This Statement of Work (SOW) Document 5350B001 is for service rental of one Oil-free Electric Air Compressor and one Regenerative Air Dryer for Naval Station Norfolk, with a performance period from 19 January 2026 to 19 June 2026. The technical specifications require a Grade "D" air compressor that is oil-free, uses a rotary screw design, operates at 230/460V, provides at least 800 CFM at 125 PSI, and can run 24/7. The air dryer must deliver an extra low dew point to -100°F, handle 800 CFM at 125 PSIG, operate on 110/120 VAC, and have a heatless design. Contractors must provide a brochure or technical data sheet, meet the specified delivery date, include all necessary connection equipment, and adhere to detailed rigging and safety requirements specified in the document, including compliance with OSHA and Navy shipyard safety protocols.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Statement of Work_Redacted.pdf | ||
| Combined Synopsis-Sol_ N4215826RX60225.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
DOCUMENT 5350B001
See below for: TECHNICAL CAPABILITY/CONTRACTOR/RESPONSIBILITY CERTIFICATION
STATEMENT
Vendor shall certify that equipment being quoted meets the capabilities listed below and that vendor can assume all contractor responsibilities stated below by initialing at the bottom. In order to be considered for award, this must be completed and submitted with the vendor quote.
PURPOSE OF REQUEST: Service rental from vendor to provide one (1) Oil-free Electric Air
Compressors and (1) Regenerative Air Dryers.
LOCATION: NAVAL STATION NORFOLK
PERIOD OF PERFORMANCE: 19 JANUARY 2026 to 19 JUNE 2026
TECHNICAL CAPABILITES STATEMENT
Item #0001 General Specification for Grade “D” Air Compressor
Shall be provided with the following capabilities, features and specifications: Yes No
Air Compressor must be oil free and utilize a rotary screw design. Compressors must deliver Grade “D” air per CGA G-7.1 An oil flooded rotary screw design with attached oil separator is not acceptable.
Air compressor must be a fixed design. A variable speed design is not acceptable.
Gearbox casing must be designed to maintain a vacuum on its oil contents in order to prevent a potential of contamination of the air supply in the event of a seal failure.
Must be electrical powered 230/460V. Capable of starting and running on a 400 amp circuit breaker.
Compressor to be furnished with a male 500 mcm Camlock fitting
Provide at least 800 min. Cubic Feet per Minute (CFM)
Supply pressure must be 125 Pounds per Square Inch (PSI)
Must be capable of running 24 hours/day, 7 days/week
Whip-check devices must be supplied with compressor
Must have moisture separator (electric type) after coolers
Unit must be a complete system
All equipment to connect compressors and dryers shall be provided by the contractor.
Contractor to adhere to the rigging requirements as outlined herein for contractor equipment at
Unit must be free standing and must have forklift slots (capable of being moved with a forklift).
CONTRACTOR MUST INCLUDE BROCHURE OR TECHNICAL DATA SHEET
FOR THE UNIT MODEL THAT WILL BE RENTED.
CONTRACTOR MUST ACKNOWLEDGE THE ABILITY TO MEET THE
REQUIRED DELIVERY DATE OF 19 JANUARY 2026 OR PROVIDE CLOSEST
DATE THAT UNIT CAN BE DELIVERED.
TECHNICAL CAPABILITES STATEMENT
Item #0002 General Specification for Regenerative Air Dryer
Shall be provided with the following capabilities, features and specifications: Yes No
Regenerative Air Dryer must provide an extra low dew point to -100F.
Must be capable of handling at least 800 cubic feet minute (CFM) at 125 PSIG.
Electrical Requirements: 110/120 VAC, 60 HZ, 1 Phase
Outlet must be 2” NPT. (If unit is not equipped with 2” Male NPT Inlet and Outlet connections, contractor to provide adapters as required to provide 2” Male NPT outlet connections on the unit.)
Unit must be heatless design. Heated or refrigerated regenerative air dryer designs are not acceptable
Contractor to adhere to the rigging requirements as outlined herein contractor equipment at
Unit must be free standing and must have forklift slots (capable of being moved with a forklift)
CONTRACTOR MUST INCLUDE BROCURE OR TECHNICAL DATA SHEET
FOR THE UNIT MODEL THAT WILL BE RENTED TO NNSY.
CONTRACTOR MUST ACKNOWLEDGE THE ABILITY TO MEET THE
REQUIRED DELIVERY DATE OF OR PROVIDE CLOSEST
DATE THAT UNIT CAN BE DELIVERED.
TECHNICAL CAPABILITY/CONTRACTOR RESPONSIBILITY CERTIFICATION
Vendor hereby certifies that vendor’s service meets or exceeds all specifications and contractor responsibilities stated in this solicitation, in their entirety, with no exceptions. __________ (initials)
CONTRACTOR RESPONSIBILITY:
1. Equipment delivery and removal at no cost to the government
2. Provide all parts requiring repair or replacement under circumstances of normal equipment wear and tear at no additional charge
3. Provide all equipment (i.e. hose, filters, fittings, etc.) to connect temporary compressor to dryer and air receiver. Fitting must be leak free. Hoses and fitting shall be hydrostatically tested to at least 150psi for at least 30 minutes within the past year.
4. Contractor is responsible for ensuring that all preventative maintenance is performed on equipment prior to delivery to the government as well as performing preventative maintenance as specified by the equipment’s manufacturer preventative maintenance schedule during the term of the rental period with the government. Contractor is responsible for all travel associated with preventative maintenance. Contractor is responsible for providing service technicians that are able to meet the badging and security requirements of
5. Post contact information for service/repair of equipment directly on the rental equipment. Contact information must be packaged to withstand being located in an outdoor environment
6. The contractor shall dispatch a representative in response to a service request to repair and/or replace a rental compressor and/or dryer within eight (8) hours of notification by at no additional charge, regardless if request is placed during normal business hours. Contractor is responsible for travel associated with repair of equipment.
Contractor is responsible for providing service technicians that are able to meet the badging and security requirements of
7. When the equipment is required to be removed to the contractor's facility for repair or replacement, the contractor shall be responsible for loss or damage from the time it leaves the government site until it is returned to the government.
8. Provide start up training of equipment to the government. Contractor is responsible for all travel associated with providing startup training of equipment to the government
9. Clean the air compressor/air dryer prior to delivery to the following requirements:
a. Air compressor/air dryer shall be cleaned to a degree of cleanliness that results in a surface free of grease, oil, flux, scale, dirt loose particles and any other matter foreign to the base metal. Adherent light superficial rust on steel surfaces, caused by short time exposure to the atmosphere, is acceptable.
b. For uncoated surfaces: Adherent corrosion products typical on surfaces of the type material being considered (e. g. flash rust on steel) are acceptable. Loose corrosion products are not acceptable and must be removed.
GOVERNMENT RESPONSIBILITY:
1. Provide operators
2. Monitor all gauges and/or indicator lights for proper operation, faults, and/or alarms. Notify contractor when abnormal conditions exist.
3. Equipment movements within
4. Lost items and equipment damage beyond normal wear and tear caused by the government
ADDITIONAL DETAILS/NOTES:
1. New or used equipment may be provided. Used compressor shall not have an excess of 8,000 operating hours at the beginning of the rental period. reserves the right to inspect the proposed equipment prior to contract award.
2. The compressor/dryer will be exposed to everyday weather, and saltwater air. It is the contractor’s responsibility to provide any protective coverings for the units.
3. The government reserves the right to return one or all units at any time prior to expiration of the rental period. The contractor agrees to prorate costs for the time the units are in use by only. The government agrees to give the contractor twenty-four (24) hours’ notice for return of units prior to expiration of rental period.
Requirements for Lifting of Equipment
1. The equipment shall be outfitted with suitable attachments for overhead lifting.
1.1. For multiple point lifts each lifting attachment shall be capable of supporting one half the gross weight of the equipment with a design factor of five to one based on ultimate strength. For single point lifts the lifting attachment shall be capable of supporting the gross weight of the equipment with a design factor of five to one based on ultimate strength.
1.2. For multiple point lifts each lifting attachment shall be designed to accept a standard anchor shackle
(Federal Specification RR-C-271D, type IVA) which is capable of supporting one half the gross weight of the equipment. For single point lifts the lifting attachment shall be designed to accept a standard anchor shackle (Federal Specification RR-C-271D, type IVA) which is capable of supporting the gross weight of the equipment.
1.3. Design of the lifting attachments shall be such that the attachments and shackles are not side loaded more than 10° out of the plane. Lifting attachments shall be located such that the lifting slings do not contact the equipment, or alternatively a spreader beam certified to NAVFAC P-307 shall be provided. Whenever practical, the lifting attachments shall be located above the center of gravity, and such that the lifting slings do not contact the equipment housings.
1.4. Each lifting attachment shall be conspicuously marked in a contrasting color “Lift Here”. Letters shall have a minimum height of 1”.
2. The equipment shall be marked in a prominent location with the gross weight. Sand hoppers, tubs, or other containers that may contain material shall be marked with the empty and full weight (or alternatively the empty weight and working load limit). Marking shall be upper case letters of a contrasting color, with a minimum height of 1”. Marking shall include the units (i.e. “pounds”, “long tons”, etc.).
3. The equipment shall be provided with a lifting sketch / rigging diagram that meets the Rigging Sketch
Requirements as outlined below.
3.1. The lifting sketch shall detail any specific requirements and / or configurations that must be meet prior to lifting (i.e. “engage swing lock”, “Tilt mast back fully”, “Rotate lifting basket over side”, “Utilize 10’ minimum length slings”, “Spreader beam required”, etc.).
3.2. The lifting sketch shall include the location of the center of gravity of the equipment (full fuel, hydraulic tanks, etc.), equipment model/manufacturer, and gross weight.
3.3. A copy of the lifting sketch shall be permanently posted on the equipment, and a copy shall be forwarded to Code 714 (757-396-3345, 3346).
4. If specialized handling gear other than shackles, standard slings, or chain falls (i.e. spreader beams, special lift rigs, etc.) is required, the contractor shall furnish it. This handling gear shall be provided certified in accordance with NAVFAC P-307, with written documentation of proof testing.
Rigging Sketch Requirements
Rigging sketches, as a minimum, shall identify the following:
1. The weight of the load.
2. The location of the center of gravity.
3. The minimum crane capacity.
4. The minimum capacity / length of slings.
5. The minimum capacity of other standard rigging gear.
6. The attachment (lifting) points for the load.
a. The attachment points for multiple leg lifts shall be sized such that each attachment point can support half the load’s weight at the anticipated lift angle.
b. The attachment point for single leg lifts shall be sized such that the attachment point can support the entire load’s weight.
7. Limitations on allowable orientations for any parts making up the lifting assembly.
8. For single leg vertical lifts using twisted rope (wire or synthetic), two parallel ropes each capable of supporting the entire load alone shall be required unless a method is used to prevent unlaying the rope.
9. A minimum D/d ratio of one shall be required where wire rope slings pass over any object, or in the eyes of wire rope slings. A minimum D/d ratio of two shall be required where synthetic rope slings pass over any object, or in the eyes of synthetic rope slings.
a. "D" represents the diameter of the object the sling passes over.
b. "d" represents the diameter of the sling.
c. Table 14-3 of NAVFAC P-307 lists efficiency factors at various D/d ratios.
10. Components in each handling assembly shall be sized based on the worst case distribution of loads.
a. When making a two, three, or four point lift, the handling gear shall be sized so that two legs can support the load without exceeding the safe working load (SWL) at the lift angle expected, unless an equalizing method is used.
11. When non-standard gear is required (i.e. round stock lifting bars) written instructions shall be provided that ensure:
a. The proper material is being used,
b. The item is certified IAW NAVFAC P-307.
c. Any special requirements or dimensions are followed to ensure that engineering assumptions are met
(i.e. eccentricity of the bearing points).
SAFETY NOTICE
Per FAR 22.102-1(a) entitled "Safety", Contractors are hereby informed that their employees or representatives present on property under Norfolk Naval Shipyard cognizance must follow Federal and State
OSHA requirements and Norfolk Naval Shipyard OSHE Program Manual, NAVSHIPYDNORINST P5090.2 requirements or safety requirements for site specific location of the contract.
a. Contractors and Non-NNSY Government Agencies (NNGAs) are hereby informed that their employees or representatives present on property under Norfolk Naval Shipyard (NNSY) cognizance must adhere to Federal
OSHA requirements for hazardous energy control IAW 29 CFR 1915.89 and must follow Hazardous Energy
Control (HEC) procedures as identified in NAVSEA’s Occupational Safety, Health, and Environment
Corporate Manual (OSHECM) Chapter 250 (latest revision), when performing work under NNSY contract.
All HEC work to be performed by Contractors and NNGAs requires that NNSY Technical Points of Contact
(TPOCs) and/or Contracting Officer’s Representatives (CORs) be notified of the HEC scope of work prior to starting work. Any changes or deviations in the initial scope of HEC work requires the NNSY TPOCs and/or
CORs be informed of the change/deviation. Appendix 250.B-1 through B-3 of OSHECM Chapter 250 for multiple employer work identifies when Contractors and NNGAs are required to assign their Lockout/Tags-
Plus Coordinator (LOTC) to coordinate HEC work with the cognizant NNSY LOTC. HEC locks shall be provided by the contractor or NNGA for their employees use. The HEC locks shall have red bodies with name labels or name tags affixed, identifying who installed the HEC lock(s) and a point of contact telephone number. HEC lock name labels and tags must be made of materials that will hold up to the environment to which they are exposed. HEC tags used for Tags-Plus HEC work shall be provided by the cognizant NNSY
LOTC to the contractor or NNGA for their use if machinery, equipment, or systems (MES) cannot be locked out. OSHECM Chapter 250 Tags-Plus procedures will be strictly followed.
b. Contractors and NNGA’s may obtain electronic copies of OSHECM Chapter 250 (latest revision) and access the OSHA 1915.89 web site by using the following link to NNSY’s public access web site:
http://www.navsea.navy.mil/shipyards/norfolk/default.aspx
c. Names and contact information for NNSY LOTCs and/or the Facility Custodian will be provided by NNSY
TPOC and/or CORs set forth elsewhere in this award document.
DBIDS
1.1 Identification Badges and Installation Access.
• Any new contractor, vendor or supplier requesting base access AFTER 31 May 2017 will be required to obtain a DBIDS credential. NCACS credentials will no longer be issued.
• Only DBIDS credentials will be issued to ALL contractors, vendors and suppliers seeking base access
AFTER 14 August 2017.
Defense Biometric Identification System (DBIDS) increases installation security and communications by receiving frequent database updates on changes to personnel/credential status, law enforcement warrants, lost/stolen cards, and force protection conditions. The system provides a continuous vetting anytime the
DBIDS card is scanned at an installation entry point.
If you currently have a Navy Commercial Access Control System (NCACS) card, the following is required to get a DBIDS credential:
• Present your NCACS Card and a completed copy of the SECNAV FORM 5512/1 to the base Visitor Control
Center representative.
• The VCC will pull up your information in the computer, ensuring all information is current and correct.
• Once your information is validated, a temporary DBIDS credential is provided.
• Your temporary credential will have an expiration date, prior to which you will need to obtain your permanent DBIDS credential (~ 90 days).
• For each additional U.S. Navy installation to which you need access, the first time you visit you only need to bring your DBIDS credential and statement of purpose for base access when arriving at the Visitor Control
Center.
• The representative will enter base access authorization and then you may proceed to work.
If you do NOT have an NCACS Card, the following is required to obtain a DBIDS credential:
• Present a letter or official document from my government sponsoring organization that provides the purpose for your access.
• Present valid identification, such as a passport or Real ID Act-compliant state driver's license.
• Present a completed copy of the SECNAV 5512/1 form to obtain your background check.
• Upon completion of the background check, the Visitor Control Center representative will complete the
DBIDS enrollment process, which includes your photo, finger prints, base restrictions, and several other assessments; after all this is done, you will be provided with your new DBIDS credential.
• You may now proceed to work.
FOR ADDITIONAL QUESTIONS ABOUT OBTAINING A DBIDS CARD, CONTACT YOUR LOCAL
BASE VISITOR CONTROL CENTER. INFORMATION IS ALSO PROVIDED AT:
www.cnic.navy.mil/om/dbids.html
1.2. One-Day Passes. Participation in the DBIDS is not mandatory, and if the Contractor chooses to not participate, the Contractor's personnel will have to obtain daily passes, be subject to daily mandatory vehicle inspection, and will have limited access to the installation. The Government will not be responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the DBIDS.
ECMRA
ENTERPRISE-WIDE CONTRACTOR MANPOWER REPORTING APPLICATION (ECMRA) - The contractor shall report contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via a secure data collection site. Contracted services excluded from reporting are based on Product Service Codes (PSCs). The excluded PSCs are:
(1) W, Lease/Rental of Equipment;
(2) X, Lease/Rental of Facilities;
(3) Y, Construction of Structures and Facilities;
(4) S, Utilities ONLY;
(5) V, Freight and Shipping ONLY.
The contractor is required to completely fill in all required data fields using the following web address https://doncmra.nmci.navy.mil.
Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk, linked at https://doncmra.nmci.navy.mil.
PORTABLE ELECTRONIC DEVICES (PEDs)
In accordance with COMSUBLANT/COMSUBPACINST 2075.1C, the use of Portable Electronic
Devices (PEDs) while in or on Department of Navy Submarine spaces are prohibited. A portable electronic device (PED) is defined as any non-stationary electronic apparatus with singular or multiple capabilities of, but not limited to recording, storing, and/or transmitting data, voice, video, or photo images (e.g., cell phones, laptops, tablets and wearable devices such as fitness bands and smart watches).