Dust Collector Q A.docx
DOCX document 15 KB Posted
- Attached to
- Professional Engineer for Dust Collector
- Solicitation number
- N4215822QA001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N4215822QA001 Amendment.pdf | ||
| Attachment 3 Workstation 3.doc | DOC document | |
| Attachment 4 Workstation 4.doc | DOC document | |
| Attachment 8 2021 Shop 57 IH Survey 49.pdf | ||
| Attachment 6 Workstation 7.doc | DOC document | |
| Attachment 2 Bandsaw Room.docx | DOCX document | |
| Attachment 7 Workstation 10.doc | DOC document | |
| Attachment 5 Workstation 5.doc | DOC document | |
| N4215822QA001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| 1. Q: | Not a licensed engineer as most of my non-government projects do not require. Would I be eligible for consideration? |
| A: | No, you must have a Professional Engineering license valid in a state of the USA. |
2. Q: Inspection of dust collectors is completed twice a year at other facilities, is this a service the base needs?
| A: | No, we need a PE to analyze our shop ventilation requirements, design a new system, and write specifications for a new dust collector and ducting that will provide the required ventilation for safe work operations. |
| 3. Q: | Is a Virginia PE license required to submit a proposal? |
A: I am willing to accept a PE license that is valid in any state of the US.
4. Q: Are there existing system drawings available that can be viewed prior to issuing a proposal? We have referenced item 6.1.7., et al., and would like additional detail. At a minimum, our team would like to know the existing system flow rate, in addition to the number of collection points, to give a sense of how large the system is.
A: Yes, I will provide a drawing of the shop floor. I have attached drawings of the workstations from the Industrial Hygienists that show details of the collection points. I have attached an IH survey with flow rate readings.
5. Q: Are there existing AutoCAD layout drawings of the building, ductwork, and equipment that will be made available for use for potential demo and layout drawings?
A: Yes, I will provide these.
6. Q: When do they tentatively expect the field measurement to occur?
A: Anytime during the POP.
7. Q: When does the engineering phase need to be complete?
A: October 15, 2022