006_RFC.docx
DOCX document 16 KB Posted
- Attached to
- YTB-836 Habor Tug Federal contract opportunity
- Solicitation number
- N4523A-17-R-0009
About this file
006 RFC
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N4523A-17-R-0009_Amendment_4.pdf | ||
| 017_RFC_YTB-836.pdf | ||
| 015_RFC_YTB-836.pdf | ||
| 013_RFC_YTB-836.pdf | ||
| 012_RFC_YTB-836.pdf | ||
| 011_RFC_YTB-836.pdf | ||
| 010_RFC_YTB-836.pdf | ||
| 009_RFC_YTB-836.pdf | ||
| 016_RFC_YTB-836.pdf | ||
| 014_RFC_YTB-836.pdf | ||
| N4523A-17-R-0009_Amendment_3.pdf | ||
| YTB_836__5-Way_Breakdown_Sheet_Erratta_1.xls | XLS spreadsheet | |
| 205-4563432A1_Stack_Detail.pdf | ||
| 008_RFC.pdf | ||
| 007_RFC.pdf | ||
| 005_RFC.docx | DOCX document | |
| 003._RFC.docx | DOCX document | |
| Amend_2.pdf | ||
| 004_RFC.docx | DOCX document | |
| REQUEST_FOR_SPECIFICATION_CLARIFICATION_0002.docx | DOCX document | |
| amend_1.pdf | ||
| Dec15YTB_836__5-Way_Breakdown_WKG.xls | XLS spreadsheet | |
| YTB_BID_Q_1).docx | DOCX document | |
| REQUEST_FOR_SPECIFICATION_CLARIFICATION.docx | DOCX document | |
| CDRL_&_DID.pdf | ||
| N4523A-17-R-0009.pdf | ||
| YTB_836__5-Way_Breakdown_WKG.xls | XLS spreadsheet | |
| SOW_YTB_836_FY17.pdf |
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR SPECIFICATION CLARIFICATION
| DATE OF REQUEST: |
| QUESTION NO: |
| REQUIREMENT: |
| REQUISITION NO.: N4523A-17-R-0009 |
ITEM NO: 3.10.7
TITLE: Air conditioning service
ISSUING OFFICE POC(CODE 446):
| PARA. NO: 3.10.7 |
| PAGE NO: |
| CONTRACTOR: |
| PLANNER’S NAME: |
| ATTACH. NO: |
| CONTRACTOR POC & PHONE:. |
CONTRACTOR QUESTION: (ONE QUESTION PER PAGE)
Can you supply the model and serial number of the equipment listed in the YTB specs parg. 3.10.7 thur 3.10.7.2 ?
DO NOT WRITE BELOW THIS LINE
| SPEC CHG: Y/N |
| DWG/REF CHG. Y/N |
| RQMTS CHG: Y/N |
| MAT'L CHG: Y/N |
| TECHNICAL REVIEW: |
| SERIAL NO: |
Contractor will be able to verify existing configuration during Ship check on 21 DEC 2016.
ALL REQUESTS FOR CLARIFICATION MUST BE RECEIVED BY THE ISSUING
OFFICE POC NO LATER THAN THE DATE & TIME IDENTIFIED IN THE REQUEST
FOR PROPOSAL.