Atthachment_J-3_KTR_5-Way_Breakdown_YC_1624.xls
XLS spreadsheet 39 KB Posted
- Attached to
- Repair of YC-1624
- Solicitation number
- N4523A16R0012
About this file
Attachment J-3 5-Way Breakdown
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N4523A16R0012_0001.doc | DOC document | |
| YT_1624_RFC_1_Answered.pdf | ||
| YC_1624_SOW_Solicitation.pdf | ||
| Attachment_J-2_YT_1624_RSC_form.doc | DOC document | |
| N4523A16R0012.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| INSERT CONTRACTOR/COMPANY NAME HERE | ||||||||||
| Project = | N4523A-16-R-0012/YC-1624 Attachment J-3 | DATE: = | ||||||||
| PRIME | SUBCONTRACTOR | G&A | Profit | |||||||
| PARAGRAPH No. | TITLE | M/H | LABOR PRICE | MATERIAL PRICE | M/H | LABOR PRICE | MATERIAL PRICE | Line Item Tally | ||
| 1.0 | General Requirements | $0 | ||||||||
| 1.6 | Arrival Conference | $0 | ||||||||
| 1.8 | Progress Meetings | $0 | ||||||||
| 1.10 | Safety Requirements | $0 | ||||||||
| 1.11 | Hot Work/Welding | $0 | ||||||||
| 1.12 | Threaded Fasteners | $0 | ||||||||
| 1.13 | Environmental & HAZWASTE Mgmt. | $0 | ||||||||
| 1.14 | Materials | $0 | ||||||||
| 1.16 | Label Plates | $0 | ||||||||
| 1.17 | Availability Requirements | $0 | ||||||||
| 1.18 | Integrated Logistic Support | $0 | ||||||||
| 1.19 | Gas Free | $0 | ||||||||
| 1.20 | General Requirements for Testing | $0 | ||||||||
| 2.0 | References | $0 | ||||||||
| 3.0 | Requirements | $0 | ||||||||
| 3.1 | Docking and Undocking Vessel | $0 | ||||||||
| 3.1.1 | Personnel and Equipment | $0 | ||||||||
| 3.1.2 | Docking Procedure | $0 | ||||||||
| 3.1.3 | Blocking Plan | $0 | ||||||||
| 3.1.4 | Crib and Brace Blocking | $0 | ||||||||
| 3.1.5 | Setting and alignment of Docking Blocks | $0 | ||||||||
| 3.1.7 | Docking Conference | $0 | ||||||||
| 3.1.8 | Docking the Vessel | $0 | ||||||||
| 3.1.9 | Post Docking | $0 | ||||||||
| 3.1.10 | Shifting Vessel | $0 | ||||||||
| 3.1.11 | Undocking Vessel | $0 | ||||||||
| 3.1.13 | Final Docking Report | $0 | ||||||||
| 3.2 | Hull Repairs | $0 | ||||||||
| 3.2.1 | Identify Distinguishing Figures and Markings | $0 | ||||||||
| 3.2.2 | Rubber Fenders | $0 | ||||||||
| 3.2.3 | Zinc Anodes | $0 | ||||||||
| 3.2.4 | Hull Blasting and Preservation | $0 | ||||||||
| 3.2.5 | Hull and Freeboard Visual Inspection | $0 | ||||||||
| 3.2.6 | Hull and Freeboard UT Inspection | $0 | ||||||||
| 3.4 | Tanks/Voids | $0 | ||||||||
| 3.4.1 | Open, Pump, Clean, Ventilate and Gas Free Tanks/Voids | $0 | ||||||||
| 3.4.2 | Tank/Void VT | $0 | ||||||||
| 3.4.3 | Preliminary Air Test | $0 | ||||||||
| 3.4.4 | Tank/Void Touch-Up Preservation | $0 | ||||||||
| 3.4.5 | Blast and Preserve Void Access Covers | $0 | ||||||||
| 3.4.6 | Tank/Void Cover Exterior Identification | $0 | ||||||||
| 3.4.7 | Tank/Void Manhole Covers | $0 | ||||||||
| 3.4.8 | Final Air Test | $0 | ||||||||
| 3.4.9 | Tank/Void Closeout Inspection | $0 | ||||||||
| 3.5 | Main Deck Repairs | $0 | ||||||||
| 3.5.1 | Main Deck Repair | $0 | ||||||||
| 3.5.2 | Visual Inspection for Structural Defects | $0 | ||||||||
| 3.5.3 | Ultrasonic (UT) Inspection | $0 | ||||||||
| 3.13 | Preservation | $0 | ||||||||
| 3.13.1 | OQE Information and Data Records | $0 | ||||||||
| 3.13.2 | Environmental Establishment | $0 | ||||||||
| 3.13.3 | Contrasting Colors | $0 | ||||||||
| 3.13.4 | Stripe Coats | $0 | ||||||||
| 3.13.5 | Protective Covering | $0 | ||||||||
| 3.13.6 | Surface Cleanliness | $0 | ||||||||
| 3.13.7 | Disturbed Surfaces | $0 | ||||||||
| 3.13.8 | Feathering | $0 | ||||||||
| 4.0 | Data Submissions | $0 | ||||||||
| $0 | ||||||||||
| Grand Totals | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
&C********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR*********
File details come from the government source that posted it. Updated .