Attachment 1 USS PASADENA _ Statement of Work _ Pier LPAC and Dessicant Dryer

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Ship: USS Pasadena (SSN-752)

JSN:21413-EMMC-Q962

SOW: 660-11-003

Planner: Rich Dyer

SSP-036-15

COAR: 26-036

1. SCOPE:

1.1 TITLE: Pier LPAC & DESSICANT DRYER; provide 1.2

IDENTIFICATION:

Quantity (One) Each , LPAC (Low Pressure Air Compressor) 400 CFM at 90 psi, (One) Each , Dessicant Air Dryer, Dewpoint -40F, (One) Each, 150 CF Air Reciever, (200) Feet Hoses and fittings 1.3

LOCATION: NAVAL BASE POINT LOMA, SAN DIEGO, CA

2. REFERENCES:

2.1 NAVSEA Standard Items 2.2

JCN EMMC-Q962

3. REQUIREMENTS:

3.1 The USS Pasadena will be entering 5A1/5D1 availability which will span approximately 78 days and will invoke requirements for air layup/drying of the main condensers.

3.2 Provide and maintain as required a Low Pressure Air Compressor capable of supplying 400 CFM at 90 psi as identified in 1.2.

3.2.1 This low pressure air compressor must meet the following specifications:

ELECTRIC COMPRESSOR ( <= .01MG/CU-M OIL IN AIR OUTPUT; Class 1 per ISO 8573), A 150 CU FT AIR RECEIVER WITH SAFETY VALVES, HOSES (200'), AND FITTINGS TO CONNECT THE UNITS. MUST INCLUDE SPARE PARTS, FILTERS, AND MAINTENANCE.

This temporary equipment is critical to continue ships work while in port.

3.3 Provide and maintain as required a dessicant air dryer unit capable of supplying 400 CFM at 90 psi as identified in 1.2.

3.3.1 The desssicant air dryer unit must meet the following specidifications:

DESSICANT AIR DRYER MUST BE ABLE TO PROVIDE OUTPUT OF -40F DEWPOINT.

3.4 Provide and maintain as required a coalescent filter with auto-drain valve to be provided for installation between the air compressor and desiccant dryer, with all necessary fittings/connections/hoses provided.

4. SPECIFICATIONS:

4.1 Each LPAC shall deliver 400 cfm at 90 psi.

4.2 Each LPAC shall be an air cooled rotary screw with safety controls and sound enclosure.

4.3 Each LPAC shall include a 150 cubic foot receiver with safety valves, manual drain and manifold with services valves. Receiver and compressor mounted on a common base.

4.4 Each LPAC shall include a minimum of 200 ft of low pressure hose certified and tested at 125 psi.

4.5 Each LPAC requires a quick disconnect within 10ft of any hatch (Requiring at least one quick disconnect per service line).

4.6 The Low Pressure Air Compressor will have electrical power hook-ups (not to be fuel powered).

4.7 The desiccant air dryer shall provide -40F dewpoint.

4.8 The desiccant air dryer shall provide 400 CFM at 90 psi.

5. NOTES:

5.1 PWC will provide electrical connection to the electrical mount located on pier.

5.2 The contractorr will be responsible for the delivery of the compressor pier side and will also be responsible to hook up the unit inclusive of the mechanical (air/water) lines and associated connection points. The Portsmouth Naval Shipyard (PNS) Detachment San Diego can and will assist as practicable.

5.3 The production schedule requires that the response time for service calls from the contractor be within 60 minutes of any trouble call from PNS Detachment San Diego.

5.4 PNS Detachment San Diego will arrange forklift services as required for unloading and loading of each equipment identified in 1.2.

6. PERIOD OF PERFORMANCE DATES:

6.1 Period of Performance is 21SEPTEMBER2015-07DECEMBER2015