RFQ_N42158-19-Q-S105.docx
DOCX document 112 KB Posted
- Attached to
- Rental of HAZMAT Containers
- Solicitation number
- N4215819QS105
About this file
RFQ N4215819QS105 is for the renal of HAZMAT Containers
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ_N42158-19-Q-S105_Enclosures_(5)_through_(8).docx | DOCX document | |
| RFQ_N42158-19-Q-S105_Attachment_(A).docx | DOCX document | |
| RFQ_N42158-19-Q-S105__Enclosures_(1)_through_(4).docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N4215819QS105
Section SF 1449 - CONTINUATION SHEET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
RENTAL OF 40 FT. HAZMAT CONTAINER
FFP
Rental of One (1) EA 40 FT. HAZMAT Container in accordance with the Statement of Work found herein.
FOB: Destination
MILSTRIP: N4215819RC91115
PURCHASE REQUEST NUMBER: N4215819RC91115
PSC CD: W054
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
RENTAL OF 20 FT. HAZMAT CONTAINER
FFP
Rental of One (1) EA 20 FT. HAZMAT Container in accordance with the Statement of Work found herein FOB: Destination
MILSTRIP: N4215819RC91116
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| RENTAL OF 40 FT. HAZMAT CONTAINER |
FFP
Rental of One (1) EA 40 FT HAZMAT Container in accordance with the Statement of Work found herein.
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| RENTAL OF 20 FT HAZMAT CONTAINER |
FFP
Rental of One (1) EA 20 FT HAZMAT Container in accordance with the Statement of Work found herein.
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| RENTAL OF 40 FT HAZMAT CONTAINER |
FFP
Rental of One (1) EA 40 FT HAZMAT Container in accordance with the Statement of Work found herein.
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| RENTAL OF 20 FT HAZMAT CONTAINER |
FFP
Rental of One (1) EA 20 FT HAZMAT Container in accordance with the Statement of Work found herein.
FOB: Destination
NET AMT
STATEMENT OF WORK
Rental of One (1) EA 40 ft. HAZMAT Container – For CLINs 0001, 1001, & 2001
Contractor shall provide one (1) EA HAZMAT container with minimum dimensions of 8’ width x 9’ height x 40’ length. Contractor shall provide all labor, materials, equipment, tools, transportation and supervision necessary to provide, install, and remove the HAZMAT container in support of Shop 38 (X-38) at Naval Station Norfolk 9170 2nd St. Building CEP 200 Norfolk, Va. 23511
This specification covers the design, fabrication, quality assurance, delivery, removal, and onsite assistance of HAZMAT container for use in Norfolk Naval Shipyard in Portsmouth, VA.
The HAZMAT container shall provide a space that is suitable for the storage of hazardous material. It shall contain a sump to collect leakage and a dry chemical fire suppression system as described in the following sections.
1. Government Responsibility
1.1 Government shall provide contractor ready access to the job location during contractor’s working hours (i.e., weekdays between the hours of 7:30 AM and 4:00 PM). Emergent services outside these hours will require government approval and will be no cost to the government. The government is responsible for the cost of all additional approved or requested maintenance and repairs not specifically covered under this Agreement or any applicable warranties. The government will prevent anyone other than contractor from maintaining, repairing or modifying its product.
1.2 NNSY is an industrial facility, therefore, wear and tear beyond what is normal wear and tear is typical and should be expected
1.3 The government agrees to, upon satisfactory delivery and installation; connect HAZMAT container to temporary services. The government will also have temporary services disconnected upon completion of the contract in order to allow the contractor to remove the container from the shipyard.
1.4 Technical POC: TO BE NAMED AT TIME OF AWARD
1.5 Certifying POC: TO BE NAMED AT TIMR OF AWARD
2. Contractor Responsibilities
2.1. Provide all HAZMAT containers on or prior to 16-SEP-2019 to Norfolk Naval Shipyard in Portsmouth, VA or to an agreed upon location with the Shipyard POC.
2.2. Delivery crew security clearance request is required for shipment offload within the Controlled Industrial Area at NNSY. Contractor shall arrange the Security clearance request with the pass office at NNSY.
2.3. The contractor shall dispatch a representative within 24 hr. of notification in order to activate fire suppression system after the Government has connected temporary utilities.
2.4. The contractor shall dispatch a representative in response to a service request to repair and/or replace any equipment within 24 hours of notification by Norfolk Naval Shipyard at no additional charge.
2.5. Provide representative within 24 hours in order to modify units in the event the customer determines the units do not meet contract specifications.
2.6. Before any leased/purchased temporary production facility will be accepted by the government an inspection at NNSY will be performed to ensure that the contractor has provided a product that conforms to the agreed upon specifications. If the inspection is not satisfactory, the contractor has 3 business days to correct the discrepancies (at contractor’s cost) or the temporary production facility will not be accepted the government.
2.7. Upon completion of the contract, the contractor will provide all labor, materials, equipment, tools, transportation and supervision necessary to breakdown the HAZMAT containers and remove them from the shipyard.
2.8. The contractor shall set the box in the proper location, designated by the technical POC and provide a representative within 24-hours notification of connection to temporary services to activate the automatic fire suppression system.
3. Guiding Documents
3.1 Resulting project shall comply with all governing codes and Naval Standards including the most recent Unified Facilities Criteria, International Building Code 2012, ADA and Requirements for Lifting Equipment. Guiding Documents:
3.2 United Facilities Criteria (UFC) 1-200-01, 3-301-01, 3-600-01
3.3 National Fire Protection Association (NFPA) 1, Fire Code
3.4 National Fire Protection Association (NFPA) 70, National Electrical Code (NEC)
4. General Requirements
4.1. Shall have a minimum sump capacity of 850 gallons
4.2. A/C and heat required to maintain unit at 70 degrees at all times, year round
4.3. Shall have a dry chemical fire suppression system which meets all NFPA, and OSHA requirements.
4.4. Shall have a minimum 120/240V, 100A, 3 wire, single phase UL listed load center (NEMA 3R).Shall have exterior camlok connection box feeding a 600V, 40A 2-pole circuit breaker enclosed in a NEMA 3R enclosure feeding a 15kva, 440/240V primary:240/120V secondary, single-phase transformer. This transformer to provide power to load center. See enclosure (1) and (2).
4.5. Shall be in compliance with applicable NFPA and NEC requirements
5. Maintenance Requirements
5.1. Equipment replacement/repair for any item, and or, components other than items and or components damaged by negligence.
5.2. Fire suppression system repair and troubleshoot as needed.
5.3. Door repair/replacement as needed based on normal wear.
5.4. Quarterly A/C filter changes and replacements as needed per periodic maintenance plan
6. HAZMAT Enclosure Requirements
6.1. Provide a decal on each unit with the following information: Contractor company name, contract number and a unique number. The unique number must be different on each unit. The decal shall have the following: minimum of 8.5” x 11” in size, white in color with black writing. The decal is to be located on one of the doors of the unit. If the half of the unit does not have a door, an 11/3” x 4” at minimum label shall be placed on the electrical panel on the inside of the unit.
6.2. Hurricane proof to 110 MPH winds also must be water resistant.
6.3. All doors are to swing outward. Cipher locks are not required for the HAZMAT containers; however, the doors must be capable of being locked. Multiple sets of keys shall be provided to the Shipyard POC and key replacements must be provided upon request from the customer.
6.4. Energy efficient heat pump in each HAZMAT enclosure, in all cases, the unit must be able to maintain 70 degrees Fahrenheit in summer or winter. The unit shall be energy star rated.
6.5. Provide (1) one fire extinguisher at each door (dry chemical NIIN: 4210-01-467-3616)
6.6. There shall be no windows in the units.
6.7. Floor covering shall be a steel grate allowing the flow of hazardous material directly into the sump. The steel grating shall be designed to withstand the exposure to hazardous material.
6.8. Identification on the box shall clearly identify the enclosure as a hazardous material storage area and entry into the enclosure includes the risk of direct exposure to hazardous material.
7. Electrical Requirements
7.1. One row of surface mount fluorescent twin tube strip type interior light fixtures with energy efficient electronic ballast and 32 watt fluorescent bulbs. Mount in center of enclosure. Light fixtures shall be blast proof.
7.2. All Wire must be THHN or THWN, 75 degrees Celsius (min), size as indicated. Do not substitute wiring type/temperature rating unless the ampacity of wire and conduit fill requirements are evaluated to ensure NEC compliance.
7.3. Electrical Metallic Tubing (EMT) is specified on drawings. The NEC requires EMT to be supported within 3 ft of each box or conduit body and supported every 10 ft (min).
7.4. Liquid Tight Flexible Metal Conduit (LFMC) may be used on the exterior instead of EMT. The NEC requires LFMC to be supported within 1 ft of each box or conduit body and supported every 4.5 ft (min).
7.5. The NEC requires the following color code:
7.6. Neutral (grounded conductor) = white
7.7. Note: may be phased taped white if larger than #6 AWG
7.8. Ground (Equipment grounding conductor) = green
7.9. Exterior wiring to include a camlok connection box feeding a 600 Volt, 40 amp, 2 pole circuit breaker enclosed in a NEMA 3R circuit breaker enclosure. This is to feed a 15 kva, 480/240 volt primary, 240/120 volt secondary single phase transformer (see enclosure (2)). See enclosure (4) for a list of exterior equipment. Equivalent material may be substituted.
7.10. Contractor may use a fusible disconnect switch, NEMA 3R with current limiting fuses rated the same size as the circuit breaker in the enclosure (2) ( PC-4 and PC-5).
7.11. Receptacles: 120 volt, 20 Amp Quad type receptacle wired on a #12 AWG (min of two Quad Receptacles per circuit). Provide (1) ea 120 volt, 15 amp duplex GFCI test type receptacle wired on a dedicated circuit mounted on the exterior in a weatherproof box beside the HVAC unit.
7.12. A typical transformer wiring diagram is shown in enclosure (3) in the drawing, use the manufacturers wiring schematic to connect transformer (schematic usually located on front panel of transformer). Transformer size may be adjusted depending on load demand of HAZMAT enclosure.
7.13. Input connections of the HAZMAT container electrical system shall be per NEC requirements and using camlok receptacles (see enclosure (1)).
7.14. Transformer frame shall be bonded to unit frame using appropriate size bonding jumper from NEC table 250.122, per NEC.
7.15. Wiring of units electrical system shall comply NFPA 70 (National Electric Code) where applicable.
8. Relocation
8.1. In the case that Norfolk Naval Shipyard needs to relocate the unit the following must be provided:
8.1.1. Units shall be stiffened as required to eliminate swaying of the upper units.
8.1.2. Units are to be outfitted with suitable attachments for overhead AND forklift lifting.
8.1.2.1 For multiple point lifts, each lifting attachment shall be capable of supporting one half the gross weight of the equipment with a design factor of five to one based on ultimate strength. For single point lifts, the lifting attachment shall be capable of supporting the gross weight of the equipment with a design factor of five to one based on ultimate strength..
8.1.2.2. For multiple point lifts, each lifting attachment shall accept a standard anchor shackle (Federal Specification RR-C-271D, type IVA) which is capable of supporting one half the gross weight of the equipment. For single point lifts, the lifting attachment shall accept a standard anchor shackle (Federal Specification RR-C- 271D, type IVA) which is capable of supporting the gross weight of the equipment.
8.1.2.3. Design of the lifting attachments shall be such that the attachments and shackles are not side loaded more than 10° out of the plane of the attachment unless specified by the manufacturer. Lifting attachments shall be located such that the lifting slings do not contact the equipment, or alternatively a spreader beam certified to NAVFAC P-307 shall be provided. Whenever practical, the lifting attachments shall be located above the center of gravity, and such that the lifting slings do not contact the equipment housings.
8.1.2.4. Each lifting attachment shall be conspicuously marked in a contrasting color “lift here”. Letters shall have a minimum height of 1”. Where multiple lifting attachment points and/or tiedown points exist (i.e., forklifts and aerial platforms), each lifting attachment shall be conspicuously marked or identified.
8.1.2.5. Forklift channels shall be 5”x10” inside dimension the full width of the unit and enclosed on all four sides.
8.2. The equipment shall be marked in a prominent location with the gross weight. Sand hopper tubs, or other containers that may contain material shall be marked with the empty and full weight (or alternatively the empty weight and working load limit). Marking shall be in upper case letters of contrasting colors, with a minimum height of 1”. Marking shall include the units (i.e. “pounds”, “long tons”. Etc.).
8.3. The equipment shall be provided with a lifting sketch/rigging diagram that meets the requirements of Section (11).
8.3.1. The lifting sketch shall detail any specific requirements and/or configurations that must be met prior to lifting (i.e., “engage swing lock,” “tilt mast back fully,” “rotate lifting basket over side,” “utilize 10’ minimum length slings,” and “spreader beam required”).
8.3.2. The lifting sketch shall include the location of the equipment center of gravity (full fuel, hydraulic tanks, etc.), equipment model/manufacturer, and gross weight.
8.3.3. A copy of the lifting sketch shall be provided with the equipment and copies shall be forwarded to the government points of contacts and Code 714 (396-3345/3346).
8.4. If specialized handling gear, other than shackles, standard slings, or chain hoists, is required (i.e., spreader beams and special lift rigs), the contractor shall provide it unless NNSY previously agrees to furnish this gear.
8.5. Permanently affixed isometric rigging diagram shall be placed near the gross weight label and shall include:
8.5.1. Show one (1) unit
8.5.2. Show center of gravity location.
8.5.3. List manufacturer and gross weight.
8.5.4. Locate diagram near one of the “gross weight” markings.
8.5.5. Indicate minimum standard anchor shackle size and minimum sling length.
8.6. Provide 3 paper copies of the isometric rigging diagram.
9. Lifting Sketch Requirements
9.1. The HAZMAT container must be capable of being moved by forklift AND crane.
9.2. Lifting sketches, as a minimum, shall identify the following:
9.2.1. The weight of the load.
9.2.2. The location of the center of gravity
9.2.3. The minimum capacity/length of slings
9.2.4. The minimum capacity of other standard rigging gear
9.2.5. The attachment (lifting) points for the load
9.2.5.1. The attachment points for multiple leg lifts shall be sized such that each attachment point can support half the load’s weight at the anticipated lift angle.
9.2.5.2. The attachment point for single leg lifts shall be sized such that the attachment point can support the entire load’s weight.
9.2.6. Limitations on allowable orientations for any parts making up the lifting assembly
9.2.7. For single leg vertical lifts using twisted rope (wire or synthetic), two parallel ropes each capable of supporting the entire load alone shall be required unless a method is used to prevent unraveling the rope.
9.2.8. A minimum D/d ratio of one shall be required where wire rope slings pass over any object, or in the eyes of wire rope slings. A minimum D/d ratio of two shall be required where synthetic rope slings pass over any object, or in the eyes of synthetic rope slings.
9.2.8.1. "D" represents the diameter of the object the sling passes over.
9.2.8.2. "d" represents the diameter of the sling.
9.2.8.3. Table 14-3 of NAVFAC P-307 lists efficiency factors at various D/d ratios.
9.2.9. Components in each handling assembly shall be sized based on the worst case distribution of loads. Note: When making a two-, three-, or four-point lift, the handling gear shall be sized so that two legs can support the load without exceeding the safe working load (SWL) at the lift angle expected, unless an equalizing method is used
9.2.10. When nonstandard gear is required (i.e., round stock lifting bars) written instructions shall be provided that ensure:
9.2.10.1. The proper material is being used
9.2.10.2. The item is certified
9.2.10.3. Any special requirements or dimensions are followed to ensure that engineering assumptions are met (i.e., eccentricity of the bearing points).
9.2.11. Any special requirements or dimensions are followed to ensure that engineering assumptions are met (i.e., eccentricity of the bearing points).
9.2.12. A load indicating device (LID) and a pre-determined stopping point will be in the rigging configuration; applicable to engineering estimated weights and loads not covered by a technical work document (TWD), unless otherwise approved by C-714.
Rental of One (1) EA 20 ft. HAZMAT Container – For CLINs 0002, 1002, & 2002
Contractor shall provide one (1) EA HAZMAT container with minimum dimensions of 8’ width x 9’ height x 20’ length. Contractor shall provide all labor, materials, equipment, tools, transportation and supervision necessary to provide, install, and remove the HAZMAT container.
This specification covers the design, fabrication, quality assurance, delivery, removal, and onsite assistance of HAZMAT container for use in Naval Station Norfolk, Norfolk, VA 23511.
The HAZMAT Container shall be leased for one base-year (12-months) and includes the option to extend the period of performance for two twelve-month option periods. The period of performance for the base year shall be September 16, 2019 through September 15, 2020.
The HAZMAT container shall provide a space that is suitable for the storage of hazardous material. It shall contain a sump to collect leakage and a dry chemical fire suppression system as described in the following sections.
1. Government Responsibility
1.1 Government shall provide contractor ready access to the job location during contractor’s working hours (i.e., weekdays between the hours of 7:30 AM and 4:00 PM). Emergent services outside these hours will require government approval and will be no cost to the government. The government is responsible for the cost of all additional approved or requested maintenance and repairs not specifically covered under this Agreement or any applicable warranties. The government will prevent anyone other than contractor from maintaining, repairing or modifying its product.
1.2 NNSY is an industrial facility, therefore, wear and tear beyond what is normal wear and tear is typical and should be expected
1.3 The government agrees to, upon satisfactory delivery and installation; connect HAZMAT container to temporary services. The government will also have temporary services disconnected upon completion of the contract in order to allow the contractor to remove the container from the shipyard.
1.4 Technical POC: TO BE NAMED AT TIME OF AWARD
1.5 Certifying POC: TO BE NAMED AT TIME OF AWARD
2. Contractor Responsibilities
2.1. Provide all HAZMAT containers on or prior to 16-September-2019 to Naval Station Norfolk, 9170 2nd Street, Bldg. CEP 200, Norfolk, VA 23511or to an agreed upon location with the NSN POCs.
2.2. Delivery crew security clearance request is required for shipment offload at Naval Station Norfolk. Contractor shall arrange the Security clearance request with the pass office at NSN.
2.3. The contractor shall dispatch a representative within 24 hr. of notification in order to activate fire suppression system after the government has connected temporary utilities.
2.4. The contractor shall dispatch a representative in response to a service request to repair and/or replace any equipment within 24 hours of notification by Naval Station Norfolk at no additional charge.
2.5. Provide representative within 24 hours in order to modify units in the event the customer determines the units do not meet contract specifications.
2.6. Before any leased/purchased temporary production facility will be accepted by the government an inspection at Naval Station Norfolk will be performed to ensure that the contractor has provided a product that conforms to the agreed upon specifications. If the inspection is not satisfactory, the contractor has three business days to correct the discrepancies at contractor’s cost or the temporary production facility will not be accepted the government.
2.7. Upon completion of the contract, the contractor will provide all labor, materials, equipment, tools, transportation and supervision necessary to breakdown the HAZMAT containers and remove them from Norfolk Naval Station.
2.8. The contractor shall set the box in the proper location, designated by the technical POC and provide a representative within 24-hours notification of connection to temporary services to activate the automatic fire suppression system.
3. Guiding Documents
3.1 Resulting project shall comply with all governing codes and Naval Standards including the most recent Unified Facilities Criteria, International Building Code 2012, ADA and Requirements for Lifting Equipment. Guiding Documents:
3.2 United Facilities Criteria (UFC) 1-200-01, 3-301-01, 3-600-01
3.3 National Fire Protection Association (NFPA) 1, Fire Code
3.4 National Fire Protection Association (NFPA) 70, National Electrical Code (NEC)
4. General Requirements
4.1. Shall have a minimum sump capacity of 850 gallons
4.2. A/C and heat required to maintain unit at 70 degrees at all times, year round
4.3. Shall have a dry chemical fire suppression system which meets all NFPA, and OSHA requirements.
4.4. Shall have a minimum 120/240V, 100A, 3 wire, single phase UL listed load center (NEMA 3R)
4.5. Shall have exterior camlok connection box feeding a 600V, 40A 2-pole circuit breaker enclosed in a NEMA 3R enclosure feeding a 15kva, 440/240V primary, 240/120V secondary, single-phase transformer. This transformer to provide power to load center. See enclosure (1) and (2).
4.6. Shall be in compliance with applicable NFPA and NEC requirements
5. Maintenance Requirements
5.1. Equipment replacement/repair for any item, and or, components other than items and or components damaged by negligence.
5.2. Fire suppression system repair and troubleshoot as needed.
5.3. Door repair/replacement as needed based on normal wear.
5.4. Quarterly A/C filter changes and replacements as needed per periodic maintenance plan
6. HAZMAT Enclosure Requirements
6.1. Provide a decal on each unit with the following information: Contractor company name, contract number and a unique number. The unique number must be different on each unit. The decal shall have the following: minimum of 8.5” x 11” in size, white in color with black writing. The decal is to be located on one of the doors of the unit. If the half of the unit does not have a door, an 11/3” x 4” at minimum label shall be placed on the electrical panel on the inside of the unit.
6.2. Hurricane proof to 110 MPH winds also must be water resistant.
6.3. All doors are to swing outward. Cipher locks are not required for the HAZMAT containers; however, the doors must be capable of being locked. Multiple sets of keys shall be provided to the Naval Station Norfolk POC and key replacements must be provided upon request from the customer.
6.4. Energy efficient heat pump in each HAZMAT enclosure, in all cases, the unit must be able to maintain 70 degrees Fahrenheit in summer or winter. The unit shall be energy star rated.
6.5. Provide (1) one fire extinguisher at each door (dry chemical NIIN: 4210-01-467-3616)
6.6. There shall be no windows in the units.
6.7. Floor covering shall be a steel grate allowing the flow of hazardous material directly into the sump. The steel grating shall be designed to withstand the exposure to hazardous material.
6.8. Identification on the box shall clearly identify the enclosure as a hazardous material storage area and entry into the enclosure includes the risk of direct exposure to hazardous material.
7. Electrical Requirements
7.1. One row of surface mount fluorescent twin tube strip type interior light fixtures with energy efficient electronic ballast and 32 watt fluorescent bulbs. Mount in center of enclosure. Light fixtures shall be blast proof.
7.2. All Wire must be THHN or THWN, 75 degrees Celsius (min), size as indicated. Do not substitute wiring type/temperature rating unless the ampacity of wire and conduit fill requirements are evaluated to ensure NEC compliance.
7.3. Electrical Metallic Tubing (EMT) is specified on drawings. The NEC requires EMT to be supported within 3 ft of each box or conduit body and supported every 10 ft. (min).
7.4. Liquid Tight Flexible Metal Conduit (LFMC) may be used on the exterior instead of EMT. The NEC requires LFMC to be supported within 1 ft. of each box or conduit body and supported every 4.5 ft (min).
7.5. The NEC requires the following color code:
7.6. Neutral (grounded conductor) = white
7.7. Note: may be phased taped white if larger than #6 AWG
7.8. Ground (Equipment grounding conductor) = green
7.9. Exterior wiring to include a camlok connection box feeding a 600 Volt, 40 amp, 2 pole circuit breaker enclosed in a NEMA 3R circuit breaker enclosure. This is to feed a 15 kva, 480/240 volt primary, 240/120 volt secondary single phase transformer (see enclosure (2)). See enclosure (4) for a list of exterior equipment. Equivalent material may be substituted.
7.10. Contractor may use a fusible disconnect switch, NEMA 3R with current limiting fuses rated the same size as the circuit breaker in the enclosure (2) ( PC-4 and PC-5).
7.11. Receptacles: 120 volt, 20 Amp Quad type receptacle wired on a #12 AWG (min of two Quad Receptacles per circuit). Provide (1) each 120 volt, 15 amp duplex GFCI test type receptacle wired on a dedicated circuit mounted on the exterior in a weatherproof box beside the HVAC unit.
7.12. A typical transformer wiring diagram is shown in enclosure (3) in the drawing, use the manufacturers wiring schematic to connect transformer (schematic usually located on front panel of transformer). Transformer size may be adjusted depending on load demand of HAZMAT enclosure.
7.13. Input connections of the HAZMAT container electrical system shall be per NEC requirements and using camlok receptacles (see enclosure (1)).
7.14. Transformer frame shall be bonded to unit frame using appropriate size bonding jumper from NEC table 250.122, per NEC.
7.15. Wiring of unit’s electrical system shall comply NFPA 70 (National Electric Code) where applicable.
8. Relocation
8.1. In the case that Naval Station Norfolk needs to relocate the unit the following must be provided:
8.1.1. Units shall be stiffened as required to eliminate swaying of the upper units.
8.1.2. Units are to be outfitted with suitable attachments for overhead and forklift lifting.
8.1.2.1 For multiple point lifts, each lifting attachment shall be capable of supporting one half the gross weight of the equipment with a design factor of five to one based on ultimate strength. For single point lifts, the lifting attachment shall be capable of supporting the gross weight of the equipment with a design factor of five to one based on ultimate strength..
8.1.2.2. For multiple point lifts, each lifting attachment shall accept a standard anchor shackle (Federal Specification RR-C-271D, type IVA) which is capable of supporting one-half the gross weight of the equipment. For single point lifts, the lifting attachment shall accept a standard anchor shackle (Federal Specification RR-C-271D, type IVA) which is capable of supporting the gross weight of the equipment.
8.1.2.3. Design of the lifting attachments shall be such that the attachments and shackles are not side loaded more than 10° out of the plane of the attachment unless specified by the manufacturer. Lifting attachments shall be located such that the lifting slings do not contact the equipment, or alternatively a spreader beam certified to NAVFAC P-307 shall be provided. Whenever practical, the lifting attachments shall be located above the center of gravity, and such that the lifting slings do not contact the equipment housings.
8.1.2.4. Each lifting attachment shall be conspicuously marked in a contrasting color “lift here”. Letters shall have a minimum height of 1”. Where multiple lifting attachment points and/or tie-down points exist (i.e., forklifts and aerial platforms), each lifting attachment shall be conspicuously marked or identified.
8.1.2.5. Forklift channels shall be 5”x10” inside dimension the full width of the unit and enclosed on all four sides.
8.2. The equipment shall be marked in a prominent location with the gross weight. Sand hopper tubs, or other containers that may contain material shall be marked with the empty and full weight (or alternatively the empty weight and working load limit). Marking shall be in upper case letters of contrasting colors, with a minimum height of 1”. Marking shall include the units (i.e. “pounds”, “long tons”. Etc.).
8.3. The equipment shall be provided with a lifting sketch/rigging diagram that meets the requirements of Section (11).
8.3.1. The lifting sketch shall detail any specific requirements and/or configurations that must be met prior to lifting (i.e., “engage swing lock,” “tilt mast back fully,” “rotate lifting basket over side,” “utilize 10’ minimum length slings,” and “spreader beam required”).
8.3.2. The lifting sketch shall include the location of the equipment center of gravity (full fuel, hydraulic tanks, etc.), equipment model/manufacturer, and gross weight.
8.3.3. A copy of the lifting sketch shall be provided with the equipment and copies shall be forwarded to the government points of contacts and NNSY Code 714 (396-3345/3346).
8.4. If specialized handling gear, other than shackles, standard slings, or chain hoists, is required (i.e., spreader beams and special lift rigs), the contractor shall provide it unless NNSY previously agrees to furnish this gear.
8.5. Permanently affixed isometric rigging diagram shall be placed near the gross weight label and shall include:
8.5.1. Show one (1) unit
8.5.2. Show center of gravity location.
8.5.3. List manufacturer and gross weight.
8.5.4. Locate diagram near one of the “gross weight” markings.
8.5.5. Indicate minimum standard anchor shackle size and minimum sling length.
8.6. Provide three paper copies of the isometric rigging diagram.
9. Lifting Sketch Requirements
9.1. The HAZMAT container must be capable of being moved by forklift and crane.
9.2. Lifting sketches, as a minimum, shall identify the following:
9.2.1. The weight of the load.
9.2.2. The location of the center of gravity
9.2.3. The minimum capacity/length of slings
9.2.4. The minimum capacity of other standard rigging gear
9.2.5. The attachment (lifting) points for the load
9.2.5.1. The attachment points for multiple leg lifts shall be sized such that each attachment point can support half the load’s weight at the anticipated lift angle.
9.2.5.2. The attachment point for single leg lifts shall be sized such that the attachment point can support the entire load’s weight.
9.2.6. Limitations on allowable orientations for any parts making up the lifting assembly
9.2.7. For single leg vertical lifts using twisted rope (wire or synthetic), two parallel ropes each capable of supporting the entire load alone shall be required unless a method is used to prevent unraveling the rope.
9.2.8. A minimum D/d ratio of one shall be required where wire rope slings pass over any object, or in the eyes of wire rope slings. A minimum D/d ratio of two shall be required where synthetic rope slings pass over any object, or in the eyes of synthetic rope slings.
9.2.8.1. "D" represents the diameter of the object the sling passes over.
9.2.8.2. "d" represents the diameter of the sling.
9.2.8.3. Table 14-3 of NAVFAC P-307 lists efficiency factors at various D/d ratios.
9.2.9. Components in each handling assembly shall be sized based on the worst case distribution of loads. Note: When making a two-, three-, or four-point lift, the handling gear shall be sized so that two legs can support the load without exceeding the safe working load (SWL) at the lift angle expected, unless an equalizing method is used
9.2.10. When nonstandard gear is required (i.e., round stock lifting bars) written instructions shall be provided that ensure:
9.2.10.1. The proper material is being used
9.2.10.2. The item is certified
9.2.10.3. Any special requirements or dimensions are followed to ensure that engineering assumptions are met (i.e., eccentricity of the bearing points).
9.2.11. Any special requirements or dimensions are followed to ensure that engineering assumptions are met (i.e., eccentricity of the bearing points).
9.2.12. A load indicating device (LID) and a pre-determined stopping point will be in the rigging configuration; applicable to engineering estimated weights and loads not covered by a technical work document (TWD), unless otherwise approved by NNSY Code 714.
PICKUP/REMOVAL OF RENTAL UNITS:
Unless otherwise notified by NAVSEA Contracting, Norfolk Naval Shipyard, Code 451, rental/lease unit(s) shall be picked-up (removed) by Contractor on the morning after expiration of the established contract period of performance. In the event that this date occurs on a Saturday, Sunday, or a recognized Federal Holiday, the contractor may make the appropriate arrangements to pick-up the equipment on the first working day following the expiration of the contract at no additional cost to the Government.
If any difficulty is experienced in picking-up (removing) unit(s), the Contractor MUST immediately request the Contract Specialist’s direction by contacting Carl Cuffee, phone # 757-396-8790, email: carl.cuffee@navy.mil.
A Contractor’s failure to follow the above instructions regarding pick-up/removal of rental units will relieve the Government of any liability for further charges for the equipment.
SAFETY
"Per FAR 22.102-1(a) entitled "Safety", Contractors are hereby informed that their employees or representatives present on property under Norfolk Naval Shipyard cognizance must follow Federal and State OSHA requirements and Norfolk Naval Shipyard OSHE Program Manual, NAVSHIPYDNORINST P5090.2 requirements or safety requirements for site specific location of the contract.
a. Contractors and Non-NNSY Government Agencies (NNGAs) are hereby informed that their employees or representatives present on property under Norfolk Naval Shipyard (NNSY) cognizance must adhere to Federal OSHA requirements for hazardous energy control IAW 29 CFR 1915.89 and must follow Hazardous Energy Control (HEC) procedures as identified in NAVSEA’s Occupational Safety, Health, and Environment Corporate Manual (OSHECM) Chapter 250 (latest revision), when performing work under NNSY contract. All HEC work to be performed by Contractors and NNGAs requires that NNSY Technical Points of Contact (TPOCs) and/or Contracting Officer’s Representatives (CORs) be notified of the HEC scope of work prior to starting work. Any changes or deviations in the initial scope of HEC work requires the NNSY TPOCs and/or CORs be informed of the change/deviation. Appendix 250.B-1 through B-3 of OSHECM Chapter 250 for multiple employer work identifies when Contractors and NNGAs are required to assign their Lockout/Tags-Plus Coordinator (LOTC) to coordinate HEC work with the cognizant NNSY LOTC. HEC locks shall be provided by the contractor or NNGA for their employees use. The HEC locks shall have red bodies with name labels or name tags affixed, identifying who installed the HEC lock(s) and a point of contact telephone number. HEC lock name labels and tags must be made of materials that will hold up to the environment to which they are exposed. HEC tags used for Tags-Plus HEC work shall be provided by the cognizant NNSY LOTC to the contractor or NNGA for their use if machinery, equipment, or systems (MES) cannot be locked out. OSHECM Chapter 250 Tags-Plus procedures will be strictly followed.
b. Contractors and NNGA’s may obtain electronic copies of OSHECM Chapter 250 (latest revision) and access the OSHA 1915.89 web site by using the following link to NNSY’s public access web site: http://www.navsea.navy.mil/shipyards/norfolk/default.aspx
c. Names and contact information for NNSY LOTCs and/or the Facility Custodian will be provided by NNSY TPOC and/or CORs set forth elsewhere in this award document.”
DBIDS:
• Any new contractor, vendor or supplier requesting base access AFTER 31 May 2017 will be required to obtain a DBIDS credential. NCACS credentials will no longer be issued.
• Only DBIDS credentials will be issued to ALL contractors, vendors and suppliers seeking base access AFTER 14 August 2017.
Defense Biometric Identification System (DBIDS) increases installation security and communications by receiving frequent database updates on changes to personnel/credential status, law enforcement warrants, lost/stolen cards, and force protection conditions. The system provides a continuous vetting anytime the DBIDS card is scanned at an installation entry point.
If you currently have a Navy Commercial Access Control System (NCACS) card, the following is required to get a DBIDS credential:
· Present your NCACS Card and a completed copy of the SECNAV FORM 5512/1 to the base Visitor Control Center representative.
· The VCC will pull up your information in the computer, ensuring all information is current and correct.
· Once your information is validated, a temporary DBIDS credential is provided.
· Your temporary credential will have an expiration date, prior to which you will need to obtain your permanent DBIDS credential (~ 90 days).
· For each additional U.S. Navy installation to which you need access, the first time you visit you only need to bring your DBIDS credential and statement of purpose for base access when arriving at the Visitor Control Center.
· The representative will enter base access authorization and then you may proceed to work.
If you do NOT have an NCACS Card, the following is required to obtain a DBIDS credential:
· Present a letter or official document from my government sponsoring organization that provides the purpose for your access.
· Present valid identification, such as a passport or Real ID Act-compliant state driver's license.
· Present a completed copy of the SECNAV 5512/1 form to obtain your background check.
· Upon completion of the background check, the Visitor Control Center representative will complete the DBIDS enrollment process, which includes your photo, finger prints, base restrictions, and several other assessments; after all this is done, you will be provided with your new DBIDS credential.
· You may now proceed to work.
FOR ADDITIONAL QUESTIONS ABOUT OBTAINING A DBIDS CARD, CONTACT YOUR LOCAL BASE VISITOR CONTROL CENTER. INFORMATION IS ALSO PROVIDED AT: www.cnic.navy.mil/om/dbids.html One-Day Passes. Participation in the DBIDS is not mandatory, and if the Contractor chooses to not participate, the Contractor's personnel will have to obtain daily passes, be subject to daily mandatory vehicle inspection, and will have limited access to the installation. The Government will not be responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the DBIDS.
PORTABLE ELECTRONIC DEVICE (PED):
In accordance with COMSUBLANT/COMSUBPACINST 2075.1C, the use of Portable Electronic Devices (PEDs) while in or on Department of Navy Submarine spaces are prohibited. A portable electronic device (PED) is defined as any non-stationary electronic apparatus with singular or multiple capabilities of, but not limited to recording, storing, and/or transmitting data, voice, video, or photo images (e.g., cell phones, laptops, tablets and wearable devices such as fitness bands and smart watches).
AFTER HOURS BASE ACCESS:
Contractors are to go to Gate 15 (within the NNSY) and inform the guards that they are to provide services/support via contract N42158-19-P-S (having a copy of contract will be helpful). The guards at the gate will then call the Base Precinct and subsequently be escorted to Bldg. 1618 (within the NNSY) to have a badge created for the individuals entering the NNSY Government Installation.
ADDENDUM TO FAR 52.212-1
In addition to FAR 52.212-1, “Instructions to Offerors – Commercial Items,” and shall be received by NAVSEA NNSY Contracting Division no later than the closing date of the solicitation. This requirement will be awarded using procedures under Federal Acquisition Regulation (FAR) Part 12 - Acquisition of Commercial Items and FAR Subpart 13, Simplified Acquisition Procedures.
1) Interested vendors may send the quotation to the Navy by replying via e-mail to carl.cuffee@navy.mil;
2) Proposal content and instructions when submitting a quote shall consist of:
a) Technical Capability
b) Price Submission
c) Acknowledgement of any amendments
3) Technical Capability:
Each vendor shall provide proof/certification that they are in compliance with all of the required specifications, certifications, and qualifications outlined within the Statement of Work found herein. The information provided should be presented in such a manner as to enable the Government to make a thorough and complete evaluation and arrive at a sound determination as to whether or not the services proposed and described will satisfy the requirements of the Government as stated in this request for quote.
Furthermore, contractors shall submit a completed Technical Capability Certifications Chart (within Attachment A).
4) Price Submission:
Vendors shall submit one original signed copy of the completed Solicitation, and if applicable, executed copies of all Amendments, and executed Representations and Certifications. Signed copies may be submitted via electronic submittal. The address for electronic submittal via email is carl.cuffee@navy.mil.
Quotes submitted shall be in accordance with the Schedule contained in the solicitation. Quotes shall be held firm for sixty (60) days.
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
| CLIN |
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| 0001 |
| Destination |
| Government |
| Destination |
| Government |
| 0002 |
| Destination |
| Government |
| Destination |
| Government |
| 1001 |
| Destination |
| Government |
| Destination |
| Government |
| 1002 |
| Destination |
| Government |
| Destination |
| Government |
| 2001 |
| Destination |
| Government |
| Destination |
| Government |
| 2002 |
| Destination |
| Government |
| Destination |
| Government |
DELIVERY INFORMATION
| CLIN |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
| 0001 |
| POP 16-SEP-2019 TO |
15-SEP-2020
| N/A |
| NAVAL STATION NORFOLK (NOB) |
SEE STATEMENT OF WORK
9170 SECOND STREET
CEP-200
NORFOLK VA 23511
FOB: Destination N40025
| 0002 |
| POP 16-SEP-2019 TO |
15-SEP-2020
| N/A |
| (SAME AS PREVIOUS LOCATION) |
N40025
| 1001 |
| POP 16-SEP-2020 TO |
15-SEP-2021
| N/A |
| (SAME AS PREVIOUS LOCATION) |
N40025
| 1002 |
| POP 16-SEP-2020 TO |
15-SEP-2021
| N/A |
| (SAME AS PREVIOUS LOCATION) |
N40025
| 2001 |
| POP 16-SEP-2021 TO |
15-SEP-2022
| N/A |
| (SAME AS PREVIOUS LOCATION) |
N40025
| 2002 |
| POP 16-SEP-2021 TO |
15-SEP-2022
| N/A |
| (SAME AS PREVIOUS LOCATION) |
N40025
CLAUSES INCORPORATED BY REFERENCE
| 52.203-12 |
| Limitation On Payments To Influence Certain Federal Transactions |
| OCT 2010 |
| 52.203-18 |
| Prohibition on Contracting With Entities That Require Certain Internal Confidentiality Agreements or Statements--Representation |
| JAN 2017 |
| 52.204-2 |
| Security Requirements |
| AUG 1996 |
| 52.204-7 |
| System for Award Management |
| OCT 2018 |
| 52.204-9 |
| Personal Identity Verification of Contractor Personnel |
| JAN 2011 |
| 52.204-10 |
| Reporting Executive Compensation and First-Tier Subcontract Awards |
| OCT 2018 |
| 52.204-13 |
| System for Award Management Maintenance |
| OCT 2018 |
| 52.204-16 |
| Commercial and Government Entity Code Reporting |
| JUL 2016 |
| 52.204-18 |
| Commercial and Government Entity Code Maintenance |
| JUL 2016 |
| 52.204-19 |
| Incorporation by Reference of Representations and Certifications. |
| DEC 2014 |
| 52.204-22 |
| Alternative Line Item Proposal |
| JAN 2017 |
| 52.204-23 |
| Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities. |
| JUL 2018 |
| 52.209-6 |
| Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment |
| OCT 2015 |
| 52.209-10 |
| Prohibition on Contracting With Inverted Domestic Corporations |
| NOV 2015 |
| 52.209-11 |
| Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law |
| FEB 2016 |
| 52.212-1 |
| Instructions to Offerors--Commercial Items |
| OCT 2018 |
| 52.212-4 |
| Contract Terms and Conditions--Commercial Items |
| OCT 2018 |
| 52.219-6 |
| Notice Of Total Small Business Set-Aside |
| NOV 2011 |
| 52.219-28 |
| Post-Award Small Business Program Rerepresentation |
| JUL 2013 |
| 52.222-21 |
| Prohibition Of Segregated Facilities |
| APR 2015 |
| 52.222-26 |
| Equal Opportunity |
| SEP 2016 |
| 52.222-36 |
| Equal Opportunity for Workers with Disabilities |
| JUL 2014 |
| 52.222-50 |
| Combating Trafficking in Persons |
| JAN 2019 |
| 52.223-18 |
| Encouraging Contractor Policies To Ban Text Messaging While Driving |
| AUG 2011 |
| 52.225-13 |
| Restrictions on Certain Foreign Purchases |
| JUN 2008 |
| 52.232-2 |
| Payments Under Fixed-Price Research And Development Contracts |
| APR 1984 |
| 52.232-33 |
| Payment by Electronic Funds Transfer--System for Award Management |
| OCT 2018 |
| 52.232-39 |
| Unenforceability of Unauthorized Obligations |
| JUN 2013 |
| 52.232-40 |
| Providing Accelerated Payments to Small Business Subcontractors |
| DEC 2013 |
| 52.233-3 |
| Protest After Award |
| AUG 1996 |
| 52.233-4 |
| Applicable Law for Breach of Contract Claim |
| OCT 2004 |
| 52.237-1 |
| Site Visit |
| APR 1984 |
| 52.247-34 |
| F.O.B. Destination |
| NOV 1991 |
| 252.203-7000 |
| Requirements Relating to Compensation of Former DoD Officials |
| SEP 2011 |
| 252.203-7002 |
| Requirement to Inform Employees of Whistleblower Rights |
| SEP 2013 |
| 252.204-7003 |
| Control Of Government Personnel Work Product |
| APR 1992 |
| 252.204-7009 |
| Limitations on the Use or Disclosure of Third-Party Contractor Reported Cyber Incident Information |
| OCT 2016 |
| 252.204-7012 |
| Safeguarding Covered Defense Information and Cyber Incident Reporting |
| OCT 2016 |
| 252.204-7015 |
| Notice of Authorized Disclosure of Information for Litigation Support |
| MAY 2016 |
| 252.209-7004 |
| Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism |
| MAY 2019 |
| 252.215-7013 |
| Supplies and Services Provided by Nontraditional Defense Contractors. |
| JAN 2018 |
| 252.223-7006 |
| Prohibition On Storage, Treatment, and Disposal of Toxic or Hazardous Materials |
| SEP 2014 |
| 252.223-7008 |
| Prohibition of Hexavalent Chromium |
| JUN 2013 |
| 252.225-7048 |
| Export-Controlled Items |
| JUN 2013 |
| 252.231-7000 |
| Supplemental Cost Principles |
| DEC 1991 |
| 252.232-7003 |
| Electronic Submission of Payment Requests and Receiving Reports |
| DEC 2018 |
| 252.232-7010 |
| Levies on Contract Payments |
| DEC 2006 |
| 252.237-7000 |
| Notice Of Special Standards Of Responsibility |
| DEC 1991 |
| 252.237-7010 |
| Prohibition on Interrogation of Detainees by Contractor Personnel |
| JUN 2013 |
| 252.244-7000 |
| Subcontracts for Commercial Items |
| JUN 2013 |
| 252.247-7023 |
| Transportation of Supplies by Sea |
| FEB 2019 |
CLAUSES INCORPORATED BY FULL TEXT
52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (JUN 2016)
(a) Definitions. As used in this clause--
Covered contractor information system means an information system that is owned or operated by a contractor that processes, stores, or transmits Federal contract information.
Federal contract information means information, not intended for public release, that is provided by or generated for the Government under a contract to develop or deliver a product or service to the Government, but not including information provided by the Government to the public (such as on public Web sites) or simple transactional information, such as necessary to process payments.
Information means any communication or representation of knowledge such as facts, data, or opinions, in any medium or form, including textual, numerical, graphic, cartographic, narrative, or audiovisual (Committee on National Security Systems Instruction (CNSSI) 4009).
Information system means a discrete set of information resources organized for the collection, processing, maintenance, use, sharing, dissemination, or disposition of information (44 U.S.C. 3502).
Safeguarding means measures or controls that are prescribed to protect information systems.
(b) Safeguarding requirements and procedures.
(1) The Contractor shall apply the following basic safeguarding requirements and procedures to protect covered contractor information systems. Requirements and procedures for basic safeguarding of covered contractor information systems shall include, at a minimum, the following security controls:
(i) Limit information system access to authorized users, processes acting on behalf of authorized users, or devices (including other information systems).
(ii) Limit information system access to the types of transactions and functions that authorized users are permitted to execute.
(iii) Verify and control/limit connections to and use of external information systems.
(iv) Control information posted or processed on publicly accessible information systems.
(v) Identify information system users, processes acting on behalf of users, or devices.
(vi) Authenticate (or verify) the identities of those users, processes, or devices, as a prerequisite to allowing access to organizational information systems.
(vii) Sanitize or destroy information system media containing Federal Contract Information before disposal or release for reuse.
(viii) Limit physical access to organizational information systems, equipment, and the respective operating environments to authorized individuals.
(ix) Escort visitors and monitor visitor activity; maintain audit logs of physical access; and control and manage physical access devices.
(x) Monitor, control, and protect organizational communications (i.e., information transmitted or received by organizational information systems) at the external boundaries and key…
This is the start of the file's text. The full file is on GovTribe.