Exhibit_A_-_YC-1588_CDRLs_and_DIDs_Combined.pdf

PDF 6 MB Posted

Attached to
YC-1588 Open Lighter Barge Federal contract opportunity
Solicitation number
N4523A-17-R-0024
Issued by
Department of the Navy Naval Sea Systems Command

About this file

Exhibit A - CDRLs and DIDs for YC-1588

View the file

Other files for this federal contract opportunity

Other files attached to YC-1588 Open Lighter Barge, newest first.
File Type Posted
N4523A-17-R-0024_Reference_Materials.zip ZIP file
J-4_YC-1588_Request_for_Clarification.docx DOCX document
J-1_YC-1588_SOW_Feb_16_2017.pdf PDF
J-3_YC-1588_5-Way_Breakout.xls XLS spreadsheet
N4523A-17-R-0024_10MAY2017.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Source: https://assist.dla.mil -- Downloaded: 2016-05-07T22:28Z Check the source to verify that this is the current version before use.

Source: https://assist.dla.mil -- Downloaded: 2016-05-07T22:28Z

DATA ITEM DESCRIPTION

Title: Coating System Data Report

Number: OT-17-20118 dsw Approval Date: 20170208 dsw

AMSC Number: N/A Limitation:N4523A-17-R-0024

DTIC Applicable: N/A GIDEP Applicable: No

Office of Primary Responsibility: SH/PNSY Project Number: N/A

Applicable Forms: N/A

Use/Relationship: Coating System data report is used by the Government to define product requirements.

This DID contains the format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.

The Website cited in this DID can be accessed at:

http://www.nstcenter.biz/tech-documents/astm-f718s/

This DID is for one time use on solicitation N4523A-17-R-0024 only. dsw

Requirements:

1. References Documents. The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.

2. Format. The Report shall be in contractor’s format.

3. Content. The Report shall include all of the information specified in

The American Society of Testing and Materials, Standard Specification for Shipbuilders and Marine Paints and Coatings Product/Procedure Data

Sheet(ASTM)F-718.

End of OT-17-20118. dsw http://www.nstcenter.biz/tech-documents/astm-f718s/

DATA ITEM DESCRIPTION (DID)

Title: Safety Data Sheet (SDS) Report

Number: OT-17-20117 dsw Approval Date: 20170208 dsw

DTIC Applicable: N/A GIDEP Applicable: N/A

Use/Relationship: The SDS Report is used by the Government to define product safety and environmental procedures.

This DID contains the format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.

The Website cited in this DID can be accessed at:

https://www.osha.gov/Publications/OSHA3514.html

1. References. The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.

2. Format. The Report shall be in contractor’s format.

3. Content. The Report shall include all of the information specified in the Occupational Safety and Health Administration (OSHA) Part Number

1910.1200 App D SDS, Subpart Z Toxic and Hazardous Substances.

End of OT-17-20117. dsw https://www.osha.gov/Publications/OSHA3514.html

Title: CONDITION FOUND REPORT

Number: DI-MGMT-81648 Approval Date: 20040809 AMSC Number: N7531 Limitation: N/A DTIC Applicable: N/A GIDEP Applicable: N/A Office of Primary Responsibility: N PEO SHIPS-FL32 Applicable Forms: N/A

Use/Relationship: The Condition Found Report identifies needed repairs and recommends corrective action for work discovered during the contract performance period which are not covered by the work specifications.

This DID contains the format, content, and intended use information for the data product resulting from the work task described in the contract.

Requirements:

1. Reference documents. N/A.

2. Format. The report shall be in contractor’s format.

3. Content. The report shall be serialized by CFR Number, and shall include the following:

a. Contract number, ship and hull number

b. Work Item Number to which the CFR relates

c. Date work requirement was discovered

d. Clear description of the work requirement

e. Specific location of the work requirement

f. Recommendation for corrective action

3.1 Recommendation for appropriate/best time to accomplish (i.e. during current availability with or without schedule change, future CNO or Continuous Maintenance Availability), and supporting rationale for the recommendation (such as cost efficiencies, availability of work force, availability of material, premium expenditures, etc.).

3.2 Cost and time estimates and the time frame for which it is valid, including:

a. Class “C” cost estimates. For work requirements which could be estimated within five working days, a class “F” estimate (+/-40%) identifying any potential impact which may affect the current schedule shall be included. The Class “F” estimate shall also contain the date on which a class “C” estimate will be provided.

b. Estimated Premium/Acceleration Costs, including premium costs for; material, subcontractors, man-hours, rework and any additional costs to on going work resulting from inclusion of the CFR work requirement.

c. Identification of related changes, if any, to the internal milestones and production and contract completion dates shall be included. When no changes were required a statement to that fact shall also be included

4. Media. The electronic media requirements shall be as specified in the contract on the DD 1423 CDRL.

5. End of DI-MGMT-81648

Source: https://assist.dla.mil -- Downloaded: 2016-05-07T22:47Z

Title: Accidertflncident Report

Number DI-SAFT-8 1563 Approved Date: 2 Jun 98 AMSC Numbec A7315 Limitation:

DT3C Applicable: GIDEP Application:

Office of Primary Respomibility A/AR Applicable Fornw Use/relationship: This reportprovides tAeprocuring agency with immediate notification and information concerning any mrjor acciderrthncident (including fire) resulting in any one or more of the following: causing one or more fatalities, or two or snore disabling injuries; damaging government property exceeding $10,000; atTecting program planning or production schedules;

degrading the safety of the equipment under contract, such that persomel injury or property darnage may be involved, identi@ng a potential hazard requiring corrective action.

a. This Data Item Description contains the format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.

b. This Data Item Description replaces DI-H-I 329A.

Requirements:

1. Format. Contractor format is acceptable

2. Content. Report without delay any serious accident or incident (i.e. explosioq fire, flood pressure rupture, major rndfunction) which will adversely affect capabtity to meet contractual obligations. The report shall be made by the fkstest means, giving the following information.

c.

d.

e.

f.

i.

1.

Name, organization, telephone number, and location of the contractor and general manager Name and title of the person(s) reporting Date and time of accidenthcident Location of accidentiiciden~ i.e., building number, fkcility name Brief summary of accidentkscidcnt giving pertinent details”iircludihgtype ‘md qtiti~”of -materiel Cause of accidentliicident Camalties (fatalities, disabling irjuries, exposed to CBR agents) Estimated property damage, if applicable Nature of darnage; effect on production, operations, training or other activity Action taken by contractor Other damage or injuries sustained (public or private) Other pertinent information

Source: https://assist.dla.mil -- Downloaded: 2016-05-07T21:16Z

DI-SAFT-81563

3. Malfunction. If a malfunction of equipment is involved, the following additional information shall be finmished:

a. Equipment nomenclature

b. @@ity illvokd

c. Production lot number(s)

d. Brief teehnieal description of malfunction

I 4. End of DI-SAFT-8 1563

Source: https://assist.dla.mil -- Downloaded: 2016-05-07T21:16Z

Title: TEMPORARY ACCESS CUT DRAWING/SKETCH

Number: DI-PSSS-82079

AMSC Number: N9703

DTIC Applicable: No

Preparing Activity: SH

Applicable Forms: N/A

Approval Date: 20161004

Limitation: N/A

GIDEP Applicable: No

Project Number: PSSS-2016-020

Use/Relationship: This DID will identify each proposed access cut to the ship structure and engine enclosure and a list of each proposed bolted/riveted access removal. The drawing/sketch shall not contain authorized access cuts on NAVSEA-approved drawings.

This DID contains the format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.

References. The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the

Format. The Drawing/Sketch shall be in the contractor’s format.

Content. The Drawing/Sketch shall include the following information:

A plan and elevation view specifying the location of the access by deck, frame, and distance from the center line or deck edge and showing location of adjacent penetrations, bulkheads, framing, welds, and riveted joints within 12 inches of the proposed cut.

Location and number of previous cuts visible in each plate and the cutback of existing welds.

Temporary structural reinforcement required to prevent distortion of ship structure.

Thickness and type of material of plating and structural members to be cut. Include source or document/drawing number which identifies material requirements.

A description of the temporary access closure and enclosures.

A copy of the weld approved weld procedure number with the proposed access sketch.

List of bolted/riveted access covers shall include location, designation, and classification as identified on ship's damage control book.

All drawing titles and numbers (including applicable sub-tier), and technical documentation that will used to accomplish the requirements of MIL-STD-1689.

End of DI-PSSS-82079

Source: https://assist.dla.mil -- Downloaded: 2016-12-06T20:10Z

Title: Paint Preservation Appendices Report

Number: OT-17-20116 dsw Approval Date:20170208 dsw

DTIC Applicable: N/A GIDEP Applicable: N/A

Use/Relationship: The Preservation Appendices Report will provide the

Government with evidence of completed preservation operations.

This DID contains the format and content preparation instructions for the data product generated by the specific and discrete task requirements as delineated in the contract.

This DID is for one time use on solicitation N4523A-17-R-0024 only.dsw

1. Format. The Paint Preservation Appendices Report shall be in contractor’s format.

2. Content. The Paint Preservation Appendices Report shall contain all the information contained in SAMPLE Figures 1 through 9.

OT-17-20116 dsw

SAMPLE 1

SAMPLE 2

SAMPLE 3

SAMPLE 4

SAMPLE 5

SAMPLE 6

SAMPLE 7

SAMPLE 8

SAMPLE 9

End of OT-17-20116. dsw

Title: Hazardous Waste Report

Number: OT-17-20121 dsw Approval Date:20170208 dsw

AMSC Number: N/A Limitation: N4523A-17-R-0024 DTIC Applicable: N/A GIDEP Applicable: N/A

Office of Primary Responsibility: SH/PNSY Project Number:

Use/Relationship: The Hazardous Waste Report will identify type, amount, and disposal cost of hazardous waste removed during the period of performance. It will provide the Government with evidence of proper hazardous waste disposal.

product generated by the specific and discrete task requirement as delineated

1. Format. The Report shall be in contractor’s format.

2. Content. The report shall contain:

a. Name, title, description, and quantity of each item.

b. Analysis used to identify the hazardous waste.

c. A statement identifying each hazardous waste with generator assignment.

d. A statement identifying hazardous waste found to be non-hazardous.

e. A statement identifying hazardous waste that did not exist.

f. Copies of all paid invoices and receipts for the disposal of hazardous wastes.

End of OT-17-20121. dsw

Title: GAS FREE PROGRAM REPORT

Number: DI-MGMT-82093 Approval Date: 20161208

AMSC Number: N9754 Limitation: N/A

DTIC Applicable: No GIDEP Applicable: No

Preparing Activity: SH Project Number: MGMT-2017-001

Use/Relationship: The Gas Free Program Report will provide the Government with proof of the

Contractor’s confined space entry/gas free certification processes and qualified personnel, including sub-contractors.

by the specific and discrete task requirements as delineated in the contract.

2. Content. The Gas Free Program Report shall contain the following Sections:

2.1 Objective.

2.2 Background.

2.3 Assignment of Responsibility for:

a. Employer

b. Program Manager

c. Entry Supervisors

d. Attendants

e. Rescue Team

f. Entrants/Affected Employees

2.4 Training:

a. Training Frequency

b. General Training

c. Specific Training

d. Verification of Training

2.5 Identification of Hazards and Evaluation of Confined Spaces:

a. Survey

b. Hazard Reevaluation

c. Pre-Entry Hazard Assessment

d. Hazard Controls

Source: https://assist.dla.mil -- Downloaded: 2017-01-05T18:11Z

DI-MGMT-82093

2.6 Entry Permits:

a. Key Elements of Entry Permits

b. Permit Scope and Duration

2.7 Entry Procedures:

a. Prior to Entry

b. Opening a Confined Space

c. Atmospheric Testing

d. Isolation and Lockout/Tagout Safeguards

e. Ingress/Egress Safeguards

f. Warning Signs and Symbols

2.8 Maintenance of Safe Conditions:

a. Conditions

b. Tests required

2.9 Emergency Response:

a. Emergency Response Plan

b. Retrieval Systems and Methods of Non-Entry Rescue

2.10 Current Roster of the following personnel:

a. Certified National Fire Protection Association (NFPA) Marine Chemists

b. Certified Industrial Hygienists

c. Qualified Competent Persons

End of DI-MGMT-82093

Source: https://assist.dla.mil -- Downloaded: 2017-01-05T18:11Z

Title: TEST AND INSPECTION PLAN (TIP)

Number: DI-MGMT-82062

AMSC Number: N9711

DTIC Applicable: No

Preparing Activity: SH

Applicable Forms: N/A

Approval Date: 20161003

Limitation: N/A

Project Number: MGMT-2016-049

Use/Relationship: This DID is used to identify all inspections and tests required by zero-tier references and first tier references, as well as symbols (I)(V)(Q) test/inspections and (G) government notification identified in the Work Item, and any additional tests and inspections the contractor deems necessary to substantiate product conformance.

Format. The TIP shall be in the contractor’s format.

Content. The TIP shall include the following information:

Ship’s name/hull number

Work Item number

Work Item Paragraph number

Identification of item/component to be inspected/tested

Standard Item Number

Standard Item Paragraph

Location

Sub-Contractor (if applicable)

Inspection Symbol (I, V, Q, G)

Accept/Reject Criteria

Test Result (Accept or Reject)

Notify Date

Notify Time

Request Date

Request Time

Inspection Date

Name of Person Notified

Name of Government Representative at Inspection

Name of Contractor’s authorized representative who witnessed/performed test.

End of DI-MGMT-82062

Source: https://assist.dla.mil -- Downloaded: 2016-10-13T13:29Z

Title: VESSEL DOCKING AND UNDOCKING PLAN

Number: DI-MGMT-82094 Approval Date: 20161208

AMSC Number: N9755 Limitation: N/A

DTIC Applicable: No GIDEP Applicable: No

Preparing Activity: SH Project Number: MGMT-2017-002

Use/Relationship: The plan will document a detailed plan to safely dock and undock the vessel(s). It is used by the Government to review, comment, and approve docking and undocking plans prior to each docking and undocking evolution.

1. Format. The Plan shall be in contractor’s format.

2. Content. The Plan shall include the following Docking Procedures:

a. Operating Practices

b. Safety and Security Plans

c. Special precautions or actions required by the characteristics of the dock, marine railway, or other docking methods

d. Pumping/flooding schedule

e. Specific list, trim, and stability requirements

3. The Plan shall contain:

a. Set and align docking blocks

b. A scaled drawing including block size, block spacing, and location of vessel with respect to the blocks at landing

c. Docking clearances utilizing references for guidance

d. The use of haul, fixed, or fitted blocks

e. The number, distance from centerline, and square footage of the side blocks per side sufficient to resist overturning moments

4. The Plan shall show that at least 90 percent of blocks land on longitudinal strength members or main transverse bulkheads.

End of DI-MGMT-82094

Source: https://assist.dla.mil -- Downloaded: 2017-01-10T14:39Z

Title: Vessel Final Docking Report

Number: OT-17-20120 dsw Approval Date: 20170208 dsw

DTIC Applicable: N/A GIDEP Applicable: N/A

Office of Primary Responsibility: SH/PNSY

Applicable Forms: NAVSEA forms 9997/1 through 9997/5

Use/Relationship: The report will document the results of various vessel drydocking evolutions. It will provide the Government with historical information to be applied to future drydockings.

The NAVSEA forms 9997/1 through 9997/5 can be obtained as specified in the

2. Content. The Vessel Final Docking Report shall contain completed NAVSEA forms 9997/1 through 9997/5 as applicable to each vessel.

End of OT-17-20120. dsw

Title: Zinc Anode Location Sketch

Number: OT-17-20087 dsw Approval Date:20161118 dsw

AMSC Number: N/A Limitation:N4523A-17-R-0012

DTIC Applicable: N/A GIDEP Applicable: N/A

Use/Relationship: The Zinc Anode Location Sketch will provide detailed current zinc anode locations of the underwater hull of vessel(s).

This DID is for one time use on solicitation N4523A-17-R-0012 only. dsw

1. Format. The Zinc Anode Location Sketch shall be in contractor’s format.

2. Content. The Sketch shall contain the underwater body and freeboard plating surfaces and shall also include the following:

a. Specific locations of fixed hull structural members.

b. Specific locations of docking block locations.

c. Specific locations of hull reference points.

d. Specific measurements of zinc anodes to docking block locations.

e. Specific measurements of zinc anodes to hull reference points.

f. Specific measurements of zinc anodes to fixed hull structural members.

End of OT-17-20087. dsw

Title: STRUCTURAL INSPECTION REPORT

Number: DI-MGMT-82065

AMSC Number: N9714

DTIC Applicable: No

Preparing Activity: SH

Applicable Forms: N/A

Approval Date: 20161003

Limitation: N/A

Project Number: MGMT-2016-052

Use/Relationship: This DID will report the conditions found during structural inspection of each exposed piping penetration, deck drain, deck plating and bulkheads for structural integrity, deterioration, pitting, cracks, and areas of damage or distortion.

1. Format. The report shall be in the contractor’s format.

2. Content. The report shall contain the following information:

a. Name and Hull number of ship

b. Job Order

c. Work Item

d. Paragraph numbers including standard item paragraph number

e. Compartment (number and name)

f. Date of inspection

g. Material condition

h. Deficiencies noted

i. Recommendation for repairs

End of DI-MGMT-82065

Source: https://assist.dla.mil -- Downloaded: 2016-10-13T13:23Z

Title: Ultrasonic Test (UT) Report

Number: DI-NDTI-82095 Approval Date: 20161208

AMSC Number: N9756 Limitation: N/A

DTIC Applicable: No GIDEP Applicable: No

Preparing Activity: SH Project Number: NDTI-2017-002

Use/Relationship: The Ultrasonic Test (UT) Report will document the results of Ultrasonic

Testing. It will provide the Government with evidence of structural damage and deterioration.

1. Format. The UT Report shall be in contractor’s format.

2. Content. The UT report shall include the following:

a. Contractor’s name and address.

b. Contract number.

c. Work item number.

d. Paragraph number.

e. Date of report.

f. Test results.

End of DI-NDTI-82095

Source: https://assist.dla.mil -- Downloaded: 2017-01-05T18:03Z

DATA ITM DESCRIPTION (DID)

Title: Air Test Report

Number: OT-17-20119 dsw Approval Date:20170208 dsw

DTIC Applicable: N/A GIDEP Applicable: N/A

Use/Relationship: The report will be used to provide Objective Quality

Evidence (OQE) evidence of the contractor’s Air Test.

2. Content. The Report shall contain:

a. Statement that the tested space held steady test pressure.

b. Statement that the tested space failed to hold test pressure.

c. Recommendation for corrective action in the event of a failed air test.

d. Estimated costs, including labor, subcontractors, material, rework, and any additional costs for ongoing work resulting from the inclusion of the proposed work recommended as a result of a failed Air Test.

End of OT-17-20119. dsw

Title: STRUCTURAL INSPECTION REPORT

Number: DI-MGMT-82065

AMSC Number: N9714

DTIC Applicable: No

Preparing Activity: SH

Applicable Forms: N/A

Approval Date: 20161003

Limitation: N/A

Project Number: MGMT-2016-052

Use/Relationship: This DID will report the conditions found during structural inspection of each exposed piping penetration, deck drain, deck plating and bulkheads for structural integrity, deterioration, pitting, cracks, and areas of damage or distortion.

1. Format. The report shall be in the contractor’s format.

2. Content. The report shall contain the following information:

a. Name and Hull number of ship

b. Job Order

c. Work Item

d. Paragraph numbers including standard item paragraph number

e. Compartment (number and name)

f. Date of inspection

g. Material condition

h. Deficiencies noted

i. Recommendation for repairs

End of DI-MGMT-82065

Source: https://assist.dla.mil -- Downloaded: 2016-10-13T13:23Z

Title: Ultrasonic Test (UT) Report

Number: DI-NDTI-82095 Approval Date: 20161208

AMSC Number: N9756 Limitation: N/A

DTIC Applicable: No GIDEP Applicable: No

Preparing Activity: SH Project Number: NDTI-2017-002

Use/Relationship: The Ultrasonic Test (UT) Report will document the results of Ultrasonic

Testing. It will provide the Government with evidence of structural damage and deterioration.

1. Format. The UT Report shall be in contractor’s format.

2. Content. The UT report shall include the following:

a. Contractor’s name and address.

b. Contract number.

c. Work item number.

d. Paragraph number.

e. Date of report.

f. Test results.

End of DI-NDTI-82095

Source: https://assist.dla.mil -- Downloaded: 2017-01-05T18:03Z

A001 CDRL - Production Schedule
A001 DID - DI-MGMT-80227
A002 CDRL - Coating Data System Report
A002 DID - OT 2-8-17 Coating System
A003 CDRL - Safety Data Sheets
A003 DID - OT-17-20117 SDS Report
A004 CDRL - CFR
A004 DID - DI-MGMT-81648
DATA ITEM DESCRIPTION
A005 CDRL - Accident & Incident Report
A005 DID - DI-SAFT-81563
A006 CDRL - Proposed Access Cuts
A006 DID - DI-PSSS-82079
A007 CDRL - QA Preservation Appendices
A007 DID - OT-17-20116 Paint Preservation Appendices
A008 CDRL - Hazardous Waste Report
A008 DID - OT-17-20121 Hazardous Waste Report
A009 CDRL - Gas Free Program
A009 DID - DI-MGMT-82093 Gas Free Program
A010 CDRL - Test & Inspection Plan
A010 DID - DI-MGMT-82062 Test & Inspection Plan
A011 CDRL - Docking and Undocking Plan
A011 DID - DI-MGMT-82094 Docking & Undocking Plan
A012 CDRL - Final Docking Report
A012 DID - OT-17-20120 Final Docking Report
A013 CDRL - Zinc Location Report
A013 DID - OT-17-20087 Zinc Anode Location Report
A014 CDRL - Structural Inspection Report
A014 DID - DI-MGMT-82065 Structural Insp Report
A015 CDRL - UT Report
A015 DID - DI-NDTI-82095 - UT Report
A016 CDRL - Air Test Report
A016 DID - OT-17-20119 Air Test
A017 CDRL - Structural Inspection Report
A017 DID - DI-MGMT-82065 Structural Insp Report
A018 CDRL - UT Report
A018 DID - DI-NDTI-82095 UT Report