N4215822Q0034-Amd0001.docx
DOCX document 38 KB Posted
- Attached to
- Warping Capstan #3 Static Bitt Testing Federal contract opportunity
- Solicitation number
- N4215822Q0034
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 22Q0034 Amend 0003.pdf | ||
| 22Q0034 Amd0002.docx | DOCX document | |
| Attachment_1_PPQ_AMD0002.doc | DOC document | |
| Attachment_2_Past_Performance_Information_Form.docx | DOCX document | |
| N4215822Q0034.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N4215822Q0034
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 26-Aug-2022 04:30 PM to 02-Sep-2022 04:00 PM.
DELIVERIES AND PERFORMANCE
The following Delivery Schedule item for CLIN 0001 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 01-OCT-2022 TO
25-OCT-2022
| N/A |
| NORFOLK NAVAL SHIPYARD |
SEE STATEMENT OF WORK
FOR DELIVERY AND CONTACT INFORMATION
PORTSMOUTH VA 23709
TEL: WITHIN
FOB: Destination N42158
To:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 01-OCT-2022 TO
15-OCT-2022
| N/A |
| NORFOLK NAVAL SHIPYARD |
SEE STATEMENT OF WORK
FOR DELIVERY AND CONTACT INFORMATION
PORTSMOUTH VA 23709
TEL: WITHIN
FOB: Destination N42158
The following have been modified:
ADDENDUM TO 52.212-1
ADDENDUM to 52.212-1 Instructions
Questions relating to this notice shall be submitted in writing via the below listed email addresses no later than August 29, 2022 4:00 PM Eastern Time. Questions submitted after the questions deadline may not be answered.
In addition to the instruction requirements within FAR Provision 52.212-1, the offeror shall submit the following in Adobe Acrobat (pdf) format:
1. Complete and submit up to 3 past performance references on the Past Performance Information Form. Attachment 2 to this Solicitation. Past performance references shall be relevant to this Solicitation Statement of Work. The period of performance of submitted references shall be within the last 3 years of this Solicitation. Offerors with no past performance references, or sparse past performance, shall so state with their offer.
2. Complete and submit the Past Performance Questionnaire (PPQ) for each past performance reference. Attachment 1 to this Solicitation. The PPQ is not required if the related past performance reference is already listed in the CPAR database, however it is the offeror’s responsibility to inform the Government of existence in CPAR. The questionnaires shall be signed by offeror’s customer. The PPQ may be submitted by the customer or the offeror. The Government is not responsible for collecting PPQs or following up on their submission.
Failure to provide all of the required documents by the required date and time may preclude a quotation from award consideration at the discretion of the Government.
Offers/Quotations shall be emailed to Mr. Jonathan G Castro (E-mail: jonathan.g.castro.civ@us.navy.mil and to USFF_NNSY_C431@navy.mil by September 2, 2022 by 4pm, Eastern Time.
SOW
Statement of Work:
1. Objective:
1.1. The purpose of this test is to prove satisfactory operation of the Warping Capstan #3 after authorized repairs are accomplished by NNSY.
Section B: Applicable Documents:
2. References:
2.1. NAVSEA Standard Items FY22
http://www.navsea.navy.mil/Home/RMC/CNRMC/Our-Programs/SSRAC/)
2.2. S9582-BC-MMI-010 Technical Manual for Electrohydraulic Warping Capstan
2.3. Drawing 315324 Section and Assembly Capstan 36” Diameter
2.4. S9086-TW-STM-010/CH-582R2 NAVAL SHIPS’ TECHNICAL MANUAL Chapter 582 Mooring and Towing
2.5. Local Standard Item 042-37-001, General Requirements for Work Within Naval Station Norfolk; Accomplish Section C: Requirements
3. Scope of Work:
3.1. Contractor to provide all material and equipment necessary to accomplish Static Bitt testing of (One EA), #3 Warping Capstan, Electric, 2-Speed, 50/100 FPM, Pull 20,000/10,000 pound, Mfr Lake Shore Inc., Dwg. 55804
4. Contractor Responsibilities:
4.1. The Contractor shall provide a Process Control Procedure (PCP) IAW NAVSEA Standard Item 009-09 of applicable document 2.1
4.2. The Contractor shall develop and complete all paperwork, including but not limited to Technical Work Documents (TWDs), Test Documents, Condition Reports, and request forms
4.3. Any request for deviation or waiver of any technical requirement shall be submitted by the Contractor as described in 009-01 of applicable document 2.1.
4.4. The Contractor shall adhere to all general requirements for Naval Station Norfolk specified in applicable document 2.5.
4.5. All equipment, material, and articles incorporated into the work covered by this contract shall be domestic, new, and of the most suitable grade for the purpose intended, unless otherwise specifically provided in this contract. Applicable documents in the specifications to equipment, material, articles, or patented processes by trade name, make, or catalog number, shall be regarded as establishing a standard of quality and shall not be construed as limiting competition
(V)(G) STATIC TEST
4.6. Accomplish a static load test of the equipment listed in 3.1 and located at 8.2 using 2.2 and 2.4 for guidance
4.6.1. Erect a safety barrier around Warping Capstan No. 3 in compartment (1-13-0-Q) during testing. Safety signs "WARPING CAPSTAN #3 TEST IN PROGRESS (OR SIMILAR) - AUTHORIZED PERSONNEL ONLY BEYOND THIS POINT"
4.6.2. Accomplish Static Bitt Test by placing loop of line over the capstan head at mid-height and 90 degrees to its axis to produce bending moment only. Using the capstan head as a bitt, a load equal to the breaking strength of the largest line size the capstan is designed for shall be applied. Where the largest line size per Reference 2.3 is 170,000 lb.
4.7. Contractor shall submit all final test results to Norfolk Naval Shipyard, Code 263 & Contracting Office Representative (COR) as described in 009-04 of applicable document 2.1.
4.8. Per FAR 22.102-1(a) entitled “Safety”, Contractors are hereby informed that their employees or representatives present on property under Norfolk Naval Shipyard cognizance must follow Federal and State OSHA requirements; Norfolk Naval Shipyard OSHE Program Manual, NAVSHIPYDNORINST P5090.2 requirements; OSHE Control Manual (OSHECM) requirements; or safety requirements for site specific location of the contract
4.9. Contractors and Non-NNSY Government Agencies (NNGAs) are hereby informed that their employees or representatives present on property under Norfolk Naval Shipyard (NNSY) cognizance must adhere to Federal OSHA requirements for hazardous energy control IAW 29 CFR 1915.89 and must follow Hazardous Energy Control (HEC) procedures as identified in NAVSEA’s Occupational Safety, Health, and Environment Corporate Manual (OSHECM) Chapter 250 (latest revision), when performing work under NNSY contract. All HEC work to be performed by Contractors and NNGAs requires that NNSY Technical Points of Contact (TPOCs) and/or Contracting Officer’s Representatives (CORs) be notified of the HEC scope of work prior to starting work. Any changes or deviations in the initial scope of HEC work requires the NNSY TPOCs and/or CORs be informed of the change/deviation. Appendix 250.B-1 through B-3 of OSHECM Chapter 250 for multiple employer work identifies when Contractors and NNGAs are required to assign their Lockout/Tags-Plus Coordinator (LOTC) to coordinate HEC work with the cognizant NNSY LOTC. HEC locks shall be provided by the contractor or NNGA for their employees use. The HEC locks shall have red bodies with name labels or name tags affixed, identifying who installed the HEC lock(s) and a point of contact telephone number. HEC lock name labels and tags must be made of materials that will hold up to the environment to which they are exposed. HEC tags used for Tags-Plus HEC work shall be provided by the cognizant NNSY LOTC to the contractor or NNGA for their use if machinery, equipment, or systems (MES) cannot be locked out. OSHECM Chapter 250 Tags-Plus procedures will be strictly followed.
4.10. Contractors and NNGAs may obtain electronic copies of OSHECM Chapter 250 (latest revision) and access the OSHA 1915.89 web site by using the following link to NNSY’s public access web site: http://www.navsea.navy.mil/shipyards/norfolk/default.aspx
5. Government Responsibilities:
5.1. Provide pier access for company vehicles to drop off and load tools and equipment at Naval Station Norfolk, on the USS Dwight D. Eisenhower (CVN-69). As Required
5.2. Provide crane/rigging/forklift services as required to load/unload tools and equipment from vehicles pier side to ship. Note: Contractor must provide lift requests to NNSY Project Team in accordance with current NNSY Project lift request guidelines. As Required
5.3. Electrical power as required to operate contractor’s equipment. As Required
5.4. All electrical connections and disconnections aboard the ship. As Required
5.5. If required provide services to isolate and operate equipment when requested by the contractor. As Required
5.6. Install test placards at the completion of testing.
6. Requests for Base Access
6.1. Defense Biometric Identification System (DBIDS):
6.1.1. Any new contractor, vendor or supplier requesting base access AFTER 31 May 2017 will be required to obtain a DBIDS credential. NCACS credentials will no longer be issued.
6.1.2. Only DBIDS credentials will be issued to ALL contractors, vendors and suppliers seeking base access AFTER 14 August 2017.
6.1.3. Defense Biometric Identification System (DBIDS) increases installation security and communications by receiving frequent database updates on changes to personnel/credential status, law enforcement warrants, lost/stolen cards, and force protection conditions. The system provides a continuous vetting anytime the DBIDS card is scanned at an installation entry point.
6.2. NCACS Card Holders
6.2.1. If you currently have a Navy Commercial Access Control System (NCACS) card, the following is required to get a DBIDS credential:
6.2.1.1. Present your NCACS Card and a completed copy of the SECNAV FORM 5512/1 to the base Visitor Control Center representative.
6.2.1.2. The VCC will pull up your information in the computer, ensuring all information is current and correct.
6.2.1.3. Once your information is validated, a temporary DBIDS credential is provided.
6.2.1.4. Your temporary credential will have an expiration date, prior to which you will need to obtain your permanent DBIDS credential (~ 90 days).
6.2.1.5. For each additional U.S. Navy installation to which you need access, the first time you visit you only need to bring your DBIDS credential and statement of purpose for base access when arriving at the Visitor Control Center.
6.2.1.6. The representative will enter base access authorization and then you may proceed to work.
6.3. Non-NCACS Card Holders
6.3.1. If you do NOT have an NCACS Card, the following is required to obtain a DBIDS credential:
6.3.1.1. Present a letter or official document from my government sponsoring organization that provides the purpose for your access.
6.3.1.2. Present valid identification, such as a passport or Real ID Act-compliant state driver's license.
6.3.1.3. Present a completed copy of the SECNAV 5512/1 form to obtain your background check.
6.3.1.4. Upon completion of the background check, the Visitor Control Center representative will complete the DBIDS enrollment process, which includes your photo, finger prints, base restrictions, and several other assessments; after all this is done, you will be provided with your new DBIDS credential.
6.3.1.5. You may now proceed to work.
6.4. Non-Participants
6.4.1. One-Day Passes: Participation in the DBIDS is not mandatory, and if the Contractor chooses to not participate, the Contractor's personnel will have to obtain daily passes, be subject to daily mandatory vehicle inspection, and will have limited access to the installation. The Government will not be responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the DBIDS.
6.5. FOR ADDITIONAL QUESTIONS ABOUT OBTAINING A DBIDS CARD, CONTACT YOUR LOCAL BASE VISITOR CONTROL CENTER. INFORMATION IS ALSO PROVIDED AT: www.cnic.navy.mil/om/dbids.html
7. Government Furnished Material: N/A
8. Place of Performance:
8.1. Naval Station Norfolk, 1530 Gilbert St #2000 Norfolk VA 23511
8.2. USS Dwight D. Eisenhower space (1-13-0-Q)
9. Period of Performance (PoP)/ Completion Date/ Delivery Date: See Delivery Information section.
10. Points of Contact:
10.1. Technical POC: Ryan Nagy, Phone 757-967-6553, ryan.n.nagy.civ@us.navy.mil;
Nicholas Impastato, Phone 757-778-3155, nicholas.a.impastato.civ@us.navy.mil Invoice Certifying POC: Gregory A Little, Phone: 757-354-9036, gregory.a.little4.civ@us.navy.mil
(End of Summary of Changes) image1.wmf
File details come from the government source that posted it. Updated .