This is a Justification and Approval (J&A) document for use of an exception to fair opportunity in federal contracting.

The Mid-Atlantic Regional Maintenance Center (MARMC), a Naval Sea System Command (NAVSEA) field activity in Norfolk, Virginia, is justifying a non-competitive award of additional work under Firm Fixed Price Contract N0002422D4408 and Delivery Order N5005426FL012 to East Coast Repair & Fabrication. The work involves industrial support for replacing the Number 1B Main Propulsion Diesel Engine (MPDE) Lube Oil Piping onboard the USS CARTER HALL (LSD 50), accomplished through Request for Contract Change (RCC) 12N per Technical Performance Package (TPPC-LSD50-MARMC26-S003). The statutory authority cited is FAR 16.507-6(b)(1), which permits non-competitive procurement when agency need is so urgent that providing fair opportunity would result in unacceptable delays. The justification emphasizes operational urgency: the ship's lube oil piping requires immediate permanent repair after temporary patches and multiple unsuccessful repairs; without this work, the vessel will have limited shaft speed and cannot perform primary amphibious operations and personnel transfer missions critical to fleet commitments. East Coast Repair & Fabrication is determined to be the sole contractor capable of meeting the immediate requirement, as it has existing equipment and personnel onboard; adding another contractor would cause unacceptable scheduling delays. Cost has been determined fair and reasonable based on historical data, Independent Government Estimate, and Project Manager technical assessment of labor hours and materials. Market research was not conducted due to the work's critical and time-sensitive nature. The document includes certifications from technical and requirements personnel, legal sufficiency review, and contracting officer approval authorizing the non-competitive award.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

J&A Number: N50054-27-0009

5. RATIONALE JUSTIFYING USE OF CITED STATUTORY AUTHORITY

IAW FAR 16.507-6(b)(1) this procurement must be issued on a non-competitive basis due to the urgency of the required support which is under the same availability currently in execution and includes the same period of performance as the awarded delivery order period of performance. This additional work must be issued under a non-competitive basis because if the Government were to provide for fair opportunity, the entire schedule would be delayed t.

The mission of the USS CARTER HALL (LSD 50) is to transport and deploy Marine personnel, landing craft, vehicles, and cargo using landing craft and helicopters in support of military and humanitarian assistance operations. The LSD class of ship acts as an invaluable component to Joint Navy-Marine Expeditionary Units (ARG/MEU). Number 1B Main Propulsion Diesel Engine (MPDE) Lube Oil Piping requires replacement. Ships force has from the boss of the L/O header piping and a crack in the main piping was identified, resulting in the Belzona patch installation for light off assessment and sea trials. Multiple previous voyage repairs have been attempted unsuccessfully. The boss has excessive filler material on it preventing any further repairs on the boss. The boss will need to be cut out and replaced for permanent repair.

single MPDE on the starboard shaft. Without the L/O piping repairs the ship will have limited shaft speed and will have restrictions in the ability to perform their primary mission areas in the way of amphibious operations and personnel transfers. The work identified in this RCC must be

East Coast Repair & Fabrication has the equipment already in place to support this work, and an additional contractor onboard to complete this requirement would require additional time that the current schedule cannot support.

To award this work to a contractor other than East Coat Repair & Fabrication would result in unacceptable and costly delays to the USS CARTER HALL (LSD 50). The work must be integrated with the existing work package. Failure to accomplish this work would be

For the USS CARTER HALL (LSD 50) to meet its fleet mission commitments, East Coat Repair & Fabrication has the required equipment and is the only company able to meet the Government's immediate requirement to provide repairs of the 1B MPDE lube oil piping. East Coat Repair & Fabrication provides the Government with the appropriate avenue to accomplish this repair within the allotted Period of Performance. These repairs are commitments. The ship will not

J&A Number: N50054-27-0009 be able to repairs are accomplished.

6. DESCRIPTION OF EFFORTS MADE TO SOLICIT OTHER OFFERS

The Contracting Officer has determined that the anticipated cost to the Government for the supplies/services covered by the J&A will be fair and reasonable. The estimated cost of this work item is based upon historical data as well as the Independent Government Estimate (IGE) and the Project (PM) technical knowledge associated with the estimated man hours and material costs to complete this work. Additionally, the determined to be fair and reasonable at time of contract and delivery order award. The supported information provided should be sufficient to support the fair and reasonable cost determination of the procurement.

7. ACTIONS TO REMOVE BARRIERS TO COMPETITION

For reasons set forth in paragraphs 5 and 6, market research was not conducted. The critical nature of the work required that it be started immediately. Future acquisitions for similar work will be reviewed by the Contracting Officer on a case-by-case basis to promote the use of full and open competition in the acquisition process where possible under this multiple delivery order contract, where possible and practicable in accordance with FAR Subpart 16.5. In addition, a copy of the change(s) covered by this justification will be forwarded to MARMC Code 200, Planning and Engineering, and Code 300, Waterfront Operations, for consideration of similar work requirements in future solicitations.

CERTIFICATIONS AND APPROVAL

COMBINED TECHNICAL/REQUIREMENTS CERTIFICATION (FAR 16.507-

6(d)(2)(ix):

I certify that the facts and representations under my cognizance, which are included in this justification, are complete and accurate to the best of my knowledge and belief.

Date:

File details come from the government source that posted it. Updated .