Attachment 1 Specification Package No. SSSd 051-14
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N55236-14-Q-0075_0002.pdf | ||
| 14-Q-0075_AMEND_0001_6_19_2014_8_33_0.pdf | ||
| ATTACHMENT_2-__Request_for_Specification_Clarification_Form.docx | DOCX document | |
| N55236-14-Q-0075.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SAN DIEGO, CALIFORNIA 92136−5205
Southwest Regional Maintenance Center
3755 Brisner St. Suite 4
ASSAULT CRAFT UNIT ONE (ACU−1)
SSSD−051−14SPECIFICATION NUMBER: SSP:
DEPARTMENT OF THE NAVY
SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED
DATE PREPARED
*NO CS DATE*
SHIP: ASSAULT CRAFT UNIT ONE(ACU−1) SSP−051−14
I N D E X
009−01
009−02
009−03
009−04
009−05
009−06
009−07
009−08
009−10
009−18
009−19
009−20
009−21
009−23
009−24
009−29
009−34
009−35
ITEM NO.
07−NOV−13
29−JUL−11
17−JAN−13
07−NOV−13
17−JAN−13
17−JAN−13
17−JAN−13
07−NOV−13
29−JUL−11
17−JAN−13
29−JUL−11
17−JAN−13
29−JUL−11
17−JAN−13
17−JAN−13
29−JUL−04
17−JAN−13
07−NOV−13
DATE
General Criteria; accomplish
Environmental Compliance Reports for Material Usage at
Naval Facilities; provide
Toxic and Hazardous Substances; control
Quality Management System; provide
Temporary Accesses; provide
Maintaining Protection and Cleanliness from Non−Radioactive
Operations; accomplish
Confined Space Entry, Certification, Fire Prevention and
Housekeeping; accomplish
Fire Protection at Contractor’s Facility; accomplish
Shipboard Asbestos−Containing Material (ACM); control
Magnetic Material; control
Provisioning Technical Documentation (PTD); provide
Government Property; control
Logistics and Technical Data; provide
Interferences; remove and install
Authorization, Control, Isolation, Blanking, and Tagging
Requirements; accomplish
Asbestos−Free Pipe Hanger Liner Material; install
Fire Protection of Unmanned Vessels at Contractor’s
Facility; provide
Confined Space Entry, Certification, Fire Prevention
Utilizing Military Fire Watches, and Housekeeping;
accomplish
TITLE
CATEGORY I. FY−14 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE
ITEMS THAT ARE STRUCK OUT ON THIS INDEX DO NOT APPLY TO THIS CONTRACT.
009−39
009−40
009−59
009−60
009−61
009−64
009−65
009−67
009−69
009−70
009−72
009−73
009−74
009−77
009−79
009−80
009−81
009−82
009−83
19−JUL−07
29−JUL−11
29−JUL−11
07−NOV−13
17−JAN−13
29−JUL−11
29−JUL−11
17−JAN−13
07−NOV−13
17−JAN−13
17−JAN−13
07−NOV−13
17−JAN−13
17−JAN−13
29−JUL−11
29−JUL−11
17−JAN−13
29−JUL−11
17−JAN−13
Technical Manual Contract Requirement (TMCR) for New
Technical Manuals for Commercial Equipment/ Component;
provide
Requirements for Contractor Cranes, Multi−Purpose Machines and Material Handling Equipment at Naval Facilities;
accomplish
Organotin Antifouling Material; control
Schedule and Associated Reports for Availabilities Over 9
Weeks in Duration; provide and manage
Shipboard Use of Fluorocarbons; control
Synthetic Fire−Resistant Hydraulic Fluid; control
Polychlorinated Biphenyls (PCBs); control
Integrated Total Ship Testing; manage
Heavy Weather Plan; provide
Confined Space Entry, Certification, Fire Prevention and
Housekeeping for Unmanned Vessels; accomplish
Physical Security at Private Contractor’s Facility;
accomplish
Shipboard Electrical/Electronic/Fiber Optic Cable; remove, relocate, repair, and install
Occupational, Safety and Health Requirements; accomplish
Cofferdam Requirements; accomplish
Government Owned Material (GOM); status reporting
Ship’s Facilities; provide
Compartment Closeout; accomplish
Data Requirements When Installing an Equal Component Vice
Specified Component; provide
Wire Rope Fitting Verification; provide
009−84
009−86
009−87
009−88
009−89
009−93
009−94
009−95
009−97
009−99
009−100
009−101
009−102
009−103
009−106
009−108
009−109
009−110
17−JAN−13
01−AUG−08
17−JAN−13
29−JUL−11
29−JUL−11
17−JAN−13
17−JAN−13
17−JAN−13
17−JAN−13
17−JAN−13
30−JUL−10
17−JAN−13
29−JUL−11
29−JUL−11
17−JAN−13
29−JUL−11
29−JUL−11
29−JUL−11
Accountability of Temporary Fasteners; provide
Recovery of Chlorofluorocarbon (CFC) Refrigerants and Fire
Suppressant Halon (H) Materials; accomplish
Chemical Disinfection Procedures; accomplish
Collection, Holding and Transfer (CHT) and Mogas Tanks, Spaces, and Piping, including Sewage or Mogas−Contaminated
Tanks, Spaces, and Piping; certify
Purchase and Inspection Requirements for Contractor
Furnished Anodes; accomplish
Emergency Planning and Community Right−to−Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide
General Environmental Requirements for Work at Contractor’s
Facility; accomplish
Mechanically Attached Fittings (MAF’s) for Piping Systems;
install
Shipbuilding and Ship Repair Operations National Emission
Standard for Hazardous Air Pollutants (NESHAPS) for Surface
Coating Information; provide
Ship Departure Report; provide
Ship’s Stability Process Control Procedure (PCP); maintain
Requirements for Mooring, Entry to and Departure from
Contractor’s Facility; accomplish
Alteration Verification; provide
Weight and Moment Change Data; provide
Work Authorization Form Coordinator (WAFCOR); provide
Aircraft Carrier Requirements for Mooring, Entry to, Movement within, and Departure from Contractor’s Facility;
accomplish
Special Requirements for Non−SUBSAFE Work on SUBSAFE−
Certified Vessels; accomplish
Special Requirements for Non−Nuclear Work on Nuclear
Vessels; accomplish
009−111
009−112
009−117
009−118
07−NOV−13
29−JUL−11
17−JAN−13
17−JAN−13
Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration; provide and manage
Prevention of Radiographic−Inspection Ionizing−Radiation
Hazards; accomplish
AEGIS Light Off (ALO) Support for AEGIS Weapons Systems
Assessments (AWSA); provide
CG Deck Loading; accomplish
009−09
009−11
009−12
009−13
009−14
009−15
009−16
009−17
009−22
009−25
009−26
009−27
009−28
009−30
009−31
009−32
009−33
009−36
009−37
ITEM NO.
07−NOV−13
17−JAN−13
07−NOV−13
17−JAN−13
17−JAN−13
17−JAN−13
29−JUL−11
07−NOV−13
17−JAN−13
17−JAN−13
17−JAN−13
07−NOV−13
29−JUL−11
29−JUL−11
07−NOV−13
07−NOV−13
29−JUL−11
30−JUL−10
DATE
Process Control Procedure (PCP); provide and accomplish
Insulation and Lagging Requirements; accomplish
Welding, Fabrication, and Inspection Requirements;
accomplish
Meters; repair and certify calibration
Gages and Thermometers; repair and certify calibration
Rotating Machinery; balance
Electronic Equipment; repair
Rotating Electrical Equipment; repair
Shipboard Electric Cable; test
Structural Boundary Test; accomplish
Deck Covering Requirements; accomplish
Material Identification and Control (MIC) for Level I
Systems; accomplish
Cancelled 30 JUL 2010
Boiler Sample Tubes; inspect
Boiler Waterjet Cleaning; accomplish
Cleaning and Painting Requirements; accomplish
Rotating Electrical Equipment; rewind
Controller; repair
General Procedures for Woodwork; accomplish
TITLE
CATEGORY II. FY−14 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK ITEMS OF THIS JOB
ORDER
009−38
009−41
009−42
009−43
009−44
009−45
009−46
009−47
009−48
009−49
009−50
009−51
009−52
009−53
009−54
009−55
009−56
009−57
009−58
009−62
009−63
17−JAN−13
19−JUL−07
19−JUL−07
17−JAN−13
07−NOV−13
29−JUL−11
17−JAN−13
29−JUL−11
29−JUL−11
29−JUL−11
29−JUL−11
17−JAN−13
29−JUL−11
29−JUL−11
30−JUL−10
30−JUL−10
29−JUL−11
17−JAN−13
17−JAN−13
29−JUL−11
29−JUL−11
Boiler, Catapult Accumulator and Reboiler Dry Lay−up;
accomplish
Technical Manual Contract Requirement (TMCR) for a
Topically Structured Technical Manual; provide
Technical Manual Contract Requirement (TMCR) for Updating
Technical Manuals; provide
Light−Off Assessment (LOA) Support for Steam Propulsion
System; provide
Light−Off Assessment (LOA) Support for Gas Turbine
Propulsion System; provide
Tapered Plug Valve; repair
Butterfly Valve, Synthetic and Metal Seated; repair
Gate Valve; repair
Pressure Seal Bonnet Valve; repair (shop)
Pressure Seal Bonnet Valve; repair (in−line)
Horizontal Swing Check Valve; repair
Globe, Globe Angle, and Globe Stop Check Valve; repair
Relief Valve; repair
Bolted Bonnet Steam Valve; repair (shop)
Bolted Bonnet Steam Valve; repair (in−line)
Regulating/Reducing Valve; repair
Main Propulsion Boiler Wet Lay−Up; accomplish
Reduction Gear Security Requirements; accomplish
Pump and Driver Shaft Alignment; accomplish
Boiler Handhole and Manhole Seats and Plates; inspect
Lubricating Oils and Hydraulic Fluids; analyze
009−66
009−68
009−71
009−75
009−76
009−78
009−85
009−90
009−91
009−92
009−96
009−98
009−104
009−105
009−107
009−113
009−114
009−115
009−116
17−JAN−13
29−JUL−11
17−JAN−13
29−JUL−11
29−JUL−11
07−NOV−13
19−JUL−07
07−NOV−13
07−NOV−13
29−JUL−11
29−JUL−11
30−JUL−10
29−JUL−11
17−JAN−13
17−JAN−13
07−NOV−13
07−NOV−13
07−NOV−13
29−JUL−11
Light−Off Assessment (LOA) Support for Diesel Propulsion
System; provide
Bolted Bonnet Valve; repair
Testing Requirements for Piping Systems; accomplish
Circuit Breaker; repair
Waveguide and Transmission Line Temporary Lay−Up, Pressurization, and Purging; accomplish
Passive Countermeasures System (PCMS) Material
Repair/Installation Requirements; accomplish
Government Sponsored Planning Yard/Configuration Data
Manager (CDM) On−Site Representative Facility; provide
Technical Representative; provide
Propeller In−Place Inspection; accomplish
Resilient Mount; remove and install
Ball Valve; repair
Monel Fasteners; inspect
Vibration Testing and Analysis; accomplish
Thermal Sprayed Coatings for Machinery Component Repair;
accomplish
Piping System Cleanliness (Non−Nuclear); accomplish
Rotating Electrical Equipment with Sealed Insulation
Systems (SIS); rewind
Mold Remediation; accomplish
Bearing Rebabbitting; accomplish
Auxiliary and Waste Heat Boiler Sodium Nitrate Wet
Layup; accomplish
077−01−001
167−11−001
233−85−001
437−00−001
512−80−001
530−00−001
575−16−001
575−16−002
584−21−001
593−11−001
611−02−001
624−11−001
ITEM NO.
LCU 1680 Hazardous Waste Produced on Naval Vessels; control
LCU 1680−Watertight Door; repair
LCU 1680−Engine Emergency Shutdown Cable Assembly; repair
LCU 1680 Tank Level Indicating (TLI) System; repair and calibrate
LCU 1680 Ventilation Louver; repair
LCU 1680 Reverse Osmosis Desalination System; groom
LCU 1680 Anchor Cable; repair
LCU 1680 A−Frame Winch Assembly; replace
LCU 1680 Stern Gate; repair
LCU 1680 Crew’s head, shower drains; repair
LCU 1680 Cleat; replace
LCU 1680 Metal Joiner Doors; replace
TITLE______________
ITEM NO: 077−01−0011 of 6
ASSAULT CRAFT UNIT ONE (ACU−1) 077−01−001ITEM NO:
28−051COAR:
NONECMP:
ROSEPLANNER:
SHIP:
PCN: DA80−3010
SCOPE
REFERENCES
REQUIREMENTS
1.
2.
3.
1.2.1
1.3.1
Landing Craft Utility No. 1680
Not Applicable
Location of Work:
Identification:
2.1
2.2
2.3
2.4
Resource Conservation and Recovery Act (RCRA)
Federal Hazardous Materials Transportation Act, 49 U.S.C. 5103
Applicable Hazardous Waste Manifest Form
10 U.S.C. 7311
LCU 1680 Hazardous Waste Produced on Naval Vessels; control
Manage and dispose of all hazardous waste listed in 3.5 in accordance with 2.1 and 2.2.
When a Navy generator number is required by this Work Item, submit the original of 2.3 to the SUPERVISOR for assignment of Environmental
Protection Agency (EPA) or delegated state environmental agency identification number.
Manage and transport for Navy disposal, Navy−generated hazardous waste listed in 3.5 in accordance with 2.1 and 2.2, as designated by the
SUPERVISOR.
Submit one legible copy of 2.3 signed by the owner or operator of the disposal facility to the SUPERVISOR within 48 hours of receipt from owner or
Consider existing interior coatings to be removed by the invoking work items of this contract to contain lead, cadmium and chromium.
1.1
1.2
1.3
Title:
3.1.2.1
3.1.1
3.1.2
3.1.3
3.1
ITEM NO: 077−01−0012 of 6
SHIP:
Complete documentation required by 2.1 and 2.2, using EPA or delegated state environmental agency identification number in accordance with 2.4.
If the contractor, while performing work at a Government facility, cannot obtain a separate generator identification number from the state in which the availability will be performed, the contractor shall notify the SUPERVISOR operator of disposal facility.
Documentation related to hazardous waste generated solely by the physical actions of Ship’s Force or Navy employees (termed Navy−Generated
Hazardous Waste) on board the vessel shall only bear a generator identification number issued to the Navy pursuant to applicable law. The contractor shall obtain SUPERVISOR’S concurrence with the categorization of the waste as Navy− generated before completion of the manifest. The manifest prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.
Documentation related to hazardous waste generated solely by the physical actions of contractor personnel (termed Contractor−Generated Hazardous
Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law. Regardless of the presence of other material in or on the shipboard systems or structure which may have qualified a waste stream as hazardous, where the contractor performs work on a system or structure using materials (whether or not the use of such materials was specified by the Navy) which by themselves would cause the waste from such work to be a hazardous waste, documentation related to such waste shall only bear a generator number issued to the contractor.
Documentation related to hazardous waste generated by the combined physical actions of Navy and contractor personnel (termed Co−Generated
Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law and shall also cite in the remarks block a generator identification number issued to the Navy pursuant to applicable law.
When the contractor merely drains a system and such drainage creates hazardous waste or the contractor performs work on system or structure using materials which by themselves would not cause the waste from such work to be hazardous waste but such work nonetheless creates a hazardous waste, documentation related to such waste shall bear a generator identification number issued to the contractor and shall also cite in the remarks block a generator identification number issued to the Navy. The contractor shall sign the generator certification on the Uniform Hazardous Waste Manifest whenever use of the manifest is required for disposal. The contractor shall obtain SUPERVISOR’s concurrence with the categorization of the wastes as co−generated before completion of the manifest.
Manifests prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.
ASSAULT CRAFT UNIT ONE (ACU−1)
3.2.1
3.2.2
3.2.3
3.2
3.3
ITEM NO: 077−01−0013 of 6 within three business days of receipt of written notification by the state.
After obtaining approval of the SUPERVISOR, the contractor shall use the Navy site generator identification number and insert in the remarks block the contractor generator identification number issued for the site where his main facilities are located.
If, for availabilities at a contractor−owned or controlled facility, the
Navy cannot obtain a separate generator identification number for use at a contractor facility, the Navy shall notify the contractor within three business days of receipt of notification by the state. The contractor shall dispose of hazardous waste in accordance with 2.1, 2.2, and 3.2.3.
Hazardous waste, as identified in 2.1, expected to be produced during performance of this Job Order:
AMOUNT
TYPE NAVY CO−GENERATED CONTRACTOR
Asbestos Insulation material
Acid Solutions (may include _____ ____________ __________ spent sulfamic, citric, chromic, nitric, sulfuric, hydrochloric, etc.)
Ethylene Glycol (Antifreeze) _____ ____________
Sodium Hydroxide _____ ____________ __________
Cleaning Solvents _____ ____________ 1 gallons
Sodium Phosphates (Tri, Bi, _____ ____________ __________ or Mono)
Fluorocarbons _____ ____________ __________
Morpholine _____ ____________ __________
Sodium Chromates _____ ____________ __________
Hydrazine _____ ____________ __________
Methyl Ethyl Ketone _____ ____________ __________
Spent Abrasive Blast Material _____ ____________
(contaminated with a known hazardous waste)
ASSAULT CRAFT UNIT ONE (ACU−1)
3.4
3.5
ITEM NO: 077−01−0014 of 6
Trichloroethane _____ ____________ __________
Miscellaneous Chemicals _____ ____________ __________
(Ignitable)
Miscellaneous Chemicals _____ ____________ __________
(Corrosive)
Miscellaneous Chemicals _____ ____________ __________
(TCLP Toxic)
Miscellaneous Chemicals _____ ____________ __________
(Reactive)
Oil (Synthetic), _____ ____________ 2 gallons including hydraulic fluid
Paints (Enamel, Latex, _____ ____________ 5 gallons
Epoxy, thinners, oil based, rubber paint, non−skid, lacquer, remover, varnishes)
Paints (May include lead, _____ ____________ 2 pounds cadmium, or chrome)
Paint Strippers (phenols, _____ ____________ ______ lead, chromium)
Paint Chips _____ ____________ 1/2 pounds
Sludge (Contaminated with _____ ____________ 304 gallons a known hazardous waste)
Diesel Fuel _____ ____________
Contaminated oil, water, steam skeg & kort nozzle presevative (cosmoline) ____________
Notify the SUPERVISOR at least one working day prior to shipment of hazardous waste for disposal.
Submit one legible copy, in hard copy or electronic media, of a report identifying type, amount, and disposal cost of waste listed in 3.5 that was removed during the performance of this Job Order to the SUPERVISOR.
The report shall include analysis or other method used to
ASSAULT CRAFT UNIT ONE (ACU−1)
3.7.1
3.6
3.7
ITEM NO: 077−01−0015 of 6
NOTES4.
Nothing contained in this Work Item shall relieve the contractor from complying with applicable federal, state, and local laws, codes, ordinances, and regulations, including the obtaining of licenses and permits in connection with hazardous waste handling and disposal in the performance of this contract.
The waste listed in 3.5 is based on the best information available at the time of preparation of the solicitation. Hazardous waste generated during the actual performance of the work may vary in type or amount from waste listed in 3.5 which may result in renegotiation for credit or increase pursuant to
Paragraph (b) of 2.4. The contractor is expected to use best management practice to identify and dispose of all hazardous waste. Some of the substances listed in
3.5 may be neutralized, recycled, or otherwise removed from the requirements of
Subtitle C of 2.1. Inclusion of these substances in the waste listed in 3.5 does not preclude the contractor from taking action consistent with 2.1 to reduce or eliminate the hazardous constituents of any waste required to be disposed of under the contract in accordance with 2.2. Processes that add hazardous constituents to the bilges may require that bilge water be disposed of as a hazardous waste.
Hazardous wastes are determined by one or more of the following methods:
identify the waste and state whether each listed waste was hazardous (with generator assignment), non−hazardous, or did not exist.
The contractor shall make an effort to minimize hazardous waste generation by reducing the volume or toxicity by neutralizing, recycling, or otherwise removing it from the requirements of Subtitle C of 2.1 and include a description of such efforts in the report.
The types and amounts of wastes listed in 3.5 are estimates of waste to be disposed of under this contract as required by 2.4. They are not estimates of the amount of the work involved in generating that waste. The work requirements of each individual Work Item specify the actual work to be accomplished.
Chemical analysis which shows that the material characteristics of ignitability, corrosivity, reactivity, and/or toxicity (Toxicity
Characteristic Leachate Procedure − TCLP) exceed the limits for that material in
40 CFR 261.20 Subpart C.
Reference to a Material Safety Data Sheet (MSDS), or
Chemical analysis shall be accomplished by laboratories with state or EPA approved quality assurance programs.
3.7.1.1
3.7.2
4.1.1
4.2.1
4.2.2
3.8
4.1
4.2
ITEM NO: 077−01−0016 of 6
GOVERNMENT FURNISHED MATERIAL (GFM)5.
5.1
5.2
5.3
Asbestos, bilge water, oil/water including sludge, debris and other contaminants, sludge which includes solids and sludge from ballast tanks, CHT tanks, voids, oily waste tanks, fuel ballast tanks, fuel oil tanks, skegs (West coast), PCB’s (Maryland), etc., apply only in those states listing them as hazardous waste. When an availability is to be performed in a state where these items are hazardous waste, an estimate of the amount to be generated shall be included in 3.5.
Applying knowledge of the hazardous characteristics of the waste in light of the materials or the process used.
1. None.
1. None.
1. None.
LLTM
PUSH MATERIAL
KITTED MATERIAL
4.2.3
4.3
ITEM NO: 167−11−0011 of 2
ASSAULT CRAFT UNIT ONE (ACU−1) 167−11−001ITEM NO:
28−051COAR:
NONECMP:
ROSEPLANNER:
SHIP:
PCN: DA80−3002
SCOPE
REFERENCES
REQUIREMENTS
1.
2.
3.
1.2.1
1.3.1
Damage Control locker (1−4−1−A)
Quantity (One EA), Door (1−4−1−A), 27 5/8 Inch by 46 5/8 Inch, Individual dog, 6 Dog, Left Hand steel
Location of Work:
Identification:
2.1
2.2
2.3
2.4
Standard Items
6258997 Rev D, Hull Structural & Non Structural Closures
605−2540769 Rev D, Label Plate Standards
803−6397268, NAVSEA Standard Drawing
LCU 1680−Watertight Door; repair
Remove existing, overhaul, and install watertight door listed in 1.3 and located in 1.2, including associated door gasket, dogging mechanism, in accordance with 2.4.
Accomplish the requirements of 009−12 of 2.1, including Table 2, Column
A, Lines One through 7.
Accomplish the requirements of 009−32 of 2.1, including Table 2, Line
One, Column A, for the near−white blast clean NACE 2 SSPC−SP−10 for the surface preparation of the door panel assembly prior installation of powder coating.
Chip and grind surfaces flush in a way of removals.
Remove deteriorated 5 square feet of door plating and install New plating.
1.1
3.1.1
3.1.2
3.1
ITEM NO: 167−11−0012 of 2
NOTES
GOVERNMENT FURNISHED MATERIAL (GFM)
4.
5.
5.1
5.2
5.3
(V)(G) "CHALK TEST"
(I)(G) "AIR TEST"
(V)(G) "OPERATIONAL TEST"
Lubricate exposed working parts, using general purpose grease conforming to MIL−PRF−24139.
Apply zinc dust−petrolatum antiseize compound conforming to commercial specification A−A59313 to all fastener threads.
Adjust the dogs, hinges, and wedges for positive dogging action.
Accomplish a chalk test on watertight door installed in 3.2. Chalk imprint shall be centered with 100 percent contact.
Accomplish the requirements of 009−25 of 2.1 for the local air test of watertight door installed in 3.2. Allowable leakage: None.
Accomplish an operational test of watertight door installed. Open and close door through four complete cycles. Allowable sticking or binding: None.
Accomplish the requirements of 009−32 of 2.1 for new and disturbed.
Powder coat shall be haze gray in color and conforming to MIL−
PRF− 24712.
1. None.
1. None.
1. None.
LLTM
PUSH MATERIAL
KITTED MATERIAL
3.3.1
3.4
3.5
3.6
3.7
3.8
3.9
3.10
ITEM NO: 233−85−0011 of 2
ASSAULT CRAFT UNIT ONE (ACU−1) 233−85−001ITEM NO:
28−051COAR:
NONECMP:
ROSEPLANNER:
SHIP:
PCN: DA80−3005
SCOPE
REFERENCES
REQUIREMENTS
1.
2.
3.
1.2.1
1.2.2
1.2.3
1.3.1
1.3.2
1.3.3
FWD Engine Room, SSDG, MPDE (2−50−0−E)
AFT Engine Room, SSDG, MPDE (2−56−0−E)
Anchor Engine (2−63−0−Q)
Quantity (2 EA ), FWD SSDGE Emergency shutdown Cable Assemblies
(including Pull Handle, Brackets, Stuffing Tubes, Label Plates, and Mounting Plates),MPDE Emergency shutdown cable assemblies including pull handle, brackets, stuffing tubes, label plates, and mounting plates.
Quantity (2 EA), AFT SSDGE Emergency shutdown Cable Assemblies
(including Pull Handle, Brackets, Stuffing Tubes, and Mounting
Plates), MPDE Emergency shutdown cable including assemblies pull handle, brackets, stuffing tubes, and mounting plates
Quantity (One EA), Anchor emergency shutdown cable, including pull handle, brackets
Location of Work:
Identification:
2.1
2.2
2.3
Standard Items
252−6258922 Rev C, Main & Generator Engine Control
0961−LP−009−8010 Rev ONE, Service Manual Model 3151 Diesel Generator
Set 40 KW, 225/450 Volts A. C.
LCU 1680−Engine Emergency Shutdown Cable Assembly; repair
Remove existing and install new including each brackets, housings, stuffing tubes, attachments, and pull cable located in 1.2, identified in 1.3, 1.1
1.2
1.3
ITEM NO: 233−85−0012 of 2
NOTES
GOVERNMENT FURNISHED MATERIAL (GFM)
4.
5.
5.1
5.2
5.3
(V)(G) "OPERATIONAL TEST"
using 2.2 and 2.3 for guidance.
Accomplish the requirements of 009−12 of 2.1, including Table 2 Column
A, Line One through 7.
Accomplish an operational test of each FWD and AFT SSDGE, MPDE and
Anchor emergency shutdown cable assemblies for a minimum of five (5) cycles to ensure proper operation in accordance with Test Notes of 2.2.
Accomplish the requirements of 009−32 of 2.1 for new and disturbed surfaces.
None.
Verify each emergency shutdown cable assembly operates smoothly, without binding and sticking. Ensure valve position indicator reflects the actual valve position (open and shut).
Submit one legible copy, in hard copy or electronic media, of a report listing results of the requirements of 3.3 to the SUPERVISOR.
1. None.
1. None.
1. None.
LLTM
PUSH MATERIAL
KITTED MATERIAL
3.3.2
3.2
3.3
ITEM NO: 437−00−0011 of 2
ASSAULT CRAFT UNIT ONE (ACU−1) 437−00−001ITEM NO:
28−051COAR:
NONECMP:
ROSEPLANNER:
SHIP:
PCN: DA80−3009
SCOPE
REFERENCES
REQUIREMENTS
1.
2.
3.
1.2.1
1.2.2
1.2.3
1.2.4
1.2.5
1.3.1
Port Fuel Tank (1−51−1−Q)
Starboard Fuel Tank (1−51−1−Q)
Ballast Tank (2−56−0−E)
Ballast Tank (2−56−0−E)
Ballast Tank (2−56−0−E)
Quantity (5 EA), Tank Level Indicating (TLI) System and
Associated Equipment and Components:
Location of Work:
Identification:
2.1
2.2
2.3
Standard Items
6258876, Tank Capacity
6258891, Cables
LCU 1680 Tank Level Indicating (TLI) System; repair and calibrate
Accomplish the requirements of 009−14 of 2.1, for an on board calibration of the TLI listed in 1.2.1 through 1.2.5, using 2.2 for guidance.
Align, adjust and calibrate the Tank Level Indicating (TLI) System for each tank listed in 1.3.
Submit one legible copy, in hard copy or electronic media, of a report listing discrepancies found to the SUPERVISOR.
Affix a calibration label denoting the name and location of the
1.1
3.2.1
3.2.2
ITEM NO: 437−00−0012 of 2
NOTES
GOVERNMENT FURNISHED MATERIAL (GFM)
4.
5.
5.1
5.2
5.3
(V)(G) "OPERATIONAL TEST"
Accomplish the requirements of 009−22 of 2.1, for each TLI system including electrical cabling, listed in 1.2.
Accomplish an operational testing to each TLI listed in 1.2.1 through
1.2.5 for proper operation, in accordance with 3.1.
Accomplish the requirements of 009−32 of 2.1 for the new and disturbed surfaces.
None. The part number for TLI cable OEM GEMF 149584 calibration facility, date of calibration and due date of next calibration to the face of each Tank Level Indicating (TLI) indicator.
Remove existing damage TLI cable and install new using 2.3, for guidance.
1. None.
1. None.
1. None.
LLTM
PUSH MATERIAL
KITTED MATERIAL
3.3
3.4
ITEM NO: 512−80−0011 of 2
ASSAULT CRAFT UNIT ONE (ACU−1) 512−80−001ITEM NO:
28−051COAR:
NONECMP:
ROSEPLANNER:
SHIP:
PCN: DA80−3007
SCOPE
REFERENCES
REQUIREMENTS
1.
2.
3.
1.2.1
1.2.2
1.3.1
Fwd and Aft Engine Room lovers (2 ea),covers ( 2 ea), frame 2
(ea), and screen ( 2 ea) located in frame 56 , frame 50
Fwd and Aft Engine room Exhaust vent louver (2 ea), cover (2 ea), frame (2 ea), and screen (2 ea) located in frame 53, and frame 58
Not Applicable
Location of Work:
Identification:
2.1
2.2
Standard Items
513− 6258947 Rev C, Ventilation System and Arrangement Details
LCU 1680 Ventilation Louver; repair
Remove louvers, covers, frame, and screen for each equipment located in
1.2.1, and 1.2.2, using 2.2 for guidance.
Remove existing broken fasteners, chase, tap plenum cover, and louver exposed threaded areas.
Template from existing and fabricate 4 each screen, cover, and frame removed in 3.1.
Accomplish the requirements of 009−32 of 2.1, including Table 2, Line One, Column A, for the near−white blast clean NACE 2 SSPC−SP−10 to each equipment removed in 3.1 prior application of powder coat.
Powder coat shall be black in color for each louver, screen haze gray for each cover and frame, and shall conform to MIL−PRF−24712.
1.1
3.1.1
3.1.2
ITEM NO: 512−80−0012 of 2
NOTES
GOVERNMENT FURNISHED MATERIAL (GFM)
4.
5.
5.1
5.2
5.3
(V)(G) "OPERATIONAL TEST"
Remove high spots, burrs, abrasion, nicks, corrosion, gasket material, and foreign matter from exposed plenum cover and louver matting surfaces.
Reinstall each louver, cover, frame, and screen, using new gaskets and new CRES fasteners, using 2.2 for guidance.
Conduct an operational test verifying each cover can be dogged in open and closed positions with no sticking, binding or misalignment allowed.
Accomplish the requirements of 009−32 of 2.1 for new and disturbed surfaces.
Install and adjust each dogging mechanism for open and close position, for proper operation and to obtain 100 percent centered contact of knife edge to gasket.
Remove existing and install new, 4 each plenum cover open position securing pins with lanyard, using 2.2 for guidance.
Verify that cover can be secure in open position and proper fit of securing devices.
1. None.
1. None.
1. None.
LLTM
PUSH MATERIAL
KITTED MATERIAL
3.5.2.1
3.5.1
3.5.2
3.3
3.4
ITEM NO: 530−00−0011 of 2
ASSAULT CRAFT UNIT ONE (ACU−1) 530−00−001ITEM NO:
28−051COAR:
NONECMP:
ROSEPLANNER:
SHIP:
PCN: DA80−3000
SCOPE
REFERENCES
REQUIREMENTS
NOTES
GOVERNMENT FURNISHED MATERIAL (GFM)
1.
2.
3.
4.
5.
1.2.1
1.3.1
Aft Supply Room (2−40−0−A)
Quantity (One); Reverse Osmosis Desalination System, Mfr: Sea
Recovery, Aqua Flame Series, SRC 800 AF/NSWC
5.1
Location of Work:
Identification:
2.1
2.2
2.3
Standard Items
OWNER’S MANUAL, Sea Recovery Aqua Whisper II 450−1800
NAVSEA S6430−AE−TED−010, Technical Directive for Piping Devices, Flexible Hose Assemblies.
LCU 1680 Reverse Osmosis Desalination System; groom
Accomplish the requirements of 009−90 of 2.1, open
Accomplish the requirements of 009−32 of 2.1 for new and disturbed surfaces to match surrounding areas.
Provide the services of a qualified on−site Technical
Representative to inspect, and test of the equipment located in 1.2.1, using manufacturer’s technical manual, 2.2 as guidance.
Submit one legible copy, in hard copy or electronic media, of a report listing results of the requirements of 3.1.1 to the SUPERVISOR.
LLTM:
1.1
3.1.2
ITEM NO: 530−00−0012 of 2
5.2
5.3
1. None.
1. None.
1. None.
PUSH MATERIAL
KITTED MATERIAL
ITEM NO: 575−16−0011 of 3
ASSAULT CRAFT UNIT ONE (ACU−1) 575−16−001ITEM NO:
28−051COAR:
NONECMP:
ROSEPLANNER:
SHIP:
PCN: DA80−3008
SCOPE
REFERENCES
REQUIREMENTS
1.
2.
3.
1.2.1
1.3.1
Anchor Winch Room
Quantity (One EA) Anchor Cable
Location of Work:
Identification:
2.1
2.2
2.3
2.4
Standard Items
556−6258942 Rev D, Central and Misc. Hydraulic System Diagrams
Arrangement and Details
580− 6258983 Rev C, Anchor Handling Arrangements and Details
S9086−UU−STM−010/CH−613R3, Wire and Fiber Rope and Rigging
LCU 1680 Anchor Cable; repair
Remove existing anchor cable listed in 1.3, and located in 1.2, using
2.2 through 2.4 for guidance.
Remove existing grease, inspect anchor cable for strain, and markings.
Submit one legible copy, in hard copy and electronic media report listing the results 3.1.1, results to the SUPERVISIOR, within 24 hours after the inspection have been completed.
Lubricate anchor cable with new grease after completion of the requirements, install anchor cable using 2.2, through 2.4 for guidance.
Mark the wire rope using paint conforming to MIL−PRF−24763 in the following manner;
1.1
3.1.2
3.1.3
3.1.4
ITEM NO: 575−16−0012 of 3
NOTES
GOVERNMENT FURNISHED MATERIAL(GFM)
4.
5.
5.1
5.2
(V) (G) "OPERATIONAL TEST"
(V)(G) "VISUAL"
Raise and lower the anchor through three cycles, ensuring there is the correct tension on cable, no binding, erratic operation or improper completion of anchor cable.
Accomplish the requirements of 009−32 of 2.1 for new and disturbed surfaces.
Unclog Mud Box Drain piping, to allow for free flowing ability of drain piping.
From the anchor socket extending 20 linear feet, soild white
At the end of 100 linear feet from the anchor socket, one yellow stripe 6 inches wide.
At the end of 200 linear feet from the anchor socket, 2 yellow stripes 6 inches long separated by a 6 inch space.
At the end of 300 linear feet from the anchor socket, 3 yellow stripes 6 inches long by two 6 inch spaces.
At the end of 400 linear feet from the anchor socket, 4 yellow stripes 6 inches long separated by three 6 inch spaces.
At the end of 500 linear feet from the anchor socket, One white stripe 6 inches long.
At the end of 600 linear feet from the anchor socket, 2 white stripes 6 inches long separated by one 6 inch space.
At the end of 700 linear feet from the anchor socket, 3 white stripes 6 inches long separated b two 6 inch spaces.
At the end of 800 linear feet from the anchor socket extending to 900 feet solid white.
1. None.
LLTM
PUSH MATERIAL
ASSAULT CRAFT UNIT ONE (ACU−1)
3.1.4.1
3.1.4.2
3.1.4.3
3.1.4.4
3.1.4.5
3.1.4.6
3.1.4.7
3.1.4.8
3.1.4.9
3.2
ITEM NO: 575−16−0013 of 3
5.3
1. None.
1. None.
KITTED MATERIAL :
ITEM NO: 575−16−0021 of 2
ASSAULT CRAFT UNIT ONE (ACU−1) 575−16−002ITEM NO:
28−051COAR:
NONECMP:
ROSEPLANNER:
SHIP:
PCN: DA80−3001
SCOPE
REFERENCES
REQUIREMENTS
1.
2.
3.
1.2.1
1.2.2
1.3.1
1.3.2
A Frame Winch Main Deck Frame 67
Anchor Winch Room (2−62−20−Q)
Quantity (One EA), Anchor A−Frame Winch model Bloom winch 10−C−
S8−40
Quantity (2 Ea) Hydraulic hoses
Location of Work:
Identification:
(V) (G) "OPERATIONAL TEST"
2.1
2.2
2.3
2.4
Standard Items
556−6258942 Rev D, Central and Misc. Hydraulic System Diagrams
Arrangement and Details
580−6258983 Rev C, Anchor Handling Arrangements and Details
S9086−UU−STM−010/CH−613R3, Wire and Fiber Rope and Rigging
LCU 1680 A−Frame Winch Assembly; replace
Remove existing and install new A−frame winch, each hydraulic hoses, and winch wire listed in 1.3 and located in 1.2 in accordance with 2.2 through 2.4.
Fit and install new A−frame mounting CRES fasteners.
Install New anchor winch wire shall be certified to above maximum capacity of equipment listed in 1.3.
Lubricate/slush grease wire rope using 2.4 for guidance.
1.1
3.1.1
3.1.2
ITEM NO: 575−16−0022 of 2
NOTES
GOVERNMENT FURNISHED MATERIAL(GFM)
4.
5.
5.1
5.2
5.3
Accomplish an operational test of the new A−Frame winch assembly using
2.3 for guidance. Inspect A−Frame winch assembly for any functional problems.
Winch shall operate smoothly with no binding or hard spot when operating.
Submit one legible copy, in hard copy or electronic media, of a report warranty for the new winch assembly to the SUPERVISOR.
Accomplish the requirements of 009−32 of 2.1 for new and disturbed surfaces.
1. None.
1. None.
1. None.
LLTM
PUSH MATERIAL
KITTED MATERIAL
ASSAULT CRAFT UNIT ONE (ACU−1)
3.2
ITEM NO: 584−21−0011 of 2
ASSAULT CRAFT UNIT ONE (ACU−1) 584−21−001ITEM NO:
28−051COAR:
NONECMP:
ROSEPLANNER:
SHIP:
PCN: DA80−3011
SCOPE
REFERENCES
REQUIREMENTS
1.
2.
3.
1.2.1
1.3.1
1.3.2
Fantail
Quantity (2 EA), Hydraulic cylinder 2.50BB2HCTS14AX33.00
Quantity (4 ea), Hydraulic hoses
Location of Work:
Identification:
(V)(G) "VISUAL INSPECTION"
2.1
2.2
2.3
2.4
2.5
Standard Items
LAR 135−LCU−0925A, LCU Stern Gate Hydraulic System Upgrade
S6530−AE−TED−010, Technical Directive for Piping Devices, Flexible
Hose Assemblies
S9086−S4−STM−010/CH−556 Rev 4, Hydraulic Equipment
169−6258981 Rev E, Stern Gate arrangement
LCU 1680 Stern Gate; repair
Conduct a visual inspection of stern gate hydraulic cylinders piston travel operations attachment points, using 2.2, through 2.5 for guidance.
Remove and dispose of fluids to accomplish the requirements of this work item.
Remove existing and install new each hydraulic cylinder, hose, control valve, fitting, including deteriorated brackets, fasteners, and associated
Submit one legible copy, in hard copy or electronic media, reporting the results of operational, and visual test requirements.
1.1
3.1
ITEM NO: 584−21−0012 of 2
NOTES
GOVERNMENT FURNISHED MATERIAL (GFM)
4.
5.
5.1
5.2
5.3
(I)(G) "OPERATIONAL TEST"
components using 2.2, through 2.5 for guidance.
Accomplish the requirements of 2.3, for each flex hose fabrication, shop testing, label plate, and installation.
Accomplish the requirements of 009−12 of 2.1, including Table 2, Column
A, Lines One through 7.
Accomplish an operational test of the stern gate entire hydraulic system raising and lowering the stern gate three times, ensuring no erratic operation, no leak in the hydraulic system, free movement of each cylinder and satisfactory operation of each hydraulic valve replaced in 3.2.
Accomplish the requirements of 009−32 of 2.1 for new and disturbed surfaces.
None.
Each item install use new CRES hose fittings, and fasteners.
Install a stamped metal tag, QQ−S−766, Class 302, conforming to
MIL−P−15024, style IV, type J, indicating the quarter and year installed, and the quarter and year when retesting is requiring on each flexible hose.
1. None.
1. None.
1. None.
LLTM
PUSH MATERIAL
KITTED MATERIAL
3.4.1
3.4
3.5
3.6
ITEM NO: 593−11−0011 of 2
ASSAULT CRAFT UNIT ONE (ACU−1) 593−11−001ITEM NO:
28−051COAR:
NONECMP:
ROSEPLANNER:
SHIP:
PCN: DA80−3003
SCOPE
REFERENCES
REQUIREMENTS
1.
2.
3.
1.2.1 Crews Head (2−29−3−L)
Location of Work:
Identification:
2.1
2.2
2.3
Standard Items
MIL−STD−777, Schedule of Piping, Valves, Fittings, and Associated
Piping Components for Naval Surface Ships
530−6258931 Rev −, Fresh water service system diagram, arrangement and details
LCU 1680 Crew’s head, shower drains; repair
Remove existing and install new each shower faucet, valve, shower head, plumbing fixture, cable, light fixture high level switch, stainless steel sheeting, piping, brackets, spray nozzle, mixing valve, d− rings,sliding door shower curtain, drainiage valve, and fittings located in 1.2, using 2.2 and 2.3 for guidance.
Accomplish the requirements of 009−32 od 2.1, including Table 3 Line 4.
Accomplish the requirements of 009−26 of 2.1, including attachment C for installation of cosmetic polymeric deck covering system, in shower stall.
Replace existing with new CRES material including fasteners, small drying area of the shower in its entirety.
Restore retained piping flange mating surfaces exposed by disassembly of piping system. Repair by removing high spots, burrs, abrasions, and foreign matter, where removal can be accomplished by hand tools. Take precautions to maintain phonographic finish on flanges that have it.
1.1
3.1.2
3.1
ITEM NO: 593−11−0012 of 2
NOTES
GOVERNMENT FURNISHED MATERIAL (GFM)
4.
5.
5.1
5.2
5.3
(V)(G) "OPERATIONAL TEST"
Accomplish the requirements of 009−12 of 2.1, including Table One, Column A, Lines One through 7.
Accomplish the requipments of 009−16 of 2.1, overhaul light electrical box.
Accomplish the requirements of 009−71 of 2.1 for new and disturbed piping.
Accomplish an operational test of the new equipment installed in 3.1 under normal operating conditions. Allowable leakage: None.
Accomplish the requirements of 009−32 of 2.1 for new and disturbed surfaces.
Restore retained piping flange mating surface exposed
1. None.
1. None.
1. None.
LLTM
PUSH MATERIAL
KITTED MATERIAL
3.6.1
3.4
3.5
3.6
3.8
ITEM NO: 611−02−0011 of 2
ASSAULT CRAFT UNIT ONE (ACU−1) 611−02−001ITEM NO:
28−051COAR:
NONECMP:
ROSEPLANNER:
SHIP:
PCN: DA80−3006
SCOPE
REFERENCES
REQUIREMENTS
1.
2.
3.
1.2.1
1.3.1
Mooring Station Port side Frame 26
Quantity (One Each) 12 inch Horn Cleat, Material: Steel
Location of Work:
Identification:
(V)(G) "VISUAL INSPECTION"
(V)(G) "NON − DESTRUCTIVE"
2.1
2.2
2.3
2.4
2.5
Standard Items
MIL STD 1689, Fabrication, welding and Inspection of ship structure
804−2276338, Cleats − Welded Horn Type
611−6258990 Rev B, Hull Fitting Arrangement and Detail
S9AAO−AB−GOS−010, General Specification for overhaul, chapter 582 mooring and towing system
LCU 1680 Cleat; replace
Accomplish a visual inspection for structual integrity, deterioration, pitting, crack, and areas for damage in location listed in 1.2.
Install a new 18 inch cast steel cleat and associated chocks located in
1.2, using 2.2 through 2.5, for guidance.
Submit one legible copy, in hard copy or electronic media, of a report listing results of the requirements.
Chip and grind surfaces flush and smooth in way of installlation.
1.1
3.2.1
ITEM NO: 611−02−0012 of 2
NOTES
GOVERNMENT FURNISHED MATERIAL (GFM)
4.
5.
5.1
5.2
5.3
Accomplish the requirements of 009−12 of 2.1, including Table 2, Column
A, Lines One through 7 and 11.
Accomplish the requirements of 009−32 of 2.1, for new and disturbed surfaces to match surrounding areas.
None.
1. None.
1. None.
1. None.
LLTM
PUSH MATERIAL
KITTED MATERIAL
ASSAULT CRAFT UNIT ONE (ACU−1)
3.3
ITEM NO: 624−11−0011 of 3
ASSAULT CRAFT UNIT ONE (ACU−1) 624−11−001ITEM NO:
28−051COAR:
NONECMP:
ROSEPLANNER:
SHIP:
PCN: DA80−3004
SCOPE
REFERENCES
REQUIREMENTS
1.
2.
3.
1.2.1
1.2.2
1.2.3
1.2.4
1.2.5
1.3.1
1.3.2
1.3.3
1.3.4
1.3.5
State room (2−37−3)
Pilot House to Crew Berthing ( 1−33−1)
Pilot House to Galley (1−35−1)
Galley to Head (1−44−1)
Head to the Passage way (1−48−1−A)
Quantity ( One EA), Door (2−33−1), 27 5/8 inch by 66 3/4 inch sliding door left hand
Quantity (One EA), Door (1−33−1−Q), 27 Inch by 66 7/8 inch, and half, sliding door left hand.
Quantity (One EA), Door (1−35−1), 27 Inch by 66 1/2 inch sliding door left hand.
Quantity (One EA), Door (1−43−0−L), 27 3/4 inch by 68 inch sliding door left hand.
Quantity (One EA), door (1−33−1−Q) 27 1/2 inch by 67 inch sliding door right hand.
Location of Work:
Identification:
2.1
2.2
Standard Items
804−5959320, Doors, Joiner, Metal
LCU 1680 Metal Joiner Doors; replace
1.1
1.2
ITEM NO: 624−11−0012 of 3
Remove, repair, existing, and install (5 EA) metal joiner doors with associated frames, hull plating, stiffeners and hardwares located in 1.2, and identified in 1.3, in accordance with 2.2.
Accomplish the requirements of 009−12 of 2.1, including Table 2, Column
A, Line One through 7.
Accomplish the requirements of 009−32 of 2.1, including Table 2, Line
One, Column A, for the near−white blast clean NACE 2/ SSPC−SP−10 for the surface preparation of the door panel assembly prior installation of powder coating.
Accomplish the requirements of 009−32 of 2.1, including Table 2, Line
One, Columns B, C, and G to the new door frame assembly listed in 1.3, after
"hot" work of new door frame installed is completed.
Accomplish operational tests for each new metal joiner doors, one through 4 complete cycles verifying a smooth operation from interior and exterior
Ensure each door lock mechanism is flush.
Chip and grind surfaces flush and smooth in way of new installation.
The doors shall be the same size, type, swing and style as those removed.
Modify the bulkhead opening to accomodate the installation of the new doors and frames.
Powder coat shall be haze gray in color and conforming to MIL
PFR−24712.
Mask−off and protect door edge, and threaded prior to surface prepartion and preservation.
Ensure new doors open, close and lock freely.
Remove, existing and install new 5 each door stops with rubber tipped metal bumper including combination hook−on and hook holder.
Install new door hook and door stop on each door.
(V) (G) "OPERATIONAL TEST"
Remove protection installed in 3.4.1, upon completion of surface preparation and preservation operations.
Attach new rubber tipped metal bumper in a location to strike the door in an area backed by door framing.
3.4.1.1
3.4.3.1
3.1.1
3.1.2
3.1.3
3.1.4
3.3.1
3.4.1
3.4.2
3.4.3
3.4.4
3.1
3.2
3.3
ITEM NO: 624−11−0013 of 3
NOTES
GOVERNMENT FURNISHED MATERIAL (GFM)
4.
5.
5.1
5.2
5.3 sides. There shall be no evidence of sticking or binding.
Accomplish the requirements of 009−32 of 2.1 for the new and disturbed surfaces.
None.
1. None.
1. None.
1. None.
LLTM
PUSH MATERIAL
KITTED MATERIAL
ASSAULT CRAFT UNIT ONE (ACU−1)
File details come from the government source that posted it. Updated .