C_11.0_Exhibit_Table.xlsx
XLSX spreadsheet 11 KB Posted
- Solicitation number
- N4523A18R0213
About this file
Exhibit Table Attachment 1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q_and_A_FBO.pdf | ||
| C_03.0_Site_Visit_Contact_Info.pdf | ||
| C_09.0_Q&A_Site_Visit_FBO.docx | DOCX document | |
| C_04.0_Solicitation_Chillers.pdf | ||
| Q&A_FBO.docx | DOCX document | |
| Chiller_Serial_Model.pdf | ||
| C_11.0_Exhibit_Table.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit Table
| [Company Name] | |||||||
| Repair Services | Elin # | QTY | Unit | Unit Price | Total Price | Model # | |
| The contractor shall provide repair services on our 60 Ton Chiller units which include on-site diagnostics and repair services for Chiller failures, such as (but | |||||||
| not limited to) failure to start/run or failure to chill water. No repair work will be performed unless requested through a task order. | A0001 | 6 | EA | CGAF C604 AMA1 0000 0GH0 | |||
| The contractor shall provide repair services on our 90 Ton Chiller units which include on-site diagnostics and repair services for Chiller failures, such as (but | |||||||
| not limited to) failure to start/run or failure to chill water. No repair work will be performed unless requested through a task order. * | A0002 | 4 | EA | CGAM090F2P02AXD2A1A1A1DXXA1D1A4XXXXXXBXA3B1D1XXLXX | |||
| * TBD The contractor shall provide repair services on our 90 Ton Chiller units which include on-site diagnostics and repair services for Chiller failures, such as (but | |||||||
| not limited to) failure to start/run or failure to chill water. No repair work will be performed unless requested through a task order. | A0003 | 2 | EA | TBD |
| [Company Name] | ||||||
| Preventitive Annual Maintenance | Elin # | QTY | Unit | Unit Price | Total Price | Model # |
| The contractor shall provide annual maintenance per the manufacturers recommendation on each 60 Ton Government owned chiller and on-demand inspections. | A0004 | 6 | EA | CGAF C604 AMA1 0000 0GH0 | ||
| The contractor shall provide annual maintenance per the manufacturers recommendation on each 90 Ton Government owned chiller and on-demand inspections. * | A0005 | 4 | EA | CGAM090F2P02AXD2A1A1A1DXXA1D1A4XXXXXXBXA3B1D1XXLXX | ||
| * TBD The contractor shall provide annual maintenance per the manufacturers recommendation on each 90 Ton Government owned chiller and on-demand inspections. | A0006 | 2 | EA | TBD | ||
| [Company Name] | ||||||
| Typical Replacement Parts | Elin # | QTY | Unit | Unit Price | Total Price | Model # |
| Flow Switch 60 ton | A0007 | TBD | EA | SWT00285 | ||
| Flow Switch 90 ton | A0008 | TBD | EA | SWTT03335 | ||
| Damper Actuator Motor 60 ton | A0009 | TBD | EA | OPR00153 | ||
| Filter Drier Core 90 ton | A0010 | TBD | EA | COR00047 | ||
| Human Interface Module 60 ton | A0011 | TBD | EA | MOD00877 | ||
| Human Interface Module 90 ton | A0012 | TBD | EA | MOD02092 | ||
| Compressor 60 ton | A0013 | TBD | EA | COM06242 | ||
| Compressor 90 ton | A0014 | TBD | EA | COM09481 | ||
| Plate Chiller 60 ton | A0015 | TBD | EA | EXC02107 | ||
| Plate Chiller 90 ton | A0016 | TBD | EA | EXC02240 | ||
| Pump 60 ton | A0017 | TBD | EA | |||
| [Company Name] | ||||||
| Please Insert Additional Potential Parts Needed | Elin # | QTY | Unit | Unit Price | Total Price | Model # |
| A00018 | ||||||
| A00019 | ||||||
| A00020 | ||||||
| A00021 | ||||||
| A00022 | ||||||
| A00023 | ||||||
| A00024 |
File details come from the government source that posted it.