Attachment_J-2_Price_Proposal_Worksheet.xls
XLS spreadsheet 71 KB Posted
- Solicitation number
- N4523A18R1057
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_J-1_Statement_of_Work_(SOW).pdf | ||
| N4523A18R1057_References.zip | ZIP file | |
| Attachment_J-3_Request_for_Clarification_(RFC)_Form.docx | DOCX document | |
| Attachment_J-5_Corporate_Experience_Data_Sheet.docx | DOCX document | |
| Attachment_J-4_Contract_Performance_Data_Sheet.docx | DOCX document | |
| Exhibit_A_CDRLs_&_DIDs.pdf | ||
| N4523A18R1057_-_Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
vessel name
| INSERT CONTRACTOR/COMPANY NAME HERE | ||||||||||
| Project = | LET Kit #3 | DATE: = | ||||||||
| PRIME | SUBCONTRACTOR | PRIME | PRIME | |||||||
| PARAGRAPH No. | TITLE | M/H | MATERIAL PRICE | TOTAL | Cost | TOTAL | Other Direct Cost (ODC)* | G&A | PROFIT | Line Item Total |
| 1.0 | Gen Regs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 1.4 | Arrival Conference | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 1.6 | Progress Meetings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 1.7 | Availability Requirements | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 1.8 | Care of Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 1.11 | CFR | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 1.16 | Safety | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.3.1 | Distinguishing Figures | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.3.2.1 | Remove Roller Guides | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.3.2.2 | Install Roller Guides | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.3.2.3 | Rem/Inst Door Stop Rubber | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.3.2.4 | Rem/inst Sliding door track | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.2.2.5 | Rem/Inst Sliding Door Center Brackets | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.2.2.6 | Rem/Inst Sliding Door End Blinds | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.2.2.7 | Inst. Sliding Door Fastners | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.2.2.8 | Remove/Inst Sliding Door Hangers | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.2.2.9 | Seal Crane Mount Holes | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.2.2.10 | Install Desmoking Fan Assemble | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.2.2.11 | Rem Service Entry Doors | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.2.2.12 | Inst. Service Coamings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.2.2.13 | Install Aluminum Sheet, Item 89 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.2.2.14 | Install Coaming Sleeves | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.2.2.15 | Provide Banding | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.2.2.16 | Provide Buckles | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.2.2.17 | Rem/Inst. Rivets | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.2.2.18 | Remove Crane Feet | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.2.2.19 | Inst. New Crane Feet | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.2.2.20 | Inst. New Upper Door Stop | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.2.2.21 | Repair Doors | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.3.3.1 | Rem/Inst. Upper Deck Hatch Rubber | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.3.3.2 | Inst. New Hatch Drop Pins | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.3.3.3 | Inst. Lanyards | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.3.3.4 | Fastners | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.3.3.5 | Weld Corner Joints | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.3.3.6 | Rem/Inst Rubber | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.3.3.7 | Provide New Vertical Handrails | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.3.3.8 | Provide New Horizontal Handrails | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.3.4.1.1 | Provide New FWD MID LET Incline Step | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.3.4.1.2 | Provide New AFT MID LET Incline Step | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.3.5 | LET Platform and Incline Step Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.3.6 | LET House Water Test | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.3.7 | LET House Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.3.8 | LET Davit Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.3.9 | LET Cofferdam Modifications | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.3.10 | LET Cofferdam/Skirt Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.3.11 | LET Ladder Labeling | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.6.1 | Aft Crane Foundation Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.6.2 | House Pallets Assembly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.6.3 | House Pallets Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.10 | Electrical Systems | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.12.1 | LET House, LET Cofferdam Weight | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.12.2 | LET House Padeye Pull Test | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.12.3 | LET Cofferdam Padeye/Skirt Pull Test | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| 3.12.4 | LET House Davit Pull Test | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| Column Totals | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Scope (SOW/PWS) | Labor Rate/MH: | G&A Rate: | Profit Rate: | $0.00 | ||||||
| Total Bid: |
&C********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR********* =MH*Labor Rate*G&A =(Prime Material Price+Subcontractor Total)*Profit Rate =SUM(Prime Total+Subcontractor Total+ODC+G&A+Profit) =(MH*Labor Rate)+Material Price =Sub Cost (F) *ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.
NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.
File details come from the government source that posted it.