The file's text, extracted by GovTribe without its formatting.
Sheet1
| CONTRACT: | PUMPS AND MOTORS CONTINGENCY | N55236-16-Q-7008 |
| SHIP: | USS MILIUS (DDG-69) | |
| POP: | 19 OCTOBER - 29 NOVEMBER 2016 | |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EM02-3584 EM02-3281 | NR. 4 SEAWATER SERVICE PUMP AND PUMP MOTOR, 4-254-0-E MAIN MACHINERY ROOM NO. 2, LOWER LEVEL | 1 | | |
| ELIN A001 PROVIDE LABOR, SERVICES, EQUIPMENT, AND MATERIALS TO ELECTRICALLY AND MECHANICALLY DISCONNECT AND REMOVE THE EXISTING SEAWATER SERVICE PUMP AND PUMP MOTOR FROM THE FOUNDATION AND ASSOCIATED PIPING. AFTER COMPLETION OF OVERHAUL, RE-INSTALL THE SEA WATER SERVICE PUMP AND PUMP MOTOR ONTO THE FOUNDATION AND MECHANICALLY AND ELECTRICALLY RECONNECT. | 1 | | $0.00 |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EM02-3584 | NR. 4 SEAWATER SERVICE PUMP, 4-254-0-E MAIN MACHINERY ROOM NO. 2, LOWER LEVEL | 1 | | |
| ELIN A002 PROVIDE LABOR, SERVICES, EQUIPMENT, AND MATERIALS TO ACCOMPLISH A CLASS B OVERHAUL OF THE SEA WATER SERVICE PUMP. | 1 | | $0.00 |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EM02-3281 | NR. 4 SEAWATER SERVICE PUMP MOTOR, 4-254-0-E MAIN MACHINERY ROOM NO. 2, LOWER LEVEL | 1 | | |
| ELIN A003 PROVIDE LABOR, SERVICES, EQUIPMENT, AND MATERIALS TO ACCOMPLISH MOTOR REPAIR IN ACCORDANCE WITH ALL OF THE REFERENCES OF THE CONTRACT INCLUDING NAVSEA SI 009-17. | 1 | | $0.00 |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EM02-3584 EM02-3281 | NR. 4 SEAWATER SERVICE PUMP AND PUMP MOTOR, 4-254-0-E MAIN MACHINERY ROOM NO. 2, LOWER LEVEL | 1 | | |
| ELIN A004 PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE RIGGING (ONLOAD AND OFFLOAD) AND TRANSPORTATION OF THE SEAWATER PUMP AND MOTOR FROM THE FOUNDATION TO SHOP FOR OVERHAUL AND BACK ONTO THHE FOUNDATION AFTER OVERHAUL. | 1 | | $0.00 |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EM02-3584 EM02-3281 | NR. 4 SEAWATER SERVICE PUMP AND PUMP MOTOR, 4-254-0-E MAIN MACHINERY ROOM NO. 2, LOWER LEVEL | 1 | | |
| ELIN A005 PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE ALIGNMENT AND ADJUSTMENTS OF THE OVERHAULED SEAWATER SERVICE PUMP, MAGNETIC COUPLING, AND PUMP MOTOR. PROCURE NEW DOWEL PINS AND INSTALL AFTER COMPLETION OF ALIGNMENT AND ADJUSTMENTS PROCEDURE. | 1 | | $0.00 |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EM02-3584 EM02-3281 | NR. 4 SEAWATER SERVICE PUMP AND PUMP MOTOR, 4-254-0-E MAIN MACHINERY ROOM NO. 2, LOWER LEVEL | 1 | | |
| ELIN A006 PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE SHOP TESTING AND SHIPBOARD OPERATIONAL TESTING OF THE OVERHAULED SEAWATER SERVICE PUMP, MAGNETIC COUPLING, AND PUMP MOTOR. | 1 | | $0.00 |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EM02-3584 EM02-3281 | NR. 4 SEAWATER SERVICE PUMP AND PUMP MOTOR, 4-254-0-E MAIN MACHINERY ROOM NO. 2, LOWER LEVEL | 1 | | |
| ELIN A007 PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE PREPARATION AND PAINTING OF NEW AND DISTURBED SURFACE | 1 | | $0.00 |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EM02-3584 EM02-3281 | NR. 4 SEAWATER SERVICE PUMP AND PUMP MOTOR, 4-254-0-E MAIN MACHINERY ROOM NO. 2, LOWER LEVEL | 1 | | |
| ELIN A008 PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE REPAIR AND REPLACEMENT OF NEW AND DISTURBED LAGGING AND INSULATION | 1 | | $0.00 |
TOTAL $0.00
Refer to technical manuals S6226-RP-MMA-010 and S6226-JX-MMA-010 for detailed procedures on the removal, shaft alignment, adjustments and operational testing.
QUOTE SUBMITTED BY: PRINTED NAME / SIGNATURE / DATE
COMPANY