C09.0.1 N4523A22Q5724 Q&A#1.pdf
PDF 95 KB Posted
- Attached to
- NRTL Inspections Federal contract opportunity
- Solicitation number
- N4523A22Q5724
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C09.0.4 N4523A22Q5724 Q&A#2.pdf | ||
| C09.1 N4523A22Q5724-A001 NRTL Combined Synopsis Solicitation.pdf | ||
| C09.1.0 Attachment 1 Updated PWS 07-13-2022.pdf | ||
| C08.5 Attachment 4 Wage Determination portfolio.pdf | ||
| C08.3 Attachment 2 Facility Access Letter.pdf | ||
| C08.2 Attachment 1 PWS NRTL Inspection.pdf | ||
| C08.4 Attachment 3 Contractor Badging and Access Requirements.pdf | ||
| C08.1 Exhibit A CDRL A001 NRTL Certification.pdf | ||
| C08.0 N4523A22Q5724 Combined Synopsis Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N4523A22Q5724 Q&A #1
Q: I would recommend adding NFPA 86 (gas train – includes piping, regulators and operating devices from the Governments point of connection). Specifically this would be a second line item for each year. NFPA 86 is required for gas heated batch and process ovens used. The unit price for this type of equipment inspection [is significantly different than] the unit price for NFPA 79 (Electrical and Life Safety).
A: See N4523A22Q5724 Amendment 001 and updated Performance Work Statement Attachment 1.
File details come from the government source that posted it. Updated .