Text version
JML CONTINUATION SHEET
| REF NO. OF DOCUMENT BEING CONTINUED |
| PAGE |
OF
ORDERING DATA SHEET
Demineralizer Additional Information
1. The contractor shall provide a drawing that specifies the specific manufacturing details of the demineralizer assembly including all materials of construction. The contractor shall obtain approval of the drawing prior to demineralizer manufacture.
2. The contractor shall forward results of material testing, per Paragraph #6.a, and shall obtain approval from Puget Sound Naval Shipyard prior to demineralizer manufacture. Puget Sound Naval Shipyard shall have five working days to evaluate the material test results. Material test results shall be forwarded to Puget Sound Naval Shipyard.
3. The following is a listing of key design features of the demineralizer. This listing is not all-inclusive. Additional requirements follow these general design features.
GENERAL DESIGN FEATURES OF DEMINERALIZERS:
A. Design Pressure of 29” Hg to 150 PSI.
B. Design Temperature 140°F.
C. Design Flow Rate 25 GPM.
D. Design maximum differential pressure drop of 5 PSID at 25 GPM.
E. Outer diameter: 24” F. The overall length of the demineralizer shall be a maximum of 45-1/4”. The distance of the inlet pipe stub between the top of the demineralizer shielding material (Paragraph #10) and the bottom of the installed female quick disconnect shall be 2” +0, -1/8”. The top of the outlet and vent quick disconnects shall be even with the top of the inlet female quick disconnect.
G. Media capacity: 7 cubic feet total
H. The demineralizer shall be loaded with media as specified in Paragraph #4.
I. Demineralizer must be constructed to support the waste processing media as a fixed bed retained inside the demineralizer
CERTIFICATE OF COMPLIANCE REQUIRED
Changes to specification or other technical requirements are not allowed without Shipyard approval via the Administrative Contracting Officer (ACO).
JOB ORDER
36I05-82584
KEY OP
S01
KO ITEM
REV
IDN
5349-v508
IDN REV
PAGE
| JML CONTINUATION SHEET |
| REF NO. OF DOCUMENT BEING CONTINUED |
| PAGE |
ORDERING DATA SHEET
J. Connection ports: inlet, outlet, and vent.
K. Connections: Hansen quick disconnect fittings. Inlet connection shall be 1” female Hansen stainless steel self-sealing quick disconnect with mating aluminum dust cover and sleeve lock device. Outlet and vent connections shall be 1” male Hansen stainless steel self-sealing quick disconnects with mating aluminum dust covers. The inlet, outlet, and vent connections shall be labeled.
L. Pressure vessel must meet ASME Boiler and Pressure Vessel Code.
M. Demineralizer must have OSHA material safety warnings specified.
N. Demineralizer must be outfitted with properly certified lifting and handling means specified in Paragraph #6.
4. The demineralizer shall be furnished complete with the following media:
A. 3.5 cubic feet of HOH resin that conforms to O-I-1279, Class 3, FEDERAL SPECIFICATION ION EXCHANGE RESINS, or HOH resin that conforms to MIL-DTL-24119, Class 6. Rohm and Haas Amberlite IRN 150 is acceptable for use. The resin shall be loaded first.
B. 3.5 cubic feet of newly manufactured, granular, activated carbon:
US SIEVE SERIES 20 X 50 MESH,
0.6 AVERAGE EFFECTIVE MEAN PARTICLE DIAMETER,
APPARENT DENSITY (ASTM 2854) 30 lbs/ft³ AVERAGE, TOTAL ASH CONTENT (ASTM 2866) 2% MAXIMUM, CARBON TETRACHLORIDE ACTIVITY (ASTM 3467) 62% MINIMUM, BALL PAN HARDNESS (ASTM 3802) 97 MINIMUM, pH (ASTM 3838) 3.0-10.0, Changes to specification or other technical requirements are not allowed without Shipyard approval via the Administrative Contracting Officer (ACO).
JOB ORDER
36I05-82584
KEY OP
S01
KO ITEM
REV
IDN
5349-v508
IDN REV
PAGE
| JML CONTINUATION SHEET |
| REF NO. OF DOCUMENT BEING CONTINUED |
| PAGE |
ORDERING DATA SHEET
IODINE NUMBER (ASTM 4607) 1050 MINIMUM,
SURFACE AREA (B. E. T. EQUATION) 1100-1250 m²/g.
PICACHEM W6 Coconut Base Activated Carbon is acceptable for use. The carbon shall be loaded last so that it is above the resin bed.
5. The contractor shall provide a certification that the completed demineralizer assembly has been hydrostatically tested to a minimum of 150 psig for 30 minutes, with no leakage or deformation allowed, prior to shipment. The demineralizer shall be blown down of free standing liquid after hydrostatic test and prior to shipment. A copy of the hydrostatic test certification papers shall be provided for the demineralizer with the hydrostatic test pressure, documented proof of duration of test, and date the hydro was performed. Absence of the documents listed above shall be cause for rejection.
6. Two 1/2”-13UNC-2B tapped lifting holes must be drilled and tapped into the six-inch shielding material. The holes must be tapped to a usable depth of 7/8” (minimum) and must be drilled 180 degrees apart on a 18-1/2” DBC. An area one inch in all directions from the center of each tapped lifting hole must be flat to allow 360° contact of the safety hoist ring bushing. An area two inches in all directions from the center of each tapped lifting hole must be clear of obstructions that would restrict free movement of the safety hoist ring. The minimum yield strength of the six-inch shielding material must be 36,000 PSI.
6a. The tapped lifting holes shall meet the requirements of ANSI N14.6-1993. This requires a drop weight test per ASTM E 208 or a Charpy impact test per ASTM A 370 of the base material as specified in
Paragraph 4.2.6 of ANSI N14.6-1993. The anticipated minimum service temperature for lifting the demineralizer vessel is 20°F, therefore, the nil ductility transition temperature shall be a minimum of -20°F.
Changes to specification or other technical requirements are not allowed without Shipyard approval via the Administrative Contracting Officer (ACO).
JOB ORDER
36I05-82584
KEY OP
S01
KO ITEM
REV
IDN
5349-v508
IDN REV
PAGE
| JML CONTINUATION SHEET |
| REF NO. OF DOCUMENT BEING CONTINUED |
| PAGE |
ORDERING DATA SHEET
7. A load test shall be performed on the tapped lifting holes of Paragraph #6 with the test load applied in the same direction the demineralizer is lifted, not to exceed 10.6° from vertical. The load shall be 3750 lbs (+185 lbs, -0 lbs) applied equally between the two tapped lifting holes. The load test shall be held for a minimum of 10 minutes.
8. After load test of Paragraph #7, the tapped lifting holes shall be visually inspected to the maximum extent practical for cracks, crushed threads, gouges and other deficiencies that would affect load bearing capability and shall be inspected using GO / NO-GO gages. Proof of the tapped lifting hole certification must be submitted to the Shipyard for each tapped lifting hole. A copy of all load test certification papers, results of visual inspections, and results of gage inspections shall be sent to the Shipyard with delivery. Absence of these documents shall be cause for rejection.
9. The tapped holes shall have threaded plugs installed, after testing and inspection, to protect the internal threads. The tapped holes must be free of paint and debris.
10. The top of the demineralizer shall be shielded with six (6) inches of steel with a gamma attenuation tenth value thickness of approximately 4-inches, with minimum yield strength of 36,000 PSI.
11. The demineralizer shall be able to be dewatered to less than 0.5% of the volume of the waste as specified in 10CFR61.56. A certified dewatering procedure shall be provided with the demineralizer.
12. Exposed surfaces of the demineralizer shall have a non-porous surface to provide for easy decontamination of all accessible external exposed surfaces of the demineralizer.
13. Carbon steel surfaces shall be painted with coatings that do not have any heavy metal constituents.
14. The exterior side of the vessel shall be labeled “TOP HEAVY” in two locations on opposite sides of the vessel.
15. A certification shall be provided that all materials used for the construction of the demineralizer assembly meet the Energy Solutions’ Clive site criteria and US Ecology’s Richland site criteria for disposal of radiological material.
16. Contractor shall arrange for the transportation company to protect the demineralizer from freezing during shipment.
Changes to specification or other technical requirements are not allowed without Shipyard approval via the Administrative Contracting Officer (ACO).
JOB ORDER
36I05-82584
KEY OP
S01
KO ITEM
REV
IDN
5349-v508
IDN REV
PAGE
File details come from the government source that posted it. Updated .