REQUEST_FOR_SPECIFICATION_CLARIFICATION_0002.docx
DOCX document 17 KB Posted
- Attached to
- YTB-836 Habor Tug Federal contract opportunity
- Solicitation number
- N4523A-17-R-0009
About this file
answer to bidder question 2
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N4523A-17-R-0009_Amendment_4.pdf | ||
| 017_RFC_YTB-836.pdf | ||
| 013_RFC_YTB-836.pdf | ||
| 012_RFC_YTB-836.pdf | ||
| 009_RFC_YTB-836.pdf | ||
| 016_RFC_YTB-836.pdf | ||
| 014_RFC_YTB-836.pdf | ||
| 015_RFC_YTB-836.pdf | ||
| 011_RFC_YTB-836.pdf | ||
| 010_RFC_YTB-836.pdf | ||
| N4523A-17-R-0009_Amendment_3.pdf | ||
| 205-4563432A1_Stack_Detail.pdf | ||
| YTB_836__5-Way_Breakdown_Sheet_Erratta_1.xls | XLS spreadsheet | |
| 008_RFC.pdf | ||
| 007_RFC.pdf | ||
| Amend_2.pdf | ||
| 006_RFC.docx | DOCX document | |
| 004_RFC.docx | DOCX document | |
| 005_RFC.docx | DOCX document | |
| 003._RFC.docx | DOCX document | |
| amend_1.pdf | ||
| Dec15YTB_836__5-Way_Breakdown_WKG.xls | XLS spreadsheet | |
| YTB_BID_Q_1).docx | DOCX document | |
| REQUEST_FOR_SPECIFICATION_CLARIFICATION.docx | DOCX document | |
| CDRL_&_DID.pdf | ||
| N4523A-17-R-0009.pdf | ||
| YTB_836__5-Way_Breakdown_WKG.xls | XLS spreadsheet | |
| SOW_YTB_836_FY17.pdf |
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR SPECIFICATION CLARIFICATION
| DATE OF REQUEST: 15DEC2016 |
| QUESTION NO: 0001 |
| REQUIREMENT: TUG BOAT (YTB-836) |
| REQUISITION NO.: N4523A-17-R-0009 |
ITEM NO: N/A
TITLE: 5-WAY BREAKDOWN FORM
ISSUING OFFICE POC(CODE 446):
| PARA. NO: 3.10.3 |
| PAGE NO: 42 OF 93 |
| CONTRACTOR: |
| PLANNER’S NAME: |
| ATTACH. NO: |
| CONTRACTOR POC & PHONE: |
CONTRACTOR QUESTION: (ONE QUESTION PER PAGE)
1. Para 3.10.3, Navigational Lighting Repairs; is not listed on the 5-way breakdown sheet. Is the contract to assume this item is not up for bid?
DO NOT WRITE BELOW THIS LINE
| SPEC CHG: Y/N |
| DWG/REF CHG. Y/N |
| RQMTS CHG: Y/N |
| MAT'L CHG: Y/N |
| TECHNICAL REVIEW: |
| SERIAL NO: |
Contracting Officer to amend solicitation to update 5 way breakdown.
ALL REQUESTS FOR CLARIFICATION MUST BE RECEIVED BY THE ISSUING
OFFICE POC NO LATER THAN THE DATE & TIME IDENTIFIED IN THE REQUEST
FOR PROPOSAL.