Combat_Systems_Draft_SOW.docx
DOCX document 42 KB Posted
- Attached to
- Combat Systems Repair and Refurbishment Federal contract opportunity
- Solicitation number
- N5005420R0001
About this file
This statement of work outlines requirements for combat systems repair and refurbishment services. The contractor shall provide all necessary labor, materials, equipment and facilities to perform industrial fabrication, material procurement and repair support for various U.S. Navy and foreign military sales surface combat and C4I systems, including SLQ-32 antenna enclosures, MK-36 and MK-53 decoy launching systems, MK-141 Mod 1 Harpoon launch support structures, MK-32 surface vessel torpedo tubes, OE-82 series UHF SATCOM antennas and associated amplifiers and radomes. Repairs shall be conducted at contractor or naval facilities within 50 miles of Norfolk, Virginia. The contractor must have sufficient facilities and certifications to support refurbishment of MK-5 Mod 4 ready service lockers, MK-137 Mods 7 and 10 Nulka launchers and MK-137 Mods 1, 2 and 4 SRBOC launchers.
Combat Systems "Draft" SOW
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sources_Sought.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Descriptions and Specifications
STATEMENT OF WORK
1. SCOPE OF WORK
1.1. The Contractor shall furnish the necessary management, labor, material, repair support, equipment and facilities to perform industrial fabrication, material procurement to accomplish repair and refurbishment of United States Navy/FMS Surface Combat/C4I Systems listed below:
SLQ-32 Antenna Enclosures MK-36 and MK-53 Decoy Launching System (DLS) CERTIFICATION REQUIRED MK-141 MOD 1 Harpoon Launch Support Structure (LSS) MK-32 Surface Vessel Torpedo Tube OE-82 Series UHF SATCOM Antennas AM-6534/SSR-1, AM-7317A/SSR Amplifiers, Radomes and ancillary equipment
.1.2. A delivery order will normally consist of a single requirement. A number of the delivery orders will be issued for emergent requirements. The contractor may be required to respond to more than one requirement (simultaneous delivery orders for more than one vessel).
.1.3. Required reports and documentation shall be compatible with Windows NT Server 4.0 as the standard Network Operating System and MS Office 2010 Professional as the standard Office Software.
a. Definition of Repair Requirements - The contractor shall be required to identify repair requirements. These efforts, when required, will include, but are not limited to the following: inspect equipment and/or systems to determine repair options, repair alternatives, and make recommendations to the Contracting Officer’s Representative (COR). In some cases, the SME will confirm the repair options and requirements with the contractor prior to report being submitted. The requirements shall be reported using Condition Found Reports (CFR).
b. Repair Implementations. The contractor shall provide necessary personnel to implement repairs/refurbishment, maintenance, renewal and evaluation on naval ships and shore-based activities on MK-36, and MK-53 DLS systems. The contractor efforts shall include, but is not limited to, the following:
(1) Conduct ship visits to coordinate schedules for Combat/C4I Systems fleet technical support, inspections, repairs, equipment removal for repair, and refurbishment or replacement. Repair actions shall include the removal and reinstallation of all interferences.
(2) Correct deficiencies identified during ship visits and/or surveys when authorized by the individual delivery order.
(3) Provide journeymen level mechanics, technicians, and when required in the delivery order, the In-Service Engineering Agent (ISEA) or Original Equipment Manufacturer (OEM) representatives to accomplish repairs. Repair efforts on short notice may be required and may require work efforts to continue around the clock, including weekends and holidays, until completed.
(4) Provide subcontracting capabilities, administration, and management to accomplish repairs that may require highly specialized skills beyond the contractor’s internal workforce.
(5) Submit completion inspection report to COR, after all repair and/or replacement actions have been accomplished.
(6) Provide Quality Assurance Inspections and Certifications for all repair actions accomplished in accordance with this contract and standard industry practices.
(7) Repair and refurbishment work efforts shall be conducted at locations specified in each delivery order.
(8) During the ship visits, the contractor shall work closely with the SME to expeditiously fulfill planned or emergent work requirements and keep the Government fully informed in writing of the status of work on a weekly basis.
(9) Provide the necessary tools, rigs, and test equipment to perform repairs.
(10) Coordinate with SME when crane services are required.
(11) Provide written report of all work performed, delays of work and test documentation results to the COR after confirmation from the SME.
.1.4. Except as otherwise provided in this contract, or delivery orders issued thereunder, the contractor shall provide all material, labor, repair support, equipment, supplies, power, accessories, facilities and such other things and services as necessary for accomplishing assigned requirements .
. 1.5. The contractor shall perform the repairs ordered by the issuance of delivery orders from the Contracting Officer. When ordered, the repairs shall be in accordance with the requirements outlined in this contract. Repairs shall be performed shipboard or at contractor facilities within a 50-mile radius of NOB, Norfolk, VA. Under normal conditions, work shall be accomplished at the contractor’s facilities. Additionally, performance of work may be required elsewhere including OCONUS. In the event work is required outside of the 50-mile radius of NOB, Norfolk, VA, travel and per diem shall be paid in accordance with Joint Travel Regulations (JTR).
.2. PERSONNEL
.2.1. The contractor shall be responsible for the employment of trained and technically qualified personnel to perform delivery orders. The contractor, upon request of the Government representative, shall produce the qualifications of an individual to substantiate qualifications to perform the requirement. In addition, the contractor is responsible for employing and maintaining the personnel, organizational and administrative controls necessary to ensure that performance meets or exceeds all contract specification requirements hereunder and as set forth in each individual delivery order.
.3. ORGANIZATION
.3.1. The contractor shall have a management organization with the experience and comprehensive understanding to apply management techniques, methods and procedures required to efficiently complete the requirements of the solicitation.
.4. REFERENCES
.4.1. In performing the requirements of this contract, the contractor shall comply with all the following references.:
.4.1.1. The following Category I and II NAVSEA STANDARD ITEMS (NSI) may be viewed on the Internet at https://www.navsea.navy.mil/Home/RMC/CNRMC/Our-Programs/SSRAC/NSI/ and shall be invoked on all delivery orders and individual delivery orders:
| FY-20 ITEM NO. |
| TITLE |
| UTILIZATION |
CATEGORY
DATE
| 009-01 |
| General Criteria |
| I |
| 01 OCT 2018 |
| 009-02 |
| Environmental Compliance Report for Material Usage |
| I |
| 30 APR 2018 |
| 009-03 |
| Toxic and Hazardous Substance; control |
| I |
| 01 OCT 2017 |
| 009-04 |
| Quality Management System; provide |
| I |
| 01 OCT 2018 |
| 009-05 |
| Temporary Access |
| II |
| 01 OCT 2018 |
| 009-06 |
| Maintaining Protection and Cleanliness from Non-Radioactive Operations; accomplish |
| I |
| 31 AUG 2018 |
| 009-07 |
| Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish |
| I |
| 01 OCT 2018 |
| 009-08 |
| Shipboard Fire Protection and Fire Prevention; accomplish |
| I |
| 31 AUG 2018 |
| 009-09 |
| Process Control Procedure (PCP); provide and accomplish |
| II |
| 01 OCT 2018 |
| 009-11 |
| Insulation and Lagging; accomplish |
| II |
| 01 OCT 2017 |
| 009-12 |
| Weld, Fabricate, and Inspect; accomplish |
| II |
| 01 OCT 2018 |
| 009-13 |
| Meter, Gage, Switch, and Thermometer; repair |
| II |
| 31 AUG 2018 |
| 009-16 |
| Electronic Equipment; repair |
| II |
| 01 OCT 2018 |
| 009-19 |
| Provisioning Technical Documentation (PTD); provide |
| I |
| 01 OCT 2018 |
| 009-20 |
| Government Property; control |
| I |
| 01 OCT 2017 |
| 009-21 |
| Alteration Verification, Logistics and Technical Data; provide |
| I |
| 01 OCT 2018 |
| 009-23 |
| Interference; remove and install |
| I |
| 01 OCT 2018 |
| 009-24 |
| Authorization, Control, Isolation, Blanking, Tagging and Cleanliness; accomplish |
| I |
| 01 OCT 2018 |
| 009-25 |
| Structural Boundary Test; accomplish |
| II |
| 01 OCT 2018 |
| 009-26 |
| Deck Covering; accomplish |
| II |
| 01 OCT 2018 |
| 009-32 |
| Cleaning and Painting Requirements |
| II |
| 28 MAR 2017 |
| 009-36 |
| Controller; repair |
| II |
| 31 AUG 2018 |
| 009-37 |
| General Procedure for Woodwork; accomplish |
| II |
| 01 OCT 2018 |
| 009-39 |
| Technical Manual Contract Requirement (TMCR) for a New Technical Manual for Commercial Equipment/Component; accomplish |
| I |
| 01 OCT 2018 |
| 009-40 |
| Contractor Crane, Multi-Purpose Machine and Material Handling Equipment at a Naval Facility; provide |
| I |
| 01 OCT 2018 |
| 009-45 |
| Tapered Plug Valve; repair |
| II |
| 31 AUG 2018 |
| 009-46 |
| Butterfly Valve, Synthetic and Metal Seated; repair |
| II |
| 31 AUG 2018 |
| 009-47 |
| Gate Valve; repair |
| II |
| 31 AUG 2018 |
| 009-48 |
| Pressure Seal Bonnet Valve Shop Repair; accomplish |
| II |
| 31 AUG 2018 |
| 009-49 |
| Pressure Seal Bonnet Valve In-line Repair; accomplish |
| II |
| 31 AUG 2018 |
| 009-50 |
| Horizontal Swing Check Valve; repair |
| II |
| 31 AUG 2018 |
| 009-52 |
| Relief Valve; repair |
| II |
| 31 AUG 2018 |
| 009-53 |
| Bolted Bonnet, Globe, Globe Angle, and Globe Stop Check Valve Shop Repair; accomplish |
| II |
| 31 AUG 2018 |
| 009-54 |
| Bolted Bonnet, Globe, Globe Angle, and Globe Stop Check Valve In-line Repair; accomplish |
| II |
| 31 AUG 2018 |
| 009-55 |
| Regulating/Reducing Valve; repair |
| II |
| 31 AUG 2018 |
| 009-61 |
| Shipboard Use of Fluorocarbons; control |
| I |
| 18 JUL 2014 |
| 009-63 |
| Lubricating Oil and Hydraulic Fluid; analyze |
| II |
| 30 APR 2018 |
| 009-65 |
| Polychlorinated Biphenyls (PCBs); control |
| II |
| 26 MAR 2018 |
| 009-67 |
| Integrated Total Ship Testing; manage |
| I |
| 30 APR 2018 |
| 009-70 |
| Confined Space Entry, Certification, Fire Protection, Fire Prevention, and Housekeeping for Unmanned Vessel; accomplish |
| I |
| 01 OCT 2018 |
| 009-71 |
| Piping System; test |
| II |
| 31 AUG 2018 |
| 009-72 |
| Physical Security at a Private Contractor Facility; accomplish |
| I |
| 31 AUG 2018 |
| 009-73 |
| Shipboard Electrical/Electronic |
Cable Procedure; accomplish
| I |
| 01 OCT 2018 |
| 009-74 |
| Occupational, Safety and Health Plan; accomplish |
| I |
| 01 OCT 2018 |
| 009-75 |
| Circuit Breaker; repair |
| II |
| 31 AUG 2018 |
| 009-78 |
| Passive Countermeasures System (PCMS) Material; repair |
| II |
| 01 OCT 2018 |
| 009-79 |
| Government Owned Material (GOM) Status for Multi-Ship Multi-Option availabilities; report |
| II |
| 01 OCT 2018 |
| 009-80 |
| Ship Facilities; maintain |
| I |
| 18 NOV 2016 |
| 009-81 |
| Compartment Closeout; accomplish |
| I |
| 31 AUG 2018 |
| 009-82 |
| Installation of Equal Component |
Vice Specified Component; report
| I |
| 26 MAR 2018 |
| 009-83 |
| Wire Rope Assembly; fabricate |
| II |
| 26 MAR 2018 |
| 009-84 |
| Threaded Fastener Requirements; accomplish |
| I |
| 01 OCT 2018 |
| 009-85 |
| Government Sponsored Planning Yard/Configuration Data Manager (CDM) On-Site Representative Facility; provide |
| II |
| 19 JUL 2007 |
| 009-86 |
| Recovery and Turn-In of Ozone Depleting Substance (ODS); accomplish |
| II |
| 01 OCT 2017 |
| 009-87 |
| Chemical Disinfection Procedure; accomplish |
| II |
| 01 OCT 2017 |
| 009-93 |
| Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide |
| I |
| 06 MAR 2018 |
| 009-95 |
| Mechanically Attached Fitting (MAFs); install |
| II |
| 01 OCT 2017 |
| 009-96 |
| Ball Valve; repair |
| II |
| 31 AUG 2018 |
| 009-100 |
| Ship's Stability; maintain |
| I |
| 06 MAR 2018 |
| 009-103 |
| Weight and Moment Change Data; provide |
| II |
| 30 APR 2018 |
| 009-105 |
| Thermal Sprayed Coating for Machinery Component Repair; accomplish |
| II |
| 01 OCT 2018 |
| 009-106 |
| Work Authorization Form Coordinator (WAFCOR); provide |
| I |
| 01 OCT 2017 |
| 009-117 |
| Combat Systems Light-Off Support; provide |
| I |
| 31 AUG 2018 |
| 009-118 |
| CG Deck Loading; accomplish |
| I |
| 18 JUL 2014 |
| 009-120 |
| Fact Finding and Critique of Unplanned Event; manage |
| I |
| 06 MAR 2018 |
| 009-121 |
| Ship Assessment/Inspection; accomplish |
| II |
| 18 NOV 2016 |
| 009-122 |
| Temporary Padeye; install and remove |
| I |
| 01 OCT 2018 |
| 009-123 |
| Fiber Optic Component; remove, relocate, repair, and install |
| II |
| 01 OCT 2018 |
The following STANDARD WORK TEMPLATES (SWTs) shall be invoked on individual delivery orders as required:
| 042-13 |
| Accountability of Man-hour and Material Reservation; accomplish (Attachment JX) |
| 077-01 |
| Hazardous Waste Produced on Naval Vessels; control (Attachment JX) |
Planning Memorandum Number 601-005 (Attachment JX)
NOTE: The contractor shall comply with the latest revision of these documents in effect at solicitation closing and when each option year is invoked. Additionally, in the event that there is any conflict between the references, NSIs, LWTs, and SWTs take precedence over technical manuals, specifications, and other references. NSIs take precedence over LWTs and SWTs. Other tiered drawings shall be followed when referenced.
5. POST-AWARD SUBMISSION
After receipt of a Delivery Order Award and prior to starting work onboard the vessel, the contractor shall submit a Visit Authorization Letter (VAL) in accordance with SECNAV M-5510.30 (Dept. of the Navy, Personnel Security Program), and/or DOD 5220.22M (National Industrial Security Program Operating Manual), to the Commanding Officer of the ship via the Mid-Atlantic Regional Maintenance Center (MARMC) Security Officer.
NOTE: The contractor shall comply with the latest revision of these documents in effect at solicitation closing and when each option year is invoked.
6. MINIMUM CAPABILITIES AND FACILITY REQUIREMENTS
a. IAW Procedure for Certification of Waterfront Activity Refurbishment of MK-5 Mod 4 Ready Service Lockers (NCS-Q32-WXMO-2012-055), all contractors and subcontractors shall complete the certification process in conjunction with the Mid-Atlantic Regional Maintenance Center (MARMC) certified Subject Matter Expert before commencing work. The Contractor shall provide engineering and technical support for Mid-Atlantic Regional Maintenance Center (MARMC) Code 292. Refurbishment shall be accomplished IAW MK-5 Mod 4 Ready Service Locker Technical Repair Standard and all changes SW393-AC-TRS-010. The Contractor shall provide required facilities, services and materials to overhaul SRBOC Ready Service Lockers.
b. IAW procedure for certification of waterfront activity refurbishment of MK-137 Mods 7 and 10 Nulka Launchers NSC-Q32-WXM-2012-056, all contractors and subcontractors are shall complete the certification process in conjunction with the Mid-Atlantic Regional Maintenance Center (MARMC) certified Subject Matter Expert before commencing work. The Contractor shall provide engineering and technical support for MARMC Code 292. Refurbishment shall be accomplished IAW Intermediate Maintenance Activity Refurbishment Procedures for MK-137 Mods 7 and 10 Nulka Decoy Launchers NSC-Q32-WXM-2012-043 and all changes. The Contractor shall provide required facilities, services and materials for refurbishment of MK-137 Mod 10 Nulka Launchers.
c. IAW Procedure for Certification of Waterfront Activity Refurbishment of MK-137 Mods 1,2 and 4 SRBOC Launchers (NSC-Q32-WXM-2012-054), all contractors and subcontractors shall complete the certification process in conjunction with the Mid-Atlantic Regional Maintenance Center MARMC certified Subject Matter Expert before commencing work. The Contractor shall provide engineering and technical support for MARMC Code 292. Refurbishment shall be accomplished IAW Intermediate Maintenance Activity Refurbishment Procedures for MK-137 Mods 1, 2, and 4 Decoy Launchers and all changes NSC-Q32-WXM-2012-048.
d. Facilities. The successful offeror shall have sufficient facilities in appropriate locations to fully support the work intended by this contract. The offeror’s facilities shall be located within a 50-mile radius of NOB, Norfolk, VA.
7. GENERAL REQUIREMENTS
The following are applicable to the extent they apply to all repairs, modifications, testing and adjustments.
Any cost to comply with these requirements shall be included in the price of the CLINs listed in Section B.
7.1. The Contractor Shall:
a. Exercise own judgment and expertise to assure the successful completion of all requirements placed hereunder.
b. Designate in writing those persons authorized to accept/reject verbal orders.
c. As applicable, coordinate schedules in the work affected areas with the ship’s force representative, MARMC Maintenance Team (MT), the Subject Matter Expert (SME) as defined in the Delivery Order, and the Contracting Officer’s Representative (COR) during the performance period of the delivery order. The contractor shall obtain a copy of the ship's operation drills, etc. (prior to start of work) from the ships force, thus avoiding unnecessary delays. The work effort on delivery orders shall be coordinated on a daily basis with the ships force representative to allow for changing situations aboard ships to minimize delays and disruptions.
d. Forward all requests for changes in delivery schedules, funding requirements and scope of work in writing to the COR. These requests shall include specific details as to what changes are required and circumstances requiring such and shall be submitted to the COR prior to 85% of delivery availability being exceeded.
e. Not respond to new performance requirements until a delivery order or a modification has been signed or verbal authorization has been given by the Contracting Officer.
f. Not respond to any requests requiring deviations in technical performance as specified in the delivery order without obtaining a signed modification or prior approval of the Contracting Officer.
g. Be responsible for inspection of workspaces prior to manning to ensure spaces are available for work to avoid unnecessary delays in day to day work schedule.
h. Comply with NSI 009-24 and ships or shipyard directives in accomplishing isolation, blanking and tagging of equipment, systems, circuits, components, piping and valves. All work performed shall utilize Work Authorization Form (WAF) in conjunction with NSI 009-24. The web site for the WAF is: http://www.submepp.navy.mil/.
i. Provide protection during contamination-producing operations and maintain cleanliness in accordance with NSI 009-06. Remove and properly dispose of all debris or trash resulting from cleaning, removal, installation or any other aspect of performance. This shall be required of all delivery orders performed on this contract whether at a Government facility or at a privately owned facility.
j. Request on a case-by-case basis to use ship's services that are available. A request for use of ship's services shall be made to the ship force representative or Port Engineer. Written permission shall be obtained from the CO of the ship before actual use of any ship services. A request for ship's services may be turned down whether or not the requested service is available. Denial of a request for use of ship's services will not be a valid basis for any claim or request for compensation. Regardless of any request for ship's services, ship's services shall not be used for contractor life support systems (compressors for breathing air), lifting equipment or any other equipment wherein an unexpected disruption of services has a high potential for loss of life, injury or damage to the ship's equipment.
k. Accomplish the requirements of NSI 009-40 for the use of contractor cranes at naval facilities. For work at other than naval facilities, contact the facility manager to determine the requirements and restrictions for crane operations prior to mobilization on-load, final determination of production sequencing and production zone layout, and demobilization off-load. Crane placement restrictions may affect production sequencing and zoning.
l. Ensure that persons assigned to render repairs hereunder are at all times under the direction and control of the contractor and are not employees of the Government.
n. Follow all applicable federal, state, and local laws concerning safety, health, and welfare of contractor personnel and equipment as well as other personnel and equipment within a close proximity of the ongoing work.
o. Contact the MARMC Duty Officer at (757) 400-0000 when problems are encountered after normal working hours.
p. Submit a written weekly report detailing the daily events and the progress made during the course of each day to the on-site SME and COR, as required. Time and location for submission of the weekly report shall be agreed upon at the beginning of each delivery order and prior to the start of the work.
q. Be responsible for tag out of systems to be repaired and the removal of all interferences.
The contractor shall coordinate with the on-site SME to verify that systems have been properly tagged-out and secured prior to any production effort. The contractor shall reinstall and perform necessary test(s) to all removed interferences/equipment upon completion of all installations specified herein. NSI 009-23 shall apply.
r. Accomplish the requirements of NSI 009-29 where hangers and pipe are removed, disturbed, or new hangers are being installed.
s. Accomplish preservation of the new and disturbed normally painted surfaces in accordance with NSI 009-32, “Cleaning and Painting Requirements; accomplish.”
t. As required by 40 Code of Federal Regulations Part 63, report painting operations in accordance with NSIs 009-01 and 009-02 and LWTs 042-11 and 042-37. The contractor, when awarded work within another contractor’s facility, is required to contact the facility owner’s environmental staff to determine requirements and report accordingly using federal requirements as standard.
u. Provide the necessary tools and test equipment to perform the repairs/maintenance actions.
v. Develop and implement test and quality assurance techniques in the performance of maintenance actions. The contractor shall conduct operational tests and provide written, legible copies of all test results to the COR.
w. Accomplish the requirements of NSI 009-84 when using any temporary fasteners and NSI 009-95 when using any mechanically attached fittings.
x. Ensure personnel are familiar with the requirements of NSIs 009-08 and 009-94 when working within a privately owned ship repair facility.
y. Prior to the delivery order start date, the contractor’s On-Site Supervisor shall meet with the SME and the COR to review the plans, drawings and schedules. The contractor shall immediately submit an itemized estimate for performing in accordance with the delivery order statement of work.
z. Accomplish the requirements of NSI 009-12 when any welding or brazing services are required.
7.2. Environmental and Safety Requirements.
The contractor shall:
a. Consider all insulation, lagging, deck tile, underlayment, gasket shipboard cabling and mastic to be asbestos-containing material (ACM) until it can be established by laboratory analysis, or other reliable methods, that the material does not contain asbestos, in accordance with 29 CFR 1915.1001. Removal, disturbance or disposal of ACM shall be accomplished IAW the requirements of NSI 009-10.
b. Accomplish confined space entry, certification, fire prevention and housekeeping requirements of NSI 009-07, 009-35 and 009-70. The contractor shall maintain area cleanliness and ensure all residues and refuse are removed daily and ensure that general housekeeping is maintained for the duration of the requirement in the work areas specified on each delivery order.
c. Consider all waste to be removed from a ship under repair to be potentially hazardous waste. This includes liquids generated as a result of hydro blasting operations and includes wastes not identified under SWT 077-01. The contractor shall review and evaluate all solid waste to determine if that waste is hazardous IAW 40 CFR 262.11.
d. Consider all waste with the known potential to be hazardous, including, but not limited to, non-skid debris, paint chip debris, flooring/debris, missile blast residue and all liquid waste water removed from the ship shall be tested by a certified laboratory for metals IAW 40 CFR 261.24 using the Toxicity Characteristic Leaching Procedure (TCLP), Method 1311 in EPA Publication SW-846. Contractor shall submit all laboratory analysis reports to the COR as soon as possible upon receipt from the laboratory. No solid waste removed from the ship shall be transported off the facility until authorized by the COR.
e. Prepare, provide and affix labels/placards for all containers of solid waste accumulated on the land, pier, and/or the vessel, including solid waste that is “Pending Analysis.” Labels/placards shall be weatherproof, large enough to provide ready identification, and provide the following information:
- Contractor Name
- Contractor POC: (name, cell phone number, phone number)
- Vessel
- MARMC Contract Number
- MARMC Delivery Order Number
- COR Point of Contact (name, cell phone number, phone number)
- Ship’s QTR Deck/OOD phone number
- Description of waste
- Analysis Pending/Sample date (if applicable)
- MARMC Maintenance Team Project Manager (name, cell phone number, phone number) if applicable
- MARMC Port Engineer (name, cell phone number, phone number) if applicable
f. For operations at Naval Station Norfolk, Joint Expeditionary Base Little Creek-Fort Story, and all private contractor shipyards in the Commonwealth of Virginia, all solid waste determined to be hazardous waste shall be turned over to the ship/vessel from which the waste was produced for processing and disposal through NAVFAC MIDLANT (formerly PWC) hazardous waste operations. For operations at Naval Facilities or private contractor’s facilities outside the Commonwealth of Virginia, the contractor shall comply with all state and local regulations and local work items applicable in those areas.
g. Dispose of the waste in accordance with federal, state, and local regulations in the event that a solid waste is determined to be non-hazardous.
h. Provide a clean/empty vessel or tank truck for off-loading and transport grit blast or paint waste generated from the accomplish of the requirements of the delivery order. The contractor shall coordinate the vessel or tank truck placement with the Ships Authorized Representative (SAR). The contractor shall be responsible for all plumbing and piping as required. The contractor shall accomplish continuous clean-up of all debris and fluids incidental to installation or removal of piping system components during performance of work in individual delivery orders.
i. Submit to the COR, upon completion of each delivery order, one legible copy, in hard copy or electronic media, a report of the types and amounts of wastewater generated as a result of accomplishment of the delivery order. The report shall include description of wastewater, volume of wastewater, name/address of transporter, and the name/address of the disposal facility. If work is performed in a private contractor’s facility, the contractor shall submit this report to the COR and to the facility’s environmental manager.
File details come from the government source that posted it. Updated .