A04.01_-_SOW_-_NCC_Coatings.pdf
PDF 40 KB Posted
- Attached to
- NCC Coating BPA
- Solicitation number
- N4523A18Q1306
About this file
Statement of Work for NCC Coating
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
JML #:
DD2276 #:
Ship/Activity:
Title:
Place of Performance:
N/A Various
APPLY NCC COATING TO CONNECTORS.
VENDOR’S FACILITY
1.0 BACKGROUND: Purpose of the work is to apply Non-Conductive Ceramic (NCC) Coating to Government owned submarine outboard connector shells.
Describe current (baseline) condition: Connectors currently have a bare metal finish.
2.0 REFERENCES:
2.1 NAVSEA S9320-AM-PRO-030/MLDG REV3
2.2 NAVSEA LETTER 92T1/0337
3.0 WORK REQUIREMENTS/SCOPE:
3.1 The Contractor Shall apply NCC coating to government owned connector shells in accordance with Reference 2.1.
4.0 DELIVERABLE ITEMS:
4.1 Apply NCC Coating to Government owned submarine outboard connector shells.
4.2 Provide Certificate of Compliance (COC) stating NCC coating has been applied in accordance with Reference 1 and all associated certifying documentation. The COC will also contain, as a minimum, four additional items:
4.2.1 The contractor’s name, address, phone number, and date;
4.2.2 The issuing agency’s purchase order number;
4.2.3 Item nomenclature of the purchased item;
4.2.4 Contractor’s Quality Assurance Representative signature.
5.0 GOVERNMENT-FURNISHED MATERIAL (GFE): N/A
6.0 QUALITY ASSURANCE SURVEILLANCE PLAN:
Primary Performance Objectives
Performance Standard/AQL
Performance Assessment Method
Corrective Procedures
Services provided such that equipment functions as intended 100% compliance
Contractor shall provide assessment report to
COR
Contractor shall rework
Contractor maintain close liaison and good communication with Government
Any problems or questions encountered by either party are addressed within 24 hours (1 business day)
Provide COR with written report of discrepancies
Final condition report of assessment 100% compliance
Provide COR final assessment condition report
7.0 SECURITY REQUIREMENTS: N/A
8.0 TRAVEL REQUIREMENTS: N/A
9.0 GOVERNMENT REPRESENTATIVES:
Tech Rep: SCOTT DORAN 360-476-1894.
None of the above representatives have the authority to direct the contractor in any way to alter the obligations or change the statement of work in this contract. If the Government desires to alter the contractual obligations or to change the statement of work, change(s) will be issued in writing and signed by the Contracting Officer. The contractor should take no action on any change unless and until the contractor receives a change order.
10.0 OTHER CONSIDERATIONS: N/A
File details come from the government source that posted it.