Attachment J-2 - 5-Way Breakdown - APL-62.xls
XLS spreadsheet 63 KB Posted
- Attached to
- APL-62 Barracks Craft Federal contract opportunity
- Solicitation number
- N4523A20R1063
About this file
This document contains a federal contract solicitation and supporting cost proposal template. The solicitation seeks proposals for maintenance, repair, and preservation of the APL-62 vessel homeported at Puget Sound Naval Shipyard, Bremerton. Work will include exterior hull blasting and preservation, water heater replacements, inspections, and transporting the vessel. The period of performance is from August 12, 2020 to February 10, 2021. The contract will be awarded on a lowest price, technically acceptable basis under NAICS code 336611. Proposals are due by April 2020. Offerors must be SAM registered and ship repair facilities must be located in Washington, Oregon, or California. Reference drawings will be provided to eligible offerors who request them by February 27. The cost proposal template outlines a work breakdown structure for pricing the solicited work and calculating labor rates, overhead, and profit.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| APL-62 RFC 1 - ANS.pdf | ||
| Attachment J-1 - SOW APL-62.pdf | ||
| Attachment J-6 - PSNS CIA Access Instructions.pdf | ||
| Exhibit B - DD1149 Receiving Report.pdf | ||
| Attachment J-4 - Contract Performance Data Sheet N4523A20R1063.pdf | ||
| Attachment J-3 - Request for Clarification (RFC) N4523A20R1063.pdf | ||
| Attachment J-5 - Corporate Experience Data Sheet N4523A20R1063.pdf | ||
| SOLICITATION - N4523A20R1063 - APL-62.pdf | ||
| Exhibit A - CDRLs and DIDs - APL-62.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APL-62
| INSERT CONTRACTOR/COMPANY NAME HERE | |||||||||||
| Project = | APL-62 | DATE: = | |||||||||
| PRIME | SUBCONTRACTOR | PRIME | PRIME | ||||||||
| PARAGRAPH No. | TITLE | M/H | MATERIAL PRICE | TOTAL | Labor Cost | Material Cost | TOTAL | Other Direct Cost (ODC)* | G&A | PROFIT | Line Item Total |
| 1.4 | Arrival Conference | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.5 | Required Documents | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.6 | Progress Meetings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.7 | Availability Requirements | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.7.1 | Transport Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.8 | Care of Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.11 | CFR Reports | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.16.1 | Preservation OQE | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.17 | Enviromental/ Hazwaste Management | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.20 | Gas Free | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.21 | Develop & Maintain Test Plan | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.1 | Personnel & Equipment | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.2 | Docking Procedures | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.3 | Blocking Plan | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.4 | Crib and Brace Blocking | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.5 | Setting and Aligning Blocks | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.7 | Docking Conference | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.8 | Docking the Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.9 | Post Docking | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.10 | Shifting the Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.11 | Undocking Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.11 | Final Docking | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.1 | Identify Distinguishing Figures and Markings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.2 | Steel Fenders | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.3 | Zinc Anodes | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.4 | Hull Blasting and Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.5 | Hull and Freeboard Visual Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.6 | Hull and Freeboard UT Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.1 | Temporary Access Cut Testing PCP | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.2 | Water HTR Temp Acces Cut | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.1 | Open, Pump, Clean, Vent, Gas Free, Close all tanks | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.2 | Tank/Void Visual Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.3 | Indentfy Color Schemes and Markings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.4 | Preliminary Air Test | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.5 | CHT Blast and Preserve | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.6 | Access Cover Repairs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.7 | Final Air Test | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.8 | Tank Closeout Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.7.1 | Water HTR RMV/INST | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.7.2 | Water HTR Foundation Mod | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.8.1 | Water HTR Electrical Mod | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.9.1 | Deck Drain Piping Mod | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.9.2 | Hot Water HTR Hot Water Piping Mod | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.9.3 | Hot Water HTR Cold Water Piping Mod | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.9.4 | Hot Water HTR Steam and condensate Piping Removal | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.11.2 | Dock Trials | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| Column Totals | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Scope (SOW/PWS) | Labor Rate/MH: | G&A Rate: | Profit Rate: | ||||||||
| Total Proposal: | $0.00 | ||||||||||
| *ODC = Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc. | |||||||||||
| **Labor Rate/Hr = Represents a composite value of all categories of direct labor to accomplish the outcomes of the requirement | |||||||||||
| ***G&A = General and Administrative Overhead factor associated with | |||||||||||
| ****Profit = Incentive factor associated with materials, to include subcontracting expenses, directly attributable to the contract |
&C********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR********* =MH*Labor Rate*G&A =(Prime Material Price+Subcontractor Total)*Profit Rate =SUM(Prime Total+Subcontractor Total+ODC+G&A+Profit) =(MH*Labor Rate)+Material Price =Sub Cost (F) NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.
NOTE: Labor rates and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract.