LCU_1680_SSP_051-14_SPEC.pdf

PDF 73 KB Posted

Attached to
LCU 1680 Continuous Maintenance Availability Federal contract opportunity
Solicitation number
N5523614Q0075
Issued by
Department of the Navy Naval Sea Systems Command

About this file

Attachment 1 Specification Package No. SSSd 051-14

View the file

Other files for this federal contract opportunity

Other files attached to LCU 1680 Continuous Maintenance Availability, newest first.
File Type Posted
N55236-14-Q-0075_0002.pdf PDF
14-Q-0075_AMEND_0001_6_19_2014_8_33_0.pdf PDF
ATTACHMENT_2-__Request_for_Specification_Clarification_Form.docx DOCX document
N55236-14-Q-0075.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SAN DIEGO, CALIFORNIA 92136−5205

Southwest Regional Maintenance Center

3755 Brisner St. Suite 4

ASSAULT CRAFT UNIT ONE (ACU−1)

SSSD−051−14SPECIFICATION NUMBER: SSP:

DEPARTMENT OF THE NAVY

SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED

DATE PREPARED

*NO CS DATE*

SHIP: ASSAULT CRAFT UNIT ONE(ACU−1) SSP−051−14

I N D E X

009−01

009−02

009−03

009−04

009−05

009−06

009−07

009−08

009−10

009−18

009−19

009−20

009−21

009−23

009−24

009−29

009−34

009−35

ITEM NO.

07−NOV−13

29−JUL−11

17−JAN−13

07−NOV−13

17−JAN−13

17−JAN−13

17−JAN−13

07−NOV−13

29−JUL−11

17−JAN−13

29−JUL−11

17−JAN−13

29−JUL−11

17−JAN−13

17−JAN−13

29−JUL−04

17−JAN−13

07−NOV−13

DATE

General Criteria; accomplish

Environmental Compliance Reports for Material Usage at

Naval Facilities; provide

Toxic and Hazardous Substances; control

Quality Management System; provide

Temporary Accesses; provide

Maintaining Protection and Cleanliness from Non−Radioactive

Operations; accomplish

Confined Space Entry, Certification, Fire Prevention and

Housekeeping; accomplish

Fire Protection at Contractor’s Facility; accomplish

Shipboard Asbestos−Containing Material (ACM); control

Magnetic Material; control

Provisioning Technical Documentation (PTD); provide

Government Property; control

Logistics and Technical Data; provide

Interferences; remove and install

Authorization, Control, Isolation, Blanking, and Tagging

Requirements; accomplish

Asbestos−Free Pipe Hanger Liner Material; install

Fire Protection of Unmanned Vessels at Contractor’s

Facility; provide

Confined Space Entry, Certification, Fire Prevention

Utilizing Military Fire Watches, and Housekeeping;

accomplish

TITLE

CATEGORY I. FY−14 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE

ITEMS THAT ARE STRUCK OUT ON THIS INDEX DO NOT APPLY TO THIS CONTRACT.

009−39

009−40

009−59

009−60

009−61

009−64

009−65

009−67

009−69

009−70

009−72

009−73

009−74

009−77

009−79

009−80

009−81

009−82

009−83

19−JUL−07

29−JUL−11

29−JUL−11

07−NOV−13

17−JAN−13

29−JUL−11

29−JUL−11

17−JAN−13

07−NOV−13

17−JAN−13

17−JAN−13

07−NOV−13

17−JAN−13

17−JAN−13

29−JUL−11

29−JUL−11

17−JAN−13

29−JUL−11

17−JAN−13

Technical Manual Contract Requirement (TMCR) for New

Technical Manuals for Commercial Equipment/ Component;

provide

Requirements for Contractor Cranes, Multi−Purpose Machines and Material Handling Equipment at Naval Facilities;

accomplish

Organotin Antifouling Material; control

Schedule and Associated Reports for Availabilities Over 9

Weeks in Duration; provide and manage

Shipboard Use of Fluorocarbons; control

Synthetic Fire−Resistant Hydraulic Fluid; control

Polychlorinated Biphenyls (PCBs); control

Integrated Total Ship Testing; manage

Heavy Weather Plan; provide

Confined Space Entry, Certification, Fire Prevention and

Housekeeping for Unmanned Vessels; accomplish

Physical Security at Private Contractor’s Facility;

accomplish

Shipboard Electrical/Electronic/Fiber Optic Cable; remove, relocate, repair, and install

Occupational, Safety and Health Requirements; accomplish

Cofferdam Requirements; accomplish

Government Owned Material (GOM); status reporting

Ship’s Facilities; provide

Compartment Closeout; accomplish

Data Requirements When Installing an Equal Component Vice

Specified Component; provide

Wire Rope Fitting Verification; provide

009−84

009−86

009−87

009−88

009−89

009−93

009−94

009−95

009−97

009−99

009−100

009−101

009−102

009−103

009−106

009−108

009−109

009−110

17−JAN−13

01−AUG−08

17−JAN−13

29−JUL−11

29−JUL−11

17−JAN−13

17−JAN−13

17−JAN−13

17−JAN−13

17−JAN−13

30−JUL−10

17−JAN−13

29−JUL−11

29−JUL−11

17−JAN−13

29−JUL−11

29−JUL−11

29−JUL−11

Accountability of Temporary Fasteners; provide

Recovery of Chlorofluorocarbon (CFC) Refrigerants and Fire

Suppressant Halon (H) Materials; accomplish

Chemical Disinfection Procedures; accomplish

Collection, Holding and Transfer (CHT) and Mogas Tanks, Spaces, and Piping, including Sewage or Mogas−Contaminated

Tanks, Spaces, and Piping; certify

Purchase and Inspection Requirements for Contractor

Furnished Anodes; accomplish

Emergency Planning and Community Right−to−Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide

General Environmental Requirements for Work at Contractor’s

Facility; accomplish

Mechanically Attached Fittings (MAF’s) for Piping Systems;

install

Shipbuilding and Ship Repair Operations National Emission

Standard for Hazardous Air Pollutants (NESHAPS) for Surface

Coating Information; provide

Ship Departure Report; provide

Ship’s Stability Process Control Procedure (PCP); maintain

Requirements for Mooring, Entry to and Departure from

Contractor’s Facility; accomplish

Alteration Verification; provide

Weight and Moment Change Data; provide

Work Authorization Form Coordinator (WAFCOR); provide

Aircraft Carrier Requirements for Mooring, Entry to, Movement within, and Departure from Contractor’s Facility;

accomplish

Special Requirements for Non−SUBSAFE Work on SUBSAFE−

Certified Vessels; accomplish

Special Requirements for Non−Nuclear Work on Nuclear

Vessels; accomplish

009−111

009−112

009−117

009−118

07−NOV−13

29−JUL−11

17−JAN−13

17−JAN−13

Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration; provide and manage

Prevention of Radiographic−Inspection Ionizing−Radiation

Hazards; accomplish

AEGIS Light Off (ALO) Support for AEGIS Weapons Systems

Assessments (AWSA); provide

CG Deck Loading; accomplish

009−09

009−11

009−12

009−13

009−14

009−15

009−16

009−17

009−22

009−25

009−26

009−27

009−28

009−30

009−31

009−32

009−33

009−36

009−37

ITEM NO.

07−NOV−13

17−JAN−13

07−NOV−13

17−JAN−13

17−JAN−13

17−JAN−13

29−JUL−11

07−NOV−13

17−JAN−13

17−JAN−13

17−JAN−13

07−NOV−13

29−JUL−11

29−JUL−11

07−NOV−13

07−NOV−13

29−JUL−11

30−JUL−10

DATE

Process Control Procedure (PCP); provide and accomplish

Insulation and Lagging Requirements; accomplish

Welding, Fabrication, and Inspection Requirements;

accomplish

Meters; repair and certify calibration

Gages and Thermometers; repair and certify calibration

Rotating Machinery; balance

Electronic Equipment; repair

Rotating Electrical Equipment; repair

Shipboard Electric Cable; test

Structural Boundary Test; accomplish

Deck Covering Requirements; accomplish

Material Identification and Control (MIC) for Level I

Systems; accomplish

Cancelled 30 JUL 2010

Boiler Sample Tubes; inspect

Boiler Waterjet Cleaning; accomplish

Cleaning and Painting Requirements; accomplish

Rotating Electrical Equipment; rewind

Controller; repair

General Procedures for Woodwork; accomplish

TITLE

CATEGORY II. FY−14 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK ITEMS OF THIS JOB

ORDER

009−38

009−41

009−42

009−43

009−44

009−45

009−46

009−47

009−48

009−49

009−50

009−51

009−52

009−53

009−54

009−55

009−56

009−57

009−58

009−62

009−63

17−JAN−13

19−JUL−07

19−JUL−07

17−JAN−13

07−NOV−13

29−JUL−11

17−JAN−13

29−JUL−11

29−JUL−11

29−JUL−11

29−JUL−11

17−JAN−13

29−JUL−11

29−JUL−11

30−JUL−10

30−JUL−10

29−JUL−11

17−JAN−13

17−JAN−13

29−JUL−11

29−JUL−11

Boiler, Catapult Accumulator and Reboiler Dry Lay−up;

accomplish

Technical Manual Contract Requirement (TMCR) for a

Topically Structured Technical Manual; provide

Technical Manual Contract Requirement (TMCR) for Updating

Technical Manuals; provide

Light−Off Assessment (LOA) Support for Steam Propulsion

System; provide

Light−Off Assessment (LOA) Support for Gas Turbine

Propulsion System; provide

Tapered Plug Valve; repair

Butterfly Valve, Synthetic and Metal Seated; repair

Gate Valve; repair

Pressure Seal Bonnet Valve; repair (shop)

Pressure Seal Bonnet Valve; repair (in−line)

Horizontal Swing Check Valve; repair

Globe, Globe Angle, and Globe Stop Check Valve; repair

Relief Valve; repair

Bolted Bonnet Steam Valve; repair (shop)

Bolted Bonnet Steam Valve; repair (in−line)

Regulating/Reducing Valve; repair

Main Propulsion Boiler Wet Lay−Up; accomplish

Reduction Gear Security Requirements; accomplish

Pump and Driver Shaft Alignment; accomplish

Boiler Handhole and Manhole Seats and Plates; inspect

Lubricating Oils and Hydraulic Fluids; analyze

009−66

009−68

009−71

009−75

009−76

009−78

009−85

009−90

009−91

009−92

009−96

009−98

009−104

009−105

009−107

009−113

009−114

009−115

009−116

17−JAN−13

29−JUL−11

17−JAN−13

29−JUL−11

29−JUL−11

07−NOV−13

19−JUL−07

07−NOV−13

07−NOV−13

29−JUL−11

29−JUL−11

30−JUL−10

29−JUL−11

17−JAN−13

17−JAN−13

07−NOV−13

07−NOV−13

07−NOV−13

29−JUL−11

Light−Off Assessment (LOA) Support for Diesel Propulsion

System; provide

Bolted Bonnet Valve; repair

Testing Requirements for Piping Systems; accomplish

Circuit Breaker; repair

Waveguide and Transmission Line Temporary Lay−Up, Pressurization, and Purging; accomplish

Passive Countermeasures System (PCMS) Material

Repair/Installation Requirements; accomplish

Government Sponsored Planning Yard/Configuration Data

Manager (CDM) On−Site Representative Facility; provide

Technical Representative; provide

Propeller In−Place Inspection; accomplish

Resilient Mount; remove and install

Ball Valve; repair

Monel Fasteners; inspect

Vibration Testing and Analysis; accomplish

Thermal Sprayed Coatings for Machinery Component Repair;

accomplish

Piping System Cleanliness (Non−Nuclear); accomplish

Rotating Electrical Equipment with Sealed Insulation

Systems (SIS); rewind

Mold Remediation; accomplish

Bearing Rebabbitting; accomplish

Auxiliary and Waste Heat Boiler Sodium Nitrate Wet

Layup; accomplish

077−01−001

167−11−001

233−85−001

437−00−001

512−80−001

530−00−001

575−16−001

575−16−002

584−21−001

593−11−001

611−02−001

624−11−001

ITEM NO.

LCU 1680 Hazardous Waste Produced on Naval Vessels; control

LCU 1680−Watertight Door; repair

LCU 1680−Engine Emergency Shutdown Cable Assembly; repair

LCU 1680 Tank Level Indicating (TLI) System; repair and calibrate

LCU 1680 Ventilation Louver; repair

LCU 1680 Reverse Osmosis Desalination System; groom

LCU 1680 Anchor Cable; repair

LCU 1680 A−Frame Winch Assembly; replace

LCU 1680 Stern Gate; repair

LCU 1680 Crew’s head, shower drains; repair

LCU 1680 Cleat; replace

LCU 1680 Metal Joiner Doors; replace

TITLE______________

ITEM NO: 077−01−0011 of 6

ASSAULT CRAFT UNIT ONE (ACU−1) 077−01−001ITEM NO:

28−051COAR:

NONECMP:

ROSEPLANNER:

SHIP:

PCN: DA80−3010

SCOPE

REFERENCES

REQUIREMENTS

1.

2.

3.

1.2.1

1.3.1

Landing Craft Utility No. 1680

Not Applicable

Location of Work:

Identification:

2.1

2.2

2.3

2.4

Resource Conservation and Recovery Act (RCRA)

Federal Hazardous Materials Transportation Act, 49 U.S.C. 5103

Applicable Hazardous Waste Manifest Form

10 U.S.C. 7311

LCU 1680 Hazardous Waste Produced on Naval Vessels; control

Manage and dispose of all hazardous waste listed in 3.5 in accordance with 2.1 and 2.2.

When a Navy generator number is required by this Work Item, submit the original of 2.3 to the SUPERVISOR for assignment of Environmental

Protection Agency (EPA) or delegated state environmental agency identification number.

Manage and transport for Navy disposal, Navy−generated hazardous waste listed in 3.5 in accordance with 2.1 and 2.2, as designated by the

SUPERVISOR.

Submit one legible copy of 2.3 signed by the owner or operator of the disposal facility to the SUPERVISOR within 48 hours of receipt from owner or

Consider existing interior coatings to be removed by the invoking work items of this contract to contain lead, cadmium and chromium.

1.1

1.2

1.3

Title:

3.1.2.1

3.1.1

3.1.2

3.1.3

3.1

ITEM NO: 077−01−0012 of 6

SHIP:

Complete documentation required by 2.1 and 2.2, using EPA or delegated state environmental agency identification number in accordance with 2.4.

If the contractor, while performing work at a Government facility, cannot obtain a separate generator identification number from the state in which the availability will be performed, the contractor shall notify the SUPERVISOR operator of disposal facility.

Documentation related to hazardous waste generated solely by the physical actions of Ship’s Force or Navy employees (termed Navy−Generated

Hazardous Waste) on board the vessel shall only bear a generator identification number issued to the Navy pursuant to applicable law. The contractor shall obtain SUPERVISOR’S concurrence with the categorization of the waste as Navy− generated before completion of the manifest. The manifest prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.

Documentation related to hazardous waste generated solely by the physical actions of contractor personnel (termed Contractor−Generated Hazardous

Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law. Regardless of the presence of other material in or on the shipboard systems or structure which may have qualified a waste stream as hazardous, where the contractor performs work on a system or structure using materials (whether or not the use of such materials was specified by the Navy) which by themselves would cause the waste from such work to be a hazardous waste, documentation related to such waste shall only bear a generator number issued to the contractor.

Documentation related to hazardous waste generated by the combined physical actions of Navy and contractor personnel (termed Co−Generated

Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law and shall also cite in the remarks block a generator identification number issued to the Navy pursuant to applicable law.

When the contractor merely drains a system and such drainage creates hazardous waste or the contractor performs work on system or structure using materials which by themselves would not cause the waste from such work to be hazardous waste but such work nonetheless creates a hazardous waste, documentation related to such waste shall bear a generator identification number issued to the contractor and shall also cite in the remarks block a generator identification number issued to the Navy. The contractor shall sign the generator certification on the Uniform Hazardous Waste Manifest whenever use of the manifest is required for disposal. The contractor shall obtain SUPERVISOR’s concurrence with the categorization of the wastes as co−generated before completion of the manifest.

Manifests prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.

ASSAULT CRAFT UNIT ONE (ACU−1)

3.2.1

3.2.2

3.2.3

3.2

3.3

ITEM NO: 077−01−0013 of 6 within three business days of receipt of written notification by the state.

After obtaining approval of the SUPERVISOR, the contractor shall use the Navy site generator identification number and insert in the remarks block the contractor generator identification number issued for the site where his main facilities are located.

If, for availabilities at a contractor−owned or controlled facility, the

Navy cannot obtain a separate generator identification number for use at a contractor facility, the Navy shall notify the contractor within three business days of receipt of notification by the state. The contractor shall dispose of hazardous waste in accordance with 2.1, 2.2, and 3.2.3.

Hazardous waste, as identified in 2.1, expected to be produced during performance of this Job Order:

AMOUNT

TYPE NAVY CO−GENERATED CONTRACTOR

Asbestos Insulation material

Acid Solutions (may include _____ ____________ __________ spent sulfamic, citric, chromic, nitric, sulfuric, hydrochloric, etc.)

Ethylene Glycol (Antifreeze) _____ ____________

Sodium Hydroxide _____ ____________ __________

Cleaning Solvents _____ ____________ 1 gallons

Sodium Phosphates (Tri, Bi, _____ ____________ __________ or Mono)

Fluorocarbons _____ ____________ __________

Morpholine _____ ____________ __________

Sodium Chromates _____ ____________ __________

Hydrazine _____ ____________ __________

Methyl Ethyl Ketone _____ ____________ __________

Spent Abrasive Blast Material _____ ____________

(contaminated with a known hazardous waste)

ASSAULT CRAFT UNIT ONE (ACU−1)

3.4

3.5

ITEM NO: 077−01−0014 of 6

Trichloroethane _____ ____________ __________

Miscellaneous Chemicals _____ ____________ __________

(Ignitable)

Miscellaneous Chemicals _____ ____________ __________

(Corrosive)

Miscellaneous Chemicals _____ ____________ __________

(TCLP Toxic)

Miscellaneous Chemicals _____ ____________ __________

(Reactive)

Oil (Synthetic), _____ ____________ 2 gallons including hydraulic fluid

Paints (Enamel, Latex, _____ ____________ 5 gallons

Epoxy, thinners, oil based, rubber paint, non−skid, lacquer, remover, varnishes)

Paints (May include lead, _____ ____________ 2 pounds cadmium, or chrome)

Paint Strippers (phenols, _____ ____________ ______ lead, chromium)

Paint Chips _____ ____________ 1/2 pounds

Sludge (Contaminated with _____ ____________ 304 gallons a known hazardous waste)

Diesel Fuel _____ ____________

Contaminated oil, water, steam skeg & kort nozzle presevative (cosmoline) ____________

Notify the SUPERVISOR at least one working day prior to shipment of hazardous waste for disposal.

Submit one legible copy, in hard copy or electronic media, of a report identifying type, amount, and disposal cost of waste listed in 3.5 that was removed during the performance of this Job Order to the SUPERVISOR.

The report shall include analysis or other method used to

ASSAULT CRAFT UNIT ONE (ACU−1)

3.7.1

3.6

3.7

ITEM NO: 077−01−0015 of 6

NOTES4.

Nothing contained in this Work Item shall relieve the contractor from complying with applicable federal, state, and local laws, codes, ordinances, and regulations, including the obtaining of licenses and permits in connection with hazardous waste handling and disposal in the performance of this contract.

The waste listed in 3.5 is based on the best information available at the time of preparation of the solicitation. Hazardous waste generated during the actual performance of the work may vary in type or amount from waste listed in 3.5 which may result in renegotiation for credit or increase pursuant to

Paragraph (b) of 2.4. The contractor is expected to use best management practice to identify and dispose of all hazardous waste. Some of the substances listed in

3.5 may be neutralized, recycled, or otherwise removed from the requirements of

Subtitle C of 2.1. Inclusion of these substances in the waste listed in 3.5 does not preclude the contractor from taking action consistent with 2.1 to reduce or eliminate the hazardous constituents of any waste required to be disposed of under the contract in accordance with 2.2. Processes that add hazardous constituents to the bilges may require that bilge water be disposed of as a hazardous waste.

Hazardous wastes are determined by one or more of the following methods:

identify the waste and state whether each listed waste was hazardous (with generator assignment), non−hazardous, or did not exist.

The contractor shall make an effort to minimize hazardous waste generation by reducing the volume or toxicity by neutralizing, recycling, or otherwise removing it from the requirements of Subtitle C of 2.1 and include a description of such efforts in the report.

The types and amounts of wastes listed in 3.5 are estimates of waste to be disposed of under this contract as required by 2.4. They are not estimates of the amount of the work involved in generating that waste. The work requirements of each individual Work Item specify the actual work to be accomplished.

Chemical analysis which shows that the material characteristics of ignitability, corrosivity, reactivity, and/or toxicity (Toxicity

Characteristic Leachate Procedure − TCLP) exceed the limits for that material in

40 CFR 261.20 Subpart C.

Reference to a Material Safety Data Sheet (MSDS), or

Chemical analysis shall be accomplished by laboratories with state or EPA approved quality assurance programs.

3.7.1.1

3.7.2

4.1.1

4.2.1

4.2.2

3.8

4.1

4.2

ITEM NO: 077−01−0016 of 6

GOVERNMENT FURNISHED MATERIAL (GFM)5.

5.1

5.2

5.3

Asbestos, bilge water, oil/water including sludge, debris and other contaminants, sludge which includes solids and sludge from ballast tanks, CHT tanks, voids, oily waste tanks, fuel ballast tanks, fuel oil tanks, skegs (West coast), PCB’s (Maryland), etc., apply only in those states listing them as hazardous waste. When an availability is to be performed in a state where these items are hazardous waste, an estimate of the amount to be generated shall be included in 3.5.

Applying knowledge of the hazardous characteristics of the waste in light of the materials or the process used.

1. None.

1. None.

1. None.

LLTM

PUSH MATERIAL

KITTED MATERIAL

4.2.3

4.3

ITEM NO: 167−11−0011 of 2

ASSAULT CRAFT UNIT ONE (ACU−1) 167−11−001ITEM NO:

28−051COAR:

NONECMP:

ROSEPLANNER:

SHIP:

PCN: DA80−3002

SCOPE

REFERENCES

REQUIREMENTS

1.

2.

3.

1.2.1

1.3.1

Damage Control locker (1−4−1−A)

Quantity (One EA), Door (1−4−1−A), 27 5/8 Inch by 46 5/8 Inch, Individual dog, 6 Dog, Left Hand steel

Location of Work:

Identification:

2.1

2.2

2.3

2.4

Standard Items

6258997 Rev D, Hull Structural & Non Structural Closures

605−2540769 Rev D, Label Plate Standards

803−6397268, NAVSEA Standard Drawing

LCU 1680−Watertight Door; repair

Remove existing, overhaul, and install watertight door listed in 1.3 and located in 1.2, including associated door gasket, dogging mechanism, in accordance with 2.4.

Accomplish the requirements of 009−12 of 2.1, including Table 2, Column

A, Lines One through 7.

Accomplish the requirements of 009−32 of 2.1, including Table 2, Line

One, Column A, for the near−white blast clean NACE 2 SSPC−SP−10 for the surface preparation of the door panel assembly prior installation of powder coating.

Chip and grind surfaces flush in a way of removals.

Remove deteriorated 5 square feet of door plating and install New plating.

1.1

3.1.1

3.1.2

3.1

ITEM NO: 167−11−0012 of 2

NOTES

GOVERNMENT FURNISHED MATERIAL (GFM)

4.

5.

5.1

5.2

5.3

(V)(G) "CHALK TEST"

(I)(G) "AIR TEST"

(V)(G) "OPERATIONAL TEST"

Lubricate exposed working parts, using general purpose grease conforming to MIL−PRF−24139.

Apply zinc dust−petrolatum antiseize compound conforming to commercial specification A−A59313 to all fastener threads.

Adjust the dogs, hinges, and wedges for positive dogging action.

Accomplish a chalk test on watertight door installed in 3.2. Chalk imprint shall be centered with 100 percent contact.

Accomplish the requirements of 009−25 of 2.1 for the local air test of watertight door installed in 3.2. Allowable leakage: None.

Accomplish an operational test of watertight door installed. Open and close door through four complete cycles. Allowable sticking or binding: None.

Accomplish the requirements of 009−32 of 2.1 for new and disturbed.

Powder coat shall be haze gray in color and conforming to MIL−

PRF− 24712.

1. None.

1. None.

1. None.

LLTM

PUSH MATERIAL

KITTED MATERIAL

3.3.1

3.4

3.5

3.6

3.7

3.8

3.9

3.10

ITEM NO: 233−85−0011 of 2

ASSAULT CRAFT UNIT ONE (ACU−1) 233−85−001ITEM NO:

28−051COAR:

NONECMP:

ROSEPLANNER:

SHIP:

PCN: DA80−3005

SCOPE

REFERENCES

REQUIREMENTS

1.

2.

3.

1.2.1

1.2.2

1.2.3

1.3.1

1.3.2

1.3.3

FWD Engine Room, SSDG, MPDE (2−50−0−E)

AFT Engine Room, SSDG, MPDE (2−56−0−E)

Anchor Engine (2−63−0−Q)

Quantity (2 EA ), FWD SSDGE Emergency shutdown Cable Assemblies

(including Pull Handle, Brackets, Stuffing Tubes, Label Plates, and Mounting Plates),MPDE Emergency shutdown cable assemblies including pull handle, brackets, stuffing tubes, label plates, and mounting plates.

Quantity (2 EA), AFT SSDGE Emergency shutdown Cable Assemblies

(including Pull Handle, Brackets, Stuffing Tubes, and Mounting

Plates), MPDE Emergency shutdown cable including assemblies pull handle, brackets, stuffing tubes, and mounting plates

Quantity (One EA), Anchor emergency shutdown cable, including pull handle, brackets

Location of Work:

Identification:

2.1

2.2

2.3

Standard Items

252−6258922 Rev C, Main & Generator Engine Control

0961−LP−009−8010 Rev ONE, Service Manual Model 3151 Diesel Generator

Set 40 KW, 225/450 Volts A. C.

LCU 1680−Engine Emergency Shutdown Cable Assembly; repair

Remove existing and install new including each brackets, housings, stuffing tubes, attachments, and pull cable located in 1.2, identified in 1.3, 1.1

1.2

1.3

ITEM NO: 233−85−0012 of 2

NOTES

GOVERNMENT FURNISHED MATERIAL (GFM)

4.

5.

5.1

5.2

5.3

(V)(G) "OPERATIONAL TEST"

using 2.2 and 2.3 for guidance.

Accomplish the requirements of 009−12 of 2.1, including Table 2 Column

A, Line One through 7.

Accomplish an operational test of each FWD and AFT SSDGE, MPDE and

Anchor emergency shutdown cable assemblies for a minimum of five (5) cycles to ensure proper operation in accordance with Test Notes of 2.2.

Accomplish the requirements of 009−32 of 2.1 for new and disturbed surfaces.

None.

Verify each emergency shutdown cable assembly operates smoothly, without binding and sticking. Ensure valve position indicator reflects the actual valve position (open and shut).

Submit one legible copy, in hard copy or electronic media, of a report listing results of the requirements of 3.3 to the SUPERVISOR.

1. None.

1. None.

1. None.

LLTM

PUSH MATERIAL

KITTED MATERIAL

3.3.2

3.2

3.3

ITEM NO: 437−00−0011 of 2

ASSAULT CRAFT UNIT ONE (ACU−1) 437−00−001ITEM NO:

28−051COAR:

NONECMP:

ROSEPLANNER:

SHIP:

PCN: DA80−3009

SCOPE

REFERENCES

REQUIREMENTS

1.

2.

3.

1.2.1

1.2.2

1.2.3

1.2.4

1.2.5

1.3.1

Port Fuel Tank (1−51−1−Q)

Starboard Fuel Tank (1−51−1−Q)

Ballast Tank (2−56−0−E)

Ballast Tank (2−56−0−E)

Ballast Tank (2−56−0−E)

Quantity (5 EA), Tank Level Indicating (TLI) System and

Associated Equipment and Components:

Location of Work:

Identification:

2.1

2.2

2.3

Standard Items

6258876, Tank Capacity

6258891, Cables

LCU 1680 Tank Level Indicating (TLI) System; repair and calibrate

Accomplish the requirements of 009−14 of 2.1, for an on board calibration of the TLI listed in 1.2.1 through 1.2.5, using 2.2 for guidance.

Align, adjust and calibrate the Tank Level Indicating (TLI) System for each tank listed in 1.3.

Submit one legible copy, in hard copy or electronic media, of a report listing discrepancies found to the SUPERVISOR.

Affix a calibration label denoting the name and location of the

1.1

3.2.1

3.2.2

ITEM NO: 437−00−0012 of 2

NOTES

GOVERNMENT FURNISHED MATERIAL (GFM)

4.

5.

5.1

5.2

5.3

(V)(G) "OPERATIONAL TEST"

Accomplish the requirements of 009−22 of 2.1, for each TLI system including electrical cabling, listed in 1.2.

Accomplish an operational testing to each TLI listed in 1.2.1 through

1.2.5 for proper operation, in accordance with 3.1.

Accomplish the requirements of 009−32 of 2.1 for the new and disturbed surfaces.

None. The part number for TLI cable OEM GEMF 149584 calibration facility, date of calibration and due date of next calibration to the face of each Tank Level Indicating (TLI) indicator.

Remove existing damage TLI cable and install new using 2.3, for guidance.

1. None.

1. None.

1. None.

LLTM

PUSH MATERIAL

KITTED MATERIAL

3.3

3.4

ITEM NO: 512−80−0011 of 2

ASSAULT CRAFT UNIT ONE (ACU−1) 512−80−001ITEM NO:

28−051COAR:

NONECMP:

ROSEPLANNER:

SHIP:

PCN: DA80−3007

SCOPE

REFERENCES

REQUIREMENTS

1.

2.

3.

1.2.1

1.2.2

1.3.1

Fwd and Aft Engine Room lovers (2 ea),covers ( 2 ea), frame 2

(ea), and screen ( 2 ea) located in frame 56 , frame 50

Fwd and Aft Engine room Exhaust vent louver (2 ea), cover (2 ea), frame (2 ea), and screen (2 ea) located in frame 53, and frame 58

Not Applicable

Location of Work:

Identification:

2.1

2.2

Standard Items

513− 6258947 Rev C, Ventilation System and Arrangement Details

LCU 1680 Ventilation Louver; repair

Remove louvers, covers, frame, and screen for each equipment located in

1.2.1, and 1.2.2, using 2.2 for guidance.

Remove existing broken fasteners, chase, tap plenum cover, and louver exposed threaded areas.

Template from existing and fabricate 4 each screen, cover, and frame removed in 3.1.

Accomplish the requirements of 009−32 of 2.1, including Table 2, Line One, Column A, for the near−white blast clean NACE 2 SSPC−SP−10 to each equipment removed in 3.1 prior application of powder coat.

Powder coat shall be black in color for each louver, screen haze gray for each cover and frame, and shall conform to MIL−PRF−24712.

1.1

3.1.1

3.1.2

ITEM NO: 512−80−0012 of 2

NOTES

GOVERNMENT FURNISHED MATERIAL (GFM)

4.

5.

5.1

5.2

5.3

(V)(G) "OPERATIONAL TEST"

Remove high spots, burrs, abrasion, nicks, corrosion, gasket material, and foreign matter from exposed plenum cover and louver matting surfaces.

Reinstall each louver, cover, frame, and screen, using new gaskets and new CRES fasteners, using 2.2 for guidance.

Conduct an operational test verifying each cover can be dogged in open and closed positions with no sticking, binding or misalignment allowed.

Accomplish the requirements of 009−32 of 2.1 for new and disturbed surfaces.

Install and adjust each dogging mechanism for open and close position, for proper operation and to obtain 100 percent centered contact of knife edge to gasket.

Remove existing and install new, 4 each plenum cover open position securing pins with lanyard, using 2.2 for guidance.

Verify that cover can be secure in open position and proper fit of securing devices.

1. None.

1. None.

1. None.

LLTM

PUSH MATERIAL

KITTED MATERIAL

3.5.2.1

3.5.1

3.5.2

3.3

3.4

ITEM NO: 530−00−0011 of 2

ASSAULT CRAFT UNIT ONE (ACU−1) 530−00−001ITEM NO:

28−051COAR:

NONECMP:

ROSEPLANNER:

SHIP:

PCN: DA80−3000

SCOPE

REFERENCES

REQUIREMENTS

NOTES

GOVERNMENT FURNISHED MATERIAL (GFM)

1.

2.

3.

4.

5.

1.2.1

1.3.1

Aft Supply Room (2−40−0−A)

Quantity (One); Reverse Osmosis Desalination System, Mfr: Sea

Recovery, Aqua Flame Series, SRC 800 AF/NSWC

5.1

Location of Work:

Identification:

2.1

2.2

2.3

Standard Items

OWNER’S MANUAL, Sea Recovery Aqua Whisper II 450−1800

NAVSEA S6430−AE−TED−010, Technical Directive for Piping Devices, Flexible Hose Assemblies.

LCU 1680 Reverse Osmosis Desalination System; groom

Accomplish the requirements of 009−90 of 2.1, open

Accomplish the requirements of 009−32 of 2.1 for new and disturbed surfaces to match surrounding areas.

Provide the services of a qualified on−site Technical

Representative to inspect, and test of the equipment located in 1.2.1, using manufacturer’s technical manual, 2.2 as guidance.

Submit one legible copy, in hard copy or electronic media, of a report listing results of the requirements of 3.1.1 to the SUPERVISOR.

LLTM:

1.1

3.1.2

ITEM NO: 530−00−0012 of 2

5.2

5.3

1. None.

1. None.

1. None.

PUSH MATERIAL

KITTED MATERIAL

ITEM NO: 575−16−0011 of 3

ASSAULT CRAFT UNIT ONE (ACU−1) 575−16−001ITEM NO:

28−051COAR:

NONECMP:

ROSEPLANNER:

SHIP:

PCN: DA80−3008

SCOPE

REFERENCES

REQUIREMENTS

1.

2.

3.

1.2.1

1.3.1

Anchor Winch Room

Quantity (One EA) Anchor Cable

Location of Work:

Identification:

2.1

2.2

2.3

2.4

Standard Items

556−6258942 Rev D, Central and Misc. Hydraulic System Diagrams

Arrangement and Details

580− 6258983 Rev C, Anchor Handling Arrangements and Details

S9086−UU−STM−010/CH−613R3, Wire and Fiber Rope and Rigging

LCU 1680 Anchor Cable; repair

Remove existing anchor cable listed in 1.3, and located in 1.2, using

2.2 through 2.4 for guidance.

Remove existing grease, inspect anchor cable for strain, and markings.

Submit one legible copy, in hard copy and electronic media report listing the results 3.1.1, results to the SUPERVISIOR, within 24 hours after the inspection have been completed.

Lubricate anchor cable with new grease after completion of the requirements, install anchor cable using 2.2, through 2.4 for guidance.

Mark the wire rope using paint conforming to MIL−PRF−24763 in the following manner;

1.1

3.1.2

3.1.3

3.1.4

ITEM NO: 575−16−0012 of 3

NOTES

GOVERNMENT FURNISHED MATERIAL(GFM)

4.

5.

5.1

5.2

(V) (G) "OPERATIONAL TEST"

(V)(G) "VISUAL"

Raise and lower the anchor through three cycles, ensuring there is the correct tension on cable, no binding, erratic operation or improper completion of anchor cable.

Accomplish the requirements of 009−32 of 2.1 for new and disturbed surfaces.

Unclog Mud Box Drain piping, to allow for free flowing ability of drain piping.

From the anchor socket extending 20 linear feet, soild white

At the end of 100 linear feet from the anchor socket, one yellow stripe 6 inches wide.

At the end of 200 linear feet from the anchor socket, 2 yellow stripes 6 inches long separated by a 6 inch space.

At the end of 300 linear feet from the anchor socket, 3 yellow stripes 6 inches long by two 6 inch spaces.

At the end of 400 linear feet from the anchor socket, 4 yellow stripes 6 inches long separated by three 6 inch spaces.

At the end of 500 linear feet from the anchor socket, One white stripe 6 inches long.

At the end of 600 linear feet from the anchor socket, 2 white stripes 6 inches long separated by one 6 inch space.

At the end of 700 linear feet from the anchor socket, 3 white stripes 6 inches long separated b two 6 inch spaces.

At the end of 800 linear feet from the anchor socket extending to 900 feet solid white.

1. None.

LLTM

PUSH MATERIAL

ASSAULT CRAFT UNIT ONE (ACU−1)

3.1.4.1

3.1.4.2

3.1.4.3

3.1.4.4

3.1.4.5

3.1.4.6

3.1.4.7

3.1.4.8

3.1.4.9

3.2

ITEM NO: 575−16−0013 of 3

5.3

1. None.

1. None.

KITTED MATERIAL :

ITEM NO: 575−16−0021 of 2

ASSAULT CRAFT UNIT ONE (ACU−1) 575−16−002ITEM NO:

28−051COAR:

NONECMP:

ROSEPLANNER:

SHIP:

PCN: DA80−3001

SCOPE

REFERENCES

REQUIREMENTS

1.

2.

3.

1.2.1

1.2.2

1.3.1

1.3.2

A Frame Winch Main Deck Frame 67

Anchor Winch Room (2−62−20−Q)

Quantity (One EA), Anchor A−Frame Winch model Bloom winch 10−C−

S8−40

Quantity (2 Ea) Hydraulic hoses

Location of Work:

Identification:

(V) (G) "OPERATIONAL TEST"

2.1

2.2

2.3

2.4

Standard Items

556−6258942 Rev D, Central and Misc. Hydraulic System Diagrams

Arrangement and Details

580−6258983 Rev C, Anchor Handling Arrangements and Details

S9086−UU−STM−010/CH−613R3, Wire and Fiber Rope and Rigging

LCU 1680 A−Frame Winch Assembly; replace

Remove existing and install new A−frame winch, each hydraulic hoses, and winch wire listed in 1.3 and located in 1.2 in accordance with 2.2 through 2.4.

Fit and install new A−frame mounting CRES fasteners.

Install New anchor winch wire shall be certified to above maximum capacity of equipment listed in 1.3.

Lubricate/slush grease wire rope using 2.4 for guidance.

1.1

3.1.1

3.1.2

ITEM NO: 575−16−0022 of 2

NOTES

GOVERNMENT FURNISHED MATERIAL(GFM)

4.

5.

5.1

5.2

5.3

Accomplish an operational test of the new A−Frame winch assembly using

2.3 for guidance. Inspect A−Frame winch assembly for any functional problems.

Winch shall operate smoothly with no binding or hard spot when operating.

Submit one legible copy, in hard copy or electronic media, of a report warranty for the new winch assembly to the SUPERVISOR.

Accomplish the requirements of 009−32 of 2.1 for new and disturbed surfaces.

1. None.

1. None.

1. None.

LLTM

PUSH MATERIAL

KITTED MATERIAL

ASSAULT CRAFT UNIT ONE (ACU−1)

3.2

ITEM NO: 584−21−0011 of 2

ASSAULT CRAFT UNIT ONE (ACU−1) 584−21−001ITEM NO:

28−051COAR:

NONECMP:

ROSEPLANNER:

SHIP:

PCN: DA80−3011

SCOPE

REFERENCES

REQUIREMENTS

1.

2.

3.

1.2.1

1.3.1

1.3.2

Fantail

Quantity (2 EA), Hydraulic cylinder 2.50BB2HCTS14AX33.00

Quantity (4 ea), Hydraulic hoses

Location of Work:

Identification:

(V)(G) "VISUAL INSPECTION"

2.1

2.2

2.3

2.4

2.5

Standard Items

LAR 135−LCU−0925A, LCU Stern Gate Hydraulic System Upgrade

S6530−AE−TED−010, Technical Directive for Piping Devices, Flexible

Hose Assemblies

S9086−S4−STM−010/CH−556 Rev 4, Hydraulic Equipment

169−6258981 Rev E, Stern Gate arrangement

LCU 1680 Stern Gate; repair

Conduct a visual inspection of stern gate hydraulic cylinders piston travel operations attachment points, using 2.2, through 2.5 for guidance.

Remove and dispose of fluids to accomplish the requirements of this work item.

Remove existing and install new each hydraulic cylinder, hose, control valve, fitting, including deteriorated brackets, fasteners, and associated

Submit one legible copy, in hard copy or electronic media, reporting the results of operational, and visual test requirements.

1.1

3.1

ITEM NO: 584−21−0012 of 2

NOTES

GOVERNMENT FURNISHED MATERIAL (GFM)

4.

5.

5.1

5.2

5.3

(I)(G) "OPERATIONAL TEST"

components using 2.2, through 2.5 for guidance.

Accomplish the requirements of 2.3, for each flex hose fabrication, shop testing, label plate, and installation.

Accomplish the requirements of 009−12 of 2.1, including Table 2, Column

A, Lines One through 7.

Accomplish an operational test of the stern gate entire hydraulic system raising and lowering the stern gate three times, ensuring no erratic operation, no leak in the hydraulic system, free movement of each cylinder and satisfactory operation of each hydraulic valve replaced in 3.2.

Accomplish the requirements of 009−32 of 2.1 for new and disturbed surfaces.

None.

Each item install use new CRES hose fittings, and fasteners.

Install a stamped metal tag, QQ−S−766, Class 302, conforming to

MIL−P−15024, style IV, type J, indicating the quarter and year installed, and the quarter and year when retesting is requiring on each flexible hose.

1. None.

1. None.

1. None.

LLTM

PUSH MATERIAL

KITTED MATERIAL

3.4.1

3.4

3.5

3.6

ITEM NO: 593−11−0011 of 2

ASSAULT CRAFT UNIT ONE (ACU−1) 593−11−001ITEM NO:

28−051COAR:

NONECMP:

ROSEPLANNER:

SHIP:

PCN: DA80−3003

SCOPE

REFERENCES

REQUIREMENTS

1.

2.

3.

1.2.1 Crews Head (2−29−3−L)

Location of Work:

Identification:

2.1

2.2

2.3

Standard Items

MIL−STD−777, Schedule of Piping, Valves, Fittings, and Associated

Piping Components for Naval Surface Ships

530−6258931 Rev −, Fresh water service system diagram, arrangement and details

LCU 1680 Crew’s head, shower drains; repair

Remove existing and install new each shower faucet, valve, shower head, plumbing fixture, cable, light fixture high level switch, stainless steel sheeting, piping, brackets, spray nozzle, mixing valve, d− rings,sliding door shower curtain, drainiage valve, and fittings located in 1.2, using 2.2 and 2.3 for guidance.

Accomplish the requirements of 009−32 od 2.1, including Table 3 Line 4.

Accomplish the requirements of 009−26 of 2.1, including attachment C for installation of cosmetic polymeric deck covering system, in shower stall.

Replace existing with new CRES material including fasteners, small drying area of the shower in its entirety.

Restore retained piping flange mating surfaces exposed by disassembly of piping system. Repair by removing high spots, burrs, abrasions, and foreign matter, where removal can be accomplished by hand tools. Take precautions to maintain phonographic finish on flanges that have it.

1.1

3.1.2

3.1

ITEM NO: 593−11−0012 of 2

NOTES

GOVERNMENT FURNISHED MATERIAL (GFM)

4.

5.

5.1

5.2

5.3

(V)(G) "OPERATIONAL TEST"

Accomplish the requirements of 009−12 of 2.1, including Table One, Column A, Lines One through 7.

Accomplish the requipments of 009−16 of 2.1, overhaul light electrical box.

Accomplish the requirements of 009−71 of 2.1 for new and disturbed piping.

Accomplish an operational test of the new equipment installed in 3.1 under normal operating conditions. Allowable leakage: None.

Accomplish the requirements of 009−32 of 2.1 for new and disturbed surfaces.

Restore retained piping flange mating surface exposed

1. None.

1. None.

1. None.

LLTM

PUSH MATERIAL

KITTED MATERIAL

3.6.1

3.4

3.5

3.6

3.8

ITEM NO: 611−02−0011 of 2

ASSAULT CRAFT UNIT ONE (ACU−1) 611−02−001ITEM NO:

28−051COAR:

NONECMP:

ROSEPLANNER:

SHIP:

PCN: DA80−3006

SCOPE

REFERENCES

REQUIREMENTS

1.

2.

3.

1.2.1

1.3.1

Mooring Station Port side Frame 26

Quantity (One Each) 12 inch Horn Cleat, Material: Steel

Location of Work:

Identification:

(V)(G) "VISUAL INSPECTION"

(V)(G) "NON − DESTRUCTIVE"

2.1

2.2

2.3

2.4

2.5

Standard Items

MIL STD 1689, Fabrication, welding and Inspection of ship structure

804−2276338, Cleats − Welded Horn Type

611−6258990 Rev B, Hull Fitting Arrangement and Detail

S9AAO−AB−GOS−010, General Specification for overhaul, chapter 582 mooring and towing system

LCU 1680 Cleat; replace

Accomplish a visual inspection for structual integrity, deterioration, pitting, crack, and areas for damage in location listed in 1.2.

Install a new 18 inch cast steel cleat and associated chocks located in

1.2, using 2.2 through 2.5, for guidance.

Submit one legible copy, in hard copy or electronic media, of a report listing results of the requirements.

Chip and grind surfaces flush and smooth in way of installlation.

1.1

3.2.1

ITEM NO: 611−02−0012 of 2

NOTES

GOVERNMENT FURNISHED MATERIAL (GFM)

4.

5.

5.1

5.2

5.3

Accomplish the requirements of 009−12 of 2.1, including Table 2, Column

A, Lines One through 7 and 11.

Accomplish the requirements of 009−32 of 2.1, for new and disturbed surfaces to match surrounding areas.

None.

1. None.

1. None.

1. None.

LLTM

PUSH MATERIAL

KITTED MATERIAL

ASSAULT CRAFT UNIT ONE (ACU−1)

3.3

ITEM NO: 624−11−0011 of 3

ASSAULT CRAFT UNIT ONE (ACU−1) 624−11−001ITEM NO:

28−051COAR:

NONECMP:

ROSEPLANNER:

SHIP:

PCN: DA80−3004

SCOPE

REFERENCES

REQUIREMENTS

1.

2.

3.

1.2.1

1.2.2

1.2.3

1.2.4

1.2.5

1.3.1

1.3.2

1.3.3

1.3.4

1.3.5

State room (2−37−3)

Pilot House to Crew Berthing ( 1−33−1)

Pilot House to Galley (1−35−1)

Galley to Head (1−44−1)

Head to the Passage way (1−48−1−A)

Quantity ( One EA), Door (2−33−1), 27 5/8 inch by 66 3/4 inch sliding door left hand

Quantity (One EA), Door (1−33−1−Q), 27 Inch by 66 7/8 inch, and half, sliding door left hand.

Quantity (One EA), Door (1−35−1), 27 Inch by 66 1/2 inch sliding door left hand.

Quantity (One EA), Door (1−43−0−L), 27 3/4 inch by 68 inch sliding door left hand.

Quantity (One EA), door (1−33−1−Q) 27 1/2 inch by 67 inch sliding door right hand.

Location of Work:

Identification:

2.1

2.2

Standard Items

804−5959320, Doors, Joiner, Metal

LCU 1680 Metal Joiner Doors; replace

1.1

1.2

ITEM NO: 624−11−0012 of 3

Remove, repair, existing, and install (5 EA) metal joiner doors with associated frames, hull plating, stiffeners and hardwares located in 1.2, and identified in 1.3, in accordance with 2.2.

Accomplish the requirements of 009−12 of 2.1, including Table 2, Column

A, Line One through 7.

Accomplish the requirements of 009−32 of 2.1, including Table 2, Line

One, Column A, for the near−white blast clean NACE 2/ SSPC−SP−10 for the surface preparation of the door panel assembly prior installation of powder coating.

Accomplish the requirements of 009−32 of 2.1, including Table 2, Line

One, Columns B, C, and G to the new door frame assembly listed in 1.3, after

"hot" work of new door frame installed is completed.

Accomplish operational tests for each new metal joiner doors, one through 4 complete cycles verifying a smooth operation from interior and exterior

Ensure each door lock mechanism is flush.

Chip and grind surfaces flush and smooth in way of new installation.

The doors shall be the same size, type, swing and style as those removed.

Modify the bulkhead opening to accomodate the installation of the new doors and frames.

Powder coat shall be haze gray in color and conforming to MIL

PFR−24712.

Mask−off and protect door edge, and threaded prior to surface prepartion and preservation.

Ensure new doors open, close and lock freely.

Remove, existing and install new 5 each door stops with rubber tipped metal bumper including combination hook−on and hook holder.

Install new door hook and door stop on each door.

(V) (G) "OPERATIONAL TEST"

Remove protection installed in 3.4.1, upon completion of surface preparation and preservation operations.

Attach new rubber tipped metal bumper in a location to strike the door in an area backed by door framing.

3.4.1.1

3.4.3.1

3.1.1

3.1.2

3.1.3

3.1.4

3.3.1

3.4.1

3.4.2

3.4.3

3.4.4

3.1

3.2

3.3

ITEM NO: 624−11−0013 of 3

NOTES

GOVERNMENT FURNISHED MATERIAL (GFM)

4.

5.

5.1

5.2

5.3 sides. There shall be no evidence of sticking or binding.

Accomplish the requirements of 009−32 of 2.1 for the new and disturbed surfaces.

None.

1. None.

1. None.

1. None.

LLTM

PUSH MATERIAL

KITTED MATERIAL

ASSAULT CRAFT UNIT ONE (ACU−1)

File details come from the government source that posted it. Updated .