STATEMENT OF WORK

SHIP/COMMAND : CNRSW Port Operations SSP: SSSD-0048-15 YFN-1280, 1281, 1282, & 1284 SURVEYOR: Rod Taliman

1. SCOPE:

1.1 TITLE: Correct Waterline Draft Markings, accomplish

1.2 LOCATION: Naval Weapons Station Seal Beach, California

1.3 IDENTIFICATION:

1.3.1 Quantity (One EA), Covered Lighter Craft, Hull Identification Number: YFN-1280

1.3.2 Quantity (One EA), Covered Lighter Craft, Hull Identification Number: YFN-1281

1.3.3 Quantity (One EA), Covered Lighter Craft, Hull Identification Number: YFN-1282

1.3.4 Quantity (One EA), Covered Lighter Craft, Hull Identification Number: YFN-1284

2. REFERENCE:

2.1 FY15 NAVSEA Standard Items

2.2 845-4459201 Rev-C, YC & YFN Lighters Docking Plan & Cathodic Protection Plan

2.3 801-6894368 Rev A, YFN Series Covered Lighters Outboard Profile & General Arrangement

2.4 T9074-AS-GIB-010/271, Requirements For Non-Destructive Testing Methods

2.5 Attachment “A”, Management and Disposal of all Hazardous Waste

3. REQUIREMENTS:

3.1 Contractor shall be responsible for the dry-berthing, tug boat, barge, crane, transportation, and rigging of each craft listed in 1.3.1 through 1.3.4, from the location in 1.2 to contractor’s facility and vice versa after the completion of the availability.

3.1.1 Contractor shall acquire necessary permit for water front access or oversize load road permits for the transport of each craft.

3.1.2 Contractor shall furnish a sound facility, necessary qualified personnel and equipment, to safely dry-berth each craft, using 2.2 for guidance.

3.2 Remove existing and install new waterline draft markings in its entirety, including each 4 corners of each barge on crafts identified in 1.3.1 through 1.3.4, using 2.2 and 2.3 for guidance.

3.3 Record existing periphery lines, exact locations, painted stenciling, colors and dimensions of paint coatings and non-skid deck covering on exterior surface of the craft exposed to weather, extending from the waterline to the main deck edge.

3.4 Shroud the entire platform to contain debris and airborne contaminants generated by abrasive blasting and mechanical cleaning on craft identified in 1.3.1 through 1.3.4.

3.4.1 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line One, 2, 3, or 4, Columns B, C, E, and G for the preservation of exterior surfaces not receiving non-skid deck covering.

3.4.1.1 Accomplish the requirements of SSPC-SP 11, power tool clean to bare metal for the surface preparation in the accomplishment of 3.2.

OPTION ITEM-One (Paragraphs 3.5 - 3.7.3)

3.5 Accomplish pressure wash using clean fresh water on each craft underwater hulls, components and fittings ensuring the removal of dirt, slime, marine growth, fouling and other foreign substance.

3.6 Conduct visual inspections of material conditions of each underwater hull plating on crafts listed in 1.3.1 through 1.3.4, using 2.2 and 2.3 for guidance.

3.6.1 Identify craft structural members for structural integrity, deterioration, pitting, cracks, and areas of damage or distortion.

3.6.2 Submit two legible copies, one in hard and one in electronic format, of a complete report listing the results of 3.2 to the SUPERVISOR within 24 hours of completion of inspection.

3.7 Accomplish the requirements of 009-12 of 2.1, including Table 3, Column(s) A, Line 9 Ultrasonic Inspection (UT) on craft listed in 1.3.1 through 1.3.4.

3.7.1 Accomplish an ultrasonic thickness survey on the entire underwater hull shell plating, in accordance with paragraph 6 of 2.4.

3.7.2 The Survey shall be conducted of each intersecting point of one foot grid pattern to the entire underwater hull up to the bootop.

3.7.2.1 List in columns the actual readings taken, the design thickness, the minimum allowable thickness, and the amount the actual reading is above or below minimum allowable thickness.

3.7.2.2 Notate if reading is taken over an existing doubler or insert plate.

3.7.2.3 Highlight or bold, actual readings that are taken that are at or below minimum allowable thickness.

3.7.2.4 List specific locations with respect to the structural members or measurements from suitable reference points.

3.7.2.5 A sketch of the underwater hull plating with the reading locations annotated and a separate sheet with the appropriate data is an acceptable alternative.

3.7.3 Submit one legible copy, in hard copy or electronic media, of a report listing the results of the requirements of 3.7 to the SUPERVISOR.

OPTION ITEM-2 (Paragraphs 3.8 – 3.8.2)

3.8 Accomplish the requirements of 009-32 of 2.1, including Table One, Line 3, Columns A, B, E, F, and G for the underwater hull preservation on each craft identified in 1.3.1 through 1.3.4.

CHECK POINT: (I) (G) “BLOCKING ARRANGEMENT”

3.8.1 Reposition craft’s supporting blocks to permit 100 percent preservation.

3.8.2 Final color of underwater hull antifouling coating shall be Black.

OPTION ITEM-3 (Paragraphs 3.9 – 3.9.2)

3.9 Remove existing and install new in its entirety, each zinc anode on crafts listed in 1.3.1 through 1.3.4, in accordance with 2.2.

3.9.1 Remove existing and install new in its entirety, each zinc anode fastener, in accordance with 2.2

3.9.2 Remove existing and install new, 12 each zinc anode studs.

CHECK POINT: (I) (G) “VISUAL INSPECTION”

3.10 Accomplish visual inspection of each tasking performed in paragraphs 3.1 through 3.9.2, to ensure each work accomplished were in accordance with paragraphs 2.1 through 2.4 and with the OEM standards.

3.10.1 Submit legible copies, one in hard and one in electronic format, of a report listing the results of 3.10, including recommended repairs and material needed to correct discrepancy found to the SUPERVISOR within 24 hours of completion of testing.

3.11 Contractor shall ensure that only qualified, competent personnel carry out the tasks outlined in this SOW. Competent is defined as registered professional or, where registration is not applicable, trained, and /or certified in their respective field.

3.12 Primary and Sub-Contractor personnel shall be available for meetings at the Government’s facility throughout the performance of this availability.

3.13 Bidding contractors shall submit proposals with line items pricing of materials and man hours per paragraph of the SOW.

3.14 Accomplish the requirements of Attachment-A listed in 2.5 for the management and disposal of all hazardous waste through completion of this availability.

3.15 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.

4 NOTES:

4.1 Ship check Point of Contacts:

4.1.1 Brian Lehmkuhler, Navy Region Southwest Maintenance Manager for Port Operations, (619) 556-6790

4.1.2 Matt Lynch, Assistant Navy Region Southwest Maintenance Manager for Port Operations, (619) 556-3136

4.1.3 Albert Rosales, 800 Seal Beach Blvd, Building 305, Floor 1, Room 1, Seal Beach, Ca. 90740, (562) 626-7206

5 GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 None.