17-T-N063_Attachment_1_-_Technical_Capability_Certs.docx
DOCX document 19 KB Posted
- Attached to
- Rental of High Pressure Air Compressors
- Solicitation number
- N4215817TN063
About this file
Attachment (1) - Technical Capability Certification Chart
View the file
Other files
| File | Type | Posted |
|---|---|---|
| COMBINED_N42158-17-T-N063_AMEND._1.doc | DOC document | |
| 17-T-N063_Attachment_1_-_Technical_Capability_Certs.docx | DOCX document | |
| COMBINED_N42158-17-T-N063.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N42158-17-T-N063 ATTACHMENT (1)
TECHNICAL CAPABILITY CERTIFICATIONS
Vendor shall self-certify that the equipment and services proposed either meets or does not meet the Government’s minimum requirements specified in the associated Statement of Work (SOW) reference by initialing in the “YES” or “NO” area of the chart below. .
Any deviation to the Government specifications shall identified as such - A detailed explanation shall be provided for each negative response.
Note: In order to be considered for award, the table must be completed in its entirety and submitted with your quotation in accordance with the Instructions of Offerors.
| SOW Ref |
| Description |
| YES |
| NO |
CLIN 0001 – Statement of Work – SCOPE - Specifications set forth in Specification 1.1 through 1.3.1
CLIN 0001 – Statement of Work – GENERAL SPECIFICATIONS – Specifications set forth in Specifications 3.1.1 through 3.1.2
CLIN 0001 – Statement of Work – EQUIPMENT REQUIREMENTS – Specifications set forth in Specifications 3.2.1 through 3.2.7
CLIN 0001 – Statement of Work – CONSTRUCTION – Specifications set forth in Specifications 3.2.8 through 3.2.27
CLIN 0001 – Statement of Work – MARKINGS – Specification 3.3.1
CLIN 0001 – Statement of Work – APENDIX “A” INTERFACE
REQUIREMENTS
CLIN 0001 – Statement of Work – PERIOD OF PERFORMANCE (01 August 2017 through 17 March 2018)
CLIN 0001 – Statement of Work – CONTRACTOR REQUIREMENTS – Specifications set forth in Specifications 5.1 through 5.19
CLIN 0001 – Statement of Work – PREPERATION FOR DELIVERY - Specification 5.20.1
(Insert full name/title/ date) hereby certifies the equipment/services proposed meet or exceed all Government Minimum Specifications.
(Insert full name/title/ date) hereby certifies the equipment/services proposed meet or exceed the Government Minimum Specifications with the following deviations/exceptions:
(Provide separately detailed explanation for each SOW association)
File details come from the government source that posted it. Updated .