Dec15YTB_836__5-Way_Breakdown_WKG.xls
XLS spreadsheet 46 KB Posted
- Attached to
- YTB-836 Habor Tug Federal contract opportunity
- Solicitation number
- N4523A-17-R-0009
About this file
5 Way Breakdown Sheet
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N4523A-17-R-0009_Amendment_4.pdf | ||
| 017_RFC_YTB-836.pdf | ||
| 013_RFC_YTB-836.pdf | ||
| 012_RFC_YTB-836.pdf | ||
| 009_RFC_YTB-836.pdf | ||
| 016_RFC_YTB-836.pdf | ||
| 014_RFC_YTB-836.pdf | ||
| 011_RFC_YTB-836.pdf | ||
| 010_RFC_YTB-836.pdf | ||
| 015_RFC_YTB-836.pdf | ||
| N4523A-17-R-0009_Amendment_3.pdf | ||
| 205-4563432A1_Stack_Detail.pdf | ||
| YTB_836__5-Way_Breakdown_Sheet_Erratta_1.xls | XLS spreadsheet | |
| 008_RFC.pdf | ||
| 007_RFC.pdf | ||
| Amend_2.pdf | ||
| 006_RFC.docx | DOCX document | |
| 004_RFC.docx | DOCX document | |
| 003._RFC.docx | DOCX document | |
| 005_RFC.docx | DOCX document | |
| REQUEST_FOR_SPECIFICATION_CLARIFICATION_0002.docx | DOCX document | |
| amend_1.pdf | ||
| YTB_BID_Q_1).docx | DOCX document | |
| REQUEST_FOR_SPECIFICATION_CLARIFICATION.docx | DOCX document | |
| CDRL_&_DID.pdf | ||
| N4523A-17-R-0009.pdf | ||
| YTB_836__5-Way_Breakdown_WKG.xls | XLS spreadsheet | |
| SOW_YTB_836_FY17.pdf |
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| INSERT CONTRACTOR/COMPANY NAME HERE | |||||||||||
| Project = | YTB 836 | DATE: = | |||||||||
| PRIME | SUBCONTRACTOR | PRIME | PRIME | ||||||||
| PARAGRAPH No. | TITLE | M/H | LABOR PRICE | MATERIAL PRICE | M/H | LABOR PRICE | MATERIAL PRICE | Other Direct Cost (ODC)* | G&A | PROFIT | Line Item Total |
| 1.4 | Arrival Conference | $0 | |||||||||
| 1.6 | Progress Meetings | $0 | |||||||||
| 1.7 | Availability Requirements | $0 | |||||||||
| 1.18 | Environmental/Hazwaste Managemment | $0 | |||||||||
| 1.23 | Gas Free | $0 | |||||||||
| 3.1 | Docking & Undocking | $0 | |||||||||
| 3.2.1 | Distinguishing Figures & Markings | $0 | |||||||||
| 3.2.2 | Rubber Fenders | $0 | |||||||||
| 3.2.3 | Zinc Anodes | $0 | |||||||||
| 3.2.4 | Hull Preservation | $0 | |||||||||
| 3.2.5 | Hull Opening Inspection | $0 | |||||||||
| 3.2.6 | Hull Visual Inspection | $0 | |||||||||
| 3.2.7 | Hull Ultrasonic Inspection | $0 | |||||||||
| 3.3.1 | Air Conditioning Cabinet Preservation | $0 | |||||||||
| 3.3.2 | Modify Foam Tank | $0 | |||||||||
| 3.4.1 | Tanks: Open, Clean, Vent, Gas Free | $0 | |||||||||
| 3.4.2 | Tanks: Visual Inspection | $0 | |||||||||
| 3.4.3 | Tank Preservation | $0 | |||||||||
| 3.4.4 | Aft Steering Compartment Preservation | $0 | |||||||||
| 3.4.5 | Preliminary Air Test | $0 | |||||||||
| 3.4.6 | Tank Cover Identification | $0 | |||||||||
| 3.4.7 | Clean, Flush, and Disinfect Potable Water Sys | $0 | |||||||||
| 3.4.8 | Certify Potable Water System | $0 | |||||||||
| 3.4.9 | Final Air Test | $0 | |||||||||
| 3.4.10 | Tank Closeout Inspection | $0 | |||||||||
| 3.4.11 | Tank Manhole Cover Install | $0 | |||||||||
| 3.4.12 | Onload Fuel | $0 | |||||||||
| 3.5.1 | Main Deck CPD | $0 | |||||||||
| 3.5.2 | Main Deck Nonskid | $0 | |||||||||
| 3.5.3 | Main Deck Visual Inspection | $0 | |||||||||
| 3.5.4 | Main Deck Ultrasonic Inspection | $0 | |||||||||
| 3.5.5 | Main Deck Repair Fairleads | $0 | |||||||||
| 3.6.1 | Superstructure Boat/Pilot House Deck Nonskid | $0 | |||||||||
| 3.6.2 | Superstructure Visual Inspection | $0 | |||||||||
| 3.6.3 | Superstructure Ultrasonic Inspection | $0 | |||||||||
| 3.6.4 | Superstructure Preservation | $0 | |||||||||
| 3.7.1 | Waterborne Shaft Position | $0 | |||||||||
| 3.7.2 | Remove Shaft Assemblies | $0 | |||||||||
| 3.7.3 | Inspect Shaft Assemblies | $0 | |||||||||
| 3.7.4 | Repair Shaft Assemblies | $0 | |||||||||
| 3.7.5 | Re-assemble Shaft Assemblies | $0 | |||||||||
| 3.7.6 | Void Under Shaft Preservation | $0 | |||||||||
| 3.8.1 | Rudder Swing Test | $0 | |||||||||
| 3.8.2 | Steering Removals | $0 | |||||||||
| 3.8.3 | Steering Inspections | $0 | |||||||||
| 3.8.4 | Interior Rudder Preservation | $0 | |||||||||
| 3.8.5 | Steering Cylinder Repair | $0 | |||||||||
| 3.8.6 | Steering Pump Repairs | $0 | |||||||||
| 3.8.7 | Steering System Installation | $0 | |||||||||
| 3.8.8 | Rudder Swing Test | $0 | |||||||||
| 3.10.1 | Fathometer Transducer Repairs | $0 | |||||||||
| 3.10.2 | Anemometer Repairs | $0 | |||||||||
| 3.10.3 | Navigational Lighting Repairs | $0 | |||||||||
| 3.10.4 | Install Electric/Hydraulic Mast Lift | $0 | |||||||||
| 3.10.5 | Repair Ventilation System | $0 | |||||||||
| 3.10.6 | Ventilation System Operational Test | $0 | |||||||||
| 3.10.7 | Repair Air conditioning System | $0 | |||||||||
| 3.10.8 | Install Aft Winch Monitoring System | $0 | |||||||||
| 3.11.1 | Sea Valve Repairs | $0 | |||||||||
| 3.11.2 | Lube Oil Pipe Lagging Repairs | $0 | |||||||||
| 3.11.3 | Potable Tank Drain Repairs | $0 | |||||||||
| 3.11.4 | Fire main Piping Repairs | $0 | |||||||||
| 3.11.5 | Sea Strainer Repairs | $0 | |||||||||
| 3.12.1 | Winch Hydraulic Hose Repairs | $0 | |||||||||
| 3.12.2 | Stern Winch Brake Cylinder Repair | $0 | |||||||||
| 3.12.3 | Hydraulic Oil Cooler Modification | $0 | |||||||||
| 3.13 | Dock & Sea Trials | $0 | |||||||||
| $0 | |||||||||||
| Column Totals | $0 |
&C********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR********* *ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.
NOTE: Please fill in within the yellow highlighted boxes, the proposed G&A and proposed Profit rates.
File details come from the government source that posted it. Updated .