C04.0 N4523A23R1056 YC-1569 & YC-1570 Attachment J-2 Price Proposal Worksheet.xls

XLS spreadsheet 248 KB Posted

Attached to
YC-1569 and YC-1570
Solicitation number
N4523A23R1056
Issued by

About this file

This solicitation seeks proposals for maintenance, repair, and preservation work on two open lighter barges, YC-1569 and YC-1570, owned by the Department of the Navy. Contractors must have facilities capable of accommodating the 110-foot barges in the Puget Sound, Washington region. Scope of work includes docking and undocking the vessels; blasting and preserving exterior surfaces; shifting blocks for underwater hull preservation; installing new zinc anodes; hull and deck ultrasonic thickness measurements and repairs; applying non-skid coating; inspecting and testing six tanks/voids per vessel with partial preservation; and verifying and providing vessel drawings. The period of performance is May 3 to July 20, 2023. This is a 100% small business set-aside under NAICS code 336611 with a size standard of 1,250 employees. Proposals are due by the specified closing date. The solicitation was issued by the Regional Maintenance Center at Puget Sound Naval Shipyard and Intermediate Maintenance Facility.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instruction Sheet

Instructions for Contractors for Filling-out J-2 Price Proposal Worksheet
All yellow fields are to be filled out by the Contractor prior to submittal to The Government.
DO NOT FILL IN ANY CELL THAT IS NOT BRIGHT YELLOW.
Labor Mix & Rates Sheet
1Enter Company Name and Date
2Fill in each rate in its applicable yellow cell
3Fill in each labor category and ensure all yellow boxes are filled in
a.Example Labor Categories
Shipfitter
Sheetmetal
Welder/Burer
Electrician
Inside Machinist
Outside Machinist
Boilermaker
Pipefitter
Insulator/Lagger
Shipwright/Carpenter
EX/Ord
Painter/Blaster
Rigger/Laborer
QA/NDT
4Next, fill in each yellow cell for Regular Labor Hours and Overtime Labor Hours
5Your Total Direct Labor Rate Per Hour will autopopulate in each sheet. All other rates entered will also auto populate.
Price Proposal Worksheet
1All company and contract information and rates will be autopopulated from previous sheet.
2Fill in each yellow cell with its applicable information
3Anything that is not in yellow is locked, these cells will auto-calculate.
4Before submitting, ensure there are no more bright yellow cells.
IF USING FCCOM
Facilities Capital Cost of Money (FCCOM) is not required. If you are not inputting FCCOM please enter N/A in all cells. However, if your company is inputting FCCOM, it needs to be calculated based on the proper CASB-CMF form. Please include the CASB-CMF form with your submission.
Labor Hour Breakdown
1Enter each labor categoy will autofill from the "labor Mix & Rates" sheet
2Fill in each Regular and Overtime hour for each labor category and line item.

Labor Mix & Rates

Contractor/Company Name:
Project/Vessel Name:YC-1569 & YC-1570Date:
Base Rates:Regular Labor$0.00FringeOverheadG&AProfitFCCOM
Labor Mix and Rates
Labor CategoryRegular HoursOvertime HoursTotal Category HoursTotal Regular $/hourTotal Overtime $/hourTotal Category Dollars
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
Column Totals000$0.00$0.00$0.00
Direct Labor Rate Per Hour0

Example Labor Categories Shipfitter Sheetmetal Welder/Burer Electrician Inside Machinist Outside Machinist Boilermaker Pipefitter Insulator/Lagger Shipwright/Carpenter EX/Ord Painter/Blaster Rigger/Laborer QA/NDT

YC-1569

Contractor/Company Name:0
Project/Vessel Name:YC-1569 & YC-1570Date:12/31/99
Base Rates:Labor$0.00Fringe0.00%Overhead0.00%G&A0.00%Profit0.00%FCCOM0.00
Base Work Package Proposal
PARAGRAPH No.TITLEPRIMESUBCONTRACTOROther Direct Cost (ODC)*PRIMELine Item Total
M/HLabor CostMATERIAL PRICETOTALLabor CostMaterial CostTOTALODCTravel ODCTOTALFringeOverheadG&AProfitFCCOM
1.4Arrival Conference$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.5Required Documents$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.6Progress Meetings$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.7Availability Requirements$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.7.1Transport Vessels$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.8Care of Vessel$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.11CFR Reports$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.13Safety Requirements$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.16.1Preservation OQE$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.17Enviromental/Hazwaste Management$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.22Gas Free$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.23Develop & Maintain Test Plan$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.1Personal & Equipment$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.2Docking Procedures$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.3Blocking Plan$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.5Setting and Aligning Blocks$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.7Docking Conference$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.8Docking the Vessel$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.9Post Docking$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.10Shifting Vessel$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.11Undocking$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.13Final Docking Report$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.1Identify Distinguishing Figures and Markings$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.2Steel Half Pipe Fenders$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.3Zinc Anodes$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.4Hull Blasting and Preservation$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.5Hull & FB Visual Inspection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.6Hull & FB U/T Inspection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.1Open, Pump, Clean, Vent, Gas Free, Close all tanks$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.2Tank/ Void Visual Inspection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.3Identify Color Schemes and Markings$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.4Preliminary Air Test$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.5Tank/Void Touch Up Preservation$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.6Access Cover Preservation$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.7Final Air Test$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.8Tank/Void Closeout Inspection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.5.1Main Deck Non-Skid Preservation$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.5.5Main Deck Visual Inspection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.5.6Main Deck Test (UT) Inspection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
Column Totals0$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Base Work Package$0.00
OPTION YEAR TABLE IF NEEDED:
Option Item Proposal Package
PARAGRAPH No.TITLEM/HLabor CostMATERIAL PRICETOTALLabor CostMaterial CostTOTALODCTravel ODCTOTALFringeOverheadG&AProfitFCCOMLine Item Total
0$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Column Totals00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Option Items (O):$0.00
TOTAL PROPOSED PRICE:$0.00

*ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.

NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.

NOTE: Labor rates and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract.

YC-1570

Contractor/Company Name:0
Project/Vessel Name:YC-1569 & YC-1570Date:12/31/99
Base Rates:Labor$0.00Fringe0.00%Overhead0.00%G&A0.00%Profit0.00%FCCOM0.00
Base Work Package Proposal
PARAGRAPH No.TITLEPRIMESUBCONTRACTOROther Direct Cost (ODC)*PRIMELine Item Total
M/HLabor CostMATERIAL PRICETOTALLabor CostMaterial CostTOTALODCTravel ODCTOTALFringeOverheadG&AProfitFCCOM
1.4Arrival Conference$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.5Required Documents$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.6Progress Meetings$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.7Availability Requirements$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.7.1Transport Vessels$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.8Care of Vessel$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.11CFR Reports$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.13Safety Requirements$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.16.1Preservation OQE$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.17Enviromental/Hazwaste Management$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.22Gas Free$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.23Develop & Maintain Test Plan$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.1Personal & Equipment$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.2Docking Procedures$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.3Blocking Plan$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.5Setting and Aligning Blocks$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.7Docking Conference$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.8Docking the Vessel$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.9Post Docking$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.10Shifting Vessel$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.11Undocking$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.13Final Docking Report$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.1Identify Distinguishing Figures and Markings$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.2Steel Half Pipe Fenders$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.3Zinc Anodes$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.4Hull Blasting and Preservation$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.5Hull & FB Visual Inspection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.6Hull & FB U/T Inspection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.1Open, Pump, Clean, Vent, Gas Free, Close all tanks$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.2Tank/ Void Visual Inspection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.3Identify Color Schemes and Markings$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.4Preliminary Air Test$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.5Tank/Void Touch Up Preservation$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.6Access Cover Preservation$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.7Final Air Test$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.8Tank/Void Closeout Inspection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.5.1Main Deck Non-Skid Preservation$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.5.5Main Deck Visual Inspection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.5.6Main Deck Test (UT) Inspection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
Column Totals0$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Base Work Package$0.00
OPTION YEAR TABLE IF NEEDED:
Option Item Proposal Package
PARAGRAPH No.TITLEM/HLabor CostMATERIAL PRICETOTALLabor CostMaterial CostTOTALODCTravel ODCTOTALFringeOverheadG&AProfitFCCOMLine Item Total
0$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Column Totals00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Option Items (O):$0.00
TOTAL PROPOSED PRICE:$0.00

*ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.

NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.

NOTE: Labor rates and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract.

Labor Hour Breakdown

Contractor/Company Name:0
Project/Vessel Name:YC-1569 & YC-1570Date:12/31/99
Base Rates:Regular Labor Rate$0.00
NameRateTotal CostNameRateTotal Cost
Labor Hour Breakdown
PARAGRAPH No.TITLELabor CategoriesTotal Overall Labor Cost
000000000000000000Total Regular HoursTotal Overtime Hours
REGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOT
1.4Arrival Conference00$0.00
1.5Required Documents00$0.00
1.6Progress Meetings00$0.00
1.7Availability Requirements00$0.00
0000$0.00
1.7.1Transport Vessels00$0.00
1.8Care of Vessel00$0.00
1.11CFR Reports00$0.00
1.13Safety Requirements00$0.00
1.16.1Preservation OQE00$0.00
1.17Enviromental/Hazwaste Management00$0.00
1.22Gas Free00$0.00
1.23Develop & Maintain Test Plan00$0.00
3.1.1Personal & Equipment00$0.00
3.1.2Docking Procedures00$0.00
3.1.5Setting and Aligning Blocks00$0.00
3.1.7Docking Conference00$0.00
3.1.8Docking the Vessel00$0.00
3.1.9Post Docking00$0.00
3.1.10Shifting Vessel00$0.00
3.1.11Undocking00$0.00
3.1.13Final Docking Report00$0.00
3.2.1Identify Distinguishing Figures and Markings00$0.00
0000$0.00
3.2.3Zinc Anodes00$0.00
3.2.4Hull Blasting and Preservation00$0.00
3.2.5Hull & FB Visual Inspection00$0.00
3.4.3Identify Color Schemes and Markings00$0.00
3.4.4Preliminary Air Test00$0.00
3.4.5Tank/Void Touch Up Preservation00$0.00
3.4.6Access Cover Preservation00$0.00
3.4.7Final Air Test00$0.00
3.4.8Tank/Void Closeout Inspection00$0.00
0000$0.00
0000$0.00
3.5.1Main Deck Non-Skid Preservation00$0.00
3.5.6Main Deck Test (UT) Inspection00$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
0000$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
Column Totals00000000000000000000000000000000000000$0.00
Base Work Package$0.00
OPTION YEAR TABLE IF NEEDED:
Labor Hour Breakdown
PARAGRAPH No.TITLELabor CategoriesTotal Overall Labor Cost
000000000000000000Total Direct HoursTotal Overtime Hours
REGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOT
0000$0.00
0000$0.00
0000$0.00
0000$0.00
Column Totals00000000000000000000000000000000000000$0.00
Total Option Items (O):$0.00
TOTAL DIRECT LABOR COSTS BY WORK ITEM$0.00