N42158-19-Q-0014 ATTACHMENT 2
REVISED TECHNICAL CAPABILITY CERTIFICATIONS
Vendor shall self-certify that the equipment and services proposed either meets or does not meet the Government’s minimum requirements specified in the associated Statement of Work (SOW) reference by initialing in the “YES” or “NO” area of the chart below.
Any deviation to the Government specifications shall be identified as such – A detailed explanation shall be provided for each negative response.
Note: In order to be considered for award, the table must be completed in its entirety and submitted with your quotation in accordance with FAR 52.212-1 Instructions of Offerors ADDENDUM.
Technical Capabilities Statement
Item #1 Specifications for Two (2) 60 Ton Air Cooled Chillers
| Shall be provided with the following capabilities, features, and specifications: |
| YES |
| NO |
Provide and deliver (2) 60 Ton Air Cooled Chillers
Be rated at greater than 60 tons nominal while still meeting General Specification 3.1.3, at least a 60 ton capacity..
Must be air cooled
Must be electrically powered by 440/460V, less than 400 full load Amps with a male 500 MCM Camlock fitting
Must be capable of operating 24 Hours a day / Seven (7) days a week.
Must have single 150 GPM (minimum) Circulating Pump that is able to supply a minimum of 80 Feet of Head & assoc. hardware if necessary
Electrical Panel in National Electrical Manufacturers Association (NEMA) 4 metal enclosure with lockable disconnect and Cam-lock cords.
Water Inlets and Outlets 6 in. Cam-Lok male inlet & female outlet, with quantity of three (3) each for total of six (6) 6 in. Cam-Lok flexible hoses approx. 25 FT long, with associated hardware to connect to 6 NPS 150 psi commercial flat face flanges
Units must be a complete system, if pump is separate, vendor will provide all piping/valves/fittings as required to couple pump to Chill Water Unit
Units must be capable of operating in an industrial environment where dust, dirt, and sea air are present.
Gross weight must be stenciled on four sides
Free standing, forklift pockets and four-point certified lift frame required for forklift/crane movement
Units to be equipped with Inlet and Outlet Temperature Gages
Units to be equipped with Flow Indicating Device
Evaporator must be capable of delivering a leaving temp of less than 40 F
Evaporator must be capable of operating in a wide ambient temperature range (0°F - 125°F)
Units must be weather tight for outdoor use.
Unit maximum size: 30’-10” long X 9’ wide X 9’ high
Unit maximum weight: 30,000 LB.
Unit shall conform to cable hook-ups in Appendix A in SOW. For 220VAC equipment vendor to provide 440VAC to 220VAC transformer with connections capable of being mated to NNSY 440VAC power supply, see Appendix A in SOW.
Vendor shall provide a rigging sketch. Lifting and Rigging must conform to NAVFAC-P-307 Standards
Vendor shall be responsible for all repairs / maintenance
Vendor shall be available within 4 hours of notification for all service related items, including holidays (24/7)
If applicable Vendor shall provide an electronic remote equipment monitoring and/or management tool for use by NNSY Personnel for best and quickest method for communication with vendor
Should a unit breakdown and become inoperable, vendor shall have a replacement box available within 24 hours
Unit shall comply with the applicable OSHA regulations
Unit shall be complete and operational after delivery and setup. Setup shall be complete within 24 hours of installation onboard the ship. The unit shall be highly reliable and shall function without repair or adjustment when set-up is complete. If units initially fail, cannot be repaired within 24 hours, another equal unit must be provided by vendor at no additional cost
Power cable end fittings will be lugged and color coded to indicate proper phasing
Unit shall be capable of being moved via fork lift and/or lifting pad eyes.
The equipment shall be outfitted with suitable attachments for overhead lifting
Each lifting attachment shall be capable of supporting one half the gross weight of the equipment with a design factor of five to one based on ultimate strength
Each lifting attachment shall be designed to accept a standard anchor shackle (Federal Specification RR-C-271D, type IVA) which is capable of supporting one half the gross weight of the equipment
Design of the lifting attachments shall be such that the shackles are not side loaded.
Each lifting attachment shall be conspicuously marked in a contrasting color “Lift Here”. Letters shall have a minimum height of 1”
The lifting sketch shall detail any specific requirements and / or configurations that must be meet prior to lifting (i.e. “engage swing lock”, “Tilt mast back fully”, “Rotate lifting basket over side”, “Utilize 10’ minimum length slings”, “Spreader beam required”, etc.)
The equipment shall be marked in a prominent location with vendor Point Of Contact information, including name and phone number
The equipment shall be marked in a prominent location with the gross weight. Marking shall be upper case letters of a contrasting color, with a minimum height of 1”. Marking shall include the units (i.e. “pounds”, “long tons”, etc.)
In order to be considered technically acceptable, this form must be completed in its entirety.
Vendor shall certify that his product meets or does not meet each specification listed above by initialing in the applicable YES or NO box beside each specification.
Vendor Name and Signature:
Vendor’s Certification is as of _____________________.
Date