Attachment 3-Brand Name Justification FY24-16(A).pdf

PDF 775 KB Posted

Attached to
Controllers and Modules Federal contract opportunity
Solicitation number
N4215824QE046
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This document is a Brand Name Justification under FAR 13.5 for the Naval Sea Systems Command (NAVSEA), Norfolk Naval Shipyard (NNSY) to award a firm fixed-price contract for National Instruments Corporation RTD Input Modules, DMM Modules, Quad Core Version Controllers, and Mid-Range Controllers. The total estimated cost is $375,100. These brand name items are required to support Carrier A4W Plant Testing on the USS Gerald R. Ford, CVN 78, as they are compatible with existing National Instruments software used by NNSY. No other manufacturers can provide the necessary equipment, and the sole source procurement is justified under FAR 13.5 Simplified Procedures for Certain Commercial Items. The related federal contract opportunity is a combined synopsis/solicitation for these brand name items, solicited on an unrestricted basis with a closing date of April 24, 2024. Award will be made to the technically acceptable item or combination of items resulting in the lowest aggregate price.

View the file

Other files for this federal contract opportunity

Other files attached to Controllers and Modules, newest first.
File Type Posted
Attachment 1-Technical Capability Statement.pdf PDF
Attachment 2-Certificate of Compliance.pdf PDF
Attachment 3-Brand Name Justification FY24-16.pdf PDF
N4215824QE046.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

J&A Number: FY24-16 NNSY Code 411

BRAND NAME JUSTIFICATION AND APPROVAL

UNDER FAR 13.5

1. Contracting Activity

Naval Sea Systems Command (NAVSEA), Norfolk Naval Shipyard (NNSY), Code 400 Contracts Department, Portsmouth VA.

2. Description of the Action Being Approved

Award of a firm fixed price contract on a brand name basis for National Instruments Corporation RTD Input and DMM Modules, and Quad Core Versions and Mid-Range Controllers to support Carrier A4W Plant Testing on board the USS Gerald R Ford, CVN 78.

3. Description of the Supplies/Services

NNSY C2330 requires the procurement of a total of eighteen (18) RTD INPUT MODULES, eighteen (18) DMM MODULES, ten (10) QUAD CORE VERSION CONTROLLERS and eight (8) MID RANGE CONTROLLERS, to support Carrier A4W Plant Testing on board the USS Gerald R Ford, CVN 78. The purchase of the required brand name item will assure compatibility with current National Instruments software already in use by C2330 for testing and troubleshooting A4W indications and controls. This equipment is needed to support critical path operations.

The total Independent Government Estimate (IGE) for this requirement is $375,100.00. Item 3318ZN01, RTD INPUT MODULE is estimated to cost approximately $4,600.00 each. Item 3318ZN02, DMM MODULE is estimated to cost approximately $6,500.00 each. Item 3318ZN03, QUAD CORE VERSION CONTROLLER is estimated to cost approximately 11,450.00 each. Item 3318ZN04, MID RANGE CONTROLLER is estimated to cost approximately $7,600.00 each. Operation and Maintenance, Navy (OM&N) funds will be used for this procurement.

The anticipated delivery for these four (4) items is 50-85 business days from the acceptance of the contract.

The technical and requirements personnel.

4. Statutory Authority Permitting a Brand Name Acquisition

41 U.S.C 1901 as implemented by Federal Acquisition Regulation (FAR) Subpart 13.5 - Simplified Procedures for Certain Commercial Items.

5. Rationale Justifying Use of Cited Statutory Authority

To better serve its customers, National Instruments has partnered with distributors such as Testforce USA Inc. and Newark to help connect customers with experts in their area to acquire products that meet Testing enclosures utilizing the requested brand name items are needed to support testing/troubleshooting of all carrier A4W plants throughout the fleet. No other parts were found to be sufficient for compatibility with equipment needed to interface with. This equipment is used for temporary instrumentation that requires NAVSEA 08 approval. Part of that approval is the manufacturer evaluation as acceptable, compliant, & secure. Deviation from the manufacturer would potentially invalidate the overall system approval for use. There are no other manufacturers capable of supplying the necessary equipment, and the OEM or its authorized distributors must be utilized.

The total Independent Government Estimate (IGE) for this requirement is $375,100.00. Item 3318ZN01, RTD INPUT MODULE is estimated to cost approximately $4,600.00 each. Item 3318ZN02, DMM MODULE is estimated to cost approximately $6,500.00 each. Item 3318ZN03, QUAD CORE VERSION CONTROLLER is estimated to cost approximately 11,450.00 each. Item 3318ZN04, MID RANGE CONTROLLER is estimated to cost approximately

Item 3318ZN01, RTD INPUT MODULES, is required to perform Carrier A4W Plant Testing. This part has already been tested and validated as acceptable for use. Purchase of separate components (even if it was the same part number from a different manufacturer) would require retesting and validation by engineering and production to ensure system response. No other parts were found to be sufficient for

, it is selected for its compatibility with national instruments software already in use by C2330 throughout the shipyard. The equipment requested is required to maintain compatibility with existing systems and is compatible with software drivers already in use at the shipyard. Requested brand name replacement with similar but nonstandard (different brand) equipment presents the potential for inconsistency in the application, both operation and training which increases the likelihood of adverse impact to the command.

This item has a national stock number (NSN) of 9B-5998-01-690-0674. This item is no longer supported by the Naval Stock System. This item was previously procured on requisition 2210ZN09, Contract N4215822PE243, and awarded to the Original Equipment Manufacturer, National Instruments Corporation.

Item 3318ZN02, DMM Module, is required to perform Carrier A4W Plant Testing. This part has already been tested and validated as acceptable for use. Purchase of separate components (even if it was the same part number from a different manufacturer) would require retesting and validation by engineering and production to ensure system response. No other parts were found to be sufficient for compatibility with national instruments software already in use by C2330 throughout the shipyard. The equipment requested is required to maintain compatibility with existing systems and is compatible with software drivers already in use at the shipyard. Requested brand name replacement with similar but nonstandard (different brand) equipment presents the potential for inconsistency in the application, both operation and training which increases the likelihood of adverse impact to the command.

This item has a NSN of 9B-6625-01-686-1830. This item is no longer supported by the Naval Stock the manufacturer, whether or not the prime contractor is the actual manufacturer. This item was previously procured on requisition 2210ZN12, Contract N4215822PE243, and awarded to the Original Equipment Manufacturer, National Instruments Corporation.

Item 3318ZN03, Controller, Quad Core Version, is required to perform Carrier A4W Plant Testing.

Purchase of separate components (even if it was the same part number from a different manufacturer) would require retesting and validation by engineering and production to ensure system response. No other parts exist to be suff Additionally, it is selected for its compatibility with national instruments software already in use by C2330 throughout the shipyard. The equipment requested is required to maintain compatibility with existing systems and is compatible with software drivers already in use at the shipyard. Requested brand name replacement with similar but nonstandard (different brand) equipment presents the potential for inconsistency in the application, both operation and training which increases the likelihood of adverse impact to the command.

Item 3318ZN04, Mid-Range Controller, is required to perform Carrier A4W Plant Testing. Purchase of separate components (even if it was the same part number from a different manufacturer) would require retesting and validation by engineering and production to ensure system response. No other parts were lly, it is selected for its compatibility with national instruments software already in use by C2330 throughout the shipyard. The equipment requested is required to maintain compatibility with existing systems and is compatible with software drivers already in use at the shipyard. Requested brand name replacement with similar but nonstandard (different brand) equipment presents the potential for inconsistency in the application, both operation and training which increases the likelihood of adverse impact to the command.

6. Description of Efforts Made to Solicit Offers from as Many Offerors as Practicable

The requirement for the brand name controllers and modules will be posted as a combined synopsis to the www.sam.gov website on an unrestricted basis, in accordance with FAR 12.603. No other manufacturers will be considered. No additional market research will be conducted because it is not practical, for the reasons discussed in paragraph 5 above, as National Instruments or its authorized distributors are the only qualified sources that can fulfill this requirement. Pursuant to FAR 13.501(a)(1)(iv), this brand name justification will be made publicly available with the solicitation, in accordance with 5.102(a)(6).

7. Determination for Fair and Reasonable Costs

The Contracting Officer has determined that the anticipated price(s) will be fair and reasonable based on prior history for the same/similar brand name items procured under Purchase Order N4215823PE243, which was sole sourced to National Instruments Corporation as the Original Equipment Manufacturer (OEM) at similar anticipated costs that were determined fair and reasonable. The Contracting Officer will determine the final price to be fair and reasonable in accordance with FAR 13.106-3.

8. Actions to Remove Barriers to Competition

For the reasons set forth in Paragraph 5, NNSY has no plans at this time to compete future requirements for the types of supplies covered by this document. If another potential source emerges, NNSY will assess whether competition for future requirements is feasible.

CERTIFICATIONS AND APPROVALS

TECHNICAL/REQUIREMENTS CERTIFICATION

I certify that the facts and representations under my cognizance, which are included in this justification and its supporting acquisition planning data, except as noted herein, are complete and accurate to the best of my knowledge and belief.

TECHNICAL/REQUIREMENTS COGNIZANCE:

Todd Holt, C2305 Nuclear Engineer Technician Date

LEGAL SUFFICIENCY REVIEW

I have determined this justification is legally sufficient.

W. Ryan James, C107 Legal Counsel Date

CONTRACTING OFFICER CERTIFICATION/APPROVAL

I certify that this justification is accurate and complete to the best of my knowledge and belief. Upon the basis of the above justification, I hereby approve the solicitation of the proposed procurement described herein.

Chad Godwin, C411 Branch Manager Date

File details come from the government source that posted it. Updated .