DEPARTMENT OF THE NAVY
SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED
SPECIFICATION NUMBER:
SHIP CHARACTERISTICS
FEET INCHESLENGTH OVERALL
FEET INCHESMAX. BEAM AT DESIGN WATERLINE
FEET INCHESEXTREME BEAM INCLUDING APPENDAGES
FEET INCHESDRAFT (MAX. NAVIGABLE) (FWD.)
FEET INCHESDRAFT (MAX. NAVIGABLE) (AFT.)
LONG TONLIGHT DISPLACEMENT
LONG TONFULL LOAD DISPLACEMENT
INCHESFEETHEIGHT OF MAST ABOVE DESIGN WATERLINE
INCLUDES ALL CHANGES THROUGH 5/15/2015
INDEX
SHIP: PHIBCB ONE (RMC 55104) SSSD-013-15
ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.
CATEGORY I. FY-16 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.
ITEM_NO. TITLE DATE
009-01 General Criteria; accomplish 01/02/2015
009-02 Environmental Compliance Reports for Material Usage at Naval Facilities; provide 01/02/2015
009-03 Toxic and Hazardous Substances; control 01/02/2015
009-04 Quality Management System; provide 01/02/2015
009-05 Temporary Accesses; provide 01/02/2015
009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations;
accomplish
01/02/2015
009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish 01/02/2015
009-08 Fire Protection at Contractor's Facility; accomplish 01/02/2015
009-10 Shipboard Asbestos-Containing Material (ACM); control 01/02/2015
009-18 Magnetic Material; control 01/02/2015
009-19 Provisioning Technical Documentation (PTD); provide 01/02/2015
009-20 Government Property; control 01/02/2015
009-21 Logistics and Technical Data; provide 01/02/2015
009-23 Interferences; remove and install 01/02/2015
009-24 Authorization, Control, Isolation, Blanking, and Tagging Requirements; accomplish 01/02/2015
009-28 Fire Prevention Requirements; accomplish 01/02/2015
009-29 Asbestos-Free Pipe Hanger Liner Material; install 01/02/2015
009-34 Fire Protection of Unmanned Vessels at Contractor's Facility; provide 01/02/2015
009-35 Confined Space Entry, Certification, Fire Prevention Utilizing Military Fire Watches, and Housekeeping; accomplish
01/02/2015
009-39 Technical Manual Contract Requirement (TMCR) for New Technical Manuals for Commercial Equipment/ Component; provide
01/02/2015
009-40 Requirements for Contractor Cranes, Multi-Purpose Machines and Material Handling Equipment at Naval Facilities; accomplish
01/02/2015
009-59 Organotin Antifouling Material; control 01/02/2015
009-60 Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration;
provide and manage
01/02/2015
009-61 Shipboard Use of Fluorocarbons; control 01/02/2015
009-64 Synthetic Fire-Resistant Hydraulic Fluid; control 01/02/2015
009-65 Polychlorinated Biphenyls (PCBs); control 01/02/2015
009-67 Integrated Total Ship Testing; manage 01/02/2015
009-69 Heavy Weather/Mooring Plan; provide 01/02/2015
009-70 Confined Space Entry, Certification, Fire Prevention and Housekeeping for Unmanned Vessels; accomplish
01/02/2015
009-72 Physical Security at Private Contractor's Facility; accomplish 01/02/2015
009-73 Shipboard Electrical/Electronic/Fiber Optic Cable; remove, relocate, repair, and install 01/02/2015
Page 1 of 4 EXECUTING WORK
ITEM_NO. TITLE DATE
009-74 Occupational, Safety and Health Requirements; accomplish 01/02/2015
009-77 Cofferdam Requirements; accomplish 01/02/2015
009-79 Government Owned Material (GOM); status reporting 01/02/2015
009-80 Ship's Facilities; provide 01/02/2015
009-81 Compartment Closeout; accomplish 01/02/2015
009-82 Data Requirements When Installing an Equal Component Vice Specified Component;
provide
01/02/2015
009-83 Wire Rope Fitting Verfication; provide 02/19/2015
009-84 Accountability of Temporary Fasteners; provide 02/13/2015
009-86 Recovery of Chlorofluorocarbon (CFC) Refrigerants and Fire Suppressant Halon (H) Materials; accomplish
02/13/2015
009-87 Chemical disinfection Procedures; accomplish 02/13/2015
009-88 Collection, Holding and Transfer (CHT) and Mogas Tanks, Spaces, and Piping, including Sewage or Mogas-Contaminated Tanks, Spaces, and Piping; certify
01/02/2015
009-89 Purchase and Inspection Requirements for Contractor Furnished Anodes;
accomplish
01/02/2015
009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide
01/02/2015
009-94 General Environmental Requirements for Work at Contractor's Facility; accomplish 01/02/2015
009-95 Mechanically Attached Fittings (MAF's) for Piping Systems; install 01/02/2015
009-97 Shipbuilding and Ship Repair Operations National Emission Standard for Hazardous Air Pollutants (NESHAPS) for Surface Coating Information; provide
01/02/2015
009-99 Ship Departure Report; provide 01/02/2015
009-100 Ship's Stability Process Control Procedure (PCP); maintain 01/02/2015
009-101 Requirements for Entry to and Departure from Contractor's Facility; accomplish 01/02/2015
009-102 Alteration Verification; provide 01/02/2015
009-103 Weight and Moment Change Data; provide 01/02/2015
009-106 Work Authorization Form Coordinator (WAFCOR); provide 01/02/2015
009-108 Aircraft Carrier Requirements for Entry to, Movement within, and Departure from Contractor's Facility; accomplish
01/02/2015
009-109 Special Requirements for Non-SUBSAFE Work on SUBSAFE-Certified Vessels;
accomplish
01/02/2015
009-110 Special Requirements for Non-Nuclear Work on Nuclear Vessels; accomplish 01/02/2015
009-111 Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration;
provide and manage
01/02/2015
009-112 Prevention of Radiographic-Inspection Ionizing-Radiation Hazards; accomplish 01/02/2015
009-118 CG Deck Loading; accomplish 01/02/2015
009-120 Fact Finding and Critique of Unplanned Events; manage 01/02/2015
009-121 Ship Assessment/Inspection Requirements; provide 01/02/2015
Page 2 of 4 EXECUTING WORK
DATETITLEITEM NO.
CATEGORY II. FY-15 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK ITEMS OF THIS JOB ORDER
009-11 Insulation and Lagging Requirements; accomplish 17-Jan-13
009-12 Welding, Fabrication, and Inspection Requirements;
accomplish
07-Nov-13
009-12 Welding, Fabrication, and Inspection Requirements;
accomplish
02-Jan-15
009-12 Welding, Fabrication, and Inspection Requirements;
accomplish
02-Jan-15
009-14 Gages and Thermometers; repair and certify calibration 17-Jan-13
009-32 Cleaning and Painting Requirements; accomplish 02-Jan-15
009-32 Cleaning and Painting Requirements; accomplish 02-Jan-15
009-32 Cleaning and Painting Requirements; accomplish 07-Nov-13
Page 3 of 4 EXECUTING WORK
ITEM NO. TITLE
Hazardous Waste; control077-11-001
Hull Damage; repair110-00-001
Hull Damage; repair110-00-002
Hull Damage; repair110-00-003
Fenders; repair130-11-001
Mast SAR IN1300001; install150-11-001
Roller Line Guard; install.161-00-001
Main Propulsion Diesel Engine (MPDE) Jacket Water Heaters; install233-11-001
Veth Rope Guard and Lower Seal; replace243-11-001
Electrical Meters and gauges; calibration and repair253-11-001
SHIPALT IN1400001 NATO Receptacle; install322-00-001
Ventilation; clean512-00-001
SAR IN1200005 Damper, Access Door & Test Switch; install512-11-001
SHIPALT IN1200004, Access Door & Test Switch; install512-11-002
Supply Vent Damper; install512-11-003
Ventilation Supply System; clean513-11-001
ASME Air Compressor Receivers Inspection; accomplish.551-00-001
ASME Low Pressure Air Receivers; accomplish.551-00-002
Bull Chain Hawse Pipe Cover Plate; repair581-10-002
A Frame Hydraulic; repair589-20-001
Inclined Ladders & Platform; repair623-11-001
Interior Compartment; preserve631-13-001
Exterior; preserve631-41-001
Lagging and Lagging Pads; repairs635-00-001
Pilot House Chair; repair698-11-001
Page 4 of 4 EXECUTING WORK
SHIP: PHIBCB ONE (RMC 55104) ITEM NO: 077-11-001
COAR: 26 PCN: CF16-0079
CMP: NONE
PLANNER: BURLESON, JERRY
SSP: SSSD-013-15 1 of 5 ITEM NO: 077-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Hazardous Waste; control
1.2 Location of Work:
1.2.1 Various
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 Standard Items
2.2 42 U.S.C. 6901, Resource Conservation and Recovery Act (RCRA)
2.3 49 U.S.C. 5103, Federal Hazardous Materials Transportation Act
2.4 Applicable Hazardous Waste Manifest Form
2.5 10 U.S.C. 7311, Repair or Maintenance of Naval Vessels; handling of hazardous waste
3. REQUIREMENTS:
3.1 Manage and dispose of all hazardous waste listed in 3.5 in accordance with 2.2 through 2.3.
3.1.1 When a Navy generator number is required by this Work Item, submit the original of 2.4 to the SUPERVISOR for assignment of Environmental Protection Agency (EPA) or delegated state environmental agency identification number.
3.1.2 Manage and transport for Navy disposal, Navy-generated
hazardous waste listed in 3.5 in accordance with 2.2 and 2.3, as designated by the SUPERVISOR.
Report: DISPOSAL FACILITY REPORT Date: + 2
3.1.3 Submit one legible copy, in hard copy or electronic media, of
2.4 signed by the owner or operator of the disposal facility to the SUPERVISOR within 48 hours of receipt from owner or operator of disposal facility.
3.2 Complete documentation required by 2.2 and 2.3, using EPA or delegated state environmental agency identification number in accordance with 2.5.
3.2.1 Documentation related to hazardous waste generated solely by the physical actions of Ship's Force or Navy employees (termed Navy- Generated Hazardous Waste) on board the vessel shall only bear a generator identification number issued to the Navy pursuant to applicable law. The contractor shall obtain SUPERVISOR'S concurrence with the categorization of the waste as Navy-generated before completion of the manifest. The manifest prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been
SHIP: PHIBCB ONE (RMC 55104)
SSP: SSSD-013-15 2 of 5 ITEM NO: 077-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
identified.
3.2.2 Documentation related to hazardous waste generated solely by the physical actions of contractor personnel (termed Contractor- Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law.
Regardless of the presence of other material in or on the shipboard systems or structure which may have qualified a waste stream as hazardous, where the contractor performs work on a system or structure using materials (whether or not the use of such materials was specified by the Navy) which by themselves would cause the waste from such work to be a hazardous waste, documentation related to such waste shall only bear a generator number issued to the contractor.
3.2.3 Documentation related to hazardous waste generated by the combined physical actions of Navy and contractor personnel (termed Co-Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law and shall also cite in the remarks block a generator identification number issued to the Navy pursuant to applicable law. When the contractor merely drains a system and such drainage creates hazardous waste or the contractor performs work on system or structure using materials which by themselves would not cause the waste from such work to be hazardous waste but such work nonetheless creates a hazardous waste, documentation related to such waste shall bear a generator identification number issued to the contractor and shall also cite in the remarks block a generator identification number issued to the Navy. The contractor shall sign the generator certification on the Uniform Hazardous Waste Manifest whenever use of the manifest is required for disposal. The contractor shall obtain SUPERVISOR's concurrence with the categorization of the wastes as co-generated before completion of the manifest. Manifests prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.
3.3 If the contractor, while performing work at a Government facility, cannot obtain a separate generator identification number from the state in which the availability will be performed, the contractor shall notify the SUPERVISOR within three business days of receipt of written notification by the state. After obtaining approval of the SUPERVISOR, the contractor shall use the Navy site generator identification number and insert in the remarks block the contractor generator identification number issued for the site where his main facilities are located.
3.4 If, for availabilities at a contractor-owned or controlled facility, the Navy cannot obtain a separate generator identification number for use at a contractor facility, the Navy shall notify the contractor within three business days of receipt of notification by the state. The contractor shall dispose of hazardous waste in accordance with 2.2, 2.3, and 3.2.2.
3.5 Hazardous waste, as identified in 2.2, expected to be produced during performance of this Job Order:
AMOUNT TYPE NAVY CO-GENERATED CONTRACTOR
Acid Solutions (may include N/A N/A N/A
SSP: SSSD-013-15 3 of 5 ITEM NO: 077-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
spent sulfamic, citric, chromic, nitric, sulfuric, hydrochloric, etc.)
Ethylene Glycol (Antifreeze) N/A N/A N/A
Sodium Hydroxide N/A N/A N/A
Cleaning Solvents N/A N/A 120 Gallons
Sodium Phosphates (Tri, Bi, N/A N/A N/A or Mono)
Fluorocarbons N/A N/A N/A
Morpholine N/A N/A N/A
Sodium Chromates N/A N/A N/A
Hydrazine N/A N/A N/A
Methyl Ethyl Ketone N/A N/A N/A
Spent Abrasive Blast Material N/A N/A 500 Tons
(contaminated with a known hazardous waste)
Trichloroethane N/A N/A N/A
Miscellaneous Chemicals N/A N/A N/A
(Ignitable)
(Corrosive)
(TCLP Toxic)
(Reactive)
Oil (Synthetic) N/A N/A 50 Gallons
Paints (Enamel, Latex, Epoxy, N/A N/A 800 Gallons thinners, oil based, rubber
SSP: SSSD-013-15 4 of 5 ITEM NO: 077-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
paint, non-skid, lacquer, remover, varnishes)
Paints (May include lead, N/A N/A N/A cadmium, or chrome)
Paint Strippers (phenols, N/A N/A N/A lead, chromium)
Paint Chips N/A N/A 5000 Pounds
Sludge (Contaminated with N/A N/A 300 Gallons a known hazardous waste)
Wool Felt (contaminated with N/A N/A N/A chromium and PCB's)
Rags N/A N/A 300 lbs
Report: DISPOSAL OF WASTE REPORT Date: + 5
3.6 Submit one legible copy, in hard copy or electronic media, of a report identifying type, amount, and disposal cost of waste listed in 3.5 that was removed during the performance of this Job Order to the
SUPERVISOR.
3.6.1 The report shall include analysis or other method used to identify the waste and state whether each listed waste was hazardous (with generator assignment), non-hazardous, or did not exist.
3.6.1.1 Chemical analysis shall be accomplished by laboratories with state or EPA approved quality assurance programs.
3.6.2 The contractor shall make an effort to minimize hazardous waste generation by reducing the volume or toxicity by neutralizing, recycling, or otherwise removing it from the requirements of Subtitle C of 2.2 and include a description of such efforts in the report.
3.7 Nothing contained in this Work Item shall relieve the contractor from complying with applicable federal, state, and local laws, codes, ordinances, and regulations, including the obtaining of licenses and permits in connection with hazardous waste handling and disposal in the performance of this contract.
4. NOTES:
4.1 The waste listed in 3.5 is based on the best information available at the time of preparation of the solicitation. Hazardous waste generated during the actual performance of the work may vary in type or amount from waste listed in 3.5 which may result in renegotiation
SSP: SSSD-013-15 5 of 5 ITEM NO: 077-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
pursuant to Paragraph (b) of 2.5. The contractor is expected to use best management practice to identify and dispose of all hazardous waste. Some of the substances listed in 3.5 may be neutralized, recycled, or otherwise removed from the requirements of Subtitle C of 2.2. Inclusion of these substances in the waste listed in 3.5 does not preclude the contractor from taking action consistent with 2.2 to reduce or eliminate the hazardous constituents of any waste required to be disposed of under the contract in accordance with 2.3. Processes that add hazardous constituents to the bilges may require that bilge water be disposed of as a hazardous waste.
4.1.1 The types and amounts of wastes listed in 3.5 are estimates of waste to be disposed of under this contract as required by 2.5. They are not estimates of the amount of the work involved in generating that waste. The work requirements of each individual Work Item specify the actual work to be accomplished.
4.2 Hazardous wastes are determined by one or more of the following methods:
4.2.1 Chemical analysis which shows that the material
characteristics of ignitability, corrosivity, reactivity, and/or toxicity (Toxicity Characteristic Leachate Procedure - TCLP) exceed the limits for that material in 40 CFR 261.20 Subpart C.
4.2.2 Reference to a Material Safety Data Sheet (MSDS).
4.2.3 Applying knowledge of the hazardous characteristics of the waste in light of the materials or the process used.
4.3 Asbestos, bilge water, oil/water including sludge, debris and other contaminants, sludge which includes solids and sludge from ballast tanks, CHT tanks, voids, oily waste tanks, fuel ballast tanks, fuel oil tanks, skegs (West coast), PCB's (Maryland), etc., apply only in those states listing them as hazardous waste. When an availability is to be performed in a state where these items are hazardous waste, an estimate of the amount to be generated shall be included in 3.5.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
1. None.
SHIP: PHIBCB ONE (RMC 55104) ITEM NO: 110-00-001
COAR: 26 PCN: CF16-0066
CMP: NONE
SSP: SSSD-013-15 1 of 2 ITEM NO: 110-00-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Hull Damage; repair
1.2 Location of Work:
1.2.1 80CM0306, Port Aft, Frame 12 To 14
1.3 Identification:
1.3.1 Hull Plating A36.
2. REFERENCES:
2.1 Standard Items
2.2 1600210, Rev E, Improved Navy Lighterage System Scantlings, Deck, Shell, Profile, Midship Section
2.3 1600303, Rev D, INLS CM Structural Arrangements and Details
2.4 1600471, Rev G, INLS Paint Schedule
3. REQUIREMENTS:
3.1 Gas Free spaces safe for personnel and hot work.
3.2 Cut out approximately 5 foot X 5 foot of damaged port side shell on craft listed in 1.2 and identified in 1.3. Grind area smooth in way of removal. Install approximately 25 sq ft of A36 steel plate using 2.2 and
2.3 for guidance and material requirements.
(I)(G) "NDT"
3.2.1 Accomplish the requirements of 009-12 of 2.1 including Table 4, Column A, Lines One through 7 and 11.
3.2.2 Submit one legible copy, in approved transferable media, of a report listing results of the requirements of 3.2.1 to the
SUPERVISOR.
3.3 After repair; preserve repaired area to include 2 inches of existing hull on all sides of repair, in accordance with 009-32 of 2.1, using 2.4 for guidance and material requirements.
3.4 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
5.2 PUSH MATERIAL:
SSP: SSSD-013-15 2 of 2 ITEM NO: 110-00-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. None.
SHIP: PHIBCB ONE (RMC 55104) ITEM NO: 110-00-002
COAR: 26 PCN: CF16-0080
CMP: NONE
SSP: SSSD-013-15 1 of 2 ITEM NO: 110-00-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Hull Damage; repair
1.2 Location of Work:
1.2.1 80CM0310, Port Fwd, Frame 2
1.2.2 80CM0310, Port Fwd, Frame 3
1.3 Identification:
1.3.1 Hull Plating A36.
2. REFERENCES:
2.1 Standard Items
2.2 1600210, Rev E, Improved Navy Lighterage System Scantlings, Deck, Shell, Profile, Midship Section
2.3 1600303, Rev D, INLS CM Structural Arrangements and Details
2.4 1600471, Rev G, INLS Paint Schedule
3. REQUIREMENTS:
3.1 Gas Free spaces safe for personnel and hot work.
3.2 Cut out approximately 6 Sq Ft of damaged port side shell at approximately frame 2 and 2 Sq Ft of damaged port side shell at approximately frame 3 on craft listed in 1.2 and identified in 1.3. Grind area smooth in way of removal. Install approximately 8 sq ft of A36 steel plate using 2.2 and 2.3 for guidance and material requirements.
3.2.1 Accomplish the requirements of 009-12 of 2.1 including Table 4, Column A, Lines One through 7 and 11.
3.2.2 Submit one legible copy, in approved transferable media, of a report listing results of the requirements of 3.2.1 to the
SUPERVISOR.
3.3 After repair; preserve repaired area to include 2 inches of existing hull on all sides of repair, in accordance with 009-32 of 2.1, using 2.4 for guidance and material requirements.
3.4 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
SSP: SSSD-013-15 2 of 2 ITEM NO: 110-00-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. None.
SHIP: PHIBCB ONE (RMC 55104) ITEM NO: 110-00-003
COAR: 26 PCN: CF02-0128
CF02-0129
CMP: NONE
PLANNER: BURLESON, JERRY
SSP: SSSD-013-15 1 of 2 ITEM NO: 110-00-003
ADDENDUM NO. 2
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Hull Damage; repair
1.2 Location of Work:
1.2.1 80IM0303, Port and Starboard Side Shell.
1.2.2 80IM0303, Female Shear Connector, Port.
1.3 Identification:
1.3.1 Approximatly 70 Sq Foot Side Shell, Hull Plating A-36
1.3.1.1 Approximately 20 Linear Feet of Stiffeners.
1.3.2 Quantity; (One each) Port Female Shear Connector.
2. REFERENCES:
2.1 Standard Items
2.2 1600261, Rev P, Improved Navy Lighterage System Inboard & Outboard Profiles
2.3 1600314, Rev E, Improved Navy Lighterage System Scantlings, Deck, Shell Profile, Midship Section, (Powered Modules)
2.4 1600138-1, Rev D, Flexor Connector System Optional Shelf Angles
2.5 1600138-2, Rev D, Flexor Connector System Optional Shelf Angles
2.6 1600131, Rev C, Flexible Connector System Female Shear Connector
2.7 1600131-2, Rev C, Flexible Connector System Female Shear Connector
2.8 1600471, Rev F, INLS Paint Schedule & Deck Covering
3. REQUIREMENTS:
3.1 Gas Free spaces safe for personnel and hot work. Remove
interferrances in way of repair.
3.2 Cut out multiple areas on craft listed in 1.2.1 and identified in
1.3.1 and 1.3.1.1. Grind area smooth in way of removal. Areas identified by the SUPERVISOR comprise approximately 70 square feet of damaged side shell and approximately 20 linear feet of stiffeners. Procure material and install approximately 70 square feet of A36 steel plate and 20 linear feet of stiffeners at identified locations using 2.2 and 2.3 for guidance and material requirements.
3.2.1 Cut out damaged areas on craft listed in 1.2.2 and identified in 1.3.2. Grind area smooth in way of removal. Procure material, fabricate, and install new port aft female sheer connector using 2.2 through 2.7 for guidance and material requirements.
(I)(G) "NDT INSPECTION"
SSP: SSSD-013-15 2 of 2 ITEM NO: 110-00-003
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
3.2.1.1 Accomplish the requirements of 009-12 of 2.1 including Table 4, Column A, Lines One through 7 and 11 for repairs listed in 3.2 and 3.2.1.
3.2.1.2 Submit one legible copy, in approved transferrable
media, of a report listing results of the requirements of 3.2 to the SUPERVISOR.
3.3 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.
4. NOTES:
4.1 None
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SHIP: PHIBCB ONE (RMC 55104) ITEM NO: 130-11-001
COAR: 26 PCN: WT04-0014
WT04-0015
CMP: NONE
SSP: SSSD-013-15 1 of 2 ITEM NO: 130-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Fenders; repair
1.2 Location of Work:
1.2.1 88WT0304, PORT SIDE, BETWEEN FRAME 12 & 13
1.2.2 88WT0304, STBD SIDE, BETWEEN FRAME 12 & 13
1.3 Identification:
1.3.1 Quanity (One each), FENDER, Soft Loop, Upper and Lower Fender Mounts (6 Each).
1.3.2 Quanity (One each), FENDER, Soft Loop, Upper and Lower Fender Mounts (6 Each).
2. REFERENCES:
2.1 Standard Items
2.2 1600260, Rev L, FENDERING A&D,
2.3 1600471, Rev G, INLS Paint Schedule
3. REQUIREMENTS:
3.1 Gas free space safe for personnel and hotwork
3.2 Remove existing damaged fendering and keepers on craft listed in 1.2 and identified in 1.3.
3.2.1 Remove broken or damaged fenders and fender mount (12 Each) on craft listed in 1.2 and identified in 1.3. Grind area smooth in way of removal.
3.2.2 Procure material and install fender mounting pads removed in
3.2.1 with new using 2.2 for guidance and material requirements.
3.2.3 Accomplish the requirements of 009-12 of 2.1, including Table 4, Column(s) A, Lines One through 7.
3.2.4 Submit one legible copy, in approved transferrable media, of a report listing results of the requirements of 3.2.3 to the
SUPERVISOR.
3.2.5 Power tool clean to bare metal area where fenders are removed and prior to installation of new or re-used fenders. Accomplish the requirements of Surface Preparation Specification SSPC-SP-11 of 2.1.
3.2.6 Procure and install new soft loop rubber fenders in areas removed in 3.2 and identified in 1.3 replace studs, keepers, and fasteners with new using 2.2 for guidance and material requirments.
3.3 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces. Use 2.3 for paint type and color requirements.
3.3.1 Accomplish the requirements of 3.3 prior to final installation
SSP: SSSD-013-15 2 of 2 ITEM NO: 130-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
of the fendering.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SHIP: PHIBCB ONE (RMC 55104) ITEM NO: 150-11-001
COAR: 26 PCN: WT04-0002
CF16-L004
CMP: NONE
SSP: SSSD-013-15 1 of 2 ITEM NO: 150-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Mast SAR IN1300001; install
1.2 Location of Work:
1.2.1 88WT0304 Mast, Aft of Pilot House.
1.2.2 88CFPM0616 Mast, Aft of Pilot House.
1.3 Identification:
1.3.1 Main Mast Lateral Support
2. REFERENCES:
2.1 FY-15, Rev CH1, Standard Items
2.2 IN1300001, SAR-INLS MAST REDESIGN INSTALLATION INSTRUCTIONS
2.3 IN1300001, Rev 1, SAR INLS Mast Redesign
2.4 F9YF0-AA-TMM-020, Rev C, TECHNICAL MANUAL CAUSEWAY FERRY CRAFT
INFORMATION BOOK VOLUME II - POWER MODULE FOR IMPROVED NAVY LIGHTERAGE
SYSTEM (INLS)FOR CFPM 88CFPM0603 AND UP
2.5 F9YF0-AB-TMM-010, Rev E, TECHNICAL MANUAL WARPING TUG CRAFT
INFORMATION BOOK FOR IMPROVED NAVY LIGHTERAGE SYSTEM (INLS)FOR WT
88WT0605 AND UP
2.6 F9YFU-AA-TMM-010, Technical Manual Craft Information Book for Warping Tug for Improved Navy Lighterage System (INLS)
2.7 F9YFU-AB-TMM-020, Technical Manual Craft Information Book for Causeway Ferry Volume II Causeway Ferry Power Module for Improved Navy Lighterage System (INLS)
2.8 SK-INLS022, Rev E, Base Assembly, Lateral Support Arm
2.9 SK-INLS023, Rev E, Collar Assembly, Mast
2.10 SK-INLS020, Rev C, Modification And Installation, Mast Lift Support
2.11 1600414, Rev F/G, (IS/WAS) INLS Mast A&D
2.12 1600274, Rev F/E, (IS/WAS) Crewspace, Pilothouse & Beach Module Engine Room A&D
2.13 1600316, Rev G/F, (IS/WAS) Scantlings Superstructure (Powered)
2.14 1600214, Rev J/H, (IS Sheets 1-24/WAS Sheets 1-12) Improved Navy Lighterage System Mast A & D
2.15 1600474, Rev E/D, (IS/WAS) Crewspace, Pilothouse & Beach Module Engine Room A&D
2.16 1600516, Rev B, (IS/WAS)Scantlings Superstructure (Powered)
2.17 1600273, Rev F, Thermal & Acoustic Insulation
SSP: SSSD-013-15 2 of 2 ITEM NO: 150-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
2.18 1600473, Rev D, Thermal & Acoustic Insulation
2.19 IN1300001, Rev -, SUPPORT AND TEST REQUIREMENTS
2.20 1600471, Rev G, INLS Paint Schedule
3. REQUIREMENTS:
3.1 Accomplish the requirements of SAR IN1300001 on craft listed in 1.2 and identified in 1.3 using 2.3 through 2.18 for guidance and material requirements.
(I)(G) "NDT"
3.2 Accomplish the requirements of 009-12 of 2.1 including Table 4 Column C Lines one through 7 and Line 10.
3.2.1 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing results of the requirements of 3.2 to the SUPERVISOR.
(V)(G) ""OPERATIONAL TEST""
3.3 Accomplish the requirements of 2.19 with ships force assistance, raise and lower mast through two complete cycles. Ensure smooth travel with zero binding.
3.4 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces using 2.20 for paint type and color.
4. NOTES:
4.1 Installation of additional mast hinge tabs is not applicable to these craft.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
TOTAL
QUANTITY
PROVIDED NAME Of PART PIECE NO. REF NO.
NATIONAL
STOCK NO.
REQ
PARA NO.
1. 2 AT
Lateral Support Assembly 2.7 3.1
SHIP: PHIBCB ONE (RMC 55104) ITEM NO: 161-00-001
COAR: 26 PCN: WT04-L001
CMP: NONE
SSP: SSSD-013-15 1 of 1 ITEM NO: 161-00-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Roller Line Guard; install.
1.2 Location of Work:
1.2.1 88WT0304
1.3 Identification:
1.3.1 Quantity (1 each), Line Guard
2. REFERENCES:
2.1 Standard Items
2.2 1600265, Rev T, Hull Fittings
2.3 Roller Fairlead, Roller Button Keeper
2.4 1600471, Rev G, INLS Paint Schedule
3. REQUIREMENTS:
3.1 Accomplish the requirements to procure material, fabricate, and install new (one each) line guard on craft listed in 1.2 and identified in 1.3 using 2.2 and 2.3 for guidance and material requirements.
3.2 Accomplish the requirements of 009-12 of 2.1, including Table 4, Column A, lines One through 7
3.3 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces using 2.4 for guidance and material requirements.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SHIP: PHIBCB ONE (RMC 55104) ITEM NO: 233-11-001
COAR: 26 PCN: EE01-0067
CMP: NONE
SSP: SSSD-013-15 1 of 2 ITEM NO: 233-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Main Propulsion Diesel Engine (MPDE) Jacket Water Heaters;
install
1.2 Location of Work:
1.2.1 88CFPM0616 # 1 MPDE, 2-8-0-E
1.3 Identification:
2. REFERENCES:
2.1 Standard Items
2.2 F9SLW-AK-TMM-010, Rev B, SERVICE MANUAL FOR C18 MARINE ENGINES
IMPROVED NAVY LIGHTERAGE SYSTEM
2.3 F9SLW-AK-TMM-020, Rev 01, C18 MAIN PROPULSION ENGINE MODEL NAY1-UP
IMPROVED NAVY LIGHTERAGE SYSTEM
2.4 KENR8975-01, C18 Marine Engine Electrical System, Pg 1
2.5 KENR8975-01, C18 Marine Engine Electrical System, Pg 2
3. REQUIREMENTS:
3.1 Drain cooling system on # one Main Propulsion Diesel Engine (MPDE).
3.2 Accomplish the requirement to remove existing and install new GFM (See NOTE: 4.1) Jacket Water Heater on # One MPDE on craft listed in
1.2.1 using 2.2 through 2.5 for guidance and material requirements.
(V)(G) "OPERATIONAL TEST"
3.3 After installation, refill system with coolant and accomplish operational test of Jacket Water Heater using 2.2 through 2.5 for guidance. Allowable leakage; ZERO.
3.4 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.
4. NOTES:
4.1 GFM Jacket Water Heater will be provided originating work center.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SSP: SSSD-013-15 2 of 2 ITEM NO: 233-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
SHIP: PHIBCB ONE (RMC 55104) ITEM NO: 243-11-001
COAR: 26 PCN: CF16-0057
CMP: NONE
SSP: SSSD-013-15 1 of 3 ITEM NO: 243-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Veth Rope Guard and Lower Seal; replace
1.2 Location of Work:
1.2.1 80BM0616, Thruster Room 2-5-0-E, Under Water Hull Frame 5-6,
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 Standard Items
2.2 F9SLW-AL-TMM-010, Rev E, VETH-JET BOWTHRUSTER TYPE 3-K-1200 S5
IMPROVED NAVY LIGHTERAGE SYSTEM
2.3 1600455, Rev F, Bow Thruster Propulsion Installation
2.4 1600471, Rev G, INLS Paint Schedule
3. REQUIREMENTS:
3.1 Gas Free space safe for personnel and hot work.
3.1.1 Accomplish removal of welded-in Bow Thruster intake grating on craft listed in 1.2.Retain for reinstall later .
3.2 Accomplish the disassembly of the propeller nut, propeller, rope guard assembly and lower seal from craft. Retain the propeller nut and propeller for reinstall later.
3.3 Accomplish mechanical cleaning of exposed Bow Thruster and shaft assembly lower end, and lower seal housing to remove all corrosion.
(V) "VISUAL INSPECTION"
3.3.1 Accomplish a visual inspection of all areas cleaned in 3.3.
Identify areas of damage or advanced corrosion.
3.3.1.1 Submit one legible copy, in approved transferrable
media, of a report listing results of the requirements of 3.3.1 to the SUPERVISOR
3.4 Install new lower seal using 2.2 for guidance and material requirements.
(V)(G) "CLEARANCE MEASUREMENT"
3.5 Mount propeller without rope guard using 2.2 for guidance. measure and record the distance between the top of the propeller and the bolt flange of the seal housing, Remove propeller nut and propeller. See Note 4.1
3.5.1 Submit one legible copy, in approved transferrable media, of a
SSP: SSSD-013-15 2 of 3 ITEM NO: 243-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
report listing results of the requirements of 3.5 to the SUPERVISOR
3.6 Accomplish the install of new GFM bronze rope guard to propeller.
3.6.1 Mount propeller and rope guard assembly using 2.2 paragraph
11.5 for guidance and material requirements.
(V)(G) "PROPELLER FREE-ROTATION TEST"
3.7 Rotate the propeller by hand ensuring no excessive force required, through 10 revolutions, ensuring zero binding or scraping, allowable binding; ZERO.
(V)(G) "OPERATIONAL TEST"
3.7.1 Upon successful completion of 3.7.1. Operate bow thruster using prime mover for 5 minutes. allowable leakage, binding, or grinding; ZERO.
(V) "VISUAL INSPECTION"
3.8 Accomplish the requirements of 009-12 of 2.1, Table 2, Colum A, Lines one through 7 for reinstall inlet grating removed in 3.1.1.
(I)(G) "“SURFACE PROFILE”"
3.9 Accomplish the requirements of 009-32 of 2.1, for new and disturbed surfaces, using 2.4 for guidance, paint type and color, and material requirements.
4. NOTES:
4.1 GFM bronze rope guard will require machining for correct fit and installation.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
TOTAL
QUANTITY
PROVIDED NAME Of PART PIECE NO. REF NO.
NATIONAL
STOCK NO.
REQ
PARA NO.
1. 1 EA
Housing Burgmann Seal VJ-2531
2. 3 EA
Haxagon Socket Head Cap Screw IM8X045A2
SSP: SSSD-013-15 3 of 3 ITEM NO: 243-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
3. 1 EA
Press on Ring Burgmann VJ-1608
4. 3 EA Adjusting Screw SM06X016A2
5. 8 EA
Hexagon Socket Head Cap Screw IM8X025A2
6. 1 EA V Ring V100A
7. 1 EA Burgmann Seal
MG1/100-
G4-PGG
8. 1 EA O Ring 215X4
9. 1 EA
Rope Guard Assembly, Bronze, and associated new mounting hardware VJ2520 GBR
10. 1 EA
Veth Bow Thruster Special Tool Kit
SHIP: PHIBCB ONE (RMC 55104) ITEM NO: 253-11-001
COAR: 26 PCN: EE01-0070
CMP: NONE
SSP: SSSD-013-15 1 of 1 ITEM NO: 253-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Electrical Meters and gauges; calibration and repair
1.2 Location of Work:
1.2.1 80BM0616
1.3 Identification:
1.3.1 Pressure Switch Sending Unit
2. REFERENCES:
2.1 Standard Items
2.2 F9SLW-BK-TMM-010, SECTION 10 TANK CONTENTS TRANSMITTER INSTALLATION
AND USERS MANUAL/DRAWINGS
3. REQUIREMENTS:
3.1 Accomplish the requirements of 009-14 of 2.1 to calibrate pressure switch sending unit identified by the SUPERVISOR on craft listed in 1.2 and identified in 1.3 using 2.2 for guidance.
3.2 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SHIP: PHIBCB ONE (RMC 55104) ITEM NO: 322-00-001
COAR: 26 PCN: EE01-0010
CMP: NONE
SSP: SSSD-013-15 1 of 1 ITEM NO: 322-00-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: SHIPALT IN1400001 NATO Receptacle; install
1.2 Location of Work:
1.2.1 88WT0304 Main Deck, Forward Inboard side of Superstructure (one each) and Aft Superstructure Starboard side (one each).
1.3 Identification:
1.3.1 320-01-00012 Slave Cable Receptacle, 24 VDC Tech Supply Services 5935-01-097-9974 NATO STYLE, PC 42 OF 1600288.
2. REFERENCES:
2.1 Standard Items.
2.2 SOW IN1400001, NATO Slave Cable Connector Box Replacement
2.3 1600228, Rev N, Improved Navy Lighterage System
2.4 1600471, Rev G, INLS Paint Schedule & Deck Covering
3. REQUIREMENTS:
3.1 Remove damaged NATO Slave Cable Receptacle. Procure new and install new (2 each) mounting brackets, housings, and NATO Slave Cable Receptacle Fwd and Aft. Install new receptacle in area located in 1.2 and identified in 1.3 using 2.2 and 2.3 for guidance and material requirements.
(V)(G) "(V)(G) "OPERATIONAL TEST""
3.2 Accomplish an operational test of equipment and circuit using 2.2 for guidance.
3.3 Accomplish the requirements 009-32 of 2.1 for new and disturbed surfaces. Match surrounding areas using 2.4 for guidance and material requirements.
4. NOTES:
4.1 None
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SHIP: PHIBCB ONE (RMC 55104) ITEM NO: 512-00-001
COAR: 26 PCN: See Attachment A
LWT FILE NO: 512-012 CMP: NONE
REVISED: 16 Jun 2014 PLANNER: BURLESON, JERRY
SSP: SSSD-013-15 1 of 3 ITEM NO: 512-00-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Ventilation; clean
1.2 Location of Work:
1.2.1 88CFPM0616, Engine Room 2-8-0-E, Incinolet/Head Ventilation, Crew Space Ventilation
1.2.2 80BM0616 Engine Room 2-9-0-E, Thruster Room 2-6-0-F.
1.2.3 88WT0304,Engine Room 2-8-0-E, Incinolet/Head 2-7-0-L, Crew Space 2-6-2-L
1.3 Identification:
1.3.1 88CFPM0616 Engine Room Port and STBD Supply & Exhaust Ventilation, Incinolet/Head Ventilation, Crew Space Ventilation.
1.3.2 80BM0616 Engine Room Supply Ventilation, Thruster Room Supply Ventilation.
1.3.3 88WT0304 Engine Room Port and STBD Supply & Exhaust Ventilation, Incinolet/Head Ventilation, Crew Space Ventilation.
2. REFERENCES:
2.1 Standard Items
2.2 5131/010, Ventilation Systems PMS MRC A-2
2.3 1600292, Rev K, HVAC & Engine Room Ventilation A&D, Warping Tug, Power Module, & Beach Module.
2.4 1600173, Rev F, Thermal & Acoustic Insulation
2.5 1600471, Rev G, INLS Paint Schedule
3. REQUIREMENTS:
3.1 Accomplish the requirements of 2.2 on craft listed in 1.2 and identified in 1.3 using 2.3 for guidance. Inspect and clean the supply, exhaust and duct valve remote operator listed in 1.3.
3.1.1 Retain the fan motors, fan housings, fans, built in
ventilation and ventilation spool penetrations in their present location (do not remove).
3.2 Clean the entire interior surfaces of the ventilation ductwork listed in 3.1 and 3.1.1 free of oil, grease, film, dirt and foreign matter.
(V)(G) "CLEANLINESS "
3.3 Accomplish a cleanliness inspection with the SUPERVISOR, of all systems cleaned prior to re-assembly.
3.4 Install the ventilation ductwork removed in 3.1 using 2.2 and 2.3 for guidance and material requirements.
SSP: SSSD-013-15 2 of 3 ITEM NO: 512-00-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
3.4.1 Accomplish lubrication of duct valve remote operator using 2.3 for guidance.
3.4.2 Install new CRES fasteners, Class 304, MIL-DTL-1222 and new gasket material using 2.3 for guidance and material requirements, in each flange joint.
3.5 Install new insulation where removed in 3.1, in accordance with 009- 11 of 2.1.
3.6 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces using 2.5 for guidance and material requirements.
3.7 Install new metal tags with contractor's name, date and stating "PCB FREE" to all new/disturbed ventilation flanges, access covers and closures where gaskets are required.
4. NOTES:
4.1 This work item shall be accomplished in conjunction with:
ITEM NO. TITLE
513-11-001 Ventilation Supply System; Clean
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SSP: SSSD-013-15 3 of 3 ITEM NO: 512-00-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
Attachment A
PCN Identification
EE01-0112 BM16 CLEAN VENT INTERIOR
EE01-0114 WT04 CLEAN VENT INTERIOR
EE01-0119 WT04 CLEAN VENT INTERIOR
EE01-0111 PM16 CLEAN VENT INTERIOR
EE01-0109 PM16 CLEAN VENT INTERIOR
EE01-0113 BM16 CLEAN VENT INTERIOR
EE01-0115 WT04 CLEAN VENT INTERIOR
EE01-0108 PM16 CLEAN VENT INTERIOR
EE01-0116 WT04 CLEAN VENT INTERIOR
EE01-0117 WT04 CLEAN VENT INTERIOR
EE01-0118 WT04 CLEAN VENT INTERIOR
EE01-0106 PM16 VENT INTERIOR CLEANING
EE01-0107 PM16 CLEAN VENT INTERIOR
EE01-0110 PM16 CLEAN VENT INTERIOR
SHIP: PHIBCB ONE (RMC 55104) ITEM NO: 512-11-001
COAR: 26 PCN: EE01-0019
CMP: NONE
SSP: SSSD-013-15 1 of 2 ITEM NO: 512-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: SAR IN1200005 Damper, Access Door & Test Switch; install
1.2 Location of Work:
1.2.1 88WT0304 Engine Room 2-8-0-E
1.3 Identification:
1.3.1 Quantity (1 each) 88WT0304, Access Doors, Test Switch
2. REFERENCES:
2.1 Standard Items
2.2 IN1200005 , STATEMENT OF WORK – INLS ALTERATION PACKAGE IN1200005
INLS Engine Room (ER) Supply Vent Damper Mod (LRIP)
Installation of New Damper and Access Door
2.3 IN1200005, Approved SAR
2.4 IN1200005, INLS ALTERATION PACKAGE IN1200005 INLS Engine Room (ER) Supply Vent Damper Mod (LRIP)
Installation of New Damper and Access Door
2.5 1600245, Rev G/H, HVAC Diagram IS/WAS
2.6 1600296, Rev H, Ship Service Air System A&D Power Module, Warping Tug, Beach Module, Intermediate, Combination, and Docking Module
2.7 1600465, Rev D, Hull Fittings
2.8 F9YFU-AB-TMM-010, Rev 1, CRAFT INFORMATION BOOK FOR CAUSEWAY FERRY
VOLUME I INLS AND CF GENERAL INFORMATION FOR
IMPROVED NAVY LIGHTERAGE SYSTEM (INLS)
2.9 F9YFU-AA-TMM-010, Rev 3, CRAFT INFORMATION BOOK FOR WARPING TUG FOR
IMPROVED NAVY LIGHTERAGE SYSTEM (INLS)
2.10 1600471, Rev F, Paint Schedule and Deck Covering
3. REQUIREMENTS:
3.1 Accomplish the requirements of 2.2 and 2.3 to craft listed in 1.2.1 and identified in 1.3.1 in its entirety, using 2.2 through 2.10 for guidance and material requirements. All parts to be provide CFM.
3.2 Accomplish the requirements of 2.2 the SOW to install access doors and test switch on craft listed in 1.2.2 and identified in 1.3.2 using
2.2 through 2.10 for guidance and material requirements. All parts to be provide CFM.
3.3 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces using 2.10 for guidance and material requirements.
4. NOTES:
SSP: SSSD-013-15 2 of 2 ITEM NO: 512-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR).