N4215824RE002_Class A Waste Disposal.pdf

PDF 1 MB Posted

Attached to
Class A Radioactive Waste Disposal
Solicitation number
N4215824RE002
Issued by

About this file

This is a solicitation for Class A Radioactive Waste Disposal Services in support of the Naval Nuclear Propulsion Program. The solicitation seeks proposals for an Indefinite Delivery/Indefinite Quantity, Firm Fixed Price contract to provide disposal and transportation services for solid and liquid Class A Low Level Radioactive Waste at a licensed disposal facility. The contractor must be able to receive waste directly from Naval Nuclear Propulsion Program sites or from contractors processing such waste. Transportation of waste from program sites to the contractor's disposal facility is also required. Disposal and transportation services must comply with all applicable nuclear regulatory, environmental, health and safety, and transportation laws and regulations. Questions are due by February 9, 2024, with proposals due on an unspecified future date. The solicitation is issued by the Services Contract Division, C412 at Norfolk Naval Shipyard on behalf of the Naval Nuclear Propulsion Program.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

N4215824RE002 01-Feb-2024

b. TELEPHONE NUMBER

757-396-9689

8. OFFER DUE DATE/LOCAL TIME

05:00 PM 02 Mar 2024

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

N421589. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

DUSHANI C STARKS

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

N4215823RCD0014

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED ORX

SMALL BUSINESS

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

NORFOLK NAVAL SHIPYARD

ATTN: DUSHANI STARKS

NNSY CONTRACTING

C400, BLDG 65, 1ST FLOOR

PORTSMOUTH VA 23709-1022

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE N42158 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

SEE SCHEDULE

PERFORMANCE WORK STATEMENT

AS SPECIFIED

PORTSMOUTH VA 23709

TEL: FAX:

FAX:

TEL: 757-396-9689 SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$47,000,000

NAICS:

562112

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF108

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

N4215824RE002

Section SF 1449 - CONTINUATION SHEET

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0001 1 Lot Class A Disposal Rad Waste-Base Year

FFP

Contractor services for transportation and disposal of Naval Nuclear Propulsion Program (NNPP) waste materials in accordance with Performance Work Statement (PWS) identified.

NOTE: The contract minimum guarantee of $1500.00 will be satisfied in the base year effort.

FOB: Destination

MILSTRIP: N4215823RCD0014

PURCHASE REQUEST NUMBER: N4215823RCD0014

PSC CD: F108

MAX

NET AMT

UNIT UNIT PRICE MAX AMOUNT

0002 72 Set Class A Disposal Rad Waste-Base Year

FFP

Contract Data Requirements List (CDRL) as identified Performance Work Statement (PWS).

This line item is not separately price (NSP).

FOB: Destination

MILSTRIP: N4215823RCD0014

UNIT UNIT PRICE MAX AMOUNT

1001 1 Lot OPTION Class A Disposal Rad Waste Option Year 1

FFP

Contractor services for transportation and disposal of Naval Nuclear Propulsion Program (NNPP) waste materials in accordance with Performance Work Statement (PWS) identified.

FOB: Destination

MILSTRIP: N4215823RCD0014

UNIT UNIT PRICE MAX AMOUNT

1002 72 Set OPTION Class A Disposal Rad Waste Option Year 1

FFP

Contract Data Requirements List (CDRL) as identified Performance Work Statement (PWS).

This line item is not separately price (NSP).

FOB: Destination

MILSTRIP: N4215823RCD0014

UNIT UNIT PRICE MAX AMOUNT

2001 1 Lot OPTION Class A Disposal Rad Waste-Option Year 2

FFP

Contractor services for transportation and disposal of Naval Nuclear Propulsion Program (NNPP) waste materials in accordance with Performance Work Statement (PWS) identified.

FOB: Destination

MILSTRIP: N4215823RCD0014

UNIT UNIT PRICE MAX AMOUNT

2002 72 Set OPTION Class A Disposal Rad Waste-Option Year 2

FFP

Contract Data Requirements List (CDRL) as identified Performance Work Statement (PWS).

This line item is not separately price (NSP).

FOB: Destination

MILSTRIP: N4215823RCD0014

UNIT UNIT PRICE MAX AMOUNT

3001 1 Lot OPTION Class A Disposal Rad Waste-Option Year 3

FFP

Contractor services for transportation and disposal of Naval Nuclear Propulsion

UNIT UNIT PRICE MAX AMOUNT

3002 72 Set OPTION Class A Disposal Rad Waste-Option Year 3

FFP

Contract Data Requirements List (CDRL) as identified Performance Work Statement (PWS).

This line item is not separately price (NSP).

FOB: Destination

MILSTRIP: N4215823RCD0014

UNIT UNIT PRICE MAX AMOUNT

4001 1 Lot OPTION Class A Disposal Rad Waste-Option Year 3

FFP

Contractor services for transportation and disposal of Naval Nuclear Propulsion

UNIT UNIT PRICE MAX AMOUNT

4002 72 Set OPTION Class A Disposal Rad Waste-Option Year 3

FFP

Contract Data Requirements List (CDRL) as identified Performance Work Statement (PWS).

This line item is not separately price (NSP).

FOB: Destination

MILSTRIP: N4215823RCD0014

PERFORMANCE WORK STATEMENT

DISPOSAL OF CLASS A RADIOACTIVE WASTE

IN SUPPORT OF THE NAVAL NUCLEAR PROPULSION PROGRAM

1 SCOPE:

1.1 Contractor services are required for transportation (at the site’s option) and licensed disposal of Naval Nuclear Propulsion Program (NNPP) Class A Radioactive solid and liquid waste, hereinafter also referred to as “Material”.

2 APPLICABLE DOCUMENTS: The following documents are applicable to this Performance Work Statement to the extent specified herein.

2.1 Title 49 Code of Federal Regulations (CFR) “Transportation”

2.2 Title 10 CFR “Energy”

2.3 Occupational Safety and Health Act (OSHA)

2.4 U.S. Department of Energy Health, Safety and Security Office of Corporate Safety Analysis, “Suspect/Counterfeit Items Awareness Training” (latest revision)

3 REQUIREMENTS:

3.1 General Requirements: In the performance of the resulting contract, the Contractor shall:

3.1.1 Dispose of NNPP material in a disposal facility licensed to accept Class A waste material.

3.1.2 Receive waste materials generated at various NNPP sites such as (but not limited to):

3.1.2.1 Norfolk Naval Shipyard (NNSY), Portsmouth, VA

3.1.2.2 Portsmouth Naval Shipyard (PNS), Kittery, ME

3.1.2.3 Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS & IMF), Bremerton, WA

3.1.2.4 Pearl Harbor Naval Shipyard and Intermediate Maintenance Facility (PHNS & IMF), Pearl Harbor, HI

3.1.2.5 Nuclear Regional Maintenance Department (NRMD) Point Loma, San Diego, CA

3.1.2.6 Naval Base Coronado (NBC), San Diego, CA

3.1.2.7 NRMD Norfolk, Norfolk, VA

3.1.2.8 NRMD Kings Bay, Kings Bay, GA

3.1.2.9 NRMD Bangor, Bangor, WA

3.1.2.10 NRMD New London, New London, CT

3.1.2.11 Kenneth A. Kesselring Site (Kesselring), West Milton, NY

3.1.2.12 Knolls Atomic Power Laboratory (Knolls), Niskayuna, NY

3.1.2.13 Bettis Atomic Power Laboratory (Bettis), West Mifflin, PA

3.1.2.14 Naval Reactors Facility (NRF), Idaho Falls, ID

3.1.2.15 Nuclear Power Training Unit (NPTU), Charleston, SC

3.1.2.16 Electric Boat Shipyard (EB), New London, CT

3.1.2.17 Huntington Ingalls Industries - Newport News Shipbuilding (HII-NNS), Newport

News, VA

3.1.3 Contractor services are required for the receipt and disposal of material generated from NNPP sites. Shipments may come directly from the NNPP site or from contractors operating under separate contract(s) where the material has been volume reduced or otherwise processed/handled.

NNPP processed waste will be packaged and shipped by the processing contractor in accordance with Department of Transportation (DOT), Agreement State, and disposal site regulations directly to the Contractor’s licensed disposal facility for disposal.

3.1.4 Contractor services are required for the transportation of material directly from NNPP sites to the disposal facility, at the option of the NNPP sites. See Section 3.7.

3.1.4.1 For PHNS & IMF shipments, special requirements are necessary, as the transportation of waste will occur in two segments, an ocean voyage and a land voyage. Section 3.10.2 provides details related to these special requirements.

3.1.5 The Contractor shall submit reports as specified in Section 3.5 to the Contracting Officer’s

Representative (COR) and to the shipping NNPP site(s) technical representative(s) as identified in each individual task order.

3.1.6 The Contractor shall (at their own expense) comply with all laws, ordinances, and regulations of

Federal, State, and Local authorities regarding licenses, permits and consents that may be necessary. For any supplies or services provided pursuant to this contract, the Contractor shall comply with all applicable laws and regulations, including, but not limited to, the Nuclear Regulatory Commission (NRC), the Environmental Protection Agency (EPA), the Occupational Safety and Health Act (OSHA) and associated regulations, the DOT, the Toxic Substances Control Act (TSCA) and associated regulations, radioactive waste compact, and the appropriate Agreement State (as applicable).

3.1.7 The Contractor shall allow site inspections by NNPP Representatives at all reasonable times. The

Contractor shall arrange for site inspections by NNPP Representatives for subcontractor sites when requested by the Government. In the event of a site inspection violation concerning any waste previously accepted at the site, the Contractor may be held liable to the extent that its actions or inactions caused the violation, at the discretion of the NNPP, for costs incurred to ensure the proper disposal of such waste at the facility.

3.1.8 The Contractor, upon taking possession, custody, or control of the waste material, will, to the extent legally permissible, assume all risk, risk of loss, and all other incidents of ownership to conforming waste material and its containers. The shipping NNPP site will provide necessary information to the Contractor for transfer of such material. The information, which may include waste characterization profiles and shipping forms, will be provided in a mutually acceptable format. The Contractor shall be liable and responsible to the extent allowed by applicable laws and regulations in any action that may claim damages or compensation in any connection with the waste materials or the containers after the Contractor has accepted possession, custody, or control of the waste material.

3.1.9 The contractor shall perform all work including, but not limited to, waste disposal and transportation in the United States of America.

3.2 Waste Contents/Form:

3.2.1 Solid and/or liquid non-flammable and non-explosive material for disposal will be in drums, boxes, tanks, or other general design containers. Material will be packaged for shipment by NNPP personnel in accordance with DOT, applicable state, and NRC regulations. Material will be packaged, shielded, marked, and labeled by the sending NNPP site or processing contractor as required by Code of Federal Regulations (CFR), Title 49 and Title 10 and applicable Federal, State, disposal facility site criteria, radioactive material license requirements, and individual NNPP site requirements. All materials sent for disposal will be packaged and shipped in accordance with DOT, Agreement State, and disposal site regulations directly to the Contractor’s licensed disposal facility for disposal.

3.2.2 Waste material for disposal will contain individual radionuclides or combinations of radionuclides listed in Title 10 CFR Part 61. Waste material will meet the limits of Class A waste as defined by Title 10 CFR Part 61 Subpart D Part 61.55. No waste material requiring disposal as Class B or Class C will be disposed under the resulting contract.

3.2.3 Radiation dose rates from the packages offered for transport will not exceed any limits imposed by

Title 49 of the CFR.

3.2.4 These same requirements apply to waste that is received from processing facilities.

3.2.5 The Contractor shall provide services for disposal of components having unique design characteristics or for large components. The Contractor shall provide a proposal upon the request of the Government on a case-by-case basis for this work hereby known as a “Special Quote”.

Volume alterations, if required, should be conducted in such a manner as to minimize the total disposal volume of the unique item/large component to the maximum extent practical. All waste shall be handled according to Federal, State, and local regulations at the Contractor’s facility and shall be disposed of in accordance with the Contractor’s waste acceptance criteria (WAC)/waste acceptance guidelines (WAG).

3.3 Waste Profiling and Characterization:

3.3.1 The Waste Generating Site, or processing contractor as applicable, shall prepare and submit for the

Contractor’s approval of all certifications and waste profile forms as required by the Contractor’s licenses and permits. The Government represents that the information contained in its completed waste profile forms will be true and correct to the best of its knowledge, and the Government acknowledges that the Contractor can rely on the information contained in such waste profile form.

3.3.2 If the Contractor receives waste material that is not consistent with waste profile forms and the

Contractor believes the waste cannot be successfully disposed, the Contractor shall notify the COR and applicable NNPP site’s technical representative within one (1) calendar day. The Contractor shall submit a quote for any costs and expenses associated with waste material that is not consistent with waste profile forms for approval by the Contracting Officer prior to taking further action or disposing of the waste material. The Government reserves the right to arrange alternative disposal services for the waste material if it is advantageous to the Government.

3.4 Non-Conforming Waste Material:

3.4.1 Waste Material delivered to the Contractor for disposal shall be non-conforming when:

3.4.1.1 The material delivered is not in accordance with the analyses, description, specification, or limitations stated in the approved Radioactive Waste Profile Record in accordance with the disposal site WAC/WAG, as applicable.

3.4.1.2 The material delivered does not comply with the Contractor’s licenses, permits, or regulations, and includes the following:

3.4.1.2.1 Manifesting errors

3.4.1.2.2 Resultant contamination from failure to comply with packaging, marking, and shipment of material in accordance with DOT Title 49 CFR – Transportation

3.4.1.2.3 Shipment is delivered to the disposal facility without prior authorization in accordance with the Contractor’s licenses and permits

3.4.2 Remedies for materials considered Non-Conforming:

3.4.2.1 The Contractor shall notify the Contracting Officer and COR immediately upon discovery of the non-conforming materials for negotiation of a resolution. At the discretion of the Government, resolution may be, but not limited to, the following:

3.4.2.1.1 Contractor shall provide a proposal to correct the non-conformance issue that would permit disposal, and provide an estimate of the cost to correct.

3.4.2.1.2 The Contracting Officer, with input from the COR, may direct an alternative course of action.

3.4.2.1.3 Either party may negotiate a rejection of the shipment.

3.4.3 If the Contractor receives non-conforming waste material for disposal under this contract, the

Contractor shall notify the COR and applicable NNPP site’s technical representative within one

(1) calendar day. The Contractor shall submit a quote for any costs and expenses associated with this non-conforming waste for approval by the Contracting Officer prior to taking further action or disposing of the non-conforming waste material. The Government reserves the right to arrange alternative disposal services for the waste material if it is advantageous to the Government.

3.5 Reporting Requirements:

3.5.1 The Contractor shall, in accordance with Exhibit A (Contract Data Requirements List (CDRL)

A001), submit a certificate of disposal (COD) for each container/item of NNPP waste received/disposed of by the Contractor.

3.5.2 The Contractor shall provide radiological survey results in accordance with Exhibit A (CDRL

A002).

3.5.3 Asbestos waste and any asbestos containing daughter waste products originating from asbestos waste generated within the State of South Carolina shall be tracked until disposed. The Contractor shall, in accordance with Exhibit A (CDRL A003), provide copies of all signed Asbestos Waste Documentation.

3.5.4 The Contractor shall provide status reports that identify the disposal status of each NNPP generator's waste disposed of (per shipping manifest number) in the designated period in accordance with Exhibit A (CDRL A004).

3.5.5 For the transportation of waste directly from a NNPP generating site, the contractor shall provide copies of signed shipping documentation in accordance Exhibit A (CDRL A005).

3.5.6 Contractor personnel shall notify the COR and the Contracting Officer of any issue related to licenses, permits, agreements, consents, or other legal authorization required to perform work specified herein that would adversely affect the Contractor’s ability to perform the functions defined in the contract. This notification is required whether or not such documents are identified in this specification. This notification shall be within one (1) calendar day of identification of the issue and shall be followed up in writing within five (5) calendar days. Additionally, Contractor personnel shall inform the Contracting Officer and the COR prior to initiating any discussion, oral or written, with State, Federal, or local regulators concerning the handling, processing, disposal, or transportation of NNPP waste. This notification shall occur under all circumstances even if the Contractor does not specifically identify that the NNPP is the waste generator. This notification is in addition to, and not in lieu of, the Contractor's responsibility to promptly notify the Contracting Officer of any issues that could adversely affect schedule, impact performance or result in non-compliance with the contract.

3.5.7 The cognizant Contractor personnel shall participate in conference calls with NNPP personnel to discuss shipment and disposal efforts of NNPP waste. These calls will be scheduled by the NNPP at appropriate intervals as requested.

3.5.8 The Contractor will provide the Contracting Officer and COR notice of any revision or change to the Contractor's WAC/WAG no later than forty-five (45) calendar days prior to implementing the revision or change. The Government reserves the right to accept or reject any revisions or changes to the WAC that are not imposed on the Contractor by an external government regulator such as the NRC, EPA, radioactive waste Compact, or Agreement State.

3.6 Loading of Material on Contractor Vehicles:

3.6.1 NNPP site personnel will place materials on Contractor’s vehicle, unless otherwise specified. The

NNPP site will furnish dunnage, as necessary, to permit safe transport of material, brace or cushion the load to prevent movement, secure the load using either Contractor-supplied or NNPP-furnished equipment for safe transportation and arrange for distribution of weight and compliance with radiation levels per DOT regulations. The Contractor is responsible to ensure the load is properly secured.

3.6.2 For open topped vans, curtain trailers, or flatbed trucks, the assistance provided by the Contractor's driver shall consist of removing or opening covers or closures on the truck prior to loading, and ensuring that the loading meets all DOT regulations. Upon completion of the loading operation, the driver shall secure and/or replace covers and closures as necessary on the vehicle and shall sign for and accept transport responsibility as the carrier and custody of the materials.

3.6.3 As requested by the ordering NNPP sites, the Contractor may be required to furnish chains, ropes, friction mats, straps or other rigging materials as necessary to secure the load to the transport vehicle, in addition to the normal working ISO locks used to secure ten (10), twenty (20) foot, and forty (40) foot sea-land containers to the trailer. All tie-down equipment supplied by the Contractor shall be new or in like new condition and be in proper working order to support its intended function. Any tie-down equipment found to have suspect/counterfeit components as identified in the latest version of the U.S. Department of Energy Health, Safety and Security Office of Corporate Safety Analysis, “Suspect/Counterfeit Items Awareness Training” shall be rejected and replaced at the Contractor’s expense.

3.6.4 Tie-down and rigging equipment furnished by NNPP sites to secure the load for shipment shall be returned to the NNPP site when requested. As much as possible, return transportation of NNPP supplied tie-down and rigging equipment furnished by NNPP sites shall be scheduled in conjunction with a shipment of material to or from the NNPP site unless otherwise agreed to by the Contractor and NNPP site.

3.7 Transportation of Materials by the Disposal Contractor:

3.7.1 Transportation and disposal of radioactive solid/liquid waste shall be in accordance with all applicable laws, rules, and regulations, including, but not limited to, the DOT, NRC, EPA, and state and local regulations for all states and local areas where transport occurs. The Contractor shall, at their own expense, comply with all laws, ordinances, and regulations of federal, state, and local authorities regarding transportation licenses, and consents that may be necessary in connection therewith. The Contractor may be required to provide rail transportation on a case by case basis via the Special Quote process. Transportation of waste materials to the disposal facility may be subcontracted, but the subcontractor shall be under the direct authority of the Contractor.

The subcontractor’s vehicles, equipment and personnel shall fully comply with this contract.

3.7.2 The Contractor shall, upon request and as designated in the applicable task order, pick-up radioactive material from the NNPP site(s) and shall dispose of the material at the disposal facility. The Contractor shall contact the cognizant shipping NNPP site for specific site access requirements for contractor personnel. Unless otherwise agreed upon, the material shall be removed from the NNPP site(s) in truckload units. The Contractor shall furnish a curtain trailer, a closed van or van with open top covered with tarps, or a tractor trailer vehicle with a minimum of five (5) axles, and the maximum capacity permitted by state laws. Radiation and contamination levels on Contractor vehicles shall meet the requirements delineated in Section 3.9 of this specification. Truckload units will be determined by cognizant NNPP site personnel.

3.7.3 The Contractor shall furnish a double-walled, steel tank inside a freight container to ship radioactive liquid waste. The Contractor shall broker the water shipments. Brokerage costs shall be determined via the Special Quote process.

3.7.4 At a minimum, the Contractor shall have the ability to transport shipments from two (2) different

NNPP facilities within the same week with no expectation of route overlap.

3.7.5 On certain shipments two (2) drivers may be required by the NNPP shipping site to expedite the transportation of the material.

3.7.5 The Contractor shall furnish any special tags or labels required due to DOT special permits held by the Contractor.

3.7.6 Additional costs due to transportation permits (i.e., overweight/over dimension conditions) and other miscellaneous charges will be compensated in accordance with the Transportation Rate Sheet. Supporting documentation for the additional costs shall accompany the invoice(s).

3.7.7 The Contractor shall have vehicles inspected per the requirements of Title 49 CFR Part 396 and any additional NNPP requirements prior to each use to transport radioactive materials under this contract. The results of this inspection shall be provided to the NNPP site upon request prior to release of materials to the Contractor’s custody. Discrepancies observed in the checklist or which may be found associated with the contractor's vehicles shall be the sole responsibility of the contractor to correct prior to shipment.

3.7.8 The Contractor shall be responsible for any costs associated with delays resulting from the

Contractor's failure to comply with statutory, regulatory, or contractual requirements; detention and demurrage charges will not apply as a result of any such delays.

3.7.9 The Contractor shall sign for and accept transport responsibility as the carrier as soon as each shipment is loaded on/in the vehicle. The Contractor shall ensure that recipients authorized to accept radioactive material have in their possession an up-to-date emergency response plan that includes actions required in the event of an accident. The plan shall also include appropriate authorities to be notified such as federal, state and local authorities. Only in the event of an accident within the boundaries of the NNPP site shall the NNPP site be required to provide assistance. The above recipients shall also have in their possession personnel dosimetry and radiation monitoring equipment to be utilized as required by the Contractor’s NRC or Agreement State license, emergency response plan, law, regulation, etc. The Contractor shall ensure that NNPP site approved routes for transport of radioactive material within the NNPP site are followed. The Contractor shall provide the NNPP site with off-site routes prior to each shipment, if requested. The Contractor shall be responsible for ensuring that routes meet the requirements of Title 49 CFR and applicable federal, state, and local regulations.

3.7.10 Prior to departing the NNPP site, the Contractor’s representative (i.e., broker (if required by the NNPP site)), shall sign a certification to the effect that they have received the listed radioactive material for transportation, certify for compliance with DOT regulations and that they are a designated representative of a licensee of the NRC or an agreement state, to receive such material and shall furnish the duly assigned license number.

3.7.11 Unless otherwise specified in the task order, the Contractor’s driver shall transport the material directly to the licensed disposal facility upon departure from the NNPP site. In addition, the driver shall notify the NNPP site POC (noted in the shipping papers) at the NNPP site making the shipment of any problems encountered, such as mechanical problems with the equipment, adverse weather conditions, or any other conditions which would result in a delay in delivering the material to the disposal site. Contractor personnel shall contact the COR and NNPP site personnel (as listed in the shipping paperwork) immediately of any delay in the shipment.

3.7.12 The Contractor must be capable of responding to emergencies that may occur during transportation of radioactive materials over public highways between the NNPP site and the radioactive waste disposal site. At a minimum the Contractor shall:

3.7.12.1 Provide the driver with an accident plan, which will include instructions for calling

DOT and NRC or an agreement state agency in the event of an accident. The Contractor shall make provisions for radiological control response capabilities at the accident site.

3.7.12.2 Equip each vehicle used to transport waste with material required in the event of a minor accident or spill to isolate and post the affected area, contain small spills of solid or liquid material, protect initial emergency response personnel (including the driver) from becoming radioactively contaminated, and to perform radiological surveys to determine the extent of the spread of radioactive materials.

3.7.12.3 Maintain personnel, equipment, and the capability to transport the personnel and equipment, in order to respond to a major accident or spill at any location between the NNPP site and the radioactive waste disposal site. Provide sufficient personnel and equipment to isolate and contain any spread of radioactive materials, repackage materials as necessary, and perform radiological surveys as necessary to determine actions required to release the site for unrestricted access.

3.7.13 The minimum qualifications for the Contractor’s drivers under the Contract are as follows:

3.7.13.1 Must be experienced in handling radioactive materials and in handling oversize/overweight loads.

3.7.13.2 Must have successfully passed a driving test in accordance with Title 49 CFR 391.31 and a physical examination in accordance with Title 49 CFR 391.41 within the previous two (2) years.

3.7.13.4 Must have received training which meets the requirements of Title 49 CFR Part 172

Subpart H in the proper handling of emergencies which may occur during transportation of radioactive materials.

3.7.13.5 Must be under a Title 10 CFR Part 20 compliant radiation protection program and personnel must wear radiation exposure monitoring devices as required by Title 10 CFR Part 20 while at NNPP sites.

3.8 Definitions:

3.8.1 Detention charges: Charges applicable to the driver and the tractor in excess of four (4) hours at the NNPP site only (or the Port of Entry, for PHNS & IMF shipments).

3.8.2 Demurrage charges: Charges applicable to the trailer in excess of seven (7) days at the NNPP site only (or the Port of Entry, for PHNS & IMF shipments).

3.8.3 Bobtail: Movement of a tractor, without trailer, over the highway.

3.8.4 Deadhead: Transportation to/from NNPP site or to/from disposal site without loaded disposal shipment.

3.8.5 LSMM: Lead Shipyard for Mixed Material, Code 106.4 located at Norfolk Naval Shipyard, Portsmouth, VA.

3.8.6 NNPP: Naval Nuclear Propulsion Program, a joint Department of Energy/Navy program responsible for all aspects of naval nuclear propulsion.

3.8.7 NRC Agreement State: A state that has signed an agreement with the NRC authorizing the State to regulate certain uses of radioactive materials within the State.

3.8.8 COR: A COR assists in the technical monitoring or administration of a contract. A COR has no authority to make any commitments or changes that affect price, quality, quantity, delivery, or other terms and conditions of the contract nor in any way direct the contractor or its subcontractors to operate in conflict with the contract terms and conditions.

3.8.9 Dunnage: Wood, matting, or other types of material to support/shore/protect items during shipping.

3.8.10 “Material”: NNPP Class A Radioactive solid and liquid waste.

3.9 Radiological Requirements:

3.9.1 In addition to the requirements of federal, state and local regulatory authorities and those specific requirements stipulated in applicable licenses, permits, and authorizations, the below stated radiological requirements apply, as indicated.

3.9.1.1 Contractor vehicles used for transporting NNPP wastes, including equipment supplied with the vehicle to secure the load (i.e. chain binders or cargo straps), shall not be used to transport or provide for the transport of NNPP materials unless these vehicles and equipment are surveyed by the Contractor prior to departure from the Contractor’s facility and meet the limits of the following paragraphs.

3.9.1.1.1 Loose radioactive contamination on internal and external surfaces shall be less than 450 Ci/probe beta-gamma () when frisked with a ratemeter equipped with a DT-304/PDR probe or instrument of equal sensitivity or shall be less than 450 Ci/100cm2 beta-gamma () as measured with dry swipes counted with a ratemeter equipped with a DT-304/PDR probe or instrument of equal sensitivity.

3.9.1.1.2 Loose radioactive contamination on internal and external surfaces shall be less than 50 Ci/probe and 100cm2 alpha () as measured with dry swipes measured with a DT-681/PDQ or equivalent instrument.

3.9.1.1.3 Fixed radioactivity on internal and external surfaces shall be less than 450

Ci/probe beta-gamma () as measured with a ratemeter equipped with a DT-304/PDR probe or instrument of equivalent sensitivity, and shall be less than 50 Ci/probe alpha () as measured with a DT-681/PDQ or equivalent instrument.

3.9.1.1.4 Contractor vehicles, containers, and equipment used for transporting NNPP wastes that are found to be above the limits specified above shall, at the option of the NNPP site, be returned at Contractor expense to the Contractor for decontamination, or be decontaminated by the NNPP site at Contractor expense. If the return of the vehicle or equipment would result in a violation of federal, state, or local regulations, the Contractor will be notified in advance of the extent of the work to be performed by the NNPP site, and the estimated cost. No on-site decontamination by Contractor personnel will be permitted. No detention or demurrage charges will accrue during the period the vehicle or equipment is being detained or decontaminated by the NNPP site.

3.9.1.2 Shielded overpacks/casks to be returned to the NNPP site or processing vendor’s site shall be surveyed and show compliance with the following paragraphs.

3.9.1.2.1 Loose radioactive contamination on external surfaces shall be less than 450 Ci/probe beta-gamma () when frisked with a ratemeter equipped with a DT-304/PDR probe or instrument of equal sensitivity or less than 450 Ci/100cm2 as measured with dry swipes counted with a ratemeter equipped with a DT-304/PDR probe or instrument of equal sensitivity.

3.9.1.2.2 Loose radioactive contamination on external surfaces shall not exceed 50

Ci/probe alpha () as measured with a DT-681/PDQ or equivalent instrument.

3.9.1.2.3 Loose radioactive contamination on internal surfaces shall not exceed 450

Ci per large area swipe beta-gamma () counted with a ratemeter equipped with a DT-304/PDR probe or instrument of equal sensitivity.

These large area wipes shall be performed in the cask bottom, the internal side of the lid and in four (4) quadrant locations on the side.

3.9.1.2.4 Loose radioactive contamination on internal surfaces shall not exceed 50

Ci alpha () per large area swipe referenced above counted with a DT- 681/PDQ or equivalent instrument.

3.9.1.2.5 Fixed radioactivity on internal and external surfaces shall not exceed DOT limits. Fixed radioactivity on internal surfaces shall be verified by radiation scans performed in the cask bottom, the internal side of the lid and in four

(4) quadrant locations on the side as measured with an IM-265/PDQ radiac meter with DT680/PDQ gamma/beta probe or equivalent instrument, as applicable, calibrated to Cobalt-60 equivalent.

3.9.1.2.6 Shielded overpacks/casks used for transporting NNPP wastes that are found to be above the limits specified above shall, at the option of the NNPP site, be decontaminated at the Contractor’s site or be shipped as radioactive material to the NNPP or cask vendor’s site. To the extent the Contractor caused the contamination, decontamination costs will be at the Contractor’s expense.

3.9.1.3 The following radiation measuring methods will be used to determine the various radiation and/or contamination levels:

3.9.1.3.1 Gamma radiation fields shall be measured with an IM-265/PDQ radiac meter with DT680/PDQ gamma/beta probe or equivalent instrument, as applicable, calibrated to Cobalt-60 equivalent.

3.9.1.3.2 Beta-gamma () swipes will be measured within ½”inch with a Geiger tube type instrument, or E-140N (IM-254/UD) equipped with a DT- 304/PDR probe, or equivalent, as applicable, calibrated to Cobalt-60 equivalent.

3.9.1.3.3 Alpha () activity swipes shall be measured within 1/8” with a DT-

681/PDQ Alpha survey meter, or equivalent, as applicable, calibrated to Pu- 239 equivalent.

3.9.1.3.4 Swipes will be taken dry over an area of 100 cm2 using a 1-1/8” diameter filter or paper disc.

3.9.1.3.5 Frisk surveys shall be performed with a DT-304/PDR equipped ratemeter or instrument of equal sensitivity, with the probe held within ½”of the surface being scanned with the probe moved no faster than about two (2) inches per second.

3.9.1.4 The Contractor shall provide copies of radiological surveys of transportation equipment to the COR and/or NNPP site, as requested.

3.10 Special Requirements:

3.10.1 For material shipped in a High Integrity Container (HIC) with a shielded overpack/cask where the overpack/cask is not intended for disposal, the following requirements apply:

3.10.1.1 Upon receipt of the shipment at the Contractor’s disposal facility, the Contractor shall remove the HIC from the shielded overpack/cask.

3.10.1.2 The HIC and contents shall be disposed.

3.10.1.3 The Contractor shall survey both the interior and exterior surfaces of the shielded overpack/cask to the maximum extent practicable to the requirements of Section 3.9 and provide survey data to the NNPP shipping site as designated in the individual task order and the COR upon request. A list of NNPP sites and COR points of contacts will be provided in each individual task order. The Contractor shall secure the shielded overpack/cask onto the Government carrier’s trailer for transport to the designated NNPP site or vendor location.

3.10.1.4 Tie-down and rigging equipment furnished by an NNPP site to secure the load for shipment shall be returned to the NNPP site, when requested.

3.10.2 For PHNS & IMF shipments, the transportation of waste will occur in two (2) segments, an ocean voyage and a land voyage.

3.10.2.1 PHNS & IMF shall provide and/or coordinate the ocean transport from PHNS & IMF to a Port of Entry on the West Coast.

3.10.2.2 The Contractor shall coordinate with the ocean transporter for loading of the freight container onto the Contractor’s vehicle at the Port of Entry.

3.10.2.3 The Contractor shall provide the land transport from the Port of Entry on the West Coast to the Contractor’s facility.

3.10.3 After removal of waste from a conveyance at the disposal facility, the Contractor may be required to return the freight container to the originating NNPP facility or to another designated facility.

The location of the return facility will be identified prior to placement of a task order and a price quote for return of the freight container (including potential radiological surveys/decontamination as required) will be requested at that time.

3.11 Public Release of Information:

3.11.1 Information, data, photographs, sketches, advertising, displays, promotional brochures, or other materials related to work under this contract, which the Contractor desires to publish, display, or release internally, to other Contractors, to Government agencies, or to the public, shall be submitted to the Contracting Officer for approval at least eight (8) weeks prior to the desired printing or release date. This includes descriptive or promotional material, which links or relates, directly or indirectly, the Contractor’s product line, manufacturing facilities, or manufacturing capabilities to performance of NNPP work. As part of the approval request, the Contractor shall identify the specific media to be used, as well as other pertinent details of the proposed release.

All releases, regardless of tier of supplier, must have prior approval of the Contracting Officer.

3.11.2 Should any information described in the paragraph above be requested, subpoenaed, or otherwise sought by a court of competent jurisdiction or other judicial or administrative authority, this should promptly be brought to the attention of the Contracting Officer to permit appropriate measures to be taken to protect the information. Under no circumstances should this information be released to such authority without prior notification and agreement of the Contracting Officer except for any unreasonable delay in agreement by the Contracting Officer which would keep the Contractor from legally fulfilling its duty to the aforementioned authority.

3.11.3 The Contractor agrees that this requirement of prior Contracting Officer approval of any release shall survive the resulting Contract and that the Contractor shall not for a period of twenty (20) years subsequent to the issuance of the resulting contract (or Contract extension period, if applicable) either directly or indirectly issue any such release without the requisite approval of the Contracting Officer.

3.11.4 The Contractor shall include all provisions of this article including this sentence in all subcontracts under the resulting contract.

3.12 Required Standard of Workmanship:

3.12.1 Unless otherwise specifically provided in the contract, the quality of all services rendered hereunder shall conform to the highest standards in the relevant profession, trade or field of endeavor. All services shall be rendered by or supervised directly by individuals fully qualified in the relevant profession, trade or field, and holding any licenses required by law and regulation.

3.12.2 For the purpose of the clause, the “highest standards” shall be the generally prevailing standards in the radioactive waste processing industry. In the event an industry-recognized authority subsequently issues a generally accepted standard for the industry, Contractor’s services shall, as a minimum, meet such a standard.

3.13 Prior Written Permission Required for All Subcontracts:

3.13.1 Any changes in subcontractors, additions of subcontractors, or change in the processes performed by subcontractors must be approved by the Contracting Officer prior to the change or addition. A Contractor's request to change or add subcontractors or subcontracted processes will include the

Technical Capability Information from the solicitation, which is delineated in the 52.212-1 Instructions to Offerors provision of the solicitation, about the subcontractor(s) covered by the request.

SAFETY

"Per FAR 22.102-1(a) entitled "Safety", Contractors are hereby informed that their employees or representatives present on property under Norfolk Naval Shipyard cognizance must follow Federal and State OSHA requirements and Norfolk Naval Shipyard OSHE Program Manual, NAVSHIPYDNORINST P5090.2 requirements or safety requirements for site specific location of the contract.

a. Contractors and Non-NNSY Government Agencies (NNGAs) are hereby informed that their employees or representatives present on property under Norfolk Naval Shipyard (NNSY) cognizance must adhere to Federal OSHA requirements for hazardous energy control IAW 29 CFR 1915.89 and must follow Hazardous Energy Control (HEC) procedures as identified in NAVSEA’s Occupational Safety, Health, and Environment Corporate Manual (OSHECM) Chapter 250 (latest revision), when performing work under NNSY contract. All HEC work to be performed by Contractors and NNGAs requires that NNSY Technical Points of Contact (TPOCs) and/or Contracting Officer’s Representatives (CORs) be notified of the HEC scope of work prior to starting work. Any changes or deviations in the initial scope of HEC work requires the NNSY TPOCs and/or CORs be informed of the change/deviation. Appendix 250.B-1 through B-3 of OSHECM Chapter 250 for multiple employer work identifies when Contractors and NNGAs are required to assign their Lockout/Tags-Plus Coordinator (LOTC) to coordinate HEC work with the cognizant NNSY LOTC. HEC locks shall be provided by the contractor or NNGA for their employees use. The HEC locks shall have red bodies with name labels or name tags affixed, identifying who installed the HEC lock(s) and a point of contact telephone number. HEC lock name lables and tags must be made of materials that will hold up to the environment to which they are exposed. HEC tags used for Tags-Plus HEC work shall be provided by the cognizant NNSY LOTC to the contractor or NNGA for their use if machinery, equipment, or systems (MES) cannot be locked out. OSHECM Chapter 250 Tags-Plus procedures will be strictly followed.

b. Contractors and NNGA’s may obtain electronic copies of OSHECM Chapter 250 (latest revision) and access the OSHA 1915.89 web site by using the following link to NNSY’s public access web site:

http://www.navsea.navy.mil/shipyards/norfolk/default.aspx

c. Names and contact information for NNSY LOTCs and/or the Facility Custodian will be provided by NNSY TPOC and/or CORs set forth elsewhere in this award document.”

REQUIREMENTS FOR ACCESS TO NAVY INSTALLATIONS

Commander, Navy Installations Command (CNIC), has established the Defense Biometric Identification System, (DBIDS), a standardized process for granting unescorted access privileges to vendors, contractors, suppliers and service providers not otherwise entitled to the issuance of a Common Access Card (CAC) who seek access to and can provide justification to enter Navy installations and facilities. Participation in the DBIDS is not mandatory, and if the Contractor chooses to not participate, the Contractor's personnel will have to obtain daily passes, be subject to daily mandatory vehicle inspection, and will have limited access to the installation. The Government will not be responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the DBIDS. Alternatively, if the vendor so chooses, it may voluntarily elect to obtain long-term credentials through enrollment, registration, background vetting, screening, issuance of credentials, and electronic validation of credentials. Further information regarding DBIDS can be found at www.cnic.navy.mil/om/dbids.html NOTE: Bldg 276 TELEPHONE: 757-396-5815 (or 5095)

ADDENDUM TO FAR 52.212-1

52.212-1 INSTRUCTIONS TO OFFERORS – COMMERCIAL ITEMS (ADDENDUM)

Attention is directed to FAR 15.101-1, Tradeoff Process, which provides that the award will be made to that Offeror whose proposal is the most advantageous to the Government under the selection criteria set forth in Addendum to FAR 52.212-2 herein.

The Government intends to evaluate proposals and award a single award Indefinite Delivery/Indefinite Quantity (IDIQ), Firm Fixed Price Contract based upon initial written proposals. Therefore, the Offeror's initial proposal should contain the Offeror's best terms from a price and technical standpoint. However, the Government may contact any or all or a limited number of Offerors with questions concerning its responses as permitted under FAR Part 15. The Government reserves the right to award a firm fixed price contract to other than lowest priced offeror.

The Government also reserves the right to award a firm fixed price contract with or without discussions, whichever is in the best interest of the Government.

Offerors are advised that this solicitation is full and open. Proposals will be evaluated on the below factors and offerors need to submit proposals with the following volumes:

Volume Factors

I Technical Capability

II Past Performance

III Small Business Participation

IV Price

1.1 Questions

It is the Offeror's responsibility to bring to the attention of the Contracting Officer at the earliest possible time, but prior to the closing date, any ambiguities, discrepancies, inconsistencies, or conflicts between the Performance Work Statement (PWS) and other solicitation documents attached hereto or incorporated by reference. All questions shall be submitted via email to (Christopher Vieira, Contract Specialist, Christopher.f.vieira.civ@us.navy.mil & Dushani Starks, Contract Specialist, Dushani.c.starks.civ@us.navy.mil) by close of businesss on Friday, Febuarary 09, 2024 to allow the Government adequate time to prepare and issue responses, and amend the solicitation if required, so that Offerors can use the information in preparing its proposals. Emails asking questions concerning the solicitation must be accompanied with a Read Receipt to ensure the Government has received the email. The Government makes no guarantee that questions received after this date will be answered.

1.2 Start Date for Use in Price Proposal

In order to allow for procurement lead-time and a fair and equal evaluation of all proposals submitted under this competitive procurement, all proposals shall be based on the start date referenced in the PWS. This date is only an estimate of the anticipated contract start date and will be used for the purpose of proposal evaluation only. A definitive start date will be incorporated into the Contract award document.

2.0 Instructions for Submission of Offers

The Government reserves the right to reject any proposal that does not comply with these instructions to offerors.

2.1 General

Proposals shall be submitted via email to (Christopher Vieira, Contract Specialist, Christopher.f.vieira.civ@us.navy.mil & Dushani Starks, Contract Specialist,…