ELINS_USS_COWPENS.xls
XLS spreadsheet 41 KB Posted
- Attached to
- USS COWPENS (CG-63) CIS SCAFFOLDING SERVICES
- Solicitation number
- N55236-15-Q-2044
About this file
N55236-15-Q-2044 USS COWPENS (CG-63) ELINS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N55236-15-Q-2044-0001_USS_COWPENS.pdf | ||
| Attachment_1_Request_for_Specification_Clarification_Form.docx | DOCX document | |
| N55236-15-Q-2044_USS_COWPENS.pdf | ||
| N55236-15-Q-2044_USS_COWPENS_(CG-63)_SOW.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SCOPE OF WORK | ||||
| EXHIBIT LINE ITEM (ELIN) | CONTRACTOR TO FOLLOW NOTES BELOW | |||
| RFQ #: | N55236-15-Q-2044 | |||
| SHIP: | USS COWPENS (CG-63) | |||
| POP: | 20 JUN 2015 - 20 JUL 2015 | |||
| LOCATION: | NAVBASE SAN DIEGO CA | |||
| POC: | CHIEF DONATO | |||
| JSN | LOCATION | EA | UNIT PRICE | EXT PRICE |
| OD01-2240 | 01 LEVEL FR: 174-290 FROM DECK EDGE TO WATERLINE | 13 | ||
| OD01-2241 | 01 LEVEL FR: 310-400 BETWEEN YOKOHAMA FENDERS FROM DECK EDGE TO WATERLINE | 9 | ||
| OD01-2242 | 01 LEVEL FR: 510-565 AFT OF BARGE BROW AND WRAPS AROUND THE FAINTAIL FROM DECK EDGE TO WATERLINE | 12 | ||
| OD01-2249 | STBD SIDE SUPERSTRUCTURE 01 LEVEL UP TO 03 LEVEL FR: 180-250 | 12 | ||
| OD01-2251 | STBD SIDE FANTAIL FRAME 460-530 | 14 | ||
| ER01-L003 | PIPE BRACKET FOR COUNTER MEASURE WASH DOWN PORT SIDE SUPERSTRUCTURE HOUSE 20 FEET UP ON FR: 138 | 3 | ||
| ELIN A001: PROVIDE LABOR AND MATERIAL TO DELIVER, ERECT, DISMANTLE, AND PICK-UP OF FIXED SCAFFOLDING IN ACCORDANCE WITH THE STATEMENT OF WORK (SOW). DAILY RENTAL WITH DIMENSIONS: 3 FT X 10 FT X 6.5 FT. (TOTAL: 63 EA FIXED SCAFFOLDING FOR 1 DAY) | 63 | $0.00 | ||
| JSN | LOCATION | EA | UNIT PRICE | EXT PRICE |
| OD01-2250 | PORT SIDE SUPERSTRUCTURE 01 LEVEL UP TO 04 LEVEL FR: 174-245 | 16 | ||
| ELIN A002: PROVIDE LABOR AND MATERIAL TO DELIVER, ERECT, DISMANTLE, AND PICK-UP OF FIXED SCAFFOLDING IN ACCORDANCE WITH THE STATEMENT OF WORK (SOW). DAILY RENTAL WITH DIMENSIONS: 3 FT X 10 FT X 19.5 FT. (TOTAL: 16 EA FIXED SCAFFOLDING FOR 1 DAY) | 16 | $0.00 | ||
| JSN | LOCATION | EA | UNIT PRICE | EXT PRICE |
| OD01-2242 | 01 LEVEL FR: 510-565 AFT OF BARGE BROW AND WRAPS AROUND THE FAINTAIL FROM DECK EDGE TO WATERLINE | 1 | ||
| OD01-2249 | STBD SIDE SUPERSTRUCTURE 01 LEVEL UP TO 03 LEVEL FR: 180-250 | 12 | ||
| OD01-2250 | PORT SIDE SUPERSTRUCTURE 01 LEVEL UP TO 04 LEVEL FR: 174-245 | 16 | ||
| ER01-L003 | PIPE BRACKET FOR COUNTER MEASURE WASH DOWN PORT SIDE SUPERSTRUCTURE HOUSE 20 FEET UP ON FR: 138 | 1 | ||
| ELIN A003: PROVIDE LABOR AND MATERIAL TO DELIVER, ERECT, DISMANTLE, AND PICK-UP OF FIXED SCAFFOLDING IN ACCORDANCE WITH THE STATEMENT OF WORK (SOW). DAILY RENTAL WITH DIMENSIONS: 3 FT X 10 FT X 26 FT. (TOTAL: 30 EA FIXED SCAFFOLDING FOR 1 DAY) | 30 | $0.00 | ||
| JSN | LOCATION | EA | UNIT PRICE | EXT PRICE |
| OD01-2240 | 01 LEVEL FR: 174-290 FROM DECK EDGE TO WATERLINE | 13 | ||
| OD01-2241 | 01 LEVEL FR: 310-400 BETWEEN YOKOHAMA FENDERS FROM DECK EDGE TO WATERLINE | 9 | ||
| OD01-2242 | 01 LEVEL FR: 510-565 AFT OF BARGE BROW AND WRAPS AROUND THE FAINTAIL FROM DECK EDGE TO WATERLINE | 12 | ||
| OD01-2249 | STBD SIDE SUPERSTRUCTURE 01 LEVEL UP TO 03 LEVEL FR: 180-250 | 12 | ||
| OD01-2251 | STBD SIDE FANTAIL FRAME 460-530 | 14 | ||
| ER01-L003 | PIPE BRACKET FOR COUNTER MEASURE WASH DOWN PORT SIDE SUPERSTRUCTURE HOUSE 20 FEET UP ON FR: 138 | 3 | ||
| ELIN A004: PROVIDE LABOR AND MATERIAL TO DELIVER, ERECT, DISMANTLE, AND PICK-UP OF FIXED SCAFFOLDING IN ACCORDANCE WITH THE STATEMENT OF WORK (SOW). MONTHLY RENTAL WITH DIMENSIONS: 3 FT X 10 FT X 6.5 FT. (TOTAL: 63 FIXED SCAFFOLDING FOR 1 MONTH) | 63 | $0.00 | ||
| JSN | LOCATION | EA | UNIT PRICE | EXT PRICE |
| OD01-2250 | PORT SIDE SUPERSTRUCTURE 01 LEVEL UP TO 04 LEVEL FR: 174-245 | 16 | ||
| ELIN A005: PROVIDE LABOR AND MATERIAL TO DELIVER, ERECT, DISMANTLE, AND PICK-UP OF FIXED SCAFFOLDING IN ACCORDANCE WITH THE STATEMENT OF WORK (SOW). MONTHLY RENTAL WITH DIMENSIONS: 3 FT X 10 FT X 19.5 FT. (TOTAL: 16 EA FIXED SCAFFOLDING FOR 1 MONTH) | 16 | $0.00 | ||
| JSN | LOCATION | EA | UNIT PRICE | EXT PRICE |
| OD01-2249 | STBD SIDE SUPERSTRUCTURE 01 LEVEL UP TO 03 LEVEL FR: 180-250 | 12 | ||
| OD01-2250 | PORT SIDE SUPERSTRUCTURE 01 LEVEL UP TO 04 LEVEL FR: 174-245 | 16 | ||
| ER01-L003 | PIPE BRACKET FOR COUNTER MEASURE WASH DOWN PORT SIDE SUPERSTRUCTURE HOUSE 20 FEET UP ON FR: 138 | 1 | ||
| ELIN A006: PROVIDE LABOR AND MATERIAL TO DELIVER, ERECT, DISMANTLE, AND PICK-UP OF FIXED SCAFFOLDING IN ACCORDANCE WITH THE STATEMENT OF WORK (SOW). MONTHLY RENTAL WITH DIMENSIONS: 3 FT X 10 FT X 26 FT. (TOTAL: 29 EA FIXED SCAFFOLDING FOR 1 MONTH) | 29 | $0.00 | ||
| JSN | LOCATION | EA | UNIT PRICE | EXT PRICE |
| OD01-2240 | 01 LEVEL FR: 174-290 FROM DECK EDGE TO WATERLINE | 13 | ||
| OD01-2241 | 01 LEVEL FR: 310-400 BETWEEN YOKOHAMA FENDERS FROM DECK EDGE TO WATERLINE | 9 | ||
| OD01-2242 | 01 LEVEL FR: 510-565 AFT OF BARGE BROW AND WRAPS AROUND THE FAINTAIL FROM DECK EDGE TO WATERLINE | 12 | ||
| OD01-2251 | STBD SIDE FANTAIL FRAME 460-530 | 14 | ||
| ELIN A007: PROVIDE LABOR AND MATERIAL TO DELIVER, ERECT, DISMANTLE, AND PICK-UP OF HANGING SCAFFOLDING IN ACCORDANCE WITH THE STATEMENT OF WORK (SOW). DAILY RENTAL WITH DIMENSIONS: 3 FT X 10 FT X 26 FT. (TOTAL: HANGING SCAFFOLDING FOR 1 DAY) | 48 | $0.00 | ||
| JSN | LOCATION | EA | UNIT PRICE | EXT PRICE |
| OD01-2240 | 01 LEVEL FR: 174-290 FROM DECK EDGE TO WATERLINE | 13 | ||
| OD01-2241 | 01 LEVEL FR: 310-400 BETWEEN YOKOHAMA FENDERS FROM DECK EDGE TO WATERLINE | 9 | ||
| OD01-2242 | 01 LEVEL FR: 510-565 AFT OF BARGE BROW AND WRAPS AROUND THE FAINTAIL FROM DECK EDGE TO WATERLINE | 12 | ||
| OD01-2251 | STBD SIDE FANTAIL FRAME 460-530 | 14 | ||
| ELIN A008: PROVIDE LABOR AND MATERIAL TO DELIVER, ERECT, DISMANTLE, AND PICK-UP OF HANGING SCAFFOLDING IN ACCORDANCE WITH THE STATEMENT OF WORK (SOW). MONTHLY RENTAL WITH DIMENSIONS: 3 FT X 10 FT X 26 FT. (TOTAL: HANGING SCAFFOLDING FOR 1 MONTH) | 48 | $0.00 | ||
| JSN | LOCATION | SF | UNIT PRICE | EXT PRICE |
| OD01-2240 | 01 LEVEL FR: 174-290 FROM DECK EDGE TO WATERLINE | 4030 | ||
| OD01-2241 | 01 LEVEL FR: 310-400 BETWEEN YOKOHAMA FENDERS FROM DECK EDGE TO WATERLINE | 3100 | ||
| OD01-2242 | 01 LEVEL FR: 510-565 AFT OF BARGE BROW AND WRAPS AROUND THE FAINTAIL FROM DECK EDGE TO WATERLINE | 4,340 | ||
| OD01-2249 | STBD SIDE SUPERSTRUCTURE 01 LEVEL UP TO 03 LEVEL FR: 180-250 | 6,080 | ||
| OD01-2250 | PORT SIDE SUPERSTRUCTURE 01 LEVEL UP TO 04 LEVEL FR: 174-245 | 7,600 | ||
| OD01-2251 | STBD SIDE FANTAIL FRAME 460-530 | 5,360 | ||
| ER01-L003 | PIPE BRACKET FOR COUNTER MEASURE WASH DOWN PORT SIDE SUPERSTRUCTURE HOUSE 20 FEET UP ON FR: 138 | 1,100 | ||
| ELIN A009: PROVIDE AND INSTALL POLYETHYLENE SHRINK WRAP TO ENVELOPE SCAFFOLDING IN ACCORDANCE WITH THE STATEMENT OF WORK (SOW). | 31,610 | $0.00 | ||
| JSN | LOCATION | HR | UNIT PRICE | EXT PRICE |
| MANUAL LOADING | 180 | |||
| ELIN A010: PROVIDE LABOR SERVICES IN SUPPORT OF MANUAL LOADING AND UNLOADING OF SCAFFOLDING MATERIALS IN ACCORDANCE WITH THE STATEMENT OF WORK (SOW). | 180 | $0.00 | ||
| JSN | LOCATION | HR | UNIT PRICE | EXT PRICE |
| CRANE | 16 | |||
| ELIN A011: PROVIDE CRANE SERVICES IN SUPPORT OF LOADING AND OFFLOADING SCAFFOLDING MATERIALS IN ACCORDANCE WITH THE STATEMENT OF WORK (SOW). | 16 | $0.00 | ||
| PAUL DAMIAN, SBS | SCOPE TOTAL | $0.00 | ||
| NOTES: | ||||
| 1. KTR to on-load and completely assemble the scaffolding at all locations no later than 20-25 Jun 2015. | ||||
| 2. Ships Force to use the scaffolding for Preservation. | ||||
| 3. KTR to completely dismantle the scaffolding at all locations no later than 20 Jul 2015. | ||||
| QUOTE SUBMITTED BY: | ||||
| NAME/SIGNATURE | ||||
| COMPANY | ||||
| DATE |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .