Attachment_J-2_5-way_break_out_YC_1571.xlsx

XLSX spreadsheet 26 KB Posted

Attached to
Maintenance, Preservation, and Repair YC 1571
Solicitation number
N4523A19R1052
Issued by

About this file

Attachment J-2 5-way breakout YC-1571 N4523A19R1052

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

vessel name

INSERT CONTRACTOR/COMPANY NAME HERE
Project =YC 1571DATE: =
PRIMESUBCONTRACTORPRIME
Carney, Sean R CIV PSNS&IMF, Code 411: =MH*Labor Rate*G&APRIME

Carney, Sean R CIV PSNS&IMF, Code 411: =(Prime Material Price+Subcontractor Total)*Profit Rate

PARAGRAPH No.TITLEM/HMATERIAL PRICETOTAL
Carney, Sean R CIV PSNS&IMF, Code 411: =(MH*Labor Rate)+Material PriceLabor CostMaterial CostTOTAL

Carney, Sean R CIV PSNS&IMF, Code 411: =Sub Cost (F)

Carney, Sean R CIV PSNS&IMF, Code 411: =MH*Labor Rate*G&A Carney, Sean R CIV PSNS&IMF, Code 411: =(Prime Material Price+Subcontractor Total)*Profit Rate Other Direct Cost (ODC)* G&A PROFIT Line Item Total Carney, Sean R CIV PSNS&IMF, Code 411: =SUM(Prime Total+Subcontractor Total+ODC+G&A+Profit)

1.4Arrival Conference$0.00$0.00$0.00$0.00$0.00
1.5Required Documents$0.00$0.00$0.00$0.00$0.00
1.6Progress Meetings$0.00$0.00$0.00$0.00$0.00
1.7Availability Requirements$0.00$0.00$0.00$0.00$0.00
1.7.1Transport Vessels$0.00$0.00$0.00$0.00$0.00
1.8Care of Vessel$0.00$0.00$0.00$0.00$0.00
1.11CFR Reports$0.00$0.00$0.00$0.00$0.00
1.13Safety Requirements$0.00$0.00$0.00$0.00$0.00
1.16.1Preservation OQE$0.00$0.00$0.00$0.00$0.00
1.17Environmental/Hazwaste Management$0.00$0.00$0.00$0.00$0.00
1.20Gas Free$0.00$0.00$0.00$0.00$0.00
1.21Develop & Maintain Test Plan$0.00$0.00$0.00$0.00$0.00
3.1.1Personnel & Equipment$0.00$0.00$0.00$0.00$0.00
3.1.2Docking Procedures$0.00$0.00$0.00$0.00$0.00
3.1.3Blocking Plan$0.00$0.00$0.00$0.00$0.00
3.1.5Setting and Aligning Blocks$0.00$0.00$0.00$0.00$0.00
3.1.6Docking Conference$0.00$0.00$0.00$0.00$0.00
3.1.7Docking the Vessel$0.00$0.00$0.00$0.00$0.00
3.1.8Post Docking$0.00$0.00$0.00$0.00$0.00
3.1.9Undocking$0.00$0.00$0.00$0.00$0.00
3.1.11Final Docking Report$0.00$0.00$0.00$0.00$0.00
3.2.1Identify Distinguishing Figures and Markings$0.00$0.00$0.00$0.00$0.00
3.2.2Steel Half Pipe Fenders$0.00$0.00$0.00$0.00$0.00
3.2.3Zinc Replacement$0.00$0.00$0.00$0.00$0.00
3.2.4Hull Blasting and Preservation$0.00$0.00$0.00$0.00$0.00
3.2.5Hull & FB Visual Inspection$0.00$0.00$0.00$0.00$0.00
3.2.6Hull & FB U/T Inspection$0.00$0.00$0.00$0.00$0.00
3.3.1Manhole/Coaming Replacement$0.00$0.00$0.00$0.00$0.00
3.4.1Open, Pump, Clean, Vent, Gas Free, Close all tanks$0.00$0.00$0.00$0.00$0.00
3.4.2Tank/ Void Visual Inspection$0.00$0.00$0.00$0.00$0.00
3.4.3Identify Color Schemes and Markings$0.00$0.00$0.00$0.00$0.00
3.4.4Preliminary Air Test$0.00$0.00$0.00$0.00$0.00
3.4.5Tank/ Void Preservation$0.00$0.00$0.00$0.00$0.00
3.4.6Access Cover Preservation$0.00$0.00$0.00$0.00$0.00
3.4.7Final Air Test$0.00$0.00$0.00$0.00$0.00
3.4.8Tank Close-out Inspection$0.00$0.00$0.00$0.00$0.00
3.5.1Main Deck Non-skid Preservation$0.00$0.00$0.00$0.00$0.00
3.5.2Main Deck Visual Inspection$0.00$0.00$0.00$0.00$0.00
3.5.3Main Deck U/T Inspection$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
Column Totals0$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Scope (SOW/PWS)Labor Rate/MH:G&A RateProfit Rate:$0.00
Total Proposed Price

********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR*********

*ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.

NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.

NOTE: Labor rates and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract to include Reservation Tasking.