Attachment_J-2_Price_Proposal_Worksheet.xls

XLS spreadsheet 72 KB Posted

Attached to
YON 325 Maintenance, Repair and Preservation
Solicitation number
N4523A18R1059
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

vessel name

INSERT CONTRACTOR/COMPANY NAME HERE
Project =YON-325DATE: =
PRIMESUBCONTRACTORPRIMEPRIME
PARAGRAPH No.TITLEM/HMATERIAL PRICETOTALCostTOTALOther Direct Cost (ODC)*G&APROFITLine Item Total
1.4Arrival Conference$0.00$0.00$0.00$0.00$0.00
1.5Required Documents$0.00$0.00$0.00$0.00$0.00
1.6Progress Meetings$0.00$0.00$0.00$0.00$0.00
1.7Availability Requirements$0.00$0.00$0.00$0.00$0.00
1.7.1Transport Vessel$0.00$0.00$0.00$0.00$0.00
1.7.2Provide Office Space$0.00$0.00$0.00$0.00$0.00
1.8Care of Vessel$0.00$0.00$0.00$0.00$0.00
1.11CFR$0.00$0.00$0.00$0.00$0.00
1.13Safety Requirements$0.00$0.00$0.00$0.00$0.00
1.16.1Maintain Preservation OQE Records$0.00$0.00$0.00$0.00$0.00
1.17Enviromental/Hazwaste management$0.00$0.00$0.00$0.00$0.00
1.21Gas Free$0.00$0.00$0.00$0.00$0.00
1.22.1Develop & Maintain Test Plan$0.00$0.00$0.00$0.00$0.00
3.1.2Docking Procedure$0.00$0.00$0.00$0.00$0.00
3.1.3Blocking Plan$0.00$0.00$0.00$0.00$0.00
3.1.5Setting & Aligning Blocks$0.00$0.00$0.00$0.00$0.00
3.1.6Docking Conference$0.00$0.00$0.00$0.00$0.00
3.1.7Dock the Vessel$0.00$0.00$0.00$0.00$0.00
3.1.8Post Docking$0.00$0.00$0.00$0.00$0.00
3.1.9Undock the Vessel$0.00$0.00$0.00$0.00$0.00
3.1.11Final Docking Report$0.00$0.00$0.00$0.00$0.00
3.2.1Distinguishing Figures & Markings$0.00$0.00$0.00$0.00$0.00
3.2.2Rubber Fenders$0.00$0.00$0.00$0.00$0.00
3.2.3Steel Half Pipe Fenders$0.00$0.00$0.00$0.00$0.00
3.2.4Zinc Anodes$0.00$0.00$0.00$0.00$0.00
3.2.5Hull Blasting & Preservation$0.00$0.00$0.00$0.00$0.00
3.2.6Hull and Freeboard Visual Inspection$0.00$0.00$0.00$0.00$0.00
3.2.7Hull and Freeboar UT Inspection$0.00$0.00$0.00$0.00$0.00
3.2.8Skegs Repair$0.00$0.00$0.00$0.00$0.00
3.2.9Steel Half Pipe Ladder$0.00$0.00$0.00$0.00$0.00
3.3.1Modify Cofferdam$0.00$0.00$0.00$0.00$0.00
3.3.2Storage Locker Modifications$0.00$0.00$0.00$0.00$0.00
3.4.1Open, Pump, Clean, Close, Gas Free Tanks$0.00$0.00$0.00$0.00$0.00
3.4.2Visual Inspection$0.00$0.00$0.00$0.00$0.00
3.4.3Identify Color Schemes and Markings$0.00$0.00$0.00$0.00$0.00
3.4.4Preliminary Air Test$0.00$0.00$0.00$0.00$0.00
3.4.5Access Cover Blast & Preserve$0.00$0.00$0.00$0.00$0.00
3.4.6Tank & Void Touch Up Preservation$0.00$0.00$0.00$0.00$0.00
3.4.7Watertight Hatch &Scuttle Repair$0.00$0.00$0.00$0.00$0.00
3.4.8Replace #1 Cargo Tank Ullage Pin$0.00$0.00$0.00$0.00$0.00
3.4.9Final Air Test$0.00$0.00$0.00$0.00$0.00
3.4.10Tank & Void Closeout$0.00$0.00$0.00$0.00$0.00
3.4.11Onload Fuel$0.00$0.00$0.00$0.00$0.00
3.4.12Tank Pre-Closeout$0.00$0.00$0.00$0.00$0.00
3.4.13Tank Closeout Inspection$0.00$0.00$0.00$0.00$0.00
3.5.1Main Deck Nonskid Repair$0.00$0.00$0.00$0.00$0.00
3.5.2Visual Inspection for Structural Defects$0.00$0.00$0.00$0.00$0.00
3.5.3Ultrasonic Inspection$0.00$0.00$0.00$0.00$0.00
3.5.4Solar Panel Pivot Mount$0.00$0.00$0.00$0.00$0.00
3.5.5Muffler Bird Repellent$0.00$0.00$0.00$0.00$0.00
3.5.6Center Running Light Pigtail$0.00$0.00$0.00$0.00$0.00
3.6.1Antenna Support Modification$0.00$0.00$0.00$0.00$0.00
3.9.1-3.9.9Cargo Pump Diesel$0.00$0.00$0.00$0.00$0.00
3.9.10YD-5500 Exhaust Bellows Replacement$0.00$0.00$0.00$0.00$0.00
3.10.1Navigation Lighting$0.00$0.00$0.00$0.00$0.00
3.10.2Cargo Deck Flood Lights$0.00$0.00$0.00$0.00$0.00
3.10.3Cargo Deck Flood Lights$0.00$0.00$0.00$0.00$0.00
3.10.4Tank Level Indication$0.00$0.00$0.00$0.00$0.00
3.10.5Tapped Cable Hangers$0.00$0.00$0.00$0.00$0.00
3.11.110 Inch Cargo Fuel Valve Repair$0.00$0.00$0.00$0.00$0.00
3.11.2Day Tank Piping Replacement$0.00$0.00$0.00$0.00$0.00
3.11.3Cargo Piping Preservation$0.00$0.00$0.00$0.00$0.00
3.13.2Dock Trials$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
Column Totals0$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Scope (SOW/PWS)Labor Rate/MH:G&A Rate:Profit Rate:$0.00
Total Bid:

&C********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR********* =MH*Labor Rate*G&A =(Prime Material Price+Subcontractor Total)*Profit Rate =SUM(Prime Total+Subcontractor Total+ODC+G&A+Profit) =(MH*Labor Rate)+Material Price =Sub Cost (F) *ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.

NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.

File details come from the government source that posted it.