This file is a Questions and Answers (Q&A) document addressing inquiries regarding a federal contract opportunity for a high-pressure nitrogen generation and storage system for PSNS (Puget Sound Naval Shipyard).
The procurement requires a containerized nitrogen generation system configured within a 20-foot ISO 668 Type 1C container, designed for safe outdoor marine storage and transportation via crane, forklifts, and trucks. Key system requirements include: a high-pressure booster compressor matching the existing American Compressors Model 55H75 Universal High PAC (preference rather than firm requirement), approximately 36,000 SCF of high-pressure storage in a COTS bottle bank configuration capable of supporting 100 SCFM peak demand during 40-minute draw cycles at 350 psig output pressure, and integration with shipyard-provided Grade D breathing air at 90–125 psig. The system must deliver 100% oil-free nitrogen verified through testing, with an onboard feed air compressor (Mode 2) supplying only the nitrogen generator, not other shipyard applications. Safety requirements mandate an independent, stand-alone ambient oxygen monitoring system inside the container, separate from the master PLC controller. Acquisition strategy and final clause selection remain pending, though the estimated contract value exceeds the Trade Agreements threshold ($174,000). For unrestricted procurement, DFARS 252.225-7021 (Trade Agreements) is anticipated; if set aside for small business, DFARS 252.225-7001 (Buy American and Balance of Payments Program) and FAR 52.219-14/FAR 52.219-33 (Nonmanufacturer Rule) would apply. Equivalent boosters rated above 4,500 psig with matching connections and controls integration may be considered as alternatives to the specified American Compressors model.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Existing High-PAC Booster: The specification states that the high-pressure booster compressor shall match the make and model of the command’s existing High-PAC fleet.
Can you provide the manufacturer and model number of the existing High-PAC booster equipment?
Answer: The Make is American Compressors Model# 55H75 Model Name: Universal High PAC
2. Bottle Bank Configuration: The specification calls for approximately 36,000 SCF of high-pressure storage. Does PSNS have a preferred bottle size, quantity, rack configuration, or number of independent banks, or would you prefer that we propose the optimal configuration?
Answer: Like the container the solution proposed needs to be able to be safely moved with cranes and forklifts. The goal with the external bank configuration was to alleviate the design constraints of the main systems footprint/volume (20’ ISO Containier) by making the storage system more open to a COTS bottle bank solutions that could meet our supply needs.
3. 100 SCFM Requirement: Can you confirm whether the 100 SCFM continuous delivery requirement at 350 psig is intended to be supplied from the high-pressure storage banks during the 40-minute draw cycles, with the nitrogen generation/compression system replenishing the banks between/during draws? Or is the generation/compression equipment itself expected to continuously produce 100 SCFM?
Answer: The peak demand on the supply is 100 SCFM in 40min cycles. The bank capacity will provide supply for a full shift. 350 PSI is the solely final supply pressure and does not control SCF capacity.
4. Grade D Feed Air: For the shipyard-provided Grade D breathing-air connection at 90– 125 psig, can you provide the available flow capacity (SCFM) at the intended connection point?
Answer: The commands Grade D supply air capacity can meet the systems demand.
5. 20-ft Container Configuration: The specification indicates that the complete system should preferably be contained within a single 20-ft ISO 668 Type 1C container. Is the 20-ft configuration expected to be a firm requirement for the eventual solicitation, or would PSNS consider an alternate configuration if necessary to optimize performance, maintenance access, or safety?
Answer: The intent with the 20ft container is the need for a common and easily transported system within our command. The main concerns are a mature storage/transportation system that is well suited for safe system storage and operation in an outdoor marine environment while being transportable via crane, forklifts, and trucks.
6. Country of origin. Manufactured nitrogen generation equipment in Turkey. The container package would be integrated in the United States. Would the eventual solicitation include DFARS 252.225-7001 (Buy American and Balance of Payments Program) or 252.225-7021 (Trade Agreements)? Will there be any domestic-only restriction beyond those clauses that would prevent us from offering qualifying country end products?
Answer: The final clause selection will depend on the approved acquisition strategy.
Because the estimated value exceeds the Trade Agreements threshold ($174,000), if the solicitation is issued on an unrestricted basis, it is anticipated to include DFARS 252.225-7021 (Trade Agreements). If the procurement is set aside for small business, DFARS 252.225-7001 (Buy American and Balance of Payments Program) and FAR 52.219-14 /FAR 52.219-33 (Nonmanufacturer Rule) will apply. The Government does not anticipate additional domestic-only statutory restrictions beyond standard DFARS Part 225 clauses for this equipment, though offerors are responsible for certifying compliance with all solicitation terms upon final RFP release.
7. Booster compressor. Section 3.3 requires the booster to match the command's High PAC fleet, and the Q&A identified the American Compressor 55H75 Universal High PAC.
Is that model a firm requirement for the solicitation? Or would PSNS consider an equivalent booster rated above 4,500 psig with the same connections and controls integration?
Answer: Not a firm requirement, but a preference due to minimal training of existing work force to maintain the equipment.
8. Onboard feed air compressor. We understand that the shipyard Grade D breathing air connection in Section 3.2 is only a feed source, and that the onboard compressor (Mode
2) only needs to supply the nitrogen generator, not any other shipyard use. Please confirm. Also, must the onboard feed compressor itself be oil-free? Or is a lubricated compressor acceptable, provided the delivered nitrogen meets the 100% oil-free requirement in Section 2.1 through filtration and verified testing?
Answer: Does not need to supply any feed air other than that required to operate the high purity nitrogen generator system. Must output 100% oil free compressed air. Oil free air compressors are preferred over other options and final spec will be determined upon final release of solicitation.
9. Ambient oxygen monitoring. Section 8.1 calls for an independent ambient oxygen monitoring system inside the container. Does "independent" mean a standalone monitor with its own controller and alarms that also signals the master PLC for shutdown? Or may it be integrated into the master PLC, as long as it is separate from the product gas purity analyzer?
Answer: Independent means Stand-alone, not tied in any way to the on-board controller for the nitrogen generator system. Oxygen monitoring system does not necessarily need to be PLC controlled.