N55236-15-R-0010_AMENDMENT_0001.pdf

PDF 41 KB Posted

Attached to
Coastal Riverine Group-1 (CRG-1) Crafts 34PB0402 & 34PB0404
Solicitation number
N55236-15-R-0010
Issued by

About this file

Amendment No. 0001

View the file

Other files

File Type Posted
N55236-15-R-0010-0002.pdf PDF
34PB0402_(SOW)_Rev_3_docx.docx DOCX document
Attachment-1_(34PB0402)_Rev-2.docx DOCX document
Attachment-1_(34PB0404)_REV-2.docx DOCX document
34PB0404_(SOW)_Rev_3_docx.docx DOCX document
Attachment_5_-_Request_for_Specification_Clarification_Form.docx DOCX document
Attachment_4_-_SB_Subcontracting_Data_Sheet.doc DOC document
N55236-15-R-0010.pdf PDF
Attachment_2_34PB0404_(SOW).docx DOCX document
Attachment_3_-_Reference_Information_Sheet_(1).doc DOC document
Attachment_1_34PB0402_(SOW).docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N5523615R0010

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

REF: 34PB0402 and 34PB0404 Crafts for CRG-1

1. Replace Attachment (1) PB0402 Craft Statement of Work w ith 34PB0402 Craft Statement of Work Rev 3, attached.

2. Replace Attachment (2) PB0404 Craft Statement of Work w ith 34PB0404 Craft Statement of Work Rev 3, attached.

3. Replace ATTACHMENT-1_34PB0402 w ith ATTACHMENT-1_34PB0402 Rev-2, attached.

4. Replace ATTACHMENT-1_34PB0404 w ith ATTACHMENT-1_34PB0404 Rev-2, attached.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 06-Mar-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N55236-15-R-0010

X 9B. DATED (SEE ITEM 11)

19-Feb-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

05-Mar-2015

CODE

SOUTHWEST REGIONAL MAINTENANCE CENTER

CODE 410 3755 BRINSER STREET, STE 1

SAN DIEGO CA 92136-5205

N55236 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N55236-15-R-0010

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION F - DELIVERIES OR PERFORMANCE

The following have been modified:

RMC-F-1-0003 DELIVERY / REDELIVERY SCHEDULE (RMC)

The Government agrees to deliver the Vessel to the Contractor at Navy Outlying Field (NOLF), Imperial Beach, CA no later than the following "Commencement Date". The Contractor agrees to redeliver the Vessel to the Government at: Navy Outlying Field (NOLF), Imperial Beach, CA on the following “Completion Date".

CLIN VESSEL COMMENCEMENT DATE COMPLETION DATE

0001 34PB0402 03 April 2015 30 September 2015 0002 34PB0402 As Specified in Order and Above Work Orders 0003 34PB0404 03 April 2015 30 September 2015 0004 34PB0404 As Specified in Order and Above Work Orders

Dates specified above represent the availability dates of the Vessel.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

The following document(s), exhibit(s), and other attachment(s) form a part of this solicitation:

Attachment 1: 34PB0402 Craft Statement of Work Rev 3, 39 pages Attachment 2: 34PB0404 Craft Statement of Work Rev 3, 39 pages Attachment 3: Reference Information Sheet, 1 page Attachment 4: Small Business Subcontracting Data Sheet, 1 page Attachment 5: Request for Specification Clarification Form Attachment 6: ATTACHMENT-1_34PB0402 Rev-2, 4 pages Attachment 7: ATTACHMENT-1_34PB0404 Rev-2, 4 pages Attachment 8: ATTACHMENT-A; 34PB0402, 5 pages Attachment 9: ATTACHMENT-A; 34PB0404, 5 pages

(End of Summary of Changes)

The following items are applicable to this modification:

DESCRIPTION OF CHANGES

SUMMARY OF CHANGES

Pre-Proposal Questions and Answers Question #3: “The CD of references and the SOW and it looks like the GEN/58C and GEN59C are missing from the references." "The CD of references is missing LAR 34PB-1315."

Answer #3: An additional CD is available for pick up, or mail, with referenced documents after 5 March 2015 1300.

Question #4: LAR 34PB-1411 and LAR 34PB-1339 are listing a sole source of Soundown Corp for the 1” Marine Hull Board w/ Glass cloth facing.

There are several vendors in the immediate area that supply an equivalent product and have it readily available. When laid side by side there is no visible difference to the material from Soundown Corp.

Answer #4: IAW LAR 34PB-1339, Sundown Corp 1 INCH Marine Hull Board w/ Glass cloth facing supersedes the original OEM 1/2 INCH pressed fiberglass board insulation to increase the thermal resistance to heat flow from (R=2.08) to (R=4.35). (R) refers to resistance to heat flow. The higher the R-value, the greater the insulating power.

IAW 3.5 The repairs and modernization required on boat identified in 1.3.1 shall be performed IAW the appropriate reference listed in SECTION 2. All name brand items called out in this statement of work may be substituted with an "or equal" item provided that a condition report is submitted listing all the specifications, characteristics, and properties of that item compared to the name brand item is routed through the PM/SBS to be approved by the CPOC/TPOC/MPS prior to use. All work in SECTION 3, unless specified otherwise, applies to boat identified in 1.3.1.

Question #5: Will CPOC/TPOC/MPS and PM/SBS accept an “or equal” item for both of these LARs?

Answer #5: Prior to approval for installation, government requires listing all the specifications, characteristics, and properties of the suggested item compared to the name brand ‘Sundown Corp 1 INCH Marine Hull Board’ listed in LAR 34PB-1339 to be submitted to PM/SBS to be approved by the CPOC/TPOC prior to consideration. Material Safety Data Sheets and product information are required.

Question #6: May I ask for the serial numbers of the Twin Disc Marine Gears and Hamilton Jet drives?

Answer #6: Here is the information for the marine gears for Palmer Johnson.

34PB0402 and 0404 BOM No: S-21066;

Model No: MG5075 SC

S/N: 5JZ147

Ratio: 1:15

Question #7: 3.11 Boat Alt 34PB/9B EO/IR Sensing Installation

3.11.1 Refer to section 5.0 for provided GFM (5.3.1 refers to REF 2.10.1 which is for the Gun Tub fabrication) Please provide what is true GFM – There are numerous prefabricated cables, mounts, etc. which affect pricing.

Answer #7: KTR shall use 2.12.4 vice 2.10.1 as identified in 5.3.1 of SOW REV 3. GFM will be provided for items 1-9.

Question #8: Drawing 53711-495-5110239 For Electronic Install not included in references. The references included apply to boats years 06 thru 08, and these are 04 boats. Please provide drawing for 04 year boats.

Answer #8: Title block on drawing 53711-495-5110239 lists these are designed for crafts 04-05 crafts/ Boat Alt 34PB/9B list these as applicable crafts for this Alt. Drawing is found in references under

34PB/9B .

Question #9: 3.12 Boat Alt 34PB/13B DAGR Installation

3.12.2.1 Says contractor shall be responsible for procurement and installation of all materials including ITEMS 1-9, however the drawings say these items are provide GFM. KTR believes these are a security item and require an active purchase letter to be issued to us in order to purchase them, and if so, will be difficult to source them. KTR requests these items be provided as GFM.

Answer #9: 3.12.2.1. Contractor shall be responsible for procurement and installation of all material with exception of GFM listed in ITEM’s 1-9 as identified in SOW REV 3.