This is a Justification and Approval (J&A) document for use of an exception to fair opportunity requirements under FAR 16.507-6(b)(1).
The Mid-Atlantic Regional Maintenance Center (MARMC), a field activity of Naval Sea System Command, seeks to add work to Firm Fixed Price Contract N0002422D4408 and Delivery Order N5005426FL012, awarded to East Coast Repair & Fabrication on a non-competitive basis. The work involves industrial support for 30-Ton Cargo Crane repairs aboard USS CARTER HALL (LSD 50) in accordance with Specification Item 589-11-001, generated by Request for Contract Change (RCC) 1N. The work must commence immediately and be completed within a specified timeframe (redacted) and integrated into the existing specification package. The government's minimum needs have been verified by certifying technical and requirements personnel.
The justification for non-competitive procurement cites urgent agency need under FAR 16.507-6(b)(1), as providing fair opportunity would result in unacceptable delays of at least (redacted) to the overall schedule. The 30-Ton Cargo Crane is essential to USS CARTER HALL's amphibious operations, supporting onload and offload of small boats, supplies, and Marine vehicles while underway. East Coast Repair & Fabrication already has equipment in place; awarding to another contractor would require additional time and result in costly delays. The repairs are critical for delivering a mission-capable ship within the Continuous Maintenance Availability (CMAV) period. Cost was determined fair and reasonable based on historical data, Independent Government Estimate, and Project Manager technical knowledge. Market research was not conducted due to the critical, time-sensitive nature of the work.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J&A Number: N50054-27-0003
5. RATIONALE JUSTIFYING USE OF CITED STATUTORY AUTHORITY
IAW FAR 16.507-6(b)(1) this procurement must be issued on a non-competitive basis due to the urgency of the required support which is under the same availability currently in execution and includes the same period of performance as the awarded delivery order period of performance. This additional work must be issued under a non-competitive basis because if the Government were to provide for fair opportunity, the entire schedule would be delayed by at least t.
The mission of the USS CARTER HALL (LSD 50) is to transport and deploy Marine personnel, landing craft, vehicles, and cargo using landing craft and helicopters in support of military and humanitarian assistance operations. The LSD class of ship acts as an invaluable component to Joint Navy-Marine Expeditionary Units (ARG/MEU). The 30-Ton Cargo . There
s. The requirements are but not limited to the onload and off-load of small boats, ship supplies Marine vehicles and supplies in support of operations while the ship is underway.
Additionally, the crane provides
. The be completed to allow the 30-
East Coast Repair & Fabrication has the equipment already in place to support this work, and an additional contractor onboard to complete this requirement would require additional time .
To award this work to a contractor other than East Coat Repair & Fabrication would result in unacceptable and costly delays to the USS CARTER HALL (LSD 50). The work must be integrated with the existing work package. Failure to accomplish this work would be unacceptable
For the USS CARTER HALL (LSD 50) to meet its able to meet the -Ton Cargo
Crane. East Coat Repair & Fabrication provides the Government with the appropriate avenue to accomplish this repair within the allotted Period of Performance. These repairs are essential for the delivery of mission capable ship. Without this replacement, scheduled for the current CMAV,
6. DESCRIPTION OF EFFORTS MADE TO SOLICIT OTHER OFFERS
The Contracting Officer has determined that the anticipated cost to the Government for the supplies/services covered by the J&A will be fair and reasonable. The estimated cost of this work item is based upon historical data as well as the Independent Government Estimate (IGE) and the Project (PM) technical knowledge associated with the estimated man hours and material costs to complete this work. Additionally, the determined to be fair and reasonable at time of contract and delivery order award. The supported information provided should be sufficient to support the fair and reasonable cost determination of the procurement.
7. ACTIONS TO REMOVE BARRIERS TO COMPETITION
For reasons set forth in paragraphs 5 and 6, market research was not conducted. The critical nature of the work required that it be started immediately. Future acquisitions for similar work will be reviewed by the Contracting Officer on a case-by-case basis to promote the use of full and open competition in the acquisition process where possible under this multiple delivery order contract, where possible and practicable in accordance with FAR Subpart 16.5. In addition, a copy of the change(s) covered by this justification will be forwarded to MARMC Code 200, Planning and Engineering, and Code 300, Waterfront Operations, for consideration of similar work requirements in future solicitations.
CERTIFICATIONS AND APPROVAL
COMBINED TECHNICAL/REQUIREMENTS CERTIFICATION (FAR 16.507-
6(b)(1).
I certify that the facts and representations under my cognizance, which are included in this justification are complete and accurate to the best of my knowledge and belief.
Signature: Date:
Print: (Name) Patrick A Holden (Title) Lead Ship Building Specialist (Code) 332 (Phone) 757-933-3492
LEGAL SUFFICIENCY REVIEW (NMCARS 5206.303(90)):
I have determined this justification is legally sufficient.
ate:
Print: (Name) (Title) (Code) (Phone)
COMBINED CONTRACTING OFFICER CERTIFICATION AND APPROVAL (FAR
16.507-6(b)(1)
I certify that this justification is accurate and complete to the best of my knowledge and belief. Upon the basis of the above justification, I hereby approve, as Contracting Officer, the award of the proposed procurement(s) described herein using other than full and open competition, pursuant to the authority of FAR 16.507-6(b)(1) the agency need for the supplies or services is so urgent that providing a fair opportunity would result in unacceptable delays.
Print: (Name) (Title) (Code) (Phone)
File details come from the government source that posted it. Updated .