About this file
RFC 0014: Install electric/hydraulic mast lift
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N4523A-17-R-0009_Amendment_4.pdf | ||
| 017_RFC_YTB-836.pdf | ||
| 011_RFC_YTB-836.pdf | ||
| 010_RFC_YTB-836.pdf | ||
| 009_RFC_YTB-836.pdf | ||
| 016_RFC_YTB-836.pdf | ||
| 015_RFC_YTB-836.pdf | ||
| 013_RFC_YTB-836.pdf | ||
| 012_RFC_YTB-836.pdf | ||
| YTB_836__5-Way_Breakdown_Sheet_Erratta_1.xls | XLS spreadsheet | |
| 205-4563432A1_Stack_Detail.pdf | ||
| N4523A-17-R-0009_Amendment_3.pdf | ||
| 008_RFC.pdf | ||
| 007_RFC.pdf | ||
| 003._RFC.docx | DOCX document | |
| Amend_2.pdf | ||
| 006_RFC.docx | DOCX document | |
| 004_RFC.docx | DOCX document | |
| 005_RFC.docx | DOCX document | |
| amend_1.pdf | ||
| Dec15YTB_836__5-Way_Breakdown_WKG.xls | XLS spreadsheet | |
| REQUEST_FOR_SPECIFICATION_CLARIFICATION_0002.docx | DOCX document | |
| YTB_BID_Q_1).docx | DOCX document | |
| REQUEST_FOR_SPECIFICATION_CLARIFICATION.docx | DOCX document | |
| CDRL_&_DID.pdf | ||
| N4523A-17-R-0009.pdf | ||
| YTB_836__5-Way_Breakdown_WKG.xls | XLS spreadsheet | |
| SOW_YTB_836_FY17.pdf |
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR SPECIFICATION CLARIFICATION
DATE OF REQUEST: 12-29-2016 QUESTION NO: 014
REQUIREMENT: Electrical Systems REQUISITION NO.: N4523A-17-R-0009
ITEM NO: 3.10.4
TITLE: Install Electric/Hydraulic Mast Lift
ISSUING OFFICE POC(CODE 446):
LeAundria Shaheed: (360) 476-4053 Leaundria.shaheed@navy.mil
PARA. NO: 3.10.4 PAGE NO: 42 CONTRACTOR:
PLANNER’S NAME: ATTACH. NO: SK-
10836
CONTRACTOR POC & PHONE:
CONTRACTOR QUESTION: (ONE QUESTION PER PAGE)
Paragraph 3.10.4 refers to Dwg. No. SK-10836, which describes in note 12 the hydraulic pump to use for this installation.
What pressure does the Navy want this pump set to, when ordered, in PSI?
DO NOT WRITE BELOW THIS LINE
SPEC CHG: Y/N DWG/REF CHG. Y/N RQMTS CHG: Y/N MAT'L CHG: Y/N
TECHNICAL REVIEW: SERIAL NO:
2000 PSI will be reflected in Errata 1.
ALL REQUESTS FOR CLARIFICATION MUST BE RECEIVED BY THE ISSUING