SEE ADDENDUM
(No Collect Calls)
N4215822Q0031 16-Jun-2022
b. TELEPHONE NUMBER
757-396-9694
8. OFFER DUE DATE/LOCAL TIME
10:00 AM 22 Jun 2022
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
N421589. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
BRITTANY B. TAVASSOLI
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
SEE SCHEDULE
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
NORFOLK NAVAL SHIPYARD
ATTN: BRITTANY TAVASSOLI
NNSY CONTRACTING
C400, BLDG 65, 1ST FLOOR
PORTSMOUTH VA 23709-1022
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS AX
13b. RATING
DO-A3
CODE15. DELIVER TO CODE N42158 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
NORFOLK NAVAL SHIPYARD
SEE STATEMENT OF WORK
FOR DELIVERY AND CONTACT INFORMATION
PORTSMOUTH VA 23709
TEL: TEL: WITHIN FAX:
FAX:
TEL: 757-396-9694
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$35,000,000
NAICS:
532490
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF40
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
N4215822Q0031
Section SF 1449 - CONTINUATION SHEET
STATEMENT OF WORK
Scope:
1.1 Title: Dry Air to Ship Service Air
1.2 Location of work:
1.2.1 Inside Norfolk Naval Shipyard Waterfront Controlled Industrial Area Pier 5A.
1.3 Title: Diesel Operated Air Compressor
1.3.1 Service rental from vendor to provide one, (1) 1500 cubic feet per minute (CFM) Air
Compressor meeting the specifications outlined below:
1.4 Location of work:
1.4.1 Work to start and end at Norfolk Naval Shipyard (NNSY), Pier 5.
2. Reference:
2.1 State and Federal Codes: OSHA, ANSI, NEMA, NEC, and the ASME Pressure Vessel Code.
2.2 CGA G-7.1
2.3 ISO 8573-1
2.4 NAVFAC P-307
2.5 FAR 22.102-1(a) (Safety)
2.6 OSHECM Chapter 250
3. General Specifications:
3.1 Air Dryer Parameters:
3.1.1 Heatless Electric Regenerative Desiccant Dryer with Prefilters and Afterfilters (Twin Tower
Design).
a. Design shall be in accordance with all State and Federal Codes: ANSI, NEMA, NEC, and the
ASME Pressure Vessel Code.
b. Unit will be in continuous use outdoors, and will be directly exposed to everyday weather and salt water air. All exposed components must be weather resistant, and must meet or exceed
NEMA Type 4 for outdoor use.
3.2 EQUIPMENT REQUIREMENTS:
3.2.1 Inlet (PREFILTER) and outlet (AFTERFILTER) connections: Two ea. (2) 2” NPTF.
3.2.2 The desiccant dryer unit with pre-filter and after-filter having the connection size above must meet the following requirements:
a. Inlet Requirements: 1500 SCFM minimum, 125 PSIG air (Saturated), 100 Degrees
Fahrenheit.
b. Outlet Requirements: 1250 SCFM minimum at -40 (Negative Forty or Lower) pressure dew point degrees Fahrenheit at 125 PSIG min., Maximum change in pressure from inlet to outlet is 10 PSIG
3.2.3 Max pressure: 150 PSIG.
3.2.4 Nominal Operating Conditions: 125 PSIG at 100 Degrees Fahrenheit.
3.2.5 Dryer shall have an exhaust muffler to limit noise during dump and purge cycles.
3.2.6 Dryer will be fully charged with activated alumina.
3.2.7 Front Control Panel:
a. Active display of current outlet air dewpoint temperature reading
b. Calibrated Inlet and Outlet Pressure Gauges.
c. Calibrated Chamber Pressure Gauges.
d. Calibrated Purge Flow Gauges
Note: Calibration of the gauges shall last the full rental period of the dryer.
3.2.8 Have a purge adjusting valve.
3.2.9 Equipped for 120 VAC electrical services with connections.
3.2.10 Have a lighted power on switch.
3.2.11 Have a high humidity alarm.
3.2.12 quantities of desiccant.
3.2.13 Desiccant vessels shall be designed in accordance with the ASME Pressure Vessel Code.
3.2.14 In the event of power failure, dry air will continue to be supplied downstream until the desiccant exposed to the air flow is saturated.
3.2.15 Regeneration will be accomplished without use of heaters.
3.2.16 Must be twin tower design. One tower providing dry air while the other is in regeneration mode. Must provide continuous dry air (-40 Degrees Fahrenheit at 125 PSIG minimum) 24 hours a day.
3.2.17 After regeneration of a tower and before going back on-line, the tower must be fully charged up to line pressure before the towers switch over.
3.2.18 Dryer must have separate fill and drain ports for desiccant.
3.2.19 Unit must have a demand cycle control (Automatic Purge Saving Device). This device shall perform the following functions:
a. Assure full utilization of the moisture holding capacity of the desiccant bed before regenerating the bed.
b. Maintain outlet dew point at -40 Degrees Fahrenheit or below.
c. Sensors used will be industrial grade. Calibration of the sensors must last the full rental period of the dryer.
3.2.20 Filter Requirements:
a. PREFILTER REQUIREMENTS: Must be an oil removal/coalescing filter with a non-shedding filter medium. Remove at least 98% of all 0.008-micron oil aerosols.
Liquid and particle removal: 0.01 Micron or less (Absolute 100% removal). Filter shall have a manual or automatic drain. Flow: 0-1250 minimum SCFM. Operating temperature range: 40 degrees to 150 degrees Fahrenheit.
b. AFTER FILTER REQUIREMENTS: Liquid and particle removal: 1 micron or less
(Absolute 100% removal). Filter must be made of a non-shedding filter medium.
Operating temperature range: 40 degrees to 150 degrees Fahrenheit. Flow: 0-1250 minimum SCFM.
3.2.21 Unit shall be fully assembled and ready to use upon shipment.
3.2.22 Unit must be in one piece (Prefilter, Electric Heatless Desiccant Dryer, Afterfilter) on a heavy duty frame.
3.2.23 Unit must be free standing and must have forklift slots (capable of being moved with a forklift).
3.2.24 The equipment shall be outfitted with suitable attachments for overhead lifting. See Sections
10 and 11 for specifications.
3.3 DIESEL OPERATED AIR COMPRESSORS PARAMETERS:
3.3.1 Each air compressor shall provide at least 1500 cubic feet a minute (CFM) at 150psig to
125 psig minimum and shall be of an oil free, rotary screw design delivering oil free air per ISO 8573-1 Class 0.
3.3.2 Each air compressor must have a moisture separator after cooler.
3.4 EQUIPMENT REQUIREMENTS:
3.4.1 Compressors must be of an oil free rotary screw design. An oil flooded rotary screw design with attached oil separator is not acceptable.
3.4.2 Compressors must be a fixed speed design. A variable speed design is not acceptable.
3.4.3 The air compressors shall be diesel powered.
3.4.4 The air compressor must run 8 hour on one tank of fuel.
3.4.5 The air compressors must be capable of running 24 hours/day, 7 days/week.
3.4.6 The compressors must have a gearbox casing designed to maintain a vacuum on its oil contents in order to prevent a potential of contamination of the air supply in the event of a seal failure.
3.4.7 The air compressors shall be equipped with fully automatic switching controls, alarms, and indicators so that the compressor package requires monitoring no more than once every 24 hours by operators after start-up.
3.4.8 Units will be in continuous use outdoors, and will be directly exposed to everyday weather and saltwater air. All exposed components must be weather resistant. All components must meet or exceed NEMA Type 4 for outdoor use. It is the contractor’s responsibility to provide any protective coverings for the units.
3.4.9 Whip-check devices must be supplied with compressors.
4. Period of Performance
4.1 Two month base period with the option to extend rental of air compressors and air dryer for six (6) months in one (1) month increments. Rental extensions may terminate the rental of one or more units based on use by NNSY. This charge will be prorated. (Start time may change due to ship’s schedule.)
5. Contractor Requirements:
Air Dryer:
5.1 Provide POC information (name and phone number) on the equipment.
5.2 Deliver and retrieve the Dryer Equipment at Norfolk Naval Shipyard, Portsmouth Virginia, inside the
CIA area at no additional charge to the government. (Exact location to be determined at delivery.)
5.3 Upon arrival to NNSY for dryer unit delivery, Contractor shall contact Temporary Service Zone
Manager (TSZM) for information regarding placement of the dryer unit at NNSY job site.
5.4 Assist NNSY with making up electrical connection to ensure proper setup of dryer unit.
5.5 Provide 4 hours start up training and written instructions for shipyard operators on the proper operation and the performance of basic monitoring/visual checks for the dry air equipment on-site.
5.6 Provide all manuals and schematics for start-up, operation, and basic maintenance of dryer.
5.7 Provide all parts requiring repair or replacement under circumstances of normal equipment wear and tear at no additional charge.
5.8 Visit NNSY installation site as required to perform necessary preventative and corrective maintenance and visual checks at no additional charge.
5.9 Provide 24 hour a day, seven-day a week on-call repair service during the rental period at no additional charge. The contractor will be responsible for initiating repairs on-site, at Norfolk Naval
Shipyard, within 8 hours of verbal or written notification that the equipment has malfunctioned at no additional charge. The contractor will replace the malfunctioning component if the dryer system cannot be returned to service within 24 hours of being notified of the original malfunction at no additional charge.
5.10 When the equipment is required to be removed to the contractor's facility for repair or replacement, the contractor shall be responsible for loss or damage from the time it leaves the government site until it is returned to the government site.
5.11 Clean the air dryer prior to delivery to the following requirements:
a. Air dryer shall be cleaned to a degree of cleanliness that results in a surface free of grease, oil, flux, scale, dirt, loose particles, and any other matter foreign to the base metal. Adherent light superficial rust on steel surfaces, caused by short time exposure to the atmosphere, is acceptable. Loose corrosion products are not acceptable and must be removed.
b. In addition to the requirements above, for uncoated surfaces: Adherent corrosion products typical on surfaces of the type material being considered (e.g. flash rust on steel) are acceptable. Loose corrosion products are not acceptable and must be removed.
5.12 Contractor personnel shall notify the Temporary Service Zone Manager (TSZM) for authorization prior to any work or maintenance on rental unit.
5.13 Lost items by Government personnel and equipment damaged beyond normal wear and tear, Contractor must submit a claim separate from rental. This is to be submitted no later than 60 days past the end of the rental period.
5.14 Contractor to provide options to allow NNSY to extend rental of dryer equipment on a monthly basis.
The Government reserves the right to extend the rental period on a monthly basis if necessary. The
Government reserves the right to return the unit at any time prior to the expiration of the extension rental period. The contractor agrees to prorate costs for the time the dryer equipment in use by NNSY only.
5.15 The Government reserves the right to return the unit at any time prior to the expiration of the rental period. The contractor agrees to prorate costs for the time the dryer equipment in use by NNSY only.
The Government agrees to give the contractor twenty-four (24) hours-notice for the return of the dryer equipment if the return is prior to the expiration of rental period.
5.16 Contractor to contact NNSY 10 business days prior to the end of rental period to confirm pickup date.
Diesel Operated Air Compressor:
5.17 Contractor shall supply POC’s information (name and phone number) on the equipment.
5.18 Deliver and pick up air compressors at Norfolk Naval Shipyard (NNSY), Portsmouth , Virginia, Pier
5 at no additional charge to the government. Exact location to be determined at delivery by the
Temporary Service Zone Manager (TSZM).
5.19 Upon arrival to at Norfolk Naval Shipyard (NNSY), Portsmouth for air compressor delivery, contractor shall contact TSZM for information regarding placement of the compressors at NNSY job site.
5.20 If necessary, after delivery, connect any accessory equipment to the air compressors. Ensure the compressors are set up, full of fuel and ready for NNSY to connect shipboard when required.
5.21 Contractors provide any material that is required for proper operation of the air compressors/accessory equipment throughout the rental period at no extra cost.
5.22 Provide engineering drawings or sketches showing the general arrangement of the air compressors.
These drawings and sketches shall show the flow path through the air compressors and all auxiliary equipment that are part of the system.
5.23 Provide the separate commercial operating instruction manuals for the air compressors and all other major components.
5.24 Provide 24 hour a day, seven-day a week on-call repair service during the rental period at no additional charge. The contractor will be responsible for initiating repairs on-site, at Norfolk Naval
Shipyard (NNSY) Portsmouth within 24 hours of verbal or written notification that the equipment has malfunctioned at no additional charge. The contractor will replace the malfunctioning unit or component if the compressors cannot be returned to service within 72 hours of being notified of the original malfunction at no additional charge. Provide all parts requiring repair or replacement at no additional charge.
5.25 Contractor is responsible for ensuring that all preventative maintenance is performed on equipment prior to delivery to the government, as well as performing preventative maintenance as specified by the equipment’s manufacturer during the term of the rental period with the government. Contractor is responsible for all travel associated with preventative maintenance. Contractor is responsible for providing service technicians that are able to meet the badging and security requirements of Norfolk
Naval Shipyard/NOB/NPTU.
6. Government Responsibility:
Air Dryer:
6.1 Provide operators for equipment.
6.1.1 Perform basic monitoring/visual checks and minor adjustments as required.
6.1.2 Move equipment based off projects demands.
6.1.3 Provide point of contact for delivery, escort and notification to contractor for rental pickup.
(Temporary Service Zone Manager)
Diesel Operated Air Compressor:
6.2 Provide operators for equipment.
6.2.1 Perform basic monitoring/visual checks.
6.2.2 Provide diesel fuel to support operation.
6.2.3 Provide point of contact for delivery, escort and notification to contractor. for rental pickup. (TSZM)
6.2.4 Lost items and equipment damage beyond normal wear and tear.
7. Points Of Contact:
7.1 Technical POC: Mr. Marc De Angelis, C-269; Ph.: 757-396-3791, Nick Gorza C-269, Ph.:757-396-
3791 or Johnnie Lassiter, C-269; Ph: 757-396-3792
Certifying Offical/Temporary Service Zone Manage (TSZM): Mr. Jason Gibbs, C990, Cell: 757-
636-3766
8. Safety Requirements:
8.1 "Per FAR 22.102-1(a) entitled "Safety", Contractors are hereby informed that their employees or representatives present on property under Norfolk Naval Shipyard cognizance must follow Federal and State OSHA requirements, OSHECM Chapter Hazardous Energy Control (HEC) requirements or safety requirements for site specific location of the contract.
a. Contractors and Non-NNSY Government Agencies (NNGAs) are hereby informed that their employees or representatives present on property under Norfolk Naval Shipyard (NNSY) cognizance must adhere to Federal OSHA requirements for hazardous energy control IAW 29
CFR 1915.89 and must follow Hazardous Energy Control (HEC) procedures as identified in
NAVSEA’s Occupational Safety, Health, and Environment Corporate Manual (OSHECM)
Chapter 250 (latest revision), when performing work under NNSY contract. All HEC work to be performed by Contractors and NNGAs requires that NNSY Technical Points of Contact
(TPOCs) and/or Contracting Officer’s Representatives (CORs) be notified of the HEC scope of work prior to starting work. Any changes or deviations in the initial scope of HEC work requires the NNSY TPOCs and/or CORs be informed of the change/deviation. Appendix
250.B-1 through B-3 of OSHECM Chapter 250 for multiple employer work identifies when
Contractors and NNGAs are required to assign their Lockout/Tags-Plus Coordinator (LOTC) to coordinate HEC work with the cognizant NNSY LOTC. HEC locks shall be provided by the contractor or NNGA for their employees use. The HEC locks shall have red bodies with name labels or name tags affixed, identifying who installed the HEC lock(s) and a point of contact telephone number. HEC lock name labels and tags must be made of materials that will hold up to the environment to which they are exposed. HEC tags used for Tags-Plus HEC work shall be provided by the cognizant NNSY LOTC to the contractor or NNGA for their use if machinery, equipment, or systems (MES) cannot be locked out. OSHECM Chapter 250
Tags-Plus procedures will be strictly followed.
b. Contractors and NNGAs may obtain electronic copies of OSHECM Chapter 250 (latest revision) and access the OSHA 1915.89 web site by using the following link to NNSY’s public access web site: http://www.navsea.navy.mil/shipyards/norfolk/default.aspx
c. Names and contact information for NNSY LOTCs and/or the Building Monitor will be provided by NNSY TPOC and/or CORs set forth when the contract is awarded.
9. Requirements for Lifting of Equipment
9.1 The equipment shall be outfitted with suitable attachments for overhead lifting.
9.1.1 For multiple point lifts each lifting attachment shall be capable of supporting one half the gross weight of the equipment with a design factor of five to one based on ultimate strength.
For single point lifts the lifting attachment shall be capable of supporting the gross weight of the equipment with a design factor of five to one based on ultimate strength.
9.1.2 For multiple point lifts each lifting attachment shall be designed to accept a standard anchor shackle (Federal Specification RR-C-271D, type IVA) which is capable of supporting one half the gross weight of the equipment. For single point lifts the lifting attachment shall be designed to accept a standard anchor shackle (Federal Specification RR-C-271D, type IVA) which is capable of supporting the gross weight of the equipment.
9.1.3 Design of the lifting attachments shall be such that the attachments and shackles are not side loaded more than 10° out of the plane. Lifting attachments shall be located such that the lifting slings do not contact the equipment, or alternatively a spreader beam certified to
NAVFAC P-307 shall be provided. Whenever practical, the lifting attachments shall be located above the center of gravity, and such that the lifting slings do not contact the equipment housings.
9.1.4 Each lifting attachment shall be conspicuously marked in a contrasting color “Lift Here”.
Letters shall have a minimum height of 1”.
9.2 The equipment shall be marked in a prominent location with the gross weight. Sand hoppers, tubs, or other containers that may contain material shall be marked with the empty and full weight (or alternatively the empty weight and working load limit). Marking shall be upper case letters of a contrasting color, with a minimum height of 1”. Marking shall include the units (i.e. “pounds”, “long tons”, etc.).
9.3 The equipment shall be provided with a lifting sketch / rigging diagram that meets the requirements.
See paragraph 12, Sheet 7.
9.3.1 The lifting sketch shall detail any specific requirements and / or configurations that must be met prior to lifting (i.e. “engage swing lock”, “Tilt mast back fully”, “Rotate lifting basket over side”, “Utilize 10’ minimum length slings”, “Spreader beam required”, etc.).
9.3.2 The lifting sketch shall include the location of the center of gravity of the equipment (full fuel, hydraulic tanks, etc.), equipment model/manufacturer, and gross weight.
9.3.3 A copy of the lifting sketch shall be permanently posted on the equipment, and a copy shall be forwarded to Code 714 (396-3345, 3346).
9.4 If specialized handling gear other than shackles, standard slings, or chainfalls (i.e. spreader beams, special lift rigs, etc.) is required, the contractor shall furnish it. This handling gear shall be provided certified in accordance with NAVFAC P-307, with written documentation of proof testing.
10. Rigging Sketch Requirements
10.1 Rigging sketches shall identify at least the following:
10.1.1 The weight of the load.
10.1.2 The location of the center of gravity.
10.1.3 The minimum crane capacity.
10.1.4 The minimum capacity / length of slings.
10.1.5 The minimum capacity of other standard rigging gear.
10.1.6 The attachment (lifting) points for the load.
a. The attachment points for multiple leg lifts shall be sized such that each attachment point can support half the load’s weight at the anticipated lift angle.
b. The attachment point for single leg lifts shall be sized such that the attachment point can support the entire load’s weight.
10.2 Limitations on allowable orientations for any parts making up the lifting assembly.
10.3 For single leg vertical lifts using twisted rope (wire or synthetic), two parallel ropes each capable of supporting the entire load alone shall be required unless a method is used to prevent unlaying the rope.
10.4 A minimum D/d ratio of one shall be required where wire rope slings pass over any object, or in the eyes of wire rope slings. A minimum D/d ratio of two shall be required where synthetic rope slings pass over any object, or in the eyes of synthetic rope slings.
a. "D" represents the diameter of the object the sling passes over.
b. "d" represents the diameter of the sling.
c. Table 14-3 of NAVFAC P-307 lists efficiency factors at various D/d ratios.
10.5 Components in each handling assembly shall be sized based on the worst case distribution of loads.
a. When making a two, three, or four point lift, the handling gear shall be sized so that two legs can support the load without exceeding the safe working load (SWL) at the lift angle expected, unless an equalizing method is used.
10.6 When non-standard gear is required (i.e. round stock lifting bars) written instructions shall be provided that ensure:
a. The proper material is being used,
b. The item is certified IAW NAVFAC P-307.
c. Any special requirements or dimensions are followed to ensure that engineering assumptions are met (i.e. eccentricity of the bearing points).
DBIDS
Identification Badges and Installation Access.
• Any new contractor, vendor or supplier requesting base access AFTER 31 May 2017 will be required to obtain a
DBIDS credential. NCACS credentials will no longer be issued.
• Only DBIDS credentials will be issued to ALL contractors, vendors and suppliers seeking base access AFTER 14
August 2017.
Defense Biometric Identification System (DBIDS) increases installation security and communications by receiving frequent database updates on changes to personnel/credential status, law enforcement warrants, lost/stolen cards, and force protection conditions. The system provides a continuous vetting anytime the DBIDS card is scanned at an installation entry point.
If you currently have a Navy Commercial Access Control System (NCACS) card, the following is required to get a
DBIDS credential:
• Present your NCACS Card and a completed copy of the SECNAV FORM 5512/1 to the base Visitor Control
Center representative.
• The VCC will pull up your information in the computer, ensuring all information is current and correct.
• Once your information is validated, a temporary DBIDS credential is provided.
• Your temporary credential will have an expiration date, prior to which you will need to obtain your permanent
DBIDS credential (~ 90 days).
• For each additional U.S. Navy installation to which you need access, the first time you visit you only need to bring your DBIDS credential and statement of purpose for base access when arriving at the Visitor Control Center.
• The representative will enter base access authorization and then you may proceed to work.
If you do NOT have an NCACS Card, the following is required to obtain a DBIDS credential:
• Present a letter or official document from my government sponsoring organization that provides the purpose for your access.
• Present valid identification, such as a passport or Real ID Act-compliant state driver's license.
• Present a completed copy of the SECNAV 5512/1 form to obtain your background check.
• Upon completion of the background check, the Visitor Control Center representative will complete the DBIDS enrollment process, which includes your photo, finger prints, base restrictions, and several other assessments; after all this is done, you will be provided with your new DBIDS credential.
• You may now proceed to work.
FOR ADDITIONAL QUESTIONS ABOUT OBTAINING A DBIDS CARD, CONTACT YOUR LOCAL BASE
VISITOR CONTROL CENTER. INFORMATION IS ALSO PROVIDED AT: www.cnic.navy.mil/om/dbids.html
1.2. One-Day Passes. Participation in the DBIDS is not mandatory, and if the Contractor chooses to not participate, the Contractor's personnel will have to obtain daily passes, be subject to daily mandatory vehicle inspection, and will have limited access to the installation. The Government will not be responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the DBIDS.
ECMRA
ENTERPRISE-WIDE CONTRACTOR MANPOWER REPORTING APPLICATION (ECMRA) - The contractor shall report contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via a secure data collection site. Contracted services excluded from reporting are based on Product Service Codes (PSCs). The excluded PSCs are:
(1) W, Lease/Rental of Equipment;
(2) X, Lease/Rental of Facilities;
(3) Y, Construction of Structures and Facilities;
(4) S, Utilities ONLY;
(5) V, Freight and Shipping ONLY.
The contractor is required to completely fill in all required data fields using the following web address https://doncmra.nmci.navy.mil.
Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year
(FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk, linked at https://doncmra.nmci.navy.mil.
PORTABLE ELECTRONIC DEVICES (PEDs) In accordance with COMSUBLANT/COMSUBPACINST 2075.1C, the use of Portable Electronic Devices (PEDs) while in or on Department of Navy Submarine spaces are prohibited. A portable electronic device (PED) is defined as any non-stationary electronic apparatus with singular or multiple capabilities of, but not limited to recording, storing, and/or transmitting data, voice, video, or photo images (e.g., cell phones, laptops, tablets and wearable devices such as fitness bands and smart watches).
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Months
RENTAL OF ONE REGENERATIVE AIR DRYER
FFP
Rental services for one regenerative air dryer in accordance with the statement of work found herein.
FOB: Destination
MILSTRIP: N4215822RC20859
PURCHASE REQUEST NUMBER: N4215822RC20859
PSC CD: W043
NET AMT
https://doncmra.nmci.navy.mil/
0002 1 Months
RENTAL OF ONE AIR COMPRESSOR
FFP
Rental services for one diesel operated air compressor in accordance with the statement of work found herein.
FOB: Destination
MILSTRIP: N4215822RC20860
PURCHASE REQUEST NUMBER: N4215822RC20860
1001 1 Months
OPTION RENTAL OF ONE REGENERATIVE AIR DRYER
FFP
Rental services for one regenerative air dryer in accordance with the statement of work found herein.
FOB: Destination
MILSTRIP: N4215822RC20859
1002 1 Months
OPTION RENTAL OF ONE REGENERATIVE AIR DRYER
FFP
Rental services for one regenerative air dryer in accordance with the statement of work found herein.
FOB: Destination
MILSTRIP: N4215822RC20859
1003 1 Months
OPTION RENTAL OF ONE REGENERATIVE AIR DRYER
FFP
Rental services for one regenerative air dryer in accordance with the statement of work found herein.
FOB: Destination
MILSTRIP: N4215822RC20859
1004 1 Months
OPTION RENTAL OF ONE REGENERATIVE AIR DRYER
FFP
Rental services for one regenerative air dryer in accordance with the statement of work found herein.
FOB: Destination
MILSTRIP: N4215822RC20859
1005 1 Months
OPTION RENTAL OF ONE REGENERATIVE AIR DRYER
FFP
Rental services for one regenerative air dryer in accordance with the statement of work found herein.
FOB: Destination
MILSTRIP: N4215822RC20859
1006 1 Months
OPTION RENTAL OF ONE REGENERATIVE AIR DRYER
FFP
Rental services for one regenerative air dryer in accordance with the statement of work found herein.
FOB: Destination
MILSTRIP: N4215822RC20859
2001 1 Months
OPTION RENTAL OF ONE AIR COMPRESSOR
FFP
Rental services for one diesel operated air compressor in accordance with the statement of work found herein.
FOB: Destination
MILSTRIP: N4215822RC20860
2002 1 Months
OPTION RENTAL OF ONE AIR COMPRESSOR
FFP
Rental services for one diesel operated air compressor in accordance with the statement of work found herein.
FOB: Destination
MILSTRIP: N4215822RC20860
2003 1 Months
OPTION RENTAL OF ONE AIR COMPRESSOR
FFP
Rental services for one diesel operated air compressor in accordance with the statement of work found herein.
FOB: Destination
MILSTRIP: N4215822RC20860
2004 1 Months
OPTION RENTAL OF ONE AIR COMPRESSOR
FFP
Rental services for one diesel operated air compressor in accordance with the statement of work found herein.
FOB: Destination
MILSTRIP: N4215822RC20860
2005 1 Months
OPTION RENTAL OF ONE AIR COMPRESSOR
FFP
Rental services for one diesel operated air compressor in accordance with the statement of work found herein.
FOB: Destination
MILSTRIP: N4215822RC20860
2006 1 Months
OPTION RENTAL OF ONE AIR COMPRESSOR
FFP
Rental services for one diesel operated air compressor in accordance with the statement of work found herein.
FOB: Destination
MILSTRIP: N4215822RC20860
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
0002 Destination Government Destination Government
1001 Destination Government Destination Government
1002 Destination Government Destination Government
1003 Destination Government Destination Government
1004 Destination Government Destination Government
1005 Destination Government Destination Government
1006 Destination Government Destination Government
2001 Destination Government Destination Government
2002 Destination Government Destination Government
2003 Destination Government Destination Government
2004 Destination Government Destination Government
2005 Destination Government Destination Government
2006 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 27-JUN-2022 TO
26-AUG-2022
N/A NORFOLK NAVAL SHIPYARD
SEE STATEMENT OF WORK
FOR DELIVERY AND CONTACT
INFORMATION
PORTSMOUTH VA 23709
TEL: WITHIN
FOB: Destination
N42158
0002 POP 27-JUN-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
1001 POP 27-JUN-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
1002 POP 27-JUN-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
1003 POP 27-JUN-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
1004 POP 27-JUN-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
1005 POP 27-JUN-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
1006 POP 27-JUN-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
2001 POP 27-JUN-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
2002 POP 27-JUN-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
2003 POP 27-JUN-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
2004 POP 27-JUN-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
2005 POP 27-JUN-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
2006 POP 27-JUN-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
CLAUSES INCORPORATED BY REFERENCE
52.203-12 Limitation On Payments To Influence Certain Federal
Transactions
JUN 2020
52.204-7 System for Award Management OCT 2018
52.204-13 System for Award Management Maintenance OCT 2018
52.204-16 Commercial and Government Entity Code Reporting AUG 2020
52.204-18 Commercial and Government Entity Code Maintenance AUG 2020
52.204-19 Incorporation by Reference of Representations and
Certifications.
DEC 2014
52.204-21 Basic Safeguarding of Covered Contractor Information
Systems
DEC 2021
52.204-22 Alternative Line Item Proposal JAN 2017
52.204-24 Representation Regarding Certain Telecommunications and
Video Surveillance Services or Equipment
DEC 2021
52.204-26 Covered Telecommunications Equipment or Services--
Representation.
OCT 2020
52.209-10 Prohibition on Contracting With Inverted Domestic
Corporations
NOV 2015
52.209-11 Representation by Corporations Regarding Delinquent Tax
Liability or a Felony Conviction under any Federal Law
FEB 2016
52.212-1 Instructions to Offerors--Commercial Products and
Commercial Services
DEC 2021
52.212-3 Alt I Offeror Representations and Certifications--Commercial
Products and Commercial Services (MAY 2022) Alternate I
OCT 2014
52.212-4 Contract Terms and Conditions--Commercial Products and
Commercial Services
DEC 2021
52.229-11 Tax on Certain Foreign Procurements--Notice and
Representation
JUN 2020
52.232-39 Unenforceability of Unauthorized Obligations JUN 2013
52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
DEC 2021
52.246-1 Contractor Inspection Requirements APR 1984
52.247-34 F.O.B. Destination NOV 1991
252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013
252.203-7005 Representation Relating to Compensation of Former DoD
Officials
NOV 2011
252.204-7003 Control Of Government Personnel Work Product APR 1992
252.204-7008 Compliance With Safeguarding Covered Defense Information
Controls
OCT 2016
252.204-7012 Safeguarding Covered Defense Information and Cyber
Incident Reporting
DEC 2019
252.204-7015 Notice of Authorized Disclosure of Information for Litigation
Support
MAY 2016
252.204-7016 Covered Defense Telecommunications Equipment or Services
-- Representation
DEC 2019
252.204-7017 Prohibition on the Acquisition of Covered Defense
Telecommunications Equipment or Services -- Representation
MAY 2021
252.204-7018 Prohibition on the Acquisition of Covered Defense
Telecommunications Equipment or Services
JAN 2021
252.204-7019 Notice of NIST SP 800-171 DoD Assessment Requirements MAR 2022
252.204-7020 NIST SP 800-171 DoD Assessment Requirements MAR 2022
252.209-7004 Subcontracting With Firms That Are Owned or Controlled By
The Government of a Country that is a State Sponsor of
Terrorism
MAY 2019
252.215-7013 Supplies and Services Provided by Nontraditional Defense
Contractors.
JAN 2018
252.223-7008 Prohibition of Hexavalent Chromium JUN 2013
252.225-7048 Export-Controlled Items JUN 2013
252.225-7974 (Dev) Representation Regarding Business Operations with the
Maduro Regime (DEVIATION 2020-O0005)
FEB 2020
252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
DEC 2018
252.232-7010 Levies on Contract Payments DEC 2006
252.232-7017 Accelerating Payments to Small Business Subcontractors--
Prohibition on Fees and Consideration
APR 2020
252.237-7010 Prohibition on Interrogation of Detainees by Contractor
Personnel
JUN 2013
252.244-7000 Subcontracts for Commercial Items JAN 2021
252.247-7023 Transportation of Supplies by Sea FEB 2019
CLAUSES INCORPORATED BY FULL TEXT
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR
EXECUTIVE ORDERS--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (MAY 2022)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017)
(section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L.
113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by
Kaspersky Lab and Other Covered Entities (NOV 2021) (Section 1634 of Pub. L. 115-91).
(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or
Equipment. (NOV 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).
(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).
(5) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(6) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19
U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services: [Contracting Officer check as appropriate.]
___ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (JUN 2020), with Alternate I (NOV
2021) (41 U.S.C. 4704 and 10 U.S.C. 2402).
___ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (NOV 2021) (41 U.S.C. 3509).
___ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUN
2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment
Act of 2009.)
X (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) (Pub. L. 109-
282) (31 U.S.C. 6101 note).
___ (5) [Reserved]
___ (6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).
___ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub.
L. 111-117, section 743 of Div. C).
___ (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (NOV 2021) (31 U.S.C. 6101 note).
___ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (OCT 2018) (41
U.S.C. 2313).
____ (10) [Reserved]
____ (11) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (SEP 2021) (15 U.S.C. 657a).
____ (12) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (SEP 2021) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
____ (13) [Reserved]
X (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2020) (15 U.S.C. 644).
____ (ii) Alternate I (MAR 2020) of 52.219-6.
____ (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (NOV 2020) (15 U.S.C. 644).
____ (ii) Alternate I (MAR 2020) of 52.219-7.
____ (16) 52.219-8, Utilization of Small Business Concerns (OCT 2018) (15 U.S.C. 637(d)(2) and (3)).
____ (17)(i) 52.219-9, Small Business Subcontracting Plan (NOV 2021) (15 U.S.C. 637(d)(4)).
____ (ii) Alternate I (NOV 2016) of 52.219-9.
____ (iii) Alternate II (NOV 2016) of 52.219-9.
____ (iv) Alternate III (JUN 2020) of 52.219-9.
____ (v) Alternate IV (SEP 2021) of 52.219-9.
____ (18) (i) 52.219-13, Notice of Set-Aside of Orders (MAR 2020) (15 U.S.C. 644(r)).
____ (ii) Alternate I (MAR 2020) of 52.219-13.
____ (19) 52.219-14, Limitations on Subcontracting (SEP 2021) (15 U.S.C. 657s).
____ (20) 52.219-16, Liquidated Damages—Subcontracting Plan (SEP 2021) (15 U.S.C. 637(d)(4)(F)(i)).
____ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (SEP 2021) (15 U.S.C.
657f).
____ (22) (i) 52.219-28, Post-Award Small Business Program Rerepresentation (SEP 2021) (15 U.S.C. 632(a)(2)).
____ (ii) Alternate I (MAR 2020) of 52.219-28.
____ (23) 52.219-29, Notice of Set-Aside for, or Sole-Source Award to, Economically Disadvantaged Women-
Owned Small Business Concerns (SEP 2021) (15 U.S.C. 637(m)).
____ (24) 52.219-30, Notice of Set-Aside for, or Sole-Source Award to, Women-Owned Small Business Concerns
Eligible Under the Women-Owned Small Business Program (SEP 2021) (15 U.S.C. 637(m)).
____ (25) 52.219-32, Orders Issued Directly Under Small Business Reserves (MAR 2020) (15 U.S.C. 644(r)).
____ (26) 52.219-33, Nonmanufacturer Rule (SEP 2021) (15 U.S.C. 657s).
X (27) 52.222-3, Convict Labor (JUN 2003) (E.O. 11755).
____(28) 52.222-19, Child Labor--Cooperation with Authorities and Remedies (JAN 2022) (E.O. 13126).
X (29) 52.222-21, Prohibition of Segregated Facilities (APR 2015).
X (30)(i) 52.222-26, Equal Opportunity (SEPT 2016) (E.O. 11246).
____ (ii) Alternate I (FEB 1999) of 52.222-26.
____ (31)(i) 52.222-35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C. 4212).
____ (ii) Alternate I (JUL 2014) of 52.222-35.
X (32)(i) 52.222-36, Equal Opportunity for Workers with Disabilities (JUN 2020) (29 U.S.C. 793).
____ (ii) Alternate I (JUL 2014) of 52.222-36.
____ (33) 52.222-37, Employment Reports on Veterans (JUN 2020) (38 U.S.C. 4212).
____ (34) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O.
13496).
X (35)(i) 52.222-50, Combating Trafficking in Persons (NOV 2021) (22 U.S.C. chapter 78 and E.O. 13627).
____ (ii) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
____ (36) 52.222-54, Employment Eligibility Verification (MAY 2022). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial products or commercial services as prescribed in FAR 22.1803.)
____ (37)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (MAY
2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
____ (ii) Alternate I (MAY 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
____ (38) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (JUN
2016) (E.O. 13693).
____ (39) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners
(JUN 2016) (E.O. 13693).
____ (40) (i) 52.223-13, Acquisition of EPEAT® Registered Imaging Equipment (JUN 2014) (E.O.s 13423 and
13514).
____ (ii) Alternate I (OCT 2015) of 52.223-13.
____ (41)(i) 52.223-14, Acquisition of EPEAT® Registered Televisions (JUN 2014) (E.O.s 13423 and 13514).
____ (ii) Alternate I (JUN 2014) of 52.223-14.
____ (42) 52.223-15, Energy Efficiency in Energy-Consuming Products (MAY 2020) (42 U.S.C. 8259b).
____ (43)(i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (OCT 2015) (E.O.s
13423 and 13514).
____ (ii) Alternate I (JUN 2014) of 52.223-16.
X (44) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN 2020) (E.O.
13513).
____ (45) 52.223-20, Aerosols (JUN 2016) (E.O. 13693).
____ (46) 52.223-21, Foams (JUN 2016) (E.O. 13693).
____ (47)(i) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).
____ (ii) Alternate I (JAN 2017) of 52.224-3.
____ (48) 52.225-1, Buy American--Supplies (NOV 2021) (41 U.S.C. chapter 83).
____ (49) (i) 52.225-3, Buy American--Free Trade Agreements--Israeli Trade Act (NOV 2021) (41 U.S.C. chapter
83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.
____ (ii) Alternate I (JAN 2021) of 52.225-3.
____ (iii) Alternate II (JAN 2021) of 52.225-3.
____ (iv) Alternate III (JAN 2021) of 52.225-3.
____ (50) 52.225-5, Trade Agreements (OCT 2019) 19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
X (51) 52.225-13, Restrictions on Certain Foreign Purchases (FEB 2021) (E.O.'s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
____ (52) 52.225-26, Contractors Performing Private Security Functions Outside the United States (OCT 2016)
(Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
____ (53) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (NOV 2007) (42 U.S.C. 5150
____ (54) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (NOV 2007) (42 U.S.C.
5150).
____ (55) 52.229-12, Tax on Certain Foreign Procurements (FEB 2021).
____ (56) 52.232-29, Terms for Financing of Purchases of Commercial Products and Commercial Services (NOV
2021) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).
____ (57) 52.232-30, Installment Payments for Commercial Products and Commercial Services (NOV 2021) (41
U.S.C. 4505, 10 U.S.C. 2307(f)).
____ (58) 52.232-33, Payment by Electronic Funds Transfer—System for Award Management (OCT 2018) (31
U.S.C. 3332).
____ (59) 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award Management (JUL
2013) (31 U.S.C. 3332).
____ (60) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).
____ (61) 52.239-1, Privacy or Security Safeguards (AUG 1996) (5 U.S.C. 552a).
____ (62) 52.242-5, Payments to Small Business Subcontractors (JAN 2017)(15 U.S.C. 637(d)(13)).
____ (63)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (NOV 2021) (46 U.S.C.
55305 and 10 U.S.C. 2631).
____ (ii) Alternate I (APR 2003) of 52.247-64.
____ (iii) Alternate II (NOV 2021) of 52.247-64.
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services: [Contracting
Officer check as appropriate.]
_____ (1) 52.222-41, Service Contract Labor Standards (AUG 2018) (41 U.S.C. chapter 67).
_____ (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 2014) (29 U.S.C. 206 and 41 U.S.C.
chapter 67).
_____ (3) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (Multiple
Year and Option Contracts) (AUG 2018) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
_____ (4) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (MAY
2014) (29 U.S.C 206 and 41 U.S.C. chapter 67).
_____ (5) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for
Maintenance, Calibration, or Repair of Certain Equipment--Requirements (MAY 2014) (41 U.S.C. chapter 67).
_____ (6) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain
Services--Requirements (MAY 2014) (41 U.S.C. chapter 67).
_____ (7) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 (JAN 2022) (E.O.
13658).
_____ (8) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2022) (E.O. 13706).
_____ (9) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (JUN 2020) (42 U.S.C. 1792).
(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph
(d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, as defined in FAR 2.101, on the date of award of this contract, and does not contain the clause at 52.215-2, Audit and
Records--Negotiation.
(1) The Comptroller General of the United…