Statement of Work- Heat Shielding_Redacted.pdf
PDF 377 KB Posted
- Attached to
- Heat Shielding- Industrial Furnace
- Solicitation number
- N4215826QS018
About this file
This is a Performance Work Statement (PWS) for the manufacture, delivery, and installation of heat shielding components on an ITS Car Bottom Furnace at Norfolk Naval Shipyard (NNSY).
The contractor shall provide all labor, materials, tooling, and supervision to manufacture and install four major heat shielding components constructed from insulated stainless steel: a door mast heat shield protecting door lift cylinders, safety lock-out cylinders, bearings, and grease lines; individual lift seal cylinder heat shields for the cart seal mechanism; and a cart heat shield protecting the cart drive and retractable power cord reel. Performance is on-site at Norfolk Naval Shipyard. The contractor is responsible for shipping equipment, mechanical re-assembly and field painting, and electrical field wiring between equipment and remote-control panels with all necessary conduit. NNSY is responsible for unloading equipment, clearing pathways and work areas, site cleaning, pre-installation notifications, and providing plant PPE requirements and a customer site manager. The contractor must obtain CIA access and comply with Federal and State OSHA requirements, Norfolk Naval Shipyard OSHE Program Manual, NAVSHIPYDNORINST P5090.2 requirements, and OSHE Control Manual requirements. Operational testing of the oven will be performed. NNSY will assist with unloading parts and equipment. No specific period of performance, equipment specifications, certification of work requirements, or critical time constraints are identified in this document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Presolicitation_N4215826QS018.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance: On-site
Scope: Contractor shall Provide all labor, materials, tooling and supervision to manufacture, deliver and install Heat Shielding on the ITS Car Bottom Furnace to protect parts from excessive heat when opening the doors of the furnace when it is at temperature. The heat shielding to be provided shall include but is not limited to the following major components.
• Door mast heat shield
• Lift seal cylinder heat shield
• Cart drive heat shield
• Cart power reel heat shield
Heat Shielding Specifications: Heat shielding shall meet a minimum of the following specifications.
Door Mast: Door Mast shall be constructed from insulated stainless steel and shall be designed to protect the following components associated with the door mast. (Door Mast
Components):
• Door lift cylinder
• Door safety lock-out cylinders
• Bearings at the top of the door mast
• Grease lines to the bearings
Cart Bottom Seal: Individual insulated stainless steel heat shields shall be installed to protect the cylinders that raise the cart seal.
Cart: An insulated stainless steel heat shield will be supplied to protect the cart drive and power cord reel. Those components are:
Cart drive
Cart retractable power cord reel
Period of Performance:
Equipment Specifications: N/A
Contractor Responsibilities: "Per FAR 22.102-1(a) entitled "Safety", Contractors are hereby informed that their employees or representatives present on property under Norfolk Naval Shipyard cognizance must follow Federal and State OSHA requirements; Norfolk Naval Shipyard OSHE Program Manual, NAVSHIPYDNORINST
P5090.2 requirements; OSHE Control Manual (OSHECM) requirements; or safety requirements for site specific location of the contract."
Vendor is responsible for:
- Shipping equipment.
- Installation service including:
o Mechanical
▪ Re-assembly of equipment and components removed for shipping.
▪ Field painting of required fabricated equipment with standard colors as required.
▪ Any necessary touch-up painting.
o Electrical
▪ Field wiring between equipment and/or remote-control panels, including all conduit and wire.
Shipyard Responsibilities: NNSY Is responsible for:
- Unloading of equipment.
- Clearing pathways from unloading site to installation site for moving equipment and personnel access.
- Clearing the work area around installation site.
- Any required site cleaning before equipment arrival.
- Notification to the vendor of the requirement for any pre-installation meetings or training necessary for plant access.
- Plant PPE requirements for the vendors installation crew.
- Customer site manager.
Lifting and Handling Requirements: NNSY will be required to assist with the unloading of the parts and equipment delivered by the vendor.
Certification of Work Requirements: N/A
Testing: Operational testing of the oven will be performed.
Safety or Security: Contractor will need CIA access and PPE. "Per FAR 22.102-1(a) entitled "Safety", Contractors are hereby informed that their employees or representatives present on property under Norfolk Naval Shipyard cognizance must follow Federal and State OSHA requirements and Norfolk Naval Shipyard