Amendment 0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N55236-15-R-0029_0003.pdf | ||
| 34PB0409_SOW_Rev-1.docx | DOCX document | |
| Attachment-1_34PB0409_Rev_-1.docx | DOCX document | |
| N55236-15-R-0029-0001.pdf | ||
| N55236-15-R-0029_Solicitation.pdf | ||
| Solicitation_Attachment_4_-_Request_for_Specification_Clarification_Form.docx | DOCX document | |
| 34PB0409_SOW.docx | DOCX document | |
| Solicitation_Attachment_2_-_Reference_Information_Sheet.docx | DOCX document | |
| Attachment-1_34PB0409.docx | DOCX document | |
| Solicitation_Attachment_3_-_SB_Subcontracting_Data_Sheet.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE SCHEDULE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
REF: CRG-1 34PB0409
1. Replace Section J, Attachment 1:34PB0409 Statement of Work w ith the revised STATEMENT OF WORK REV-1, (see enclosed)
2. Replace Attachment-1_34PB0409 (Main Propulsion Diesel Engine) w ith Attachment-1_34PB0409 (Main Propulsion Diesel Engine) (Rev-1), see enclosed.
SEE CONTINUATION PAGE
1. CONTRACT ID CODE PAGE OF PAGES
J 1 38
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N55236-15-R-0029
X 9B. DATED (SEE ITEM 11)
02-Jul-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
U0002
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
28-Jul-2015
CODE
SOUTHWEST REGIONAL MAINTENANCE CENTER
CODE 410 3755 BRINSER STREET, STE 1
SAN DIEGO CA 92136
N55236 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N55236-15-R-0029
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0002 CONTINUATION
Requests for specific clarifications –
1. QUESTION: STATEMENT OF WORK, paragraph 3.36 and Attachment 1. OEM certified repair representative informed the contractor of the below configuration conflict with proposed repair listed in paragraph 3.36 and associated Attachment 1 of the Statement of Work. Please clarify repair requirement.
“On inspection of engine build sheets for the GFM engines on this bid I noticed that there are 2 different architectures in electronics 73113897 is listed as 2.0 architecture and 73010844 is listed as 1.0 architecture.
These engine configurations cannot be installed as listed in the same vessel application. Unless someone has changed one of these engine builds then we cannot accomplish the bid request as it stands.”
2. RESPONSE: See changes as per Statement of Work (SOW) Rev-1, Engine Attachment-1.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been added by full text:
STATEMENT OF WORK REV-1
1. SCOPE:
1.1. TITLE: Depot level repairs and modernization to the 34PB-0409; accomplish
1.2. LOCATION:
1.2.1. Naval Base Coronado; Navy Outlying Field (NOLF); Imperial Beach, California
1.3. IDENTIFICATION:
1.3.1. Quantity (one each), 34 Foot Patrol Boat (34PB), Hull Number: 34PB-0409.
1.3.2. Quantity (one each), 34 Foot Patrol Boat Trailer, Manufacturer: JDCI INC. / Boatmaster
INC.
2. REFERENCES (REF):
2.1. NAVSEA Standard Items (Current Fiscal Year)
2.2. Naval Ship’s Technical Manual Chapter 583, Boats and Small Craft Volume 1 Revision 7
2.3. TO300-AU-SPN-010 A, Fabrication, Welding and Inspection of Small Boats and Craft, Aluminum Hulls
2.4. Work Certification for Navy Expeditionary Combat Command (NECC) 34 FT Patrol Boat (34PB)
Overhaul
2.5. 34-Foot “Dauntless” Patrol Boat – Commercial Off the Shelf (COTS) manual, REF 2.91
2.6. Operations Manual, Boatmaster Model SA3436-HDH-30
2.7. CCD Hoist MOD Test Procedure
BOAT ALTERATIONS (BoatAlts):
2.8. BoatAlt 34PB/2C; Canopy Top (Bimini Top) Addition
2.8.1. DWG. No. 1613-623; SeaArk Marine, Inc., GSA P/N: 66001 (34PB/2C)
2.9. BoatAlt 34PB/5B; Konrad Outdrive to Waterjet Conversion
2.9.1. DWG. No. 53711-101-5108375 REV A; Outdrive to Waterjet Conversion Structural
Removals (34PB/5B)
2.9.2. DWG. No. 53711-101-5108376 REV A; Outdrive to Waterjet Conversion Structural Fabrication and Installation (34PB/5B)
2.9.3. DWG. No. 53711-301-5108377 REV A; Outdrive to Waterjet Conversion Electrical Removal (34PB/5B)
2.9.4. DWG. No. 53711-301-5108378 REV A; Outdrive to Waterjet Conversion Electrical
Installation (34PB/5B)
2.9.5. DWG. No. 53711-583-5108379 REV A; Outdrive to Waterjet Conversion Mechanical Removals (34PB/5B)
2.9.6. DWG. No. 53711-583-5108380 REV A; Outdrive to Waterjet Conversion Mechanical
Arrangement and Installation (34PB/5B)
2.9.7. DWG. No. 53711-583-5108381 REV A; Outdrive to Waterjet Conversion Auxiliary Systems Installation (34PB/5B)
2.9.8. DWG. No. 53711-602-5108382; Outdrive to Waterjet Conversion Label Plates
(34PB/5B)
2.10. BoatAlt 34PB/6B; Gun Mount Foundation Bracket Installation
2.10.1. DWG. No. 53711-187-5108451; Gun Mount Foundation Bracket Installation (34PB/6B)
2.11. BoatAlt 34PB/8B REV A; SATCOM Installations
2.11.1. DWG. No. 53711-301-5108467 REV A; SATCOM (04/05) Installation Power System
Modification (34PB/8B)
2.11.2. DWG. No. 53711-409-5108468 REV A; SATCOM (04/05) Install Electronic System Modification (34PB/8B)
2.11.3. DWG. No. 53711-445-5108477 REV A; C4I (04/05) Installation Equipment Arrangement and Configuration (34PB/8B)
2.12. BoatAlt 34PB/9B REV B; EO/IR Sensing Installation
2.12.1. DWG. No. 53711-101-5108352 REV B; EO/IR Installation – Miscellaneous Foundation
Installation (34PB/9B)
2.12.2. DWG. No. 53711-171-5110079 REV B; Cabin Top Mast Fabrication (34PB/9B)
2.12.3. DWG. No. 53711-171-5110117 REV A; Mast Upgrade IWO C4I Installations (34PB/9B)
2.12.4. DWG. No. 53711-495-5110239; EO/IR Electronics Install (34PB/9B)
2.12.5. DWG. No. 53711-409-5108466; (FY06-1003) EO/IR Sensor Install-Electronic System
MOD
2.12.6. DWG. No. 53711-301-5108465; (FY06-1003) EO/IR Sensor Install-MISC Foundation
Install
2.13. BoatAlt 34PB/13B REV B; DAGR Installation
2.13.1. DWG. No. 53711-301-5108357 REV A; DAGR Installation Power Modification
(34PB/13B)
2.13.2. DWG. No. 53711-420-5108358 REV A; DAGR Installation Electronic Modification
(34PB/13B)
2.13.3. DWG. No. 53711-117-5108554; DAGR Lock Mount Fabrication Details (34PB/13B)
2.14. BoatAlt 34PB/15B; Alternator & Battery Upgrade (04-07)
2.14.1. DWG. No. 53711-301-5108361 REV A; Alternator & Battery Upgrade (34PB/15B)
2.15. BoatAlt 34PB/16C; Emergency Dewatering
2.15.1. DWG. No. 53711-529-5108553 REV A; Emergency Dewatering System Installation
(34PB/16C)
2.16. BoatAlt 34PB/18A REV A; 34 PB Hoist Fitting Upgrades
2.16.1. DWG. No. 53711-583-5109471 REV B; Hoist Fittings Upgrade (34PB/18A)
2.17. BoatAlt 34PB/22B; Navigation Light Modification
2.17.1. DWG. No. 53711-422-5110021 REV E; Navigation Light Modification (34PB/22B)
2.18. BoatAlt 34PB/24A; IR Strobe Installation
2.18.1. DWG. No. 53711-422-5110023 REV B; IR Strobe Installation (34PB/24A)
2.19. BoatAlt 34PB/28B; Automatic Identification System (AIS) Installation
2.19.1. DWG. No. 53711-444-5110034 REV B; AIS Installation (34PB/28B)
2.19.2. DWG. No. 53711-184-5110073; AIS Transponder and Antenna Mount Fabrication
(34PB/28B)
2.20. BoatAlt 34PB/29A REV A; MTX Blue Force Tracker Installation
2.20.1. DWG. No. 53711-444-5110035 REV A; MTX Blue Force Tracker Installation
(34PB/29A)
2.21. BoatAlt 34PB/31B; Companionway Mods IWO Stress Cracking
2.21.1. DWG. No. 53711-150-5110067 REV B; Companion Way Modifications IWO Stress
Cracking (34PB/31B)
2.22. BoatAlt 34PB/32C; Inverter/Charger Replacement
2.22.1. DWG. No. 57311-314-5110069 REV A; Inverter/Charger Replacement (34PB/32C)
2.23. BoatAlt 34PB/33B; Visual Identification Tape Installation
2.23.1. DWG. No. 53711-443-5110078 REV B; Visual ID Tape Installation (34PB/33B)
2.24. BoatAlt 34PB/34B; Electronic Navigation System Upgrade (04-05)
2.24.1. DWG. No. 53711-420-5110111 REV C; (04-05) Electronic Navigation System Upgrade
(34PB/34B)
2.25. BoatAlt 34PB/42A; Fire Suppression System Agent Replacement
2.25.1. DWG. No. 53711-555-5110242; Fire Suppression System Agent Replacement
(34PB/42A)
2.26. BoatAlt 34PB/43B REV A; Cabin Top Security Light Bar Replacement
2.26.1. DWG. No. 53711-422-5110243 REV A; 24VDC Cabin Top Security Light Bar
Replacement (34PB/43B)
2.27. BoatAlt 34PB/44B; Loud Hailer Modification
2.27.1. DWG. No. 53711-443-5110244 REV A; Loud Hailer Modification (34PB/44B)
2.28. BoatAlt 34PB/48B; Electronic Navigation System Upgrade
2.28.1. DWG. No. 53711-169-5110299 REV B; Depth Transducer Enclosure Structural Mod
(34PB/48B)
2.29. BoatAlt 34PB/49B; Remote Spotlight Modification
2.29.1. DWG. No. 53711-422-5110422; Remote Spotlight Modification (34PB/49B)
2.30. BoatAlt 34PB/51B; Battery Charger Modification
2.30.1. DWG. No. 53711-313-5110437 REV B; Battery Charger Modification (34PB/51B)
2.31. BoatAlt 34PB/54B; Equipment Rack Modification
2.31.1. DWG. No. 53711-320-5110553; Equipment Rack (FY04-05) Electrical Removals
(3PB/54B)
2.31.2. DWG. No. 53711-180-5110558; Equipment Rack (FY04-05) Structural Removals
2.31.3. DWG. No. 53711-511-5110562; Equipment Rack Mechanical Removals (3PB/54B)
2.31.4. DWG. No. 53711-511-5110563; Equipment Rack Mechanical Installations (3PB/54B)
2.31.5. DWG. No. 53711-180-5110561 REV A; Equipment Rack Structural Installations
2.31.6. DWG. No. 53711-320-5110556 REV A; Equipment Rack Electrical Installations
2.32. BoatAlt 34PB/55B; Fuel Cooler Modification
2.32.1. LAR 34PB-1204; Fuel Cooler Failures on Cummins Diesel Engines, REF 2.40
2.33. BoatAlt 34PB/56B; Radio System Modification
2.33.1. DWG. No. 53711-441-5110609; Radio System Modification (34PB/56B)
2.34. GEN/55A; Cummins QSB-Series Engines-Starter Magnetic Switch Bracket Modification
2.34.1. DWG. No. 57311-180-5109418 REV A; Cummins QSB-Series Engines-Starter Magnetic
Switch Bracket Modification (GEN/55A)
2.35. GEN/58C; MTX Transceiver and Antenna Mount Fabrication
2.35.1. DWG. No. 57311-184-5109691; MTX Transceiver and Mount Fabrication (GEN-58C)
2.36. GEN/59C; VHF Marine Band Radio Replacement
2.36.1. DWG. No. 57311-441-5110268; VHF Marine Band Radio Modification (GEN-59C)
LIAISON ACTION REPORTS (LAR’s):
2.37. LAR 34PB-0706; 34 Foot Patrol Boat, Gun Mount Foundation Test Requirements
2.38. LAR 34PB-1105; Engine Alignment Precautions Incidental to Waterjet Conversion
2.39. LAR 34PB-1201; Anti fouling Application
2.40. LAR 34PB-1204; Fuel Cooler Failures on Cummins Diesel Engines
2.41. LAR 34PB-1207; Fuel Cooler Failures on Cummins Diesel Engines
2.42. LAR 34PB-1221; Battery Box Coating
2.43. LAR 34PB-1222; Alternator Cover Modification
2.44. LAR 34PB-1223; QSB.9 Cummins Engine Vessel View Harness Compatibility Technical Bulletin
2.45. LAR 34PB-1226; 34PB Shakespeare Ratchet Mount
2.46. LAR 34PB-1227; Trim Bolt Mounting Installation
2.47. LAR 34PB-1230; Alternator Upgrade Oil Line Modification
2.48. LAR 34PB-1310; Driveshaft Alignment Procedures
2.49. LAR 34PB-1312; 34PB Salt Water Pump Inlet Fitting Systemic High Failure Item
2.50. LAR 34PB-1319; 34PB0401 FLIR Main Imager Cable Routing
2.51. LAR 34PB-1326; CEU Foundation Modifications
2.52. LAR 34PB-1339; Engine Room Hatch Insulation
2.53. LAR 34PB-1411; 34PB Insulation Replacement
2.54. LAR 34PB-1414; 34PB Fuel Gage Replacement
2.55. LAR 34PB-1416; 34PB Drawer Slides Replacement
2.56. LAR 34PB-1440; SGA, CEU Sensor Cable Orientation, Alignment, Length, Dummy Plug, Cable
Retention and HCU Mount
2.57. LAR 34PB-1444; CCFLIR Incorrect Labeling and References
2.58. LAR 34PB-1459; 34PB Vendor Identification WRT BoatAlt 34PB-33B
2.59. LAR 34PB-1460; Spotlight Remote Mounting Hardware
2.60. LAR 34PB-1474; 422 Serial Input EO-IR & ECDIS-N
2.61. LAR 34PB-1484; Engine Dewatering Pipe Fitting
2.62. LAR 34PB-1491; Spotlight Control Bracket Modification
2.63. LAR 34PB-1498; Spotlight Power Cable
2.64. LAR 34PB-14105; Spotlight Mounting Fabrication Details
2.65. LAR 34PB-14115; Trailer Ladder Brace
2.66. LAR 34PB-14122; Grounding of the SGA and the CEU for the EO-IR System
2.67. LAR 34PB-14123; Replacement Oil Lines On the Cummins 5.9L Engine
2.68. LAR 34PB-14125; FY04-05 Waterjet Inspection Hatch Extension Installation
2.69. LAR 34PB-14133; CCFLIR SGA Mounting Adapter Plate
2.70. LAR 34PB-1506; Canopy Hoisting Sling Assembly Access
2.71. LAR 34PB-1509; Universal Laptop Mount for Cogent
2.72. LAR 34PB-1511; CCFLIR SGA Mounting Adapter Plate Corrections
2.73. LAR 34PB-1515; New Cable for CCFLIR HCU Installation
2.74. LAR 34PB-1516; CCLIR to NAVNET Display Cable Installation
2.75. LAR 34PB-1518; HF Antenna Cable Connector
2.76. LAR 34PB-1519; CCFLIR DBA Mounting Adapter Plate
2.77. LAR 34PB-1521; Trim Tab Suitable Substitute
2.78. LAR 34PB-1523; COGENT Laptop Power Supply
2.79. GEN-1502; Standard Horizon VHF Marine Band Radio Upgrade
2.80. GEN-1401; MTX Bracket Modification
DRAWINGS (DWG); As Built:
2.81. DWG. No. 1613-102; Inboard Profile
2.82. DWG. No. 1613-401; Bilge Piping
2.83. DWG. No. 1613-402; Fuel Piping
2.84. DWG. No. 1613-409; Heating & Air System
2.85. DWG. No. 1613-416; Engine Cooling
2.86. DWG. No. 1613-501; A. C. Electric Rev
2.87. DWG. No. 1613-502; D. C. Electric Rev
2.88. DWG. No. 1613-503; Intercommunication System
2.89. DWG. No. 1613-623; Canopy
2.90. DWG. No. 1613-629; Label Plates
2.91. DWG. No. 1613-1628; Drawing Index
2.92. DWG. No. 1613-BOM; Master Parts List
2.93. DWG. No. GEN 300-5107858 Rev A; Standard Electrical Installation Requirements and Nomenclature
2.94. DWG. No. 1689-502; D. C. Electrical
SPAWAR DWG’s:
2.95. DWG. No. 29355-79001; 34FT Boat Block Wiring Diagram (Gentex, Harris, PRC- 117/PRC-150)
2.96. DWG. No. 29355-79002; 34FT Boat Arrangement and elevation (Gentex, Harris, PRC-117/PRC-
150)
2.97. DWG. No. 29355-79003; 34FT Boat mounts and Fixture Details (Gentex, Harris, PRC-117/PRC-
150)
2.98. DWG. No. 98997; Cable Assembly Pin Out (Gentex, Harris, PRC-117/PRC-150)
ATTACHMENTS:
2.99. ATTACHMENT-1_34PB0409 (Main Propulsion Diesel Engines)
2.100. ATTACHMENT-A_34PB0409 (Material Disposition)
ADDITIONAL LARS
2.101. LAR 34PB-14138; Console Top Modification.
2.102. LAR 34PB-14141; Spotlight Terminal Board Installation.
2.103. LAR 34PB-1524; Cable Replacement for Radio Systems Modification.
2.104. LAR 34PB-1527; Inverter-Charger Dip Switch Setting.
2.105. LAR 34PB-1529; MCT and Fitting Installation.
2.106. LAR 34PB-1533; AIS Serial Input to COGENT.
2.107. LAR 34PB-1534; Communication Rack 24-12VDC Distribution Panel.
2.108. LAR 34PB-1539; Security Light Bar Replacement for Obsolete Equipment.
2.109. LAR 34PB-1542; Equipment Rack Carpet Board Installation for Cabling.
2.110. LAR 34PB-1543; Battery Charger Mounting Modification.
2.111. LAR 34PB-1544; Post Equipment Rack COGENT Power Supply Installation.
2.112. LAR 34PB-1548; Intercommunication Systems Part Number Modification.
2.113. LAR 34PB-1550; Communication Rack Step Mount Material Substitution.
3. REQUIREMENTS:
3.1. NAVSEA Standard Item 009-60; Provide a detailed schedule to PM/SBS/CPOC/TPOC/MPS prior to work commencement, within the first ten percent of the availability outlining the following events in accordance with (IAW) NAVSEA Standard Item 009-60 of REF 2.1.
3.2. Production Meetings; Primary and Sub-Contractor personnel shall be available for meetings at the
Government facilities in San Diego, as required, throughout the performance of this task. The PM/SBS shall give notice before meetings. The Contractor may also request a meeting by arrangement through the PM/SBS. A weekly progress meeting will be scheduled by the Contractor and the PM at the start of the contract.
3.2.1. Primary and Sub-Contractor weekly progress meeting location shall be the Contractor facility.
3.3. Equipment/Materials Transportation; contractor shall be responsible for all transportation expenses for equipment and materials. The contractor shall turn over all manuals, parts lists, etc. to the CPOC/TPOC/MPS prior to return of craft to command.
3.3.1. All supplies, components, materials, and hardware necessary to accomplish the requirements of this task order, which are not specifically identified as GFM, shall be supplied by the contractor.
3.3.2. Contractor shall be responsible for all MPDE/marine gear/waterjet shipping costs (if required) including, but not limited to, providing engine stands/shipping containers with adequate protection to ensure that the engine is not damaged during transit.
3.3.3. Boat and Trailer shall be transported to and from the contractor’s facility by the
Contractor. Contractor shall be responsible for all crane services required during pick-up, delivery, and throughout the period of performance of the task order. Boat will be on GFE boat trailer that has a pintle type-coupling and air brake equipped. Boat is to be removed from the GFE trailer during the accomplishment of all repairs and painting.
3.3.3.1. Contractor is responsible for preparing Boat and Trailer for transportation by the contractor after completion of repairs.
3.3.3.2. The Contractor shall be responsible for transportation of boat to and from the test launch site.
3.3.3.3. Contractor shall notify the PM/SBS/CPOC/TPOC/MPS 5 working days prior to all required Contractor movement of Boat and Trailer.
3.3.4. All Operational Sea Trials shall be accomplished in San Diego Bay. Contractor shall be responsible for delivery of craft to and from boat launch ramp or facility capable of Marine Travel Lift operation for all necessary sea trials to prove accomplished repairs IAW statement of work, or to prove the accomplishment of noted discrepancies identified during Operational Sea Trials IAW statement of work.
3.4. Hardware Statement: ALL THREADED FASTENERS SHALL BE CORROSION RESISTANT STEEL
(CRES), ASTM A276, TYPE 316, UNLESS OTHERWISE SPECIFIED. ALL NUTS SHALL
BE SELF-LOCKING TYPE, UNLESS OTHERWISE SPECIFIED. ONE CORROSION
RESISTANT STEEL WASHER SHALL BE USED UNDER EACH BOLT HEAD AND
UNDER EACH NUT. BOLT/STUD LENGTH SHALL NOT EXCEED LESS THAN 1-1/2
THREADS OR MORE THAN 5 THREADS BEYOND THE NUT WITH FULL THREAD
ENGAGEMENT.
3.5. The repairs and modernization required on boat identified in 1.3.1 shall be performed IAW the appropriate reference(s) listed in SECTION 2. All name brand items called out in this statement of work may be substituted with an "or equal" item provided that a condition report is submitted listing all the specifications, characteristics, and properties of that item compared to the name brand item is routed through the PM/SBS to be approved by the CPOC/TPOC/MPS prior to use. All work in SECTION 3, unless specified otherwise, applies to boat identified in 1.3.1.
(V)(G) ‘Preliminary Inspection’
3.6. Preliminary Inspection; within 3 working day of the boat arrival, the Contractor shall video tape all boat systems, equipment, and hull to document the existing condition.
3.6.1. Submit a copy of the video tape to the PM/SBS/CPOC/TPOC/MPS within 5 working days of the boats arrival.
3.6.2. Submit a report detailing the results of the inspection to the PM/SBS/CPOC/TPOC within
5 days of the inspection.
3.7. Hull, Bilges and Decks:
3.7.1. Completely strip craft of all equipment including sponsons, hardware, propulsion, fittings and electronics.
3.7.2. Provide services and materials to properly remove and dispose of all fluids including bilge water, petroleum products, and organic growth.
3.7.3. Perform hull inspection.
(V)(G) Structural Inspection
3.7.4. Structural Inspection; Compartments must be clean of all debris, liquid, sponson and propulsion system removed prior to inspecting the hull, stringers, beams, bulkheads and bilges throughout the craft. Structural integrity and existing weldment inspection shall be conducted by Contractor.
3.7.4.1. Submit a report detailing the results of the inspection to the
PM/SBS/CPOC/TPOC/MPS within 5 days of the inspection.
3.8. Structural Repairs: All new material shall be the same scantlings as material it replaces, unless otherwise specified. Contractor shall submit a report to the PM/SBS/CPOC in electronic format indicating exact location of repairs prior to accomplishing repairs. All fabrication, welding and inspection specified herein shall be accomplished IAW REF 2.3, TO300-AU-SPN-010 A.
3.8.1. Provide and install new a total of 100 nuts, bolts, washers and pipe clamps in place of corroded, damaged, mismatched, or missing fasteners. All fasteners shall be
CRES 316.
3.8.2. Procure and install new, hull aluminum anode ZINC’s same size, type and design as those removed using CRES 316 hardware.
3.8.3. Inspect and lubricate all thru hull and bulkhead valves.
3.8.4. Gun Tub and Engine Room access drains; remove existing, procure and install new;
check valves, drain hoses, hose clamps and mounting hardware.
3.8.5. Adhesive backed non-skid; remove existing, procure and install new to all steps in cabin and ladder rungs leading to forward gun tub and aft deck.
3.8.6. Forward Anchor storage locker deck plates; remove existing, preserve and reinstall.
Procure new and install all mounting hardware.
3.8.7. Center deck plate in main cabin; remove existing, preserve, reseal, and reinstall. Chase all threads. Procure new and install all mounting hardware.
3.8.8. Fuel Tank Access patch; remove existing, preserve, reseal, and reinstall. Chase all threads. Procure new and install all mounting hardware.
3.8.9. Engine room air intake vanes; remove existing, preserve and reinstall. Chase all threads. Procure new and install all mounting hardware.
3.8.10. LAR 34PB-0706; 34 Foot Patrol Boat, Gun Mount Foundation Test Requirements, accomplish IAW REF 2.37. Refer to SECTION 5.0 for provided GFM.
3.8.10.1. Crop-out cracked welds and repair 5 linear feet.
3.8.11. Raw Water Pick-ups; remove existing, weld repair receiver, chase threads, and replace
(2 each) raw water pick-up screens. Procure new and install all mounting hardware.
3.8.11.1. Refer to SECTION 5.0 for provided GFM.
3.8.12. Bow Towing Eye; provide services and materials to accomplish the replacement of 1 square foot of 1/4 inch plate and 5 linear feet of welding to repair damaged bow eye sections.
3.8.13. Bow Towing Eye Safety Catch; crop out, grind flush, provide and install lower bow eye safety catch.
3.8.14. Handrails; crop out and install new 5 linear feet of pipe.
3.8.15. Repair for Pitting on Hull and Framing:
3.8.15.1. Crop out, provide and install new 10 sq. feet of hull plate replacement below the water line.
3.8.15.2. Crop out, provide and install new 10 linear feet of hull plate stiffeners and transverse frames.
3.8.16. Main deck, cabin and gun tub:
3.8.16.1. Crop-out cracked welds and repair 10 linear feet.
3.8.16.2. Crop-out damaged horizontals and vertical structures and weld repair
10 square feet.
3.8.17. Underwater Hull:
3.8.17.1. Grind back cracked welds and repair 10 linear feet.
3.8.17.2. Crop-out damaged hull plate structures and weld repair 10 square feet.
3.8.18. Sponson Extrusion:
3.8.18.1. Provide weld repair services and materials to accomplish the replacement 5 linear feet of extrusion track. Refer to SECTION 5.0 for provided GFM.
3.9. BoatAlt 34PB/2C; Canopy Top (Bimini Top) Addition, REF 2.8; accomplish the following requirements:
3.9.1. LAR 34PB-1506; Canopy Hoisting Sling Assembly Access, procure new and install canopy canvas IAW REF 2.70
3.9.1.1. Fabricated canvas shall be lashed to canopy frame using 550 parachute cords; color: BLACK
3.9.2. Secure canopy frame to pipe sockets with (8 each) CRES 316 3/8 inch by 4 & 1/4 inch long bolts, washers and nyloc nuts 2 per socket.
3.10. BoatAlt 34PB/9B; EO/IR Sensing Installation, accomplish the requirements of REF 2.12
3.10.1. List of GFM provided in section 5.
3.10.2. DWG. No. 53711-101-5108352 REV B; EO/IR Installation – Miscellaneous Foundation
Installation, accomplish the requirements of REF 2.12.1
3.10.3. DWG. No. 53711-171-5110079 REV B; Cabin Top Mast Fabrication, accomplish the requirements of REF 2.12.2
3.10.3.1. Procure and install new, ITEMS# 14 thru 20 of REF 2.11.2; DWG. No.
53711-409-5108468 REV A; SATCOM Install Electronic System Modification.
3.10.4. DWG. No. 53711-171-5110117 REV A; Mast Upgrade IWO C4I Installations, accomplish the requirements of REF 2.12.3
3.10.5. DWG. No. 53711-495-5110239; EO/IR Electronics Install, accomplish the requirements of REF 2.12.4
3.10.6. LAR 34PB-1326; CEU Foundation Modifications, accomplish the requirements REF 2.51
3.10.7. LAR 34PB-1440; SGA, CEU Sensor Cable Orientation, Alignment, Length, Dummy Plug, Cable Retention and HCU Mount, accomplish the requirements REF 2.56
3.10.8. LAR 34PB-1444; CCFLIR Incorrect Labeling and References, accomplish the requirements REF 2.57
3.10.9. LAR 34PB-1474; 422 Serial Input EO-IR & ECDIS-N, accomplish the requirements of
REF 2.60
3.10.10. LAR 34PB-14122, Grounding of the SGA and the CEU for the E-IR System, accomplish the requirements REF 2.66
3.10.11. LAR 34PB-1509; Universal Laptop Mount for Cogent; accomplish the requirements
REF 2.71
3.10.12. LAR 34PB-1511; CCFLIR SGA Mounting Adapter Plate Corrections; accomplish the requirements of REF 2.72
3.10.13. LAR 34PB-1519; CCFLIR DBA Mounting Adapter Plate, accomplish the requirements of REF 2.76
3.10.14. LAR 34PB-1523; COGENT Laptop Power Supply, accomplish the requirements of REF 2.78
3.11. BoatAlt 34PB/13B; DAGR Installation, accomplish the requirements of REF 2.13
3.11.1. DWG. No. 53711-301-5108357 REV A; DAGR Installation Power Modification
(34PB/13B), REF 2.13.1
3.11.2. DWG. No. 53711-420-5108358 REV A; DAGR Installation Electronic Modification
(34PB/13B), REF 3.13.2.
3.11.3. List of GFM provided in section 5.
3.11.3.1. Contractor shall be responsible for procuring and installing LINE
ITEM(S) 2 thru 9. Refer to Para 4.9 for contact information.
3.11.4. DWG. No. 53711-117-5108554; DAGR Lock Mount Fabrication Details (34PB/13B), REF 2.13.3
3.12. BoatAlt 34PB/15B; Alternator & Battery Upgrade (04-07), accomplish the requirements of
REF 2.14
3.12.1. DWG. No. 53711-301-5108361 REV A; Alternator & Battery Upgrade, REF 2.14.1.
3.12.2. List of GFM provided in section 5.
3.13. BoatAlt 34PB/16C; Emergency Dewatering System Installation, accomplish the requirements of REF 2.15
3.13.1. DWG. No. 529-5108553 REV A; Emergency Dewatering System Installation, REF
2.15.1
3.14. BoatAlt 34PB/18A; Hoist Fitting Upgrade, accomplish the following requirements of REF 2.16
3.14.1. DWG. No. 583-5109471 REV B; Hoist Fittings Upgrade, accomplish the requirements of
REF 2.16.1.
3.14.1.1. Requirements of TEST NOTES: T1 shall be accomplished prior to preservation and paint.
3.14.1.2. Accomplish 10 linear feet of weld repairs above and below decks to FWD and AFT pad eyes as required IAW TEST NOTE T1
DYE PENETRANT TESTING.
3.14.2. SBS/PM/CPOC/TPOC/MPS shall be notified 3 working days prior to the accomplishment of TEST NOTE T3.
3.14.3. Submit individual reports detailing the results of TEST NOTES T1, T2, T3, T4, and T5 to the PM/SBS/CPOC/TPOC.
3.15. BoatAlt 34PB/22B; Navigation Light Modification, accomplish the requirements of REF 2.17
3.15.1. DWG. No. 422-5110021 REV E; Navigation Light Modification, REF 2.17.1
3.16. BoatAlt 34PB/24A; IR Strobe Installation, accomplish the following requirements of REF 2.18
3.16.1. DWG. No. 422-5110023 REV B; IR Strobe Installation, REF 2.18.1
3.16.2. List of GFM provided in section 5.
3.17. BoatAlt 34PB/28B; AIS Installation, accomplish the requirements of REF 2.19
3.17.1. DWG. No. 444-5110034 REV B, AIS Installation, REF 2.19.1
3.17.2. Refer to SECTION 5.0 for provided GFM.
3.17.3. LAR 34PB-1533; AIS Serial Input to COGENT; accomplish the requirements of
REF 2.106
3.18. BoatAlt 34PB/29A; MTX Blue Force Tracker Installation, accomplish the following requirements of REF 2.20
3.18.1. DWG. No. 444-5110035 REV A, MTX Blue Force Tracker Installation, REF 2.20.1.
3.18.1.1. LINE ITEM #1 provided as GFM during operational testing only.
3.18.2. GEN-1401; MTX Bracket Modification, accomplish the requirements of REF 2.80
3.19. BoatAlt 34PB/31B; Companionway Mods IWO Stress Cracking, accomplish the following requirements of REF 2.21
3.19.1. DWG. No. 150-5110067 REV B, Companion Way Modifications IWO Stress Cracking, REF 2.21.1
3.20. BoatAlt 34PB/32C; Inverter/Charger Replacement, accomplish the requirements of REF 2.22
3.20.1. DWG. No. 314-5110069 REV A; Inverter/Charger Replacement, REF 2.22.1
3.20.2. List of GFM provided in section 5.
3.20.3. Submit report detailing the results of TEST NOTE T3 to the PM/SBS/CPOC/TPOC.
3.20.4. LAR 34PB-1527; Inverter-Charger Dip Switch Setting; accomplish the requirements of REF 2.104
3.21. BoatAlt 34PB/33B; Visual Identification Tape Installation, accomplish the requirements of
REF 2.23
3.21.1. DWG. No. 443-5110078 REV B; Visual Identification Tape Installation, REF 2.23.1
3.21.2. LAR 34PB-1459; Vendor Identification WRT BoatAlt (34PB-33B) refer to REF 2.58
3.22. BoatAlt 34PB/34B Electronic Navigation System Upgrade (FY04-05), accomplish the requirements of REF 2.24
3.22.1. DWG. No. 53711-420-5110111 REV C; (04-05) Electronic Navigation System Upgrade
(34PB/34B), REF 2.24.1
3.22.2. List of GFM provided in section 5.
3.23. BoatAlt 34PB/42A; Fire Suppression System Agent Replacement, accomplish the requirements of REF 2.25
3.23.1. DWG. No. 555-5110242; Fire Suppression System Agent Replacement, REF 2.25.1
3.24. BoatAlt 34PB/43B REV A; Cabin Top Security Light Bar Replacement, accomplish the requirements of REF 2.26
3.24.1. DWG. No. 53711-422-5110243 REV A; 24VDC Cabin Top Security Light Bar
Replacement, REF 2.26.1
3.24.2. LAR 34PB-1539; Security Light Bar Replacement for Obsolete Equipment;
accomplish the requirements of REF 2.108
3.25. BoatAlt 34PB/44B; Loud Hailer Modification, accomplish the requirements of REF 2.27
3.25.1. DWG. No. 53711-443-5110244 REV A; Loud Hailer Modification, REF 2.27.1
3.26. BoatAlt 34PB/48B; Electronic Navigation System Upgrade; accomplish the requirements of
REF 2.28
3.26.1. DWG. No. 53711-169-5110299 REV B; Depth Transducer Enclosure Structural Mod, REF 2.28.1
3.27. BoatAlt 34PB/49B; Remote Spotlight Modification, accomplish the requirements of REF 2.29
3.27.1. DWG. No. 422-5110422; Remote Spotlight Modification, REF 2.29.1
3.27.2. LAR 34PB-1460; Spotlight Remote Mounting Hardware, accomplish the requirements of
REF 2.59
3.27.3. LAR 34PB-1491; Spotlight Control Bracket Modification, accomplish the requirements of REF 2.62
3.27.4. LAR 34PB-1498; Spotlight Power Cable, accomplish the requirements of REF 2.63
3.27.5. LAR 34PB-14105; Spotlight Mounting Fabrication Details, accomplish the requirements of REF 2.64
3.27.6. LAR 34PB-14141; Spotlight Terminal Board Installation; accomplish the requirements of REF 2.102
3.28. BoatAlt 34PB/51B; Battery Charger Modification, accomplish the requirements of REF 2.30
3.28.1. DWG. No. 53711-313-5110437 REV B; Battery Charger Modification, REF 2.30.1
3.28.2. LAR 34PB-1543; Battery Charger Mounting Modification; accomplish the requirements of REF 2.110
3.29. BoatAlt 34PB/54B; Equipment Rack Modification, accomplish the requirements of REF 2.31
3.29.1. DWG. No. 53711-320-5110553; Equipment Rack (FY04-05) Electrical Removals, REF
2.31.1
3.29.2. DWG. No. 53711-180-5110558; Equipment Rack (FY04-05) Structural Removals, REF 2.31.2
3.29.3. DWG. No. 53711-511-5110562; Equipment Rack Mechanical Removals (3PB/54B), REF 2.31.3
3.29.4. DWG. No. 53711-511-5110563; Equipment Rack Mechanical Installations (3PB/54B), REF 2.31.4
3.29.5. DWG. No. 53711-180-5110561 REV A; Equipment Rack Structural Installations, REF
2.31.5
3.29.6. DWG. No. 53711-320-5110556 REV A; Equipment Rack Electrical Installations, REF 2.31.6
3.29.7. LAR 34PB-1515; New Cable for CCFLIR HCU Installation; accomplish the requirements of REF 2.73
3.29.8. LAR 34PB-1516; CCLIR to NAVNET Display Cable Installation; accomplish the requirements of REF 2.74
3.29.9. LAR 34PB-1518; HF Antenna Cable Connector; accomplish the requirements of REF
2.75
3.29.10. LAR 34PB-14138; Console Top Modification; accomplish the requirements of REF 2.101
3.29.11. LAR 34PB-1529; MCT and Fitting Installation; accomplish the requirements of
REF 2.105
3.29.12. LAR 34PB-1534; Communication Rack 24-12VDC Distribution Panel; accomplish the requirements of REF 2.107
3.29.13. LAR 34PB-1542; Equipment Rack Carpet Board Installation for Cabling;
accomplish the requirements of REF 2.109
3.29.14. LAR 34PB-1544; Post Equipment Rack COGENT Power Supply Installation;
accomplish the requirements of REF 2.111
3.29.15. LAR 34PB-1550; Communication Rack Step Mount Material Substitution;
accomplish the requirements of REF 2.113
3.30. BoatAlt 34PB/55B; Fuel Cooler Modification, accomplish the requirements of REF 2.32
3.30.1. LAR 34PB-1204; Fuel Cooler Failures on Cummins Diesel Engines, REF 2.40
3.31. BoatAlt 34PB/56B; Radio System Modification, accomplish the requirements of REF 2.33
3.31.1. DWG. No. 53711-441-5110609; Radio System Modification, REF 2.33.1.
3.31.1.1. Contractor shall be responsible for procuring LINE ITEM 36.
3.31.2. REF 2.11.2; DWG. No. DWG. No. 53711-409-5108468 REV A; SATCOM (04/05) Install Electronic System Modification (34PB/8B). Procure new and install LINE ITEMS: 30, 46, 48 and 49.
3.31.3. List of GFM provided in section 5.
3.31.4. LAR 34PB-1524; Cable Replacement for Radio Systems Modification; accomplish the requirements of REF 2.103
3.32. GEN/55A; Cummins QSB-Series Engines- Starter Magnetic Switch Bracket Modification, accomplish the requirements of REF 2.34
3.32.1. DWG. No. 57311-180-5109418 REV A; Cummins QSB-Series Engines-Starter Magnetic
Switch Bracket Modification (GEN/55A), REF 2.34.1
3.33. GEN/58C; MTX Transceiver and Antenna Mount Fabrication, accomplish the requirements of
REF 2.35
3.33.1. DWG. No. 57311-184-5109691; MTX Transceiver and Mount Fabrication (GEN-58C)
REF 2.35.1
3.33.2. GEN-1401; MTX Bracket Modification, accomplish the requirements of REF 2.80
3.34. GEN/59C; VHF Marine Band Radio Modification, accomplish the requirements of REF 2.36
3.34.1. DWG. No. 441-5110268; VHF Marine Band Radio Modification (GEN-59C), REF 2.36.1
3.34.2. GEN-1502; Standard Horizon VHF Marine Band Radio Upgrade, accomplish the requirements of REF 2.79
3.35. BoatAlt Label Plate; Fabricate BoatAlt label plate IAW REF 2.2; NSTM 583, to include the listed modifications to hull. Attach plate in location of Cabin port side console.
3.35.1. Boat Alterations (BoatAlts)
3.35.1.1. 34PB/2C
3.35.1.2. 34PB/5B
3.35.1.3. 34PB/6B
3.35.1.4. 34PB/9B
3.35.1.5. 34PB/13B
3.35.1.6. 34PB/15B
3.35.1.7. 34PB/16C
3.35.1.8. 34PB/18A
3.35.1.9. 34PB/22B
3.35.1.10. 34PB/24A
3.35.1.11. 34PB/28B
3.35.1.12. 34PB/29A
3.35.1.13. 34PB/31B
3.35.1.14. 34PB/32C
3.35.1.15. 34PB/33B
3.35.1.16. 34PB/34B
3.35.1.17. 34PB/42A
3.35.1.18. 34PB/43B
3.35.1.19. 34PB/44B
3.35.1.20. 34PB/48B
3.35.1.21. 34PB/49B
3.35.1.22. 34PB/51B
3.35.1.23. 34PB/54B
3.35.1.24. 34PB/55B
3.35.1.25. 34PB/56B
3.35.1.26. GEN/55A
3.35.1.27. GEN/58C
3.35.1.28. GEN/59C
3.36. Main Propulsion Diesel Engines (MPDEs):
3.36.1. Accomplish the requirements of 2.1 of 009-90 to prove repairs prior to accomplishing the requirements of ‘Operational Trial’ using Current OEM Quick Serve technical/service and part manuals, and the use of Cummins ‘Insite’ Software for the Dynamometer and upon completion of installation and waterborne trials of engines, displays and gauges on the craft listed in 1.3.1.
3.36.1.1. Contractor shall submit a report to the SUPERVISOR in electronic format listing the satisfactory results of all testing prior to accomplishing ‘Operational Trial’.
3.36.2. Disconnect and remove MPDEs and marine gears from craft IAW manufacturer specifications.
3.36.3. GFM provided in SECTION 5.0.
3.36.3.1. Separate the MPDEs from marine gears.
3.36.4. ATTACHMENT-1; 34PB-0409 Main Propulsion Diesel Engines, accomplish the requirements of REF 2.99
3.36.5. MPDE Gauge cluster; remove, template from existing, procure and install new including all gauges, ‘START/STOP’ switches, ignition selection switches, RED and BLACK rubber switch boots and all mounting hardware. Provide services to calibrate gauges with the installed MPDE sensors and harnesses.
3.36.6. Teleflex Control Cables; remove, template from existing, procure and install new MPDE throttle cables, marine gear shift cables, and water jet control cables with CRES end fittings, hangers, and mounting hardware.
3.36.7. Throttle Control, MECH/ELEC Interface; remove existing, procure new and install (2 each) Cummins P/N: 4070035.
3.36.8. MPDE Vessel Adapter OEM Harness Extension; remove existing, procure new and install (2 each) Cummins P/N: 3999669, and (2 each) Terminating Resistors, Cummins P/N: 3972155 IAW OEM specification.
3.36.9. Cable Assembly, Special Purpose, E; remove existing, procure and install new (2 each)
Cummins P/N: 3969783 REV 04 (15 feet in length).
3.36.10. Template from existing and install new flex coupler/torsion dampener between MPDEs and marine gears including new mounting hardware.
3.36.11. Connect GFM provided MPDEs and marine gears IAW manufacturer specification using new hardware.
3.36.12. Remove existing, procure and install new coolant overflow bottles including hoses, clamps, and mounting hardware.
3.36.13. Insul-tech exhaust pads; remove existing, procure and install new for Port and
Starboard MPDEs exhaust elbows.
3.36.14. MPDE resilient motor mounts; remove, template from existing, procure and install new (QTY. 4 each) per engine including all new mounting hardware.
3.36.15. Remove existing, procure and install new (2 each) rubber exhaust flaps including full
CRES hose clamps.
3.36.16. Remove existing, procure and install new all fuel hoses, exhaust hoses and raw water cooling hoses. Hoses shall be double clamped with full CRES hose clamps. All hoses shall be marked for identification and flow path
3.36.17. Fast Lube Oil Change System (FLOCS); remove existing, procure and install new, FLOCS pumps, hoses, fittings, hangers and mounting hardware. Provide services and materials to accomplish all electrical connections and perform operation of system.
3.36.18. Provide and install new a total of 100 nuts, bolts, washers and pipe clamps in place of
3.37. Marine Gear; Accomplish the requirements of REF 2.1 section 009-90 for the overhaul of the
Port and Starboard Marine Gear IAW manufacturer specifications and shall consist of the following actions for each gear:
3.37.1. Remove existing oil from marine gears. Dispose of all removed oil.
3.37.2. Degrease, clean and soda-blast each marine gear prior to accomplishing overhaul.
3.37.3. Perform paint and preservation of each marine gear IAW manufacturer’s specifications after overhaul and prior to installation.
3.37.4. Teardown, clean and inspect all marine gear components and heat exchangers.
3.37.5. Remove existing, procure and install new, clutches, bearings, needle bearings, pins, clips, piston clutch, thrust races, gaskets, hoses, fluids, oil feed bushing, oil pump support bushing and seals.
3.37.6. Re-assemble marine gears.
3.37.7. Fill marine gear oil sump with SAE HD-30 to manufacturer specified level.
3.37.8. Remove existing, procure and install new lube oil dipstick.
3.37.9. Accomplish ‘Spin Test’ for each marine gear IAW OEM specifications.
3.37.9.1. Submit a report to SUPERVISOR in electronic format listing the results of ‘Spin Test’ prior to installation.
3.37.10. Connect marine gears to MPDEs including new mounting hardware.
3.37.11. Reinstall MPDEs and marine gears into craft IAW REF 2.9 and OEM specifications.
3.37.11.1. Subsequent to a successful sea trial of the marine gears, Submit a report to the PM/SBS/CPOC with the Twin Disc Certification of the marine gear re-installation and operation.
3.38. Hamilton Waterjet; Accomplish the requirements of REF 2.1 section 009-90 for the overhaul of the Port and Starboard water jets to return units to original manufacturer specification and tolerances.
3.38.1. Contractor shall use an authorized Hamilton Water Jet service center to provide all certified personnel, replacement parts, tools, equipment, material, gaskets, and seals necessary to complete all work associated with the overhaul, installation and inspection of port and starboard water jets in accordance manufacturer
3.38.2. Remove existing, procure and install new reverse bucket hydraulic cylinder assembly including bucket linkage pins, cotter pins and washers.
3.38.3. Contractor shall be responsible for having both water jet impellers returned to new impeller specifications and tolerances.
3.38.3.1. During disassembly, Contractor shall mark each impeller identifying which belongs to each boat for reassembly. The Contractor shall be responsible for the shipment of the impellers to and from Hamilton Jet.
3.38.3.2. A report containing the blade tip clearance between impellers and their associated wear rings as well as the torque applied to each impeller nut shall be submitted to the
PM/SBS/CPOC/TPOC/MPS.
3.38.4. Remove existing, perform visual inspection, and return water jet main shafts to OEM specification and tolerances.
3.38.5. Remove existing, procure and install new water jet control linkages and shafts, linkage clevis joints and rod ends, clevis pins, cotter pins, and washers. Adjust water jet control linkage to allow proper reverse bucket travel.
3.38.6. Remove existing, procure and install new water jet bushings, bearing carriers, cutlass bearings, water seals, lip seals, o-rings, and reverse and steering transom seals.
3.38.7. Remove existing, procure and install new water seals.
3.38.7.1. Water seal surfaces shall not come into contact with oils, lubricants, or skin.
3.38.8. Grease all water jet grease fittings with Mobil XHP 222, type grease.
3.38.9. Remove existing, procure and install new Parker directional valve assemblies, fittings and hoses.
3.38.10. Remove existing, procure and install new wear rings.
3.38.10.1. Perform continuity test IAW manufacturer specification.
3.38.11. Remove existing, procure and install new Saginaw hydraulic power pumps, adjustment links and pressure switches.
3.38.11.1. Remove existing, preserve and reinstall hydraulic pump pulleys and jet drive input flanges.
3.38.11.2. Remove existing, procure and install new (2 each) drive belts including (2 each) spare belts per water jet. Spare belts shall be attached to FWD end of waterjet using plastic cable ties.
3.38.12. Flush, fill, and prime waterjet hydraulic systems IAW manufacturer specifications.
3.38.12.1. Paint water jet assemblies IAW manufacturer specifications.
3.38.12.2. Underwater hull, waterjet exteriors shall anti-fouling coated;
color BLACK.
3.38.12.3. LAR 34PB-1201; Anti-fouling Application, accomplish the requirements of REF 2.39
3.38.13. Remove existing, procure and install new all internal and external water jet zinc anodes.
3.38.14. Ensure Loctite used in assembly IAW manufacturer specifications.
3.38.15. Accomplish alignment between MPDE/Marine gear combination and Waterjet units IAW manufacturer specification.
(V) ‘Hamilton Waterjet alignment with MPDEs’
3.38.15.1. Submit a report to the PM/CPOC/TPOC documenting
‘Hamilton Waterjet alignment with MPDE units’.
3.38.16. LAR 34PB-14125; FY04-05 Waterjet Inspection Hatch Extension Installation, accomplish the requirements of REF 2.68
3.39. Hull Trim Tab System; remove existing, procure and install new port and starboard Trim Tab system including tabs, pumps, indicators, indicator cables, control heads, and associated hardware and fittings IAW DWG. No. 53711-583-5108380 REV A; Outdrive to Waterjet Conversion Mechanical Arrangement and Installation (34PB/5B), REF 2.9.6
3.40. Electrical Power Generation and Distribution:
3.40.1. Develop disconnect sheets for all electrical connections disconnected. All new electrical and RF cables shall be tested IAW REF 2.1.
3.40.2. IAW REF 2.93; DWG. No. GEN 300-5107858 Rev A; Standard Electrical Installation Requirements and nomenclature:
3.40.2.1. Individual cables and harnessed wires shall be supported.
3.40.2.2. Cable support shall be no more than 18 inches apart on horizontal runs and 14 inches apart on vertical runs.
3.40.2.3. All Cables shall be continuous run and NOT SPLICED, unless otherwise specified and/or written approval by the Government.
3.40.2.4. All interior and exterior cabling will be labeled.
3.40.2.5. All individual conductors shall be labeled at termination points except color-coded OEM-supplied wire harnesses, and shall reflect information provided in drawings. Individual conductors shall be labeled.
3.40.3. Provide materials and services to clean all corrosion from all connections, secure all cables found loose on terminal strips, circuit breakers, and bus bars. Apply No- Ox to all electrical terminals and weatherproof all connections.
3.40.4. Cabin Console 12VDC and 24VDC switches/circuit breakers; remove existing, procure and install new, including switch boots and mounting hardware IAW DWG. No. 1613-502; D.C. Electric System, REF 2.87, and IAW DWG. No.
1689-502; D. C. Electrical, REF 2.94.
3.40.5. 24VDC/12VDC Convertors; remove existing, procure new and install (2 each)
MANUFACTURER: Analytic Systems; P/N: VTC1015d-24-12. Accomplish installation IAW DWG. No. 1613-502; D.C. Electric System, REF 2.87, and IAW DWG. No. 1689-502; D. C. Electrical, REF 2.94.
3.40.6. Engine Room 24VDC Distribution Panel; remove existing, procure and install new, (5 each) battery switches, (10 each) manual reset circuit breakers, and (4 each) single buss posts on Engine Room Distribution Panel IAW DWG. No. 1613- 502; D.C. Electric System, REF 2.87, and IAW DWG. No. 1689-502; D. C.
Electrical, REF 2.94.
3.40.6.1. Provide services and materials to disassemble existing, fabricate all new electrical connections, and reassemble all 24VDC Distribution Panel wiring configuration IAW DWG. No.
1613-502; D.C. Electric System, REF 2.87, and IAW DWG.
No. 1689-502; D. C. Electrical, REF 2.94.
3.40.7. Remove existing, procure and install new all CRES hardware on 12VDC, 24VD, and
VHF Radio panels.
3.40.8. Smartcraft/VesselView System displays; remove existing, procure and install new (1 each) cabin and (1 each) engine room IAW manufacturer instructions.
3.40.8.1. Calibrate and prove operation.
3.40.9. Remove existing, procure and install new, water jet position indicator gauge, wiring harness, sending unit and control rod including mounting hardware. Calibrate indicator and gauge.
3.40.10. Remove, template from existing, procure and install new (2 each) cabin interior fans.
3.40.11. Remove, template from existing, procure and install new (2 each) 120 VAC outlets in location of Pilot house and Engine room including plastic face plate.
3.40.12. Shore power connections/Galvanic Isolator; remove existing, procure and install new galvanic isolator, shore power plugs, weather caps and mounting hardware to Starboard side cabin IAW DWG. No. 1613-BOM; Master Parts List, REF 2.92, and DWG. No. 1613-501; A. C. Electric, REF 2.86
3.40.13. Fabricate and Install new battery disconnect switch labels for port and starboard engines, to be one quarter inch lettering WHITE engraved on a BLACK background.
3.40.14. Engine room lighting fixtures; remove and template from existing, procure and install new fixtures, bulbs, crush guards, and mounting hardware.
3.40.15. Remove existing, procure new and install (5 each) cabin interior dome lights.
3.40.16. LAR 34PB-1221; Battery Box Coating, accomplish the requirements of REF 2.42
3.40.17. LAR 34PB-1414; 34PB Fuel Gauge Replacement, accomplish the requirements of REF
2.54
3.40.18. Remove exiting, procure new and install all new back lighting illuminated label plates on all 12VDC and 24VDC electrical panels.
3.40.19. Remove existing, procure new and install all LED Power Indicators on all 12VDC and 24VDC electrical panels.
3.40.19.1. Contractor shall ensure all LED Power Indicators function along with associated circuit breaker.
3.40.20. Remove existing, procure new and install all 12VDC and 24VDC dimmer switches and control knobs.
3.41. Navigation System;
3.41.1. Ritchie® Magnetic helm compass; remove existing, procure and install new with back lighting wired to dimmer switch.
3.41.2. Remove existing, procure and install new dual trumpet navigation horn.
3.41.3. LAR 34PB-1226; Shakespeare Ratchet Mount Replacement; accomplish the requirements of REF 2.45
3.41.4. Provide and install new a total of 100 nuts, bolts, washers and pipe clamps in place of
3.42. Command, Control and Communication; IAW DWG. No. 1613-503; Communication
Electronics, REF 2.88; remove existing, procure and install new Gentex and Harris Intercommunication System.
3.42.1. LAR 34PB-1548; Intercommunication Systems Part Number Modification;
accomplish the requirements of REF 2.112
3.43. Steering; remove existing, procure and install new Steering system including helm pump, steering ram, hydraulic lines, hydraulic fittings, clamps and mounting hardware IAW DWG. No.