilge area surfaces shall be wiped clean by hand with lint-free rags and solvent to remove all residues of bilge liquids, contaminated liquids, grease, fuel, oil and dirt.
C.5.2 The Contractor shall clean tanks and/or voids IAW references C.1.1(a) through C.1.1(ac). Tank and/or voids surfaces shall be wiped clean by hand with lint-free rags and solvent to remove all residues of bilge liquids, contaminated liquids, grease, fuel, oil and dirt.
C.5.3 The Contractor shall coordinate with ships force (S/F) via the SAR for the opening and closing of tanks and/or voids.
C.5.4 The Contractor shall coordinate with S/F via the SAR for the disconnection of piping to allow contractor entry to piping systems when required.
C.5.5 The Contractor shall install blank flanges at the first valve or flange outside of each tank and/or void.
C.5.6 The Contractor shall submit two legible copies of the location of all installed blank flanges to the SBS and the SAR for entry into the Engineering Tag-out Log. When work is completed, the Contractor shall ensure that all installed blank flanges are removed and associated piping is restored to an operational status. After removal of all installed blank flanges, notify the SBS and the SAR for entry into the Engineering Tag-out Log.
C.5.7 The Contractor shall coordinate the emptying of tanks, voids, and/or bilges through the ship’s Damage Control Assistant (DCA) via the SAR to maintain ships stability and prevent flooding.
C 5.8 Emptying of each bilge or tank shall include removal of all liquids, contaminated liquids, sludge, foreign objects and materials from bilge or tank prior to cleaning.
C.5.9 The Contractor shall ensure that harmful or offensive odors are controlled IAW references C.1.1(a) through C.1.1(ac), and not allowed to escape into the interior of the vessel.
C.5.10 The Contractor shall ensure that isolated pockets located in and around foundations, piping, machinery, equipment, ships structures and sumps have been cleaned free of items identified in paragraph C.3.7.
C.5.11 The Contractor shall ensure that all limber holes, strainer plates and drain covers have been cleared of foreign material which may obstruct the free flow of liquids.
C.5.12 No more than one bank of compensation type tanks may be emptied at any one time when vessel is waterborne. The forward bank cannot be emptied pier side without written approval from the SWRMC Engineering Department Code 200.
C.5.13 Voids that have been contaminated by fuel and will require cleaning shall be ordered separately as fuel tanks.
C.5.14 The Contractor shall remove and dispose of petroleum products, water, contaminated liquids, sewage contaminated liquids, sludge and debris in accordance with all federal, state, and local laws, codes, ordinances, and regulations. Fluids discovered as being hazardous shall be handled and disposed of IAW references C.1.1(a) through C.1.1(ac).
C.6 CONVEYANCE FOR OFF LOAD AND TRANSPORT:
C.6.1 Each conveyance to be used by the contractor shall check-in at the NAVFAC-SW BOWTS Operating Center, Bldg. 3588, Naval Station San Diego, prior to going to the work site. The BOWTS Operating Center normal working hours of operation is 8:00 AM – 4:00 PM, seven days a week. Phone number (619) 556-9688. Between the hours of 4:00 PM and 8:00 AM, calls must be directed to the NAVFAC-SW Duty Desk at (619) 556-7349.
C.6.2 Conveyance for off load and transport of hazardous waste to the BOWTS shall be accomplished IAW the requirements of references C.1.1(a) through C.1.1(ac).
(V) CHECK POINT (Empty and Clean Conveyance)
C.6.3 The Contractor shall provide an empty and clean conveyance to off load and transport materials removed. Conveyance shall be empty and free of all debris, foreign materials and contaminants. Use of barges for conveyance is not authorized. Accomplish IAW all appropriate regulations and references C.1.1(a) through C.1.1(ac).
C.6.4 The Contractor shall measure and record the quantity and type of all liquid products removed by using the Uniform Hazardous Waste Manifest and the Waste Acceptance Form.
Fill in each block that is appropriate for fluids removed.
C.6.5 Mixing of dissimilar products or introducing chemicals, solvents, detergents or cleaning agents into fuel is prohibited.
(V) CHECK POINT (Verification of Quantity)
C.6.7 The Contractor shall inspect each conveyance prior to leaving work site to verify quantity of fluids contained in each conveyance corresponds to the Uniform Hazardous Waste Manifest and the Waste Acceptance Form.
C.6.8 Each conveyance shall check-out at NAVFAC-SW BOWTS Operating Center within two hours after sealing of the conveyance and prior to departing Naval Facility to submit the Uniform Hazardous Waste Manifest and the Waste Acceptance Form.
C.6.9 After normal working hours, the contractor shall submit the Uniform Hazardous Waste Manifest and the Waste Acceptance Form to the NAVFAC-SW BOWTS Operating center no later than 9:00 AM the following day.
C.6.10 The Contractor shall deliver fuel or contaminated effluent to the nearest Department of Defense fuel or designated handling facility after checking out of the NAVFAC-SW BOWTS Operating Center.
C.6.11 If test results exceed limits specified in references C.1.1(v) through C.1.1(y), the Contractor shall assume responsibility as sole generator of the hazardous waste, complete a new manifest and dispose of fluids accordingly.
C.6.12 The Contractor shall submit a copy of the Uniform Hazardous Waste Manifest and the Waste Acceptance Form to the SBS.
C.7 ON-LOAD, OFF-LOAD AND TRANSFER OF LIQUIDS.
C.7.1 The Contractor shall coordinate the on-loading, off-loading, or transferring of fluids through the ship’s Damage Control Assistant (DCA), via the SAR to maintain ships stability and prevent flooding.
C.7.2 The Contractor shall provide assistance to S/F personnel while accomplishing work associated with each delivery order requiring transfer of fluids. Assistance shall consist of providing pumps, hoses, temporary ventilation systems and personnel capable of operating the described equipment in the event of liquid transfer.
C.7.3 Liquid transfer shall include those accomplished from one tank to another tank on the same vessel, from any naval vessel to a barge or tank truck alongside the vessel, and vice versa.
C.7.4 The Contractor shall install calibrated flow meters when transferring liquids to ensure an accurate reading of the volume of liquid on-loaded, off-loaded, or transferred.
C.8 TANK AND BILGE CLEANLINESS INSPECTION:
C.8.1 The Contractor shall ensure that all blank flanges installed in C.5.5 are removed. After removal of all installed blank flanges, notify the SBS and the SAR for entry into the Engineering Tag-out Log.
(V) (G) CHECK POINT (FINAL)
C.8.2 Inspect each bilge, tank and/or void for cleanliness IAW references C.1.1(a) through C.1.1(ac).
C.9 INSPECTION PROCEDURES:
C.9.1 (I) Inspections require verification and documentation by a separate individual, other than the person who has accomplished the work, who is qualified as an inspector and currently certified where required by the technical documents.
C.9.2 (V) Inspections require verification and documentation by the qualified tradesperson, trade supervisor, or inspector.
C.9.3 (Q) Inspections require verification and documentation by a qualified Technical Representative IAW reference C.1.1(a) 009-90 and associated PCP requirements.
C.9.4 (G) A symbol inserted in a work item to establish a point in the sequence of accomplishment of work at which time the SBS shall be notified by the prime contractor in all cases to permit observation of a specific test or inspection (I) (V) (Q) by the government.
C.9.5 For (G) checkpoints scheduled during normal working hours, the Contractor shall notify the SBS of checkpoints via electronic method. Notification shall be at least four hours, but not more than one working day, prior to commencing the specific requirements in the paragraph annotated with the symbol (G). Notify the SBS not later than four hours before the end of the last preceding day shift when tests or inspections following a (G) checkpoint is scheduled after normal day shift working hours, on a weekend, or on a federal holiday. Notify the SBS at least 48 hours, but not more than 72 hours, prior to commencing (G) checkpoints Contractor's/Subcontractor’s plants located in excess of 50 miles by the most direct roadway nearest to the place of performance of the contract. Document the date, time, and identification of the SBS notified.
C.9.6 For (G) checkpoints scheduled during normal working hours, the Contractor shall notify the SBS for cancellation of the scheduled test or inspection as soon as known, but no later than one hour prior to the scheduled check point.
C.9.7 For (G) checkpoints scheduled after normal working hours, on a weekend, or a federal holiday, the Contractor shall notify the SBS to cancel a scheduled test or inspection as soon as known, but no later than two hours prior to the scheduled check point.
C.10 DELAYS AND DISRUPTIONS:
C.10.1 The Contractor shall coordinate his work efforts on a daily basis with the SAR to schedule his work to avoid delays and disruptions. More than one Contractor working in the same area is a normal condition encountered during ship repair periods. Delays caused by these events will be at no cost to the Government.
C.10.2 Drills, shifting of berths and piers, inspections, serving of meals, official ceremonies, additional security requirements, operation of equipment and scheduled meetings are to be considered normal evolutions to be encountered when working on board naval installations and vessels rather than unusual occurrences. Delays caused by these events will be at no cost to the Government.
C.10.3 The Contractor shall be responsible for relocation of own equipment in the event of berth shifts, pier shifts, repositioning of the ship and outboard another vessel.
C.10.4 The Contractor shall be responsible for coordinating work efforts with other Contractors working in the same or adjacent areas on board naval vessels.
C.11 PROGRESS MEETINGS/REPORTS:
C.11.1 The Contractor shall participate in daily or weekly progress meeting(s) as required. The Contractor shall provide a progress report of all active jobs to the SBS, on Monday or the first business day of each week, no later than 8:00 a.m.
C.11.2 For work on Aircraft Carriers, the Contractor shall also submit all initial production schedules to Newport News Shipbuilding (NNS) via SWRMC Code 350, Randy Sopicki at randolph.sopicki@navy.mil, Oscar Ocampo at oscar.ocampo1@navy.mil and Dannie Rios at dannie.rios@navy.mil, for integration into the topside schedule. Initial schedules shall be submitted 3-5 business days prior to the planned start dates. Production schedules shall be developed in Microsoft Project 2000 (minimum), utilizing the Work Breakdown Guidelines (Attachment A). The production schedules shall be revised/updated on a weekly basis. Weekly updates shall be submitted to NNS no later than 1200 Thursday. On the occasion that a Federal Holiday lands on a Thursday the weekly updates shall be submitted to NNS no later than 1200 on the Wednesday preceding the Thursday Holiday.
C.11.3 The Contractor shall be prepared to address all facets of the work including but not limited to schedule and/or problems with the ongoing work and the proposed actions to be taken to resolve these problems.
C.12 DELIVERY OF SERVICE:
C.12.1 The Contractor shall commence work on each delivery order within 24 hours of the start of the POP. The Contractor must also be capable of performing multiple delivery orders at the same time.
C.12.2 The services to be furnished for the first group of tanks (ten tanks or less) in the delivery order shall be completed within five calendar days after the date of each order placed, except that when the need of the Government permits, the delivery order may provide a longer time of delivery.
C.12.3 The services to be furnished for each additional group of tanks (1 group equals ten tanks) in the delivery order shall be completed with an additional five calendar for each additional group of tanks after the date of each order placed, except that when the need of the Government permits, the delivery order may provide a longer time of delivery.
C.13 SECURITY REQUIREMENTS;
C.13.1 The Contractor shall submit a list providing security information to the SWRMC Security Management Office via e-mail at swrmc.security.var@navy.mil no later than five days after the contract award date. The data is to include the list of all Contractor personnel supporting the contract effort, social security numbers, addresses, citizenship, level of clearance and radiological controls indoctrination training documents (for CVN contracted work only). The Contractor shall submit a new list whenever there is any change in the security information listing.
C.13.2 The Contractor shall issue each employee an identification card containing the employee's picture, which shall be utilized for positive identification. The card shall be worn in a visible location when employee is on Government property.
C.13.3 For submarines: Only U.S. citizens with a minimum of a confidential security clearance, who have received radiological controls indoctrination training within the required 12 month period will be granted access to submarines for work under the contract. Contractor personnel who do not meet the requirements must receive authorization from Submarine Maintenance and Engineering Team Southwest (SUBMET SW).
C.13.4 For CVN’s: Only U.S. citizens who have received radiological controls indoctrination training prior to each CVN’s availability will be granted access to CVN’s for work under the contract.
C.14 HAZARDOUS WASTE:
C.14.1 Waste generated deemed as hazardous shall be removed from the pier no later than the last day of the assigned performance period. All waste generated deemed non-hazardous shall be removed from the pier daily and will not be allowed to accumulate. Fluids discovered as being hazardous shall be handled and disposed of IAW references C.1.1(a) through C.1.1(ac).
C.14.2 The Contractor shall submit a copy of all reports of chemical analysis or other documents evidencing identification of the hazardous waste to SWRMC Environmental Department Code 106B upon completion of each delivery order.
C.14.3 The analysis of any waste requiring the services of a testing laboratory (e.g., liquids, used cleaning solvent material) shall be performed by a laboratory certified by the California Department of Public Health (CDPH) to be competent and equipped to conduct the specific type of analysis to be performed.
C.14.4 The Contractor shall comply with the requirements of NAVSEA Standard Work Template 077-001 Hazardous Waste Produced on Naval Vessels; control IAW references C.1.1(a) through C.1.1(ac).
C.14.5 The Contractor shall submit one legible copy, in hard copy or approved transferrable media of the hazardous waste manifest form signed by the owner or operator of the disposal facility to the supervisor within 48 hours of receipt from owner or operator of disposal facility IAW references C.1.1(a) through C.1.1(ac).
C.15 STANDARDS OF WORKMANSHIP:
C.15.1 The quality of all services rendered hereunder shall conform to the highest standards in the relevant profession, trade or field of endeavor. All services shall be rendered by or supervised directly by individuals fully qualified in the relevant profession, trade, or field, and holding any licenses required by law.
C.15.2 None of the services required by this contract shall be subcontracted to or performed by persons other than the Contractor or the Contractor’s employees without the prior written consent of the Contracting Officer.
C.16 BILLING/INVOICING:
At the time of billing/invoicing, the contractor shall provide to the SBS, two hard copies of all information, (i.e., Delivery Order, modifications, CFR’s, Production Schedule, TIP, PCP, WAF, check points, hazardous waste reports, gas free certificates, blank flanges location report, flowmeter readings) compiled during the performance of the work for each delivery order.
C.17 GOVERNMENT FURNISHED MATERIAL (GFM):
None.
C.18 CONTRACTOR FURNISHED EQUIPMENT:
C.18.1 The Contractor shall furnish all necessary materials and equipment to perform work required by this contract.
C.18.2 The Contractor is responsible for maintaining all Contractor Furnished Equipment (CFE). CFE shall be properly calibrated, tested and in state of repair that is ready for use, to the extent necessary to avoid impacting the performance requirements of this contract.
C.18.3 All CFE shall be located neatly out of walk ways and not be a trip hazard
C.19 NON-NAVY OWNED CRANES:
The Contractor shall adhere and follow the requirements of references C.1.1(a), C.1.1(ae), C.1.1(af), C.1.1(ag), and C.1.1(ah).
The following is a list of minimum requirements that Contractors shall comply with for all contracts that may result in the use of a crane for the accomplishment of work.
The Contractor shall notify the contracting officer, in advance, of the intent of bringing a non-Navy owned crane onto a Navy shore installation. All entries shall be through a prearranged entry point IAW references C.1.1(a), C.1.1(ad), C.1.1(ae), C.1.1(af), and C.1.1(ag).
The Contractor shall comply with the applicable American Society of Mechanical Engineers (ASME) standards (e.g., B30.5 for mobile cranes, B30.22 for articulating boom cranes, B30.3 for construction tower cranes, and B30.8 for floating cranes). For barge mounted mobile cranes, a load indicating device, a wind indicating device, and a marine type list indicator readable in one-half degree increments are required. In addition, the Contractor shall comply with specific naval crane safety and operation regulations/standards specifically required by the Navy shore installation and state or local Government.
The Contractor shall certify that the crane and rigging gear meets applicable Occupational Safety and Health Administration (OSHA) regulations by providing a Certificate of Compliance. The Certificate of Compliance can be downloaded from the NAVFAC Naval Crane Center website, https://www.navfac.navy.mil/navfac_worldwide/specialty_centers/ncc/about_us/resources/p307/p307_forms.html. The Contractor must cite which OSHA regulations are applicable, e.g., cranes used in cargo transfer shall comply with 29 CFR 1917; cranes used in construction, demolition, or maintenance shall comply with 29 CFR 1926; cranes used in shipbuilding, ship repair, or ship breaking shall comply with 29 CFR 1915.
The Contractor shall also certify that all of its crane operators working in the naval activity have been trained not to bypass safety devices (e.g., anti-two block devices) during lifting operations. The Certification of Compliance form shall be posted on the crane. For mobile cranes with original equipment manufacturer (OEM) rated capacities of 50,000 pounds or greater, the crane operators shall be designated as qualified by a source that qualifies crane operators (i.e., union, a Government agency, or an organization that tests and qualifies crane operators). Proof of current qualification shall be provided. The Contractor shall certify that the crane operator is qualified and trained for the operation of the crane to be used.
The Contractor shall provide a critical lift plan to NAVFAC for concurrence prior to the lift IAW references C.1.1(a), C.1.1(b), C.1.1(ad), C.1.1(ae), C.1.1(af), and C.1.1(ag). For each of the following lifts: lifts over 75 percent of the capacity of the crane or hoist (lifts over 50 percent of the capacity of a barge mounted mobile crane’s hoists) at any radius of lift; lifts involving more than one crane or hoist; lifts of personnel; and lifts involving non-routine rigging or operation, sensitive equipment, or unusual safety risks. The plan shall include the following as applicable:
a. The size and weight of the load to be lifted, including crane and rigging components that add to the weight. The OEM's maximum load capacities for the entire range of the lift shall also be provided.
b. The lift geometry, including the crane position, boom length and angle, height of lift, and radius for the entire range of the lift. This applies to both single and tandem crane lifts.
c. A rigging plan, showing the lift points, rigging gear, and rigging procedures.
d. The environmental conditions under which lift operations are to be stopped.
e. For lifts of personnel, the plan shall demonstrate compliance with the requirements of 29 CFR 1926.550(g).
f. For barge mounted mobile cranes, barge stability calculations identifying barge list and trim based on anticipated loading; and load charts based on calculated lists and trim. The amount of list and trim shall be within the crane manufacturer’s requirements.
The Contractor shall notify the contracting officer as soon as practicable, but no later than four hours after any weight handling equipment (WHE) accident. The Contractor shall investigate and report all accidents IAW reference C.1.1.(de), Section 12.
C.20 ORDERING ADDITIONAL WORK:
C.20.1 The following procedure will be used to order additional work which is necessary to satisfactorily complete any tank, void or bilge cleaning service under the contract. Such work may be called for by the issuance of a delivery order/delivery order modification, by the Ordering Officer, during the term of the contract.
C.20.2 During the course of work under other fixed price contract line items, the contractor shall promptly recommend to the Ordering Officer, in writing, additional work as he discovers the need for such work. Concurrently, the contractor shall quote a price and delivery time for the additional work. The Ordering Officer shall promptly review the recommendation and may, after reaching agreement with the contractor, issue a delivery order/delivery order modification. The Government has no obligation under this paragraph to issue any delivery order/delivery order modification.
C.20.3 The contractor shall not proceed with the additional work until a delivery order/delivery order modification has been issued. Whenever the Ordering Office determines that it is in the interest of the Government not to delay performance of the work while a price is being negotiated, the Ordering Officer may specify in the delivery order/delivery order modification that the contractor shall proceed with additional work. In every case, prior to completion of the work called for therein, the parties shall negotiate a price and delivery schedule as expeditiously as possible and modify the delivery order accordingly.
C.20.4 Government requirements for additional work shall be issued as delivery order/delivery order modifications under this contract by the Ordering Officer. The Ordering Officer will negotiate a firm fixed amount of man-hours and material dollars with the contractor. The price of the delivery order for additional work will be based on negotiated man hours multiplied by the hourly rate bid for additional work in Section B, plus negotiated material dollars.
a. In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the material required. The negotiated price for materials on undisclosed work shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under material items. Any material handling charges incurred by the contractor should be included as a factor in the hourly rate for additional work.
b. In negotiation a fixed number of man hours for additional work, the contractor’s proposal shall include quality assurance, engineering and supervision hours, in additions to trade hours required to accomplish the work as long as the hours proposed are not covered by an indirect cost pool under the contractor’s accounting system. All hours treated as indirect hours under the contractor’s accounting system must be accounted for as a factor included in the hourly rate. The Government will not agree to pay for separate indirect hours in the man hour negotiations.
C.21 EXTENSION OF COMMERCIAL WARRANTY
Contractors shall extend to the Government the full coverage of any standard commercial warranty normally offered in a similar commercial sale, provided that such warranty is available at no additional cost to the Government. Contractors shall provide a copy of the standard commercial warranty with the item. The standard commercial warranty period shall begin upon the final acceptance of the applicable material or software. Acceptance of the standard commercial warranty does not waive the Government’s rights under the “Inspection” clause, nor does it limit the Government’s rights with regard to other terms and conditions of the contract. In the event of a conflict, the terms and conditions of the contract shall take precedence over the standard commercial warranty.
(a) “Acceptance,” as used in this clause, means the act of an authorized representative of the Government by which the Government assumes for itself, or as an agent of another, ownership of existing and identified supplies, or approves specific services, as partial or complete performance of the contract.
(b) Notwithstanding inspection and acceptance by the Government or any provision concerning the conclusiveness thereof, the Contractor warrants that all services performed under this contract will, at the time of acceptance, be free from defects in workmanship and conform to the requirements of this contract. The Contracting Officer shall give written notice of any defect or nonconformance to the Contractor within 90 days from the acceptance by the Government. This notice shall state either (1) that the Contractor shall correct or re-perform any defective or nonconforming services, or (2) that the Government does not require correction or re-performance.
(c) If the Contractor is required to correct or re-perform, it shall be at no cost to the Government, and any services corrected or re-performed by the Contractor shall be subject to this clause to the same extent as work initially performed. If the Contractor fails or refuses to correct or re-perform, the Contracting Officer may, by contract or otherwise, correct or replace with similar services and charge to the Contractor the cost occasioned to the Government thereby, or make an equitable adjustment in the contract price.
(d) If the Government does not require correction or performance, the Contracting Officer shall make an equitable adjustment in the contract price.
C.22 ADDITIONAL PROVISIONS: