- Rental of 70 Ton A/C Units
- Solicitation number
- N42158-18-T-N031
About this file
Solicitation N42158-18-T-N031 is for the rental / lease of six (6) EA 70 Ton A/C Units for the duration of 25 January 2018 through 24 January 2019.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_C_-_Technical_Capability_Certs.docx | DOCX document | |
| Attachment_A_-_QASP.docx | DOCX document | |
| Attachment_B_-_CAP.doc | DOC document | |
| Attachment_D_-_Past_Performance_Report_Form.docx | DOCX document | |
| Attachment_E_-_Contractor_Performance_Questionnaire.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N4215818TN031
Section SF 1449 - CONTINUATION SHEET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
Rental of 70 Ton A/C Units
FFP
Rental / Lease of six (6) EA 70 Ton A/C Units in accordance with the Statement of Work found herein.
FOB: Destination
MILSTRIP: N4215818RC80174
PURCHASE REQUEST NUMBER: N4215818RC80174
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2 |
| Job |
Freight In and Out
FFP
Freight In and Out for six (6) EA 70 Ton A/C Units to and from Norfolk Naval Shipyard Portsmouth, VA 23709.
2 Jobs = $ for freight inbound and $ for freight outbound
FOB: Destination
MILSTRIP: N4215818RC80174
PURCHASE REQUEST NUMBER: N4215818RC80174
NET AMT
STATEMENT OF WORK
GENERAL SPECIFICATIONS:
1) Must be electrical powered, either 120/460V. Capable of starting and running on a 400 amp circuit breaker. Camlock end connections are required.
2) Unit must be air cooled
3) Provide a minimum of 780,000 BTU/hr cooling capacity
4) Provide at least 12000 Cubic Feet per Minute (CFM) at 5” static pressure.
5) Unit must have at least two (2), 20" vent duct inlets connections.
6) Unit must have at least two (2), 20" vent duct outlet connections (dampered).
7) Must be capable of running 24 hours/day, 7 days/week
8) Unit must be a complete system
9) Contractor to adhere to the rigging requirements as outlined in Attachment B for contractor equipment at Norfolk Naval Shipyard.
10) Unit must be free standing and must have forklift slots (capable of being moved with a forklift)
11) Unit must be affixed with a metal tag designating the supplying company, a POC responsible for repairs and maintenance, and a phone number of the POC who is responsible for repairs and maintenance.
12) In-line heater with the following requirements:
a) Power Requirements: 460 V/ 3 phase/ 60HZ
b) Provide a minimum of 60 kW heating capacity
c) Input Rating: 200,000 BTU or better
d) Air Output: 5000 cfm minimum
e) Temperature Control: 40°F Temperature Rise minimum
f) Thermostatic Controller
CONTRACTOR RESPONSIBILITY:
1. Equipment delivery and removal at no cost to the government
2. Provide all parts requiring repair or replacement under circumstances of normal equipment wear and tear at no additional charge
3. Contractor is responsible for ensuring that all preventative maintenance is performed on equipment prior to delivery to the government as well as performing preventative maintenance as specified by the equipment’s manufacturer preventative maintenance schedule during the term of the rental period with the government. Contractor is responsible for all travel associated with preventative maintenance. Contractor is responsible for providing service technicians that are able to meet the badging and security requirements of Norfolk Naval Shipyard.
4. Post contact information for service/repair of equipment directly on the rental equipment. Contact information must be packaged to withstand being located in an outdoor environment
5. The contractor shall dispatch a representative in response to a service request to repair and/or replace an air conditioner within eight (8) hours of notification by NNSY at no additional charge. regardless if request is placed during normal business hours. Contractor is responsible for travel associated with repair of equipment. Contractor is responsible for providing service technicians that are able to meet the badging and security requirements of Norfolk Naval Shipyard.
6. When the equipment is required to be removed to the contractor's facility for repair or replacement, the contractor shall be responsible for loss or damage from the time it leaves the government site until it is returned to the government.
7. Provide start up training of equipment to the government. Contractor is responsible for all travel associated with providing startup training of equipment to the government.
8. Clean the air conditioner unit(s) prior to delivery to the following requirements:
a. Air conditioners shall be cleaned to a degree of cleanliness that results in a surface free of grease, oil, flux, scale, dirt loose particles and any other matter foreign to the base metal. Adherent light superficial rust on steel surfaces, caused by short time exposure to the atmosphere, is acceptable.
b. For uncoated surfaces: Adherent corrosion products typical on surfaces of the type material being considered (e. g. flash rust on steel) are acceptable. Loose corrosion products are not acceptable and must be removed.
GOVERNMENT RESPONSIBILITY:
1. Provide operators
2. Perform basic maintenance
a. Monitor all gauges
3. Equipment movements within the shipyard
4. Lost items and equipment damage beyond normal wear and tear
OPTIONS:
1. Rental charges will be prorated if unit is returned prior to end date. Delivery of the additional air conditioner to NNSY is to be within five (5) working days of notification by NNSY.
NOTES:
1. New or used equipment may be provided. NNSY reserves the right to inspect the proposed equipment prior to contract award.
2. The units will be exposed to everyday weather, and saltwater air. It is the contractor's responsibility to provide any protective coverings for the units.
3. The government reserves the right to return one or all units at any time prior to the expiration of the rental period. The contractor agrees to prorate costs for the time the units are in use by NNSY only. The government agrees to give the contractor twenty-four (24) hours notice for return of units prior to expiration of rental period.
Requirements for Lifting of Equipment
1. The equipment shall be outfitted with suitable attachments for overhead lifting.
1.1. For multiple point lifts each lifting attachment shall be capable of supporting one half the gross weight of the equipment with a design factor of five to one based on ultimate strength. For single point lifts the lifting attachment shall be capable of supporting the gross weight of the equipment with a design factor of five to one based on ultimate strength.
1.2. For multiple point lifts each lifting attachment shall be designed to accept a standard anchor shackle (Federal Specification RR-C-271D, type IVA) which is capable of supporting one half the gross weight of the equipment. For single point lifts the lifting attachment shall be designed to accept a standard anchor shackle (Federal Specification RR-C-271D, type IVA) which is capable of supporting the gross weight of the equipment.
1.3. Design of the lifting attachments shall be such that the attachments and shackles are not side loaded more than 10° out of the plane. Lifting attachments shall be located such that the lifting slings do not contact the equipment, or alternatively a spreader beam certified to NAVFAC P-307 shall be provided. Whenever practical, the lifting attachments shall be located above the center of gravity, and such that the lifting slings do not contact the equipment housings.
1.4. Each lifting attachment shall be conspicuously marked in a contrasting color “Lift Here”. Letters shall have a minimum height of 1”.
2. The equipment shall be marked in a prominent location with the gross weight. Sand hoppers, tubs, or other containers that may contain material shall be marked with the empty and full weight (or alternatively the empty weight and working load limit). Marking shall be upper case letters of a contrasting color, with a minimum height of 1”. Marking shall include the units (i.e. “pounds”, “long tons”, etc.).
3. The equipment shall be provided with a lifting sketch / rigging diagram that meets the requirements of Rigging Sketch Requirements Section found herein.
3.1. The lifting sketch shall detail any specific requirements and / or configurations that must be meet prior to lifting (i.e. “engage swing lock”, “Tilt mast back fully”, “Rotate lifting basket over side”, “Utilize 10’ minimum length slings”, “Spreader beam required”, etc.).
3.2. The lifting sketch shall include the location of the center of gravity of the equipment (full fuel, hydraulic tanks, etc.), equipment model/manufacturer, and gross weight.
3.3. A copy of the lifting sketch shall be permanently posted on the equipment, and a copy shall be forwarded TO BE NAMED AT TIME OF AWARD.
4. If specialized handling gear other than shackles, standard slings, or chainfalls (i.e. spreader beams, special lift rigs, etc.) is required, the contractor shall furnish it. This handling gear shall be provided certified in accordance with NAVFAC P-307, with written documentation of proof testing.
Rigging Sketch Requirements Rigging sketches, as a minimum, shall identify the following:
1. The weight of the load.
2. The location of the center of gravity.
3. The minimum crane capacity.
4. The minimum capacity / length of slings.
5. The minimum capacity of other standard rigging gear.
6. The attachment (lifting) points for the load.
a. The attachment points for multiple leg lifts shall be sized such that each attachment point can support half the load’s weight at the anticipated lift angle.
b. The attachment point for single leg lifts shall be sized such that the attachment point can support the entire load’s weight.
7. Limitations on allowable orientations for any parts making up the lifting assembly.
8. For single leg vertical lifts using twisted rope (wire or synthetic), two parallel ropes each capable of supporting the entire load alone shall be required unless a method is used to prevent unlaying the rope.
9. A minimum D/d ratio of one shall be required where wire rope slings pass over any object, or in the eyes of wire rope slings. A minimum D/d ratio of two shall be required where synthetic rope slings pass over any object, or in the eyes of synthetic rope slings.
a. "D" represents the diameter of the object the sling passes over.
b. "d" represents the diameter of the sling.
c. Table 14-3 of NAVFAC P-307 lists efficiency factors at various D/d ratios.
10. Components in each handling assembly shall be sized based on the worst case distribution of loads.
a. When making a two, three, or four point lift, the handling gear shall be sized so that two legs can support the load without exceeding the safe working load (SWL) at the lift angle expected, unless an equalizing method is used.
11. When non standard gear is required (i.e. round stock lifting bars) written instructions shall be provided that ensure:
a. The proper material is being used,
b. The item is certified IAW NAVFAC P-307.
c. Any special requirements or dimensions are followed to ensure that engineering assumptions are met (i.e. eccentricity of the bearing points).
ADDITIONAL INFORMATION
SAFETY
"Per FAR 22.102-1(a) entitled "Safety", Contractors are hereby informed that their employees or representatives present on property under Norfolk Naval Shipyard cognizance must follow Federal and State OSHA requirements and Norfolk Naval Shipyard OSHE Program Manual, NAVSHIPYDNORINST P5090.2 requirements or safety requirements for site specific location of the contract.
1. Contractors and Non-NNSY Government Agencies (NNGAs) are hereby informed that their employees or representatives present on property under Norfolk Naval Shipyard (NNSY) cognizance must adhere to Federal OSHA requirements for hazardous energy control IAW 29 CFR 1915.89 and must follow Hazardous Energy Control (HEC) procedures as identified in NAVSEA’s Occupational Safety, Health, and Environment Corporate Manual (OSHECM) Chapter 250 (latest revision), when performing work under NNSY contract. All HEC work to be performed by Contractors and NNGAs requires that NNSY Technical Points of Contact (TPOCs) and/or Contracting Officer’s Representatives (CORs) be notified of the HEC scope of work prior to starting work. Any changes or deviations in the initial scope of HEC work requires the NNSY TPOCs and/or CORs be informed of the change/deviation. Appendix 250.B-1 through B-3 of OSHECM Chapter 250 for multiple employer work identifies when Contractors and NNGAs are required to assign their Lockout/Tags-Plus Coordinator (LOTC) to coordinate HEC work with the cognizant NNSY LOTC. HEC locks shall be provided by the contractor or NNGA for their employees use. The HEC locks shall have red bodies with name labels or name tags affixed, identifying who installed the HEC lock(s) and a point of contact telephone number. HEC lock name lables and tags must be made of materials that will hold up to the environment to which they are exposed. HEC tags used for Tags-Plus HEC work shall be provided by the cognizant NNSY LOTC to the contractor or NNGA for their use if machinery, equipment, or systems (MES) cannot be locked out. OSHECM Chapter 250 Tags-Plus procedures will be strictly followed.
1. Contractors and NNGA’s may obtain electronic copies of OSHECM Chapter 250 (latest revision) and access the OSHA 1915.89 web site by using the following link to NNSY’s public access web site:
http://www.navsea.navy.mil/shipyards/norfolk/default.aspx
1. Names and contact information for NNSY LOTCs and/or the Facility Custodian will be provided by NNSY TPOC and/or CORs set forth elsewhere in this award document.”
Contract POC On Any Problems Concerning The Order, Please Contact Contract Specialist, Chad Godwin, Code 410, NAVSEA Contracting Department, Bldg. 1500, 2nd Floor, Portsmouth, VA 23709-5000, Telephone: (757) 396-8277.
IMPORTANT NOTE: In the event that service(s) cannot be accomplished as currently described within this PWS, the contractor MUST immediately notify the Contracting Officer, in writing, of the circumstances preventing successful completion. Failure to do so may alleviate the Government for payment of charges deemed to be outside of the scope of contract.
IMPORTANT NOTES
MARKINGS:
In addition to any other marking requirements found herein, the Contractor shall ensure that all equipment supplied under this contract shall bear the following information:
1. Contractor’s Name and Point of Contact information (name, tele# etc)
1. Government Contract Number; Contracting Officer’s information (name, tele# etc)
1. Vessel Name/Code
The above information should be prominently displayed in a manner that will withstand weather conditions under which this equipment may be exposed.
PICKUP/REMOVAL OF RENTAL UNITS:
Unless otherwise notified by NAVSEA Contracting, Norfolk Naval Shipyard, Code 410, rental/lease unit(s) shall be picked-up (removed) by Contractor on the morning after expiration of the established contract period of performance. In the event that this date occurs on a Saturday, Sunday, or a recognized Federal Holiday, the contractor may make the appropriate arrangements to pick-up the equipment on the first working day following the expiration of the contract at no additional cost to the Government.
If any difficulty is experienced in picking-up (removing) unit(s), the Contractor MUST immediately request the Contracting Officer’s direction by contacting Contract Specialist Chad Godwin, (phone # 757-396-8277, email: chad.godwin@navy.mil).
A Contractor’s failure to follow the above instructions regarding pick-up/removal of rental units will relieve the Government of any liability for further charges for the equipment.
REQUIREMENTS FOR ACCESS TO NAVY INSTALLATIONS
Commander, Navy Installations Command (CNIC), has established the Defense Biometric Identification System, (DBIDS), a standardized process for granting unescorted access privileges to vendors, contractors, suppliers and service providers not otherwise entitled to the issuance of a Common Access Card (CAC) who seek access to and can provide justification to enter Navy installations and facilities. Participation in the DBIDS is not mandatory, and if the Contractor chooses to not participate, the Contractor's personnel will have to obtain daily passes, be subject to daily mandatory vehicle inspection, and will have limited access to the installation. The Government will not be responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the DBIDS. Alternatively, if the vendor so chooses, it may voluntarily elect to obtain long-term credentials through enrollment, registration, background vetting, screening, issuance of credentials, and electronic validation of credentials. Further information regarding DBIDS can be found at www.cnic.navy.mil/om/dbids.html
NOTE: Bldg 276 TELEPHONE: 757-396-5815 (or 5095)
Contractor Unclassified Access to Federally Controlled Facilities, Sensitive Information, Information Technology (IT) Systems or Protected Health Information (July 2013)
Homeland Security Presidential Directive (HSPD)-12, requires government agencies to develop and implement Federal security standards for Federal employees and contractors. The Deputy Secretary of Defense Directive-Type Memorandum (DTM) 08-006 – “DoD Implementation of Homeland Security Presidential Directive – 12 (HSPD-12)” dated November 26, 2008 (or its subsequent DoD instruction) directs implementation of HSPD-12. This clause is in accordance with HSPD-12 and its implementing directives.
APPLICABILITY
This clause applies to contractor employees requiring physical access to any area of a federally controlled base, facility or activity and/or requiring access to a DoN or DoD computer/network/system to perform certain unclassified sensitive duties. This clause also applies to contractor employees who access Privacy Act and Protected Health Information, provide support associated with fiduciary duties, or perform duties that have been identified by DON as National Security Position, as advised by the command security manager. It is the responsibility of the responsible security officer of the command/facility where the work is performed to ensure compliance.
Each contractor employee providing services at a Navy Command under this contract is required to obtain a Department of Defense Common Access Card (DoD CAC). Additionally, depending on the level of computer/network access, the contract employee will require a successful investigation as detailed below.
ACCESS TO FEDERAL FACILITIES
Per HSPD-12 and implementing guidance, all contractor employees working at a federally controlled base, facility or activity under this clause will require a DoD CAC. When access to a base, facility or activity is required contractor employees shall in-process with the Navy Command’s Security Manager upon arrival to the Navy Command and shall out-process prior to their departure at the completion of the individual’s performance under the contract.
ACCESS TO DOD IT SYSTEMS
In accordance with SECNAV M-5510.30, contractor employees who require access to DoN or DoD networks are categorized as IT-I, IT-II, or IT-III. The IT-II level, defined in detail in SECNAV M-5510.30, includes positions which require access to information protected under the Privacy Act, to include Protected Health Information (PHI). All contractor employees under this contract who require access to Privacy Act protected information are therefore categorized no lower than IT-II. IT Levels are determined by the requiring activity’s Command Information Assurance Manager. Contractor employees requiring privileged or IT-I level access, (when specified by the terms of the contract) require a Single Scope Background Investigation (SSBI) which is a higher level investigation than the National Agency Check with Law and Credit (NACLC) described below. Due to the privileged system access, a SSBI suitable for High Risk public trusts positions is required. Individuals who have access to system control, monitoring, or administration functions (e.g. system administrator, database administrator) require training and certification to Information Assurance Technical Level 1, and must be trained and certified on the Operating System or Computing Environment they are required to maintain.
Access to sensitive IT systems is contingent upon a favorably adjudicated background investigation. When access to IT systems is required for performance of the contractor employee’s duties, such employees shall in-process with the Navy Command’s Security Manager and Information Assurance Manager upon arrival to the Navy command and shall out-process prior to their departure at the completion of the individual’s performance under the contract. Completion and approval of a System Authorization Access Request Navy (SAAR-N) form is required for all individuals accessing Navy Information Technology resources. The decision to authorize access to a government IT system/network is inherently governmental. The contractor supervisor is not authorized to sign the SAAR-N; therefore, the government employee with knowledge of the system/network access required or the COR shall sign the SAAR-N as the “supervisor”.
The SAAR-N shall be forwarded to the Navy Command’s Security Manager at least 30 days prior to the individual’s start date. Failure to provide the required documentation at least 30 days prior to the individual’s start date may result in delaying the individual’s start date.
When required to maintain access to required IT systems or networks, the contractor shall ensure that all employees requiring access complete annual Information Assurance (IA) training, and maintain a current requisite background investigation. The Contractor’s Security Representative shall contact the Command Security Manager for guidance when reinvestigations are required.
INTERIM ACCESS
The Navy Command's Security Manager may authorize issuance of a DoD CAC and interim access to a DoN or DoD unclassified computer/network upon a favorable review of the investigative questionnaire and advance favorable fingerprint results. When the results of the investigation are received and a favorable determination is not made, the contractor employee working on the contract under interim access will be denied access to the computer network and this denial will not relieve the contractor of his/her responsibility to perform.
DENIAL OR TERMINATION OF ACCESS
The potential consequences of any requirement under this clause including denial or termination of physical or system access in no way relieves the contractor from the requirement to execute performance under the contract within the timeframes specified in the contract. Contractors shall plan ahead in processing their employees and subcontractor employees. The contractor shall insert this clause in all subcontracts when the subcontractor is permitted to have unclassified access to a federally controlled facility, federally-controlled information system/network and/or to government information, meaning information not authorized for public release.
CONTRACTOR’S SECURITY REPRESENTATIVE
The contractor shall designate an employee to serve as the Contractor’s Security Representative. Within three work days after contract award, the contractor shall provide to the requiring activity’s Security Manager and the Contracting Officer, in writing, the name, title, address and phone number for the Contractor’s Security Representative. The Contractor’s Security Representative shall be the primary point of contact on any security matter. The Contractor’s Security Representative shall not be replaced or removed without prior notice to the Contracting Officer and Command Security Manager.
BACKGROUND INVESTIGATION REQUIREMENTS AND SECURITY APPROVAL PROCESS FOR CONTRACTORS ASSIGNED TO NATIONAL SECURITY POSITIONS OR PERFORMING SENSITIVE DUTIES Navy security policy requires that all positions be given a sensitivity value based on level of risk factors to ensure appropriate protective measures are applied. Navy recognizes contractor employees under this contract as Non-Critical Sensitive [ADP/IT-II] when the contract scope of work require physical access to a federally controlled base, facility or activity and/or requiring access to a DoD computer/network, to perform unclassified sensitive duties. This designation is also applied to contractor employees who access Privacy Act and Protected Health Information (PHI), provide support associated with fiduciary duties, or perform duties that have been identified by DON as National Security Positions. At a minimum, each contractor employee must be a US citizen and have a favorably completed NACLC to obtain a favorable determination for assignment to a non-critical sensitive or IT-II position. The NACLC consists of a standard NAC and a FBI fingerprint check plus law enforcement checks and credit check. Each contractor employee filling a non-critical sensitive or IT-II position is required to complete:
1. SF-86 Questionnaire for National Security Positions (or equivalent OPM investigative product)
1. Two FD-258 Applicant Fingerprint Cards (or an electronic fingerprint submission)
1. Original Signed Release Statements
Failure to provide the required documentation at least 30 days prior to the individual’s start date shall result in delaying the individual’s start date. Background investigations shall be reinitiated as required to ensure investigations remain current (not older than 10 years) throughout the contract performance period. The Contractor’s Security Representative shall contact the Command Security Manager for guidance when reinvestigations are required.
Regardless of their duties or IT access requirements ALL contractor employees shall in-process with the Navy Command’s Security Manager upon arrival to the Navy command and shall out-process prior to their departure at the completion of the individual’s performance under the contract. Employees requiring IT access shall also check-in and check-out with the Navy Command’s Information Assurance Manager. Completion and approval of a System Authorization Access Request Navy (SAAR-N) form is required for all individuals accessing Navy Information Technology resources. The SAAR-N shall be forwarded to the Navy Command’s Security Manager at least 30 days prior to the individual’s start date. Failure to provide the required documentation at least 30 days prior to the individual’s start date shall result in delaying the individual’s start date.
The contractor shall ensure that each contract employee requiring access to IT systems or networks complete annual Information Assurance (IA) training, and maintain a current requisite background investigation. Contractor employees shall accurately complete the required investigative forms prior to submission to the Navy Command Security Manager. The Navy Command’s Security Manager will review the submitted documentation for completeness prior to submitting it to the Office of Personnel Management (OPM). Suitability/security issues identified by the Navy may render the contractor employee ineligible for the assignment. An unfavorable determination made by the Navy is final (subject to SF-86 appeal procedures) and such a determination does not relieve the contractor from meeting any contractual obligation under the contract. The Navy Command’s Security Manager will forward the required forms to OPM for processing. Once the investigation is complete, the results will be forwarded by OPM to the DON Central Adjudication Facility (CAF) for a determination.
If the contractor employee already possesses a current favorably adjudicated investigation, the contractor shall submit a Visit Authorization Request (VAR) via the Joint Personnel Adjudication System (JPAS) or a hard copy VAR directly from the contractor’s Security Representative. Although the contractor will take JPAS “Owning” role over the contractor employee, the Navy Command will take JPAS "Servicing" role over the contractor employee during the hiring process and for the duration of assignment under that contract. The contractor shall include the IT Position Category per SECNAV M-5510.30 for each employee designated on a VAR. The VAR requires annual renewal for the duration of the employee’s performance under the contract.
BACKGROUND INVESTIGATION REQUIREMENTS AND SECURITY APPROVAL PROCESS FOR CONTRACTORS ASSIGNED TO OR PERFORMING NON-SENSITIVE DUTIES Contractor employee whose work is unclassified and non-sensitive (e.g., performing certain duties such as lawn maintenance, vendor services, etc ...) and who require physical access to publicly accessible areas to perform those duties shall meet the following minimum requirements:
1. Must be either a US citizen or a US permanent resident with a minimum of 3 years legal residency in the United States (as required by The Deputy Secretary of Defense DTM 08-006 or its subsequent DoD instruction) and
1. Must have a favorably completed National Agency Check with Written Inquiries (NACI) including a FBI fingerprint check prior to installation access.
To be considered for a favorable trustworthiness determination, the Contractor’s Security Representative must submit for all employees each of the following:
1. SF-85 Questionnaire for Non-Sensitive Positions
1. Two FD-258 Applicant Fingerprint Cards (or an electronic fingerprint submission)
1. Original Signed Release Statements
The contractor shall ensure each individual employee has a current favorably completed National Agency Check with Written Inquiries (NACI) or ensure successful FBI fingerprint results have been gained and investigation has been processed with OPM
Failure to provide the required documentation at least 30 days prior to the individual’s start date may result in delaying the individual’s start date.
* Consult with your Command Security Manager and Information Assurance Manager for local policy when IT-III (non-sensitive) access is required for non-US citizens outside the United States.
CONTRACTING OFFICER’S
REPRESENTATIVE:
COMMANDER
ATTN: TO BE NAMED AT TIME OF AWARD
NAVAL SEA SYSTEMS COMMAND NNSY
PORTSMOUTH, VA 23709
Telephone No.
Email Address:
NAVSEA Contracting Department
No instructions, either verbal or written, deviating from the terms and conditions of this order are effective or binding upon the government unless authorized and formalized by contractual documents issued by the contracting officer. On any problems concerning the order, please contact contract specialist, Chad Godwin, Naval Sea Systems Command (NAVSEA)/ Norfolk Naval Shipyard (NNSY) contracting department, bldg. 1500, 2nd floor, Portsmouth, Naval Sea Systems Command (NAVSEA)/ Norfolk Naval Shipyard (NNSY) 23709-5000, telephone: (757) 396-8277.
LIABILITY FOR GOVERNMENT PROPERTY UNDERGOING SERVICES, REPAIRS OR MODIFICATION
(a) As to Government property delivered to or picked up by the Contractor for servicing, repairs, modification or for services preliminary thereto, the Contractor shall be fully liable as an insurer for any loss of or damage to such equipment or property while in his care, custody, or control arising from any cause whatsoever and he agrees to reimburse the Government in full for his account. Unless otherwise specified in the contract schedule, the Government retains title to any and all scraps, salvage or other residual materials originating from said equipment or property.
(b) Subject to the “Disputes” clause of this contract, the Contracting Officer may make an equitable adjustment downward in the contract price, or in any monies due to the Contractor, to compensate the Government in whole or in part for loss or damage for which the Contractor is liable hereunder.
52.212-1 ADDENDA
ADDENDUM TO FAR 52.212-1
In addition to FAR 52.212-1, “Instructions to Offerors – Commercial Items,” and shall be received by NAVSEA NNSY Contracting Division no later than the closing date of the solicitation.
This requirement will be awarded using procedures under Federal Acquisition Regulation (FAR) Part 12 - Acquisition of Commercial Items and FAR Subpart 13, Simplified Acquisition Procedures.
1. Interested vendors may send the quotation to the Navy by replying via e-mail to chad.godwin@navy.mil;
1. Proposal content and instructions when submitting a quote shall consist of:
0. Technical Capability
0. Past Performance
0. Price Submission
0. Acknowledgement of any amendments
1. Technical Capability:
Each vendor shall provide proof/certification that they are in compliance with all of the required specifications, certifications, and qualifications outlined within the Statement of Work found herein. The information provided should be presented in such a manner as to enable the Government to make a thorough and complete evaluation and arrive at a sound determination as to whether or not the services proposed and described will satisfy the requirements of the Government as stated in this request for quote. Furthermore, contractors shall submit a completed Technical Capability Certifications Chart (Attachment C).
1. Past Performance:
Respondents shall demonstrate relevant past performance or affirmatively state they do not possess relevant past performance.
Relevant past performance is performance under contracts or efforts within the past five (5) years that is the same as or similar to, the scope, magnitude and complexity of the work described within this Solicitation.
In demonstration of such past performance, the quoter shall provide information on no more than three (3) previous contracts whose relevant effort was performed after 25 January 2013.
Yet-to-be performed work and work performed prior to 25 January 2013 will not be considered.
Quoters may submit performance data regarding current contract performance as long as a minimum of one (1) year of performance has been completed as of the closing date of this RFQ.
Quoters shall provide a detailed explanation demonstrating the relevance of the prior contract(s) to the requirements of the RFQ.
Past performance information shall be submitted in accordance with the following:
Past Performance Report Form (Attachment D).
The quoter should contact each past performance reference and request their completion of this form. Completed forms shall be forwarded electronically by the reference directly to the Contract Specialist (chad.godwin@navy.mil) on or before the closing date of the RFQ.
The Government reserves the right to consider report forms received after the closing of the RFQ. The Government may verify past performance information by contacting some or all of the references provided and may collect additional information through questionnaires, telephone interviews and existing data sources including (but not be limited to) the Contractor Performance Assessment Reporting System (CPARS).
The Government reserves the right to obtain information for use in the evaluation of past performance from any and all sources including sources outside of the Government. This information may include contracts other than those identified by the quoter.
Contractor Performance Customer Input Sheet / Questionnaire (Attachment E).
Contractor Performance Customer Input Sheet / Questionnaire (Attachment E) shall be forwarded by the quoter to each reference listed in the Past Performance Report Form (Attachment D) for completion.
The reference will then forward the completed report forms electronically to the individuals identified elsewhere in these instructions.
The due date for Attachments D and E is the closing date of the solicitation.
1. Price Submission:
Vendors shall submit one original signed copy of the completed Solicitation, and if applicable, executed copies of all Amendments, and executed Representations and Certifications. Signed copies may be submitted via electronic submittal. The address for electronic submittal via email is chad.godwin@navy.mil.
Quotes submitted shall be in accordance with the Schedule contained in the solicitation. Quotes shall be held firm for sixty (60) days
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
| CLIN |
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| 0001 |
| Destination |
| Government |
| Destination |
| Government |
| 0002 |
| Destination |
| Government |
| Destination |
| Government |
DELIVERY INFORMATION
| CLIN |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
| 0001 |
| POP 25-JAN-2018 TO |
24-JAN-2019
| N/A |
| NORFOLK NAVAL SHIPYARD |
SEE TECHNICAL POINTS OF CONTACT
PLACE OF PERFORMANCE
PORTSMOUTH VA 23709-5000
N42158
| 0002 |
| POP 25-JAN-2018 TO |
24-JAN-2019
| N/A |
| (SAME AS PREVIOUS LOCATION) |
N42158
CLAUSES INCORPORATED BY REFERENCE
| 52.203-3 |
| Gratuities |
| APR 1984 |
| 52.203-18 |
| Prohibition on Contracting With Entities That Require Certain Internal Confidentiality Agreements or Statements--Representation |
| JAN 2017 |
| 52.203-19 |
| Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements |
| JAN 2017 |
| 52.204-3 |
| Taxpayer Identification |
| OCT 1998 |
| 52.204-7 |
| System for Award Management |
| OCT 2016 |
| 52.204-9 |
| Personal Identity Verification of Contractor Personnel |
| JAN 2011 |
| 52.204-13 |
| System for Award Management Maintenance |
| OCT 2016 |
| 52.204-18 |
| Commercial and Government Entity Code Maintenance |
| JUL 2016 |
| 52.204-19 |
| Incorporation by Reference of Representations and Certifications. |
| DEC 2014 |
| 52.212-1 |
| Instructions to Offerors--Commercial Items |
| JAN 2017 |
| 52.217-5 |
| Evaluation Of Options |
| JUL 1990 |
| 52.223-2 |
| Affirmative Procurement of Biobased Products Under Service and Construction Contracts |
| SEP 2013 |
| 52.232-1 |
| Payments |
| APR 1984 |
| 52.232-39 |
| Unenforceability of Unauthorized Obligations |
| JUN 2013 |
| 52.232-40 |
| Providing Accelerated Payments to Small Business Subcontractors |
| DEC 2013 |
| 52.237-2 |
| Protection Of Government Buildings, Equipment, And Vegetation |
| APR 1984 |
| 52.247-34 |
| F.O.B. Destination |
| NOV 1991 |
| 252.201-7000 |
| Contracting Officer's Representative |
| DEC 1991 |
| 252.203-7000 |
| Requirements Relating to Compensation of Former DoD Officials |
| SEP 2011 |
| 252.203-7002 |
| Requirement to Inform Employees of Whistleblower Rights |
| SEP 2013 |
| 252.203-7005 |
| Representation Relating to Compensation of Former DoD Officials |
| NOV 2011 |
| 252.204-7003 |
| Control Of Government Personnel Work Product |
| APR 1992 |
| 252.204-7004 Alt A |
| System for Award Management Alternate A |
| FEB 2014 |
| 252.204-7005 |
| Oral Attestation of Security Responsibilities |
| NOV 2001 |
| 252.204-7009 |
| Limitations on the Use or Disclosure of Third-Party Contractor Reported Cyber Incident Information |
| OCT 2016 |
| 252.204-7012 |
| Safeguarding Covered Defense Information and Cyber Incident Reporting |
| OCT 2016 |
| 252.204-7015 |
| Notice of Authorized Disclosure of Information for Litigation Support |
| MAY 2016 |
| 252.205-7000 |
| Provision Of Information To Cooperative Agreement Holders |
| DEC 1991 |
| 252.209-7004 |
| Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism |
| OCT 2015 |
| 252.222-7007 |
| Representation Regarding Combating Trafficking in Persons |
| JAN 2015 |
| 252.223-7006 |
| Prohibition On Storage, Treatment, and Disposal of Toxic or Hazardous Materials |
| SEP 2014 |
| 252.223-7008 |
| Prohibition of Hexavalent Chromium |
| JUN 2013 |
| 252.225-7000 |
| Buy American--Balance Of Payments Program Certificate--Basic (Nov 2014) |
| NOV 2014 |
| 252.225-7001 |
| Buy American And Balance Of Payments Program-- Basic (Dec 2016) |
| DEC 2016 |
| 252.225-7002 |
| Qualifying Country Sources As Subcontractors |
| DEC 2016 |
| 252.225-7048 |
| Export-Controlled Items |
| JUN 2013 |
| 252.232-7003 |
| Electronic Submission of Payment Requests and Receiving Reports |
| JUN 2012 |
| 252.232-7010 |
| Levies on Contract Payments |
| DEC 2006 |
| 252.237-7010 |
| Prohibition on Interrogation of Detainees by Contractor Personnel |
| JUN 2013 |
| 252.243-7002 |
| Requests for Equitable Adjustment |
| DEC 2012 |
| 252.244-7000 |
| Subcontracts for Commercial Items |
| JUN 2013 |
| 252.246-7003 |
| Notification of Potential Safety Issues |
| JUN 2013 |
| 252.246-7004 |
| Safety of Facilities, Infrastructure, and Equipment for Military Operations |
| OCT 2010 |
| 252.246-7007 |
| Contractor Counterfeit Electronic Part Detection and Avoidance System |
| AUG 2016 |
| 252.246-7008 |
| Sources of Electronic Parts |
| OCT 2016 |
| 252.247-7023 |
| Transportation of Supplies by Sea |
| APR 2014 |
CLAUSES INCORPORATED BY FULL TEXT
52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JULY 2013)
(a) Definitions. As used in this provision--
Administrative proceeding means a non-judicial process that is adjudicatory in nature in order to make a determination of fault or liability (e.g., Securities and Exchange Commission Administrative Proceedings, Civilian Board of Contract Appeals Proceedings, and Armed Services Board of Contract Appeals Proceedings). This includes administrative proceedings at the Federal and State level but only in connection with performance of a Federal contract or grant. It does not include agency actions such as contract audits, site visits, corrective plans, or inspection of deliverables.
Federal contracts and grants with total value greater than $10,000,000 means--
(1) The total value of all current, active contracts and grants, including all priced options; and
(2) The total value of all current, active orders including all priced options under indefinite-delivery, indefinite-quantity, 8(a), or requirements contracts (including task and delivery and multiple-award Schedules).
Principal means an officer, director, owner, partner, or a person having primary management or supervisory responsibilities within a business entity (e.g., general manager; plant manager; head of a division or business segment; and similar positions).
(b) The offeror ( ) has ( ) does not have current active Federal contracts and grants with total value greater than $10,000,000.
(c) If the offeror checked “has” in paragraph (b) of this provision, the offeror represents, by submission of this offer, that the information it has entered in the Federal Awardee Performance and Integrity Information System (FAPIIS) is current, accurate, and complete as of the date of submission of this offer with regard to the following information:
(1) Whether the offeror, and/or any of its principals, has or has not, within the last five years, in connection with the award to or performance by the offeror of a Federal contract or grant, been the subject of a proceeding, at the Federal or State level that resulted in any of the following dispositions:
(i) In a criminal proceeding, a conviction.
(ii) In a civil proceeding, a finding of fault and liability that results in the payment of a monetary fine, penalty, reimbursement, restitution, or damages of $5,000 or more.
(iii) In an administrative proceeding, a finding of fault and liability that results in--
(A) The payment of a monetary fine or penalty of $5,000 or more; or
(B) The payment of a reimbursement, restitution, or damages in excess of $100,000.
(iv) In a criminal, civil, or administrative proceeding, a disposition of the matter by consent or compromise with an acknowledgment of fault by the Contractor if the proceeding could have led to any of the outcomes specified in paragraphs (c)(1)(i), (c)(1)(ii), or (c)(1)(iii) of this provision.
(2) If the offeror has been involved in the last five years in any of the occurrences listed in (c)(1) of this provision, whether the offeror has provided the requested information with regard to each occurrence.
(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management database via https://www.acquisition.gov (see 52.204-7).
(End of provision)
52.209-11 REPRESENTATION BY CORPORATIONS REGARDING DELINQUENT TAX LIABILITY OR A
FELONY CONVICTION UNDER ANY FEDERAL LAW (FEB 2016)
(a) As required by sections 744 and 745 of Division E of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235), and similar provisions, if contained in subsequent appropriations acts, the Government will not enter into a contract with any corporation that--
(1) Has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, where the awarding agency is aware of the unpaid tax liability, unless an agency has considered suspension or debarment of the corporation and made a determination that suspension or debarment is not necessary to protect the interests of the Government; or
(2) Was convicted of a felony criminal violation under any Federal law within the preceding 24 months, where the awarding agency is aware of the conviction, unless an agency has considered suspension or debarment of the corporation and made a determination that this action is not necessary to protect the interests of the Government.
(b) The Offeror represents that--
(1) It is [ ] is not [ ] a corporation that has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability; and
(2) It is [ ] is not [ ] a corporation that was convicted of a felony criminal violation under a Federal law within the preceding 24 months.
52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)
The Government will conduct a lowest price technically acceptable source selection process using the policies and procedures of FAR Subpart 12.6, Streamlined Procedures for Evaluation and Solicitation for Commercial Items. This acquisition process will be used in the evaluation and award of the contract.
(a) The Government will award a contract resulting from this solicitation to the responsible vendor whose quote conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate quotations:
1. Technical Submission (Technical Capability Certifications Chart per Attachment C)
1. Past Performance (Past Performance Report Form per Attachment D and Contractor Performance Customer Input Sheet / Questionnaire per Attachment E)
1. Price
Award(s) will be made for the technically acceptable item or combination of technically acceptable items that result in the lowest aggregate price to the Government.
The quoted prices (including one base year period and two one year option periods inclusive of six (6) potential, additional months under FAR 52.217-8 OPTION TO EXTEND SERVICES) of all technically acceptable items will be evaluated and the Contracting Officer shall assume, for the purpose of making multiple awards, that $500 would be the administrative cost to the Government for issuing and administering each contract award under this Request For Quotation.
Technical Acceptability: Will be determined by reviewing the technical capability certifications chart (per Attachment C) submitted for each item (or specification) to ensure that all of the technical requirements identified are met. Technical acceptability will be defined as follows:
Technical Ratings
| Rating |
| Description |
| Acceptable |
| Quote meets all of the requirements identified. |
| Unacceptable |
| Quote does not meet all of the requirements identified. |
Failure to meet any technical requirement for an item (or specification) will make the quotation unacceptable for that item (or that specification).
If an item (or specification) is technically unacceptable, its price will not be considered for award.
Past Performance:
Past performance will be evaluated based on relevancy.
For the Past Performance factor, the ratings identified in Tables 1 and 2 below, entitled “Past Performance Relevancy Ratings Table” and “Past Performance Evaluation Ratings,” respectively will be used for the assignment of ratings for relevancy and acceptability. Relevancy includes similarity in scope and magnitude.
Past Performance will be assessed as follows:
Evaluation will focus only on work experience already performed. Work yet-to-be performed, and work prior to the last 5 years, will not be considered. Subcontractor past performance will be given weight relative to the percentage of the work under the solicitation that the subcontractor is proposed to perform.
Past Performance Relevancy Ratings - Regarding relevancy, each offeror’s Past Performance submission will be evaluated to determine its scope and magnitude relative to the instant requirement. The following definitions will apply to this evaluation:
· Scope: Experience in the areas defined in the Statement of Work (SOW).
· Magnitude: The measure of the similarity of the dollar value of actually performed work that exists between the SOW and the Quoter’s contracts.
Past Performance Evaluation Ratings - The overall assigned rating for Past Performance will be the Past Performance Evaluation rating. The assignment of this rating will be based on the quality of the relevant past performance and will consider the currency and relevance of the information, source of the information, context of the data, and general trends in contractor’s performance. The quality of performance under a past performance reference that has no relevance to the instant requirement will not be considered in the overall assessment of Past Performance Acceptability. Offerors lacking relevant past performance history or for whom information on past performance is not available will not be evaluated favorably or unfavorably on past performance. Therefore, the offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability, “unknown” shall be considered “acceptable.” In order to verify past performance information and determine how well the offeror performed on past contracts, the Government may contact some or all of the references provided, as appropriate, and may collect information through questionnaires (i.e. the Past Performance Report Form), telephone interviews and existing data sources to include, but not limited to, Contractor Performance Assessment Reporting (CPARS). The Government reserves the right to obtain information for use in the evaluation of past performance from any and all sources including sources outside of the Government. This past performance information will be used for the evaluation of past performance.
NOTE: This evaluation and rating is separate and distinct from the Contracting Officer’s responsibility determination. The assessment of the offeror’s past performance will be used as a means of evaluating the relative capability of the offeror and other competitors to successfully meet the requirements of the Solicitation. If the Contracting Officer determines that an offeror’s Past Performance is “unacceptable,” that offeror’s entire proposal will no longer be considered for further competition or award.
Table 1
Past Performance Relevance Ratings
| Rating |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.