YTB_BID_Q_1).docx

DOCX document 22 KB Posted

Attached to
YTB-836 Habor Tug Federal contract opportunity
Solicitation number
N4523A-17-R-0009
Issued by
Department of the Navy Naval Sea Systems Command

View the file

Other files for this federal contract opportunity

Other files attached to YTB-836 Habor Tug, newest first.
File Type Posted
N4523A-17-R-0009_Amendment_4.pdf PDF
017_RFC_YTB-836.pdf PDF
013_RFC_YTB-836.pdf PDF
012_RFC_YTB-836.pdf PDF
009_RFC_YTB-836.pdf PDF
016_RFC_YTB-836.pdf PDF
014_RFC_YTB-836.pdf PDF
011_RFC_YTB-836.pdf PDF
010_RFC_YTB-836.pdf PDF
015_RFC_YTB-836.pdf PDF
N4523A-17-R-0009_Amendment_3.pdf PDF
205-4563432A1_Stack_Detail.pdf PDF
YTB_836__5-Way_Breakdown_Sheet_Erratta_1.xls XLS spreadsheet
008_RFC.pdf PDF
007_RFC.pdf PDF
Amend_2.pdf PDF
006_RFC.docx DOCX document
004_RFC.docx DOCX document
003._RFC.docx DOCX document
005_RFC.docx DOCX document
REQUEST_FOR_SPECIFICATION_CLARIFICATION_0002.docx DOCX document
amend_1.pdf PDF
Dec15YTB_836__5-Way_Breakdown_WKG.xls XLS spreadsheet
REQUEST_FOR_SPECIFICATION_CLARIFICATION.docx DOCX document
CDRL_&_DID.pdf PDF
N4523A-17-R-0009.pdf PDF
YTB_836__5-Way_Breakdown_WKG.xls XLS spreadsheet
SOW_YTB_836_FY17.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR SPECIFICATION CLARIFICATION

DATE OF REQUEST: 12/12/16QUESTION NO:001
REQUIREMENT: Docking & Undocking the VesselREQUISITION NO.: N4523A-17-R-0009 ITEM NO: 3.1ISSUING OFFICE POC(CODE 446):
TITLE: Docking ProcedureLeAundria Shaheed: (360) 476-4053 leaundria.shaheed@navy.mil

PARA. NO: 3.1.2 PAGE NO: 22 CONTRACTOR: PLANNER 'S NAME: ATTACH. NO: NIA CONTRACTOR POC & PHONE:

CONTRACTOR QUESTION: (ONE QUESTION PER PAGE)

Ifawarded the contract, the contractor would dock the vessel at Port Townsend Boat Yard. However, the total weight of the vessel including the fwd & aft towing winches exceeds The boat lift limit. Would it be allowable to remove both winches at a pier at Naval Station Everett prior to docking and reinstall at Everett after undocking ? All this would be included Inthe contractors quote and completed within the POP.

DO NOT WRITE BELOW THIS LINE

SPEC CHG: YINI DWG/REF CHG. YIN
I RQMTS CHG: YINI MAT'L CHG: YIN
TECHNICAL REVIEW:
I SERIAL NO:

Government cannot accommodate work at Naval Station Everett.

ALL REQUESTS FOR CLARIFICATION MUST BE RECEIVED BY THEISSUING OFFICE POC NO LATER THAN THE DATE & TIME IDENTIFIED IN THE REQUEST FOR PROPOSAL.