Questions and Answers.docx
DOCX document 17 KB Posted
- Attached to
- Lease of 500kW Diesel Generator, 1000kW Diesel Generator, and 1600A Automatic Transfer Switch
- Solicitation number
- N4523A26Q5735
About this file
This file is a Questions and Answers document for Solicitation N4523A26Q5735, issued by the Department of the Navy Naval Supply Systems Command at Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS & IMF) in Bremerton, Washington. The solicitation requests quotes for the lease of commercial equipment including one 500kW Diesel Generator, one 1000kW Diesel Generator, and one 1600A Automatic Transfer Switch. The performance periods vary by equipment: the 500kW generator is required from September 29, 2026 through November 25, 2026, with an optional extension to December 23, 2026, while both the 1000kW generator and automatic transfer switch are required from September 29, 2026 through April 2, 2027.
Quotes must be submitted via email to Emily Hamilton (emily.g.hamilton4.civ@us.navy.mil) and Amanpreet Johal (amanpreet.s.johal2.civ@us.navy.mil) by 9:00 AM Pacific Time on September 8, 2026. All questions regarding the solicitation must be submitted to the same contacts by 9:00 AM Pacific Time on August 28, 2026. This is a combined synopsis and solicitation for commercial services prepared under FAR Part 12 simplified procedures for commercial items. The specific questions and answers contained within this document are not detailed in the provided information; however, this file serves as a reference document for potential vendors responding to the solicitation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers – Solicitation N4523A26Q5735 Lease of one (1) 500kW Diesel Generator, one (1) 1,000kW Diesel Generator, and one (1) 1600A Automatic Transfer Switch
Q: ATS rating. Section 2 of the combined synopsis/solicitation describes a 1,000A ATS, while the solicitation title, CLIN 0003, and PWS specify a 1,600A ATS. Please confirm that the required ATS rating is 1,600A.
A: The ATS is required to be at least 1,600A, the combined synopsis/solicitation has been corrected.
Q: Responsibility for Section 5 items. PWS Section 5 is titled “Government Furnished - Property, Material, Equipment, Services,” but paragraphs 5.1 through 5.7 use “Provide” for electrical cables, crane/forklift services, personnel for operations, and additional diesel fuel. Please identify whether the Government or contractor is responsible for each item and, if contractor-furnished, confirm whether all costs must be included in the monthly CLIN pricing.
A: Sections 5.1 through 5.7, were meant to indicate that “The Government will” provide electrical cables, crane/forklift services, personnel for operations, and additional diesel fuel.
Q: Delivery timing. The stated period of performance begins 29 September 2026, but PWS paragraph 10.2.2 states that a new or replacement system must be delivered within 48 hours of task order award. Please clarify the required initial-delivery timing and whether the 48-hour requirement applies only to replacement equipment.
A: The Government will not be able to receive the 500kW EDG, 1,000kW EDG, and 1600A ATS all on the same day. After the contract is awarded, in accordance with Section 8 and 10.2 of the PWS, the Government will coordinate with the Contractor to determine best delivery dates for each unit. Please take this into account for pricing of delivery and pick-up costs.
Q: DOT documentation. PWS paragraph 4.13 requires DOT certification for trailered EDGs under 49 CFR 396.17, while CDRL A001 is titled “Explosive Hazard Classification Data Report.” Please clarify the exact DOT documentation required and its submission date.
A: For the DOT certification, the Government is looking for objective quantifiable evidence that the inspection per 49 CFR 396.17 was performed. A copy of the periodic inspection report and a labeled affixed to the trailer should suffice, as it is the requirements of the subject CFR.
Q: Missing documents. Please provide Wage Determination No. 2015-5525, Revision 30, dated 12 May 2026, and the PSNS & IMF Service Call Repair / Contract Discrepancy Report forms referenced in PWS paragraphs 4.6, 4.11, and 6.1.
A: The documents have been added.