- Maintenance, Preservation, and Repair of YON-319
- Solicitation number
- N4523A21R1055
About this file
This document contains a price proposal sheet and federal contract opportunity notice for maintenance, preservation, and repair services for YON-319, a 226-foot fuel oil barge owned by the Navy. The price proposal sheet requests fixed hourly labor rates and percentages for G&A and profit to be applied to the labor and material line items. The federal contract opportunity is a 100% small business set-aside with a period of performance from July 22, 2021 to October 20, 2021. Services required include docking and undocking, hull and tank inspections and repairs, engine maintenance, electrical repairs, piping preservation, and delivery of the vessel. The solicitation is issued by the Department of the Navy Naval Supply Systems Command under NAICS code 336611 for ship building and repair with a size standard of 1,250 employees.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
YON-319
| INSERT CONTRACTOR/COMPANY NAME HERE | |||||||||||
| Project = | YON-319 | DATE: = | |||||||||
| PRIME | SUBCONTRACTOR | PRIME | PRIME | ||||||||
| PARAGRAPH No. | TITLE | M/H | MATERIAL PRICE | TOTAL | Labor Cost | Material Cost | TOTAL | Other Direct Cost (ODC)* | G&A | PROFIT | Line Item Total |
| 1.4 | Arrival Conference | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.5 | Required Documents | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.6 | Progress meetings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.7 | Availability requirements | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.7.1 | Transport Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.8 | Care of Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.9 | Quality Management | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.11 | Condition Found Report | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.13 | Safety Requirements | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.16 | Preservation OQE | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.17 | Environmental and Hazardous Waste Management | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.22 | Gas Free | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.23 | Requirements for Testing | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.2 | Docking Procedure | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.3 | Blocking Plan | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.4 | Crib and Brace Blocking: | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.5 | Setting and Alignment of Docking Blocks | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.6 | Docking Conference | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.7 | Docking the Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.8 | Post Docking | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.9 | Shifting the Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.10 | Undocking the Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.12 | Final Docking Report | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.1 | Identify Distinguishing Figures and Markings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.2 | Rubber Fenders | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.3 | Zinc Anodes | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.4 | Hull Blasting and Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.5 | Hull and Freeboard Visual Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.6 | Hull and Freeboard UT Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.7 | Steel Pipe Half Fenders | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.8 | Skeg Repairs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.1 | Open, Pump, Clean, Ventilate, and Gas Free Tanks/Voids | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.2 | Tank/Void Visual Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.3 | Identify color schemes and Markings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.4 | Preliminary Air Test | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.5 | Tank/Void Touch-up Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.6 | Cover Plate Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.7 | Trunk and Hatch Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.8 | Hatch Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.9 | Final Air Test | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.10 | On-Load Fuel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.11 | Tank/Void Closeout Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.1 | Main Deck Non-Skid Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.2 | Visual Inspection for Structural Defects | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.3 | Ultrasonic Test (UT) Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.4 | Cofferdam Drain Plugs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.5 | Running Light Stantion Remove Existing and Install New | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.6 | Hatch Life Line Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.7 | Office Step Install | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.8 | FWD Mast, Remove existing and install new | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.9 | Tank Vent Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.10 | Grounding Reel Install | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.11 | PRT and STBD Fuel Header Cofferdam Modification | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.12 | Gear Stowage Locker Install | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.13 | Stowage Locker Water Hose Test | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.14 | Blast and Preserve FWD Mast and Running Light Stantions | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.5.1 | Non-skid Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.5.2 | Mechanical Deck House Painted Label | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.5.3 | Mechanical Deck House Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.5.4 | Hazmat Locker Install | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.5.5 | Electro Magnetic Door Retainer Removal | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.5.6 | Door Hold Open Assembly Install | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.5.7 | Bulkhead Penetration Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.5.8 | Trip Hazard Marking Install | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.5.9 | Mechanical Deck House Door Gasket Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.6.1.1 | Repair Hull Plate Impact Site | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.6.1.2 | Replace L4 & L5 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.6.1.3 | Straighten Shell Plating | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.6.1.4 | New L5 & L5 flanges at FR 24 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.6.1.5 | Straighten L4 & L5 on inboard FR 24 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.6.1.6 | Identify Locaitons prior to work | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.6.2.1 | Repair Hull Plate Impact Site 2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.9.1 | Service Manual Provide | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.9.2 | Cargo Diesel Engine Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.9.3 | Cylinder Heads and Valves | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.9.4 | Fuel Injector System | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.9.5 | Engine Oil Analysis | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.9.6 | Diesel Engine Coolant | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.9.7 | Engine Compression Testing | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.9.8 | Starting and Charging System Testing | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.9.9 | PTO Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.9.10 | Engine Exhaust Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.9.12 | Engine Inspection Port Seal Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.9.13 | Cargo Pump Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.9.14 | Crankcase Vacuum System Install | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.10.1 | Navigation Light Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.10.2 | FWD Cargo Deck Flood Light Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.10.3 | Tank High Level Alarm and Indicator Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.10.4 | Office Electrical Conduit Install | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.10.5 | Shore Power Connection Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.10.6 | Antenna/Cabling Removal | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.11.1 | Piping and Valve Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.11.2 | DBB Valve Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.11.3 | Tank Gate Valve Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.11.4 | Cargo Diesel Day Tank Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.13.2 | Final Dock Trial | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.13.3 | Post Dock Trial | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Column Totals | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Scope (SOW/PWS) | Labor Rate/MH: | G&A Rate: | Profit Rate: | ||||||||
| Total Bid: | $0.00 |
&C********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR********* =MH*Labor Rate*G&A =(Prime Material Price+Subcontractor Total)*Profit Rate =SUM(Prime Total+Subcontractor Total+ODC+G&A+Profit) =(MH*Labor Rate)+Material Price =Sub Cost (F) *ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.
NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.
NOTE: Labor rates and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract.
File details come from the government source that posted it. Updated .