012_RFC_YTB-836.pdf
PDF 33 KB Posted
- Attached to
- YTB-836 Habor Tug Federal contract opportunity
- Solicitation number
- N4523A-17-R-0009
About this file
RFC 0012: Superstructure preservation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N4523A-17-R-0009_Amendment_4.pdf | ||
| 017_RFC_YTB-836.pdf | ||
| 013_RFC_YTB-836.pdf | ||
| 011_RFC_YTB-836.pdf | ||
| 010_RFC_YTB-836.pdf | ||
| 009_RFC_YTB-836.pdf | ||
| 016_RFC_YTB-836.pdf | ||
| 014_RFC_YTB-836.pdf | ||
| 015_RFC_YTB-836.pdf | ||
| N4523A-17-R-0009_Amendment_3.pdf | ||
| YTB_836__5-Way_Breakdown_Sheet_Erratta_1.xls | XLS spreadsheet | |
| 205-4563432A1_Stack_Detail.pdf | ||
| 008_RFC.pdf | ||
| 007_RFC.pdf | ||
| 003._RFC.docx | DOCX document | |
| Amend_2.pdf | ||
| 006_RFC.docx | DOCX document | |
| 004_RFC.docx | DOCX document | |
| 005_RFC.docx | DOCX document | |
| REQUEST_FOR_SPECIFICATION_CLARIFICATION_0002.docx | DOCX document | |
| amend_1.pdf | ||
| Dec15YTB_836__5-Way_Breakdown_WKG.xls | XLS spreadsheet | |
| YTB_BID_Q_1).docx | DOCX document | |
| REQUEST_FOR_SPECIFICATION_CLARIFICATION.docx | DOCX document | |
| CDRL_&_DID.pdf | ||
| N4523A-17-R-0009.pdf | ||
| YTB_836__5-Way_Breakdown_WKG.xls | XLS spreadsheet | |
| SOW_YTB_836_FY17.pdf |
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR SPECIFICATION CLARIFICATION
DATE OF REQUEST: 12-29-16 QUESTION NO: 12
REQUIREMENT: REQUISITION NO: N4523A-17-R-0009
ITEM NO: 3.6.4
TITLE: Superstructure Preservation
ISSUING OFFICE POC(CODE 446)
LeAundria Shaheed: (360) 476-4053 Leaundria.shaheed@navy.mil
PARA. NO: 3.6.4.2 PAGE NO:42 CONTRACTOR:
PLANNER’S NAME: ATTACH. NO: CONTRACTOR POC & PHONE:
CONTRACTOR QUESTION: (ONE QUESTION PER PAGE)
In 3.6.4.2 it tells the contractor to near white blast the interior of the stack. Please explain what is meant, are we to remove all exhaust piping by interior? Or are you talking about blasting from the top stack deck and up?
DO NOT WRITE BELOW THIS LINE
SPEC CHG: Y/N DWG/REF CHG. Y/N RQMTS CHG: Y/N MAT'L CHG: Y/N
TECHNICAL REVIEW: SERIAL NO:
Additional Drawing included in ERRATA 1.
ALL REQUESTS FOR CLARIFICATION MUST BE RECEIVED BY THE ISSUING
OFFICE POC NO LATER THAN THE DATE & TIME IDENTIFIED IN THE REQUEST
FOR PROPOSAL.
File details come from the government source that posted it. Updated .