ATTACHMENT A - N42158-17-T-N027 - STATEMENT OF WORK

View the file

Other files

File Type Posted
N42158-17-T-N027.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Regenerative Air Dryer Specifications

(for Main Steam System dry air layup)

Attachment A – N42158-17-T-N027

STATEMENT OF WORK

See below for: TECHNICAL CAPABILITY/CONTRACTOR / RESPONSIBLITY CERTIFICATION STATEMENT

Vendor shall certify for equipment being quoted that his product meets each capability listed below by initialing at the bottom. In order to be considered for award, this must be completed and submitted with your quote.

PURPOSE OF REQUEST: SERVICE RENTAL FROM VENDOR TO PROVIDE ONE (1) GRADE “D” AIR COMPRESSOR AND ONE (1) REGENERATIVE AIR DRYER

LOCATION –NAVAL STATION NORFOLK, SUB FMB, USS BOISE (SSN-764)

Technical Capabilities Statement

Item #0001 Specifications for GRADE D AIR COMPRESSOR

Shall be provided with the following capabilities, features, and specifications:
YES
NO

· The GRADE D AIR COMPRESSOR shall deliver Grade “D” air per CGA G-7.1 or oil free air per ISO 8573-1 Class 0.

· The GRADE D AIR COMPRESSOR shall be oil free and utilize a rotary screw design. **An oil flooded rotary screw design with attached oil separateor is NOT ACCEPTABLE.

· The GRADE D AIR COMPRESSOR shall be a fixed speed design. **Variable speed design is NOT ACCEPTABLE.

· The GRADE D AIR COMPRESSOR shall have a gearbox casing which is designed to maintain a vacuum on its oil contents in order to prevent a potential of contamination of the air supply in the eent of a seal failure.

· The GRADE D AIR COMPRESSOR shall be electrical powered 230/460V and capable of starting and running on a 400 amp circuit breaker.

· The GRADE D AIR COMPRESSOR shall be furnished with a male 500 mcm Kamlock fitting.

· The GRADE D AIR COMPRESSOR shall provide 750 cubic feet per minute (CFM).

· The GRADE D AIR COMPRESSOR shall supply pressure at 125 Pounds per Square Inch (PSI).

· The GRADE D AIR COMPRESSOR shall be capable of running 24 hours/day, 7 days/week.

· The GRADE D AIR COMPRESSOR shall be provided with whip-check devices.

· The GRADE D AIR COMPRESSOR shall have electric moisture separator after coolers.

· The GRADE D AIR COMPRESSOR shall be a complete system.

· The GRADE D AIR COMPRESSOR shall be a free standing unit and have forklift slots (capable of being moved with a forklift).

· The GRADE D AIR COMPRESSOR shall not have in excess of 2,500 operatoing hours at the beginning of the rental period.

· The GRADE D AIR COMPRESSOR shall comply with Lifting and Rigging requirements as outlined in sections entitled “Requirement for Lifting of Equipment” and “Rigging Sketch Requirements” for contractor equipment at NNSY.

· The GRADE D AIR COMPRESSOR shall contain all identifying markings to include:

· Contractor’s name and point of contact information (name, tele#, etc)

· Government Contract Number; Contracting Officer’s information (name, tele#, etc)

· Vessel Name/Code

TECHNICAL CAPABILITY/CONTRACTOR RESPONSIBLITY CERTIFICATION

Vendor hereby certifies that his/her service meets or exceeds all specifications in this solicitation, in their entirety, with no exceptions.___________________(initials) Technical Capabilities Statement

Item #0002 Specifications for REGENERATIVE AIR DRYER

Shall be provided with the following capabilities, features, and specifications:
YES
NO

· The REGENERATIVE AIR DRYER shall provide an extra low dew point to -100(F.

· The REGENERATIVE AIR DRYER shall be capable of handling 850 cubic feet per minute (CFM) at 125 PSIG.

· The REGENERATIVE AIR DRYER shall be electrical powered 110/120VAC, 60HZ, 1 Phase.

· The REGENERATIVE AIR DRYER shall have a 2” NPT Outlet. **If unit is not equipped with 2” Male NPT Inlet and Outlet connections, contractor shall provide adapters as required to provide 2” Male NPT outlet connections on the unit.)

· The REGENERATIVE AIR DRYER be heatless design. **Heated or refrigerated regenerative air dryer designs are NOT ACCEPTABLE.

· The REGENERATIVE AIR DRYER shall be a complete system.

· The REGENERATIVE AIR DRYER shall be a free standing unit and have forklift slots (capable of being moved with a forklift).

· The REGENERATIVE AIR DRYER shall comply with Lifting and Rigging requirements as outlined in sections entitled “Requirement for Lifting of Equipment” and “Rigging Sketch Requirements” for contractor equipment at NNSY.

· The REGENERATIVE AIR DRYER shall contain all identifying markings to include:

· Contractor’s name and point of contact information (name, tele#, etc)

· Government Contract Number; Contracting Officer’s information (name, tele#, etc)

· Vessel Name/Code

CONTRACTOR RESPONSIBILITY:

1. Contractor personnel shall have the required security clearances to work at Norfolk Naval Shipyard (NNSY). All contracted personnel and truck drivers must be United States Citizens. Foreign Nationals will not be allowed on job site.

2. Equipment delivery and removal at no additional cost to the government.

3. Contractor shall provide all equipment (i.e. hose, filters, fittings, etc.) to connect temporary compressor and dryer.

4. Contractor is responsible for ensuring that all preventative maintenance is performed on equipment prior to delivery to the government as well as performing preventative maintenance as specified by the equipment’s manufacturer preventative maintenance schedule during the term of the rental period with the government. Contractor is responsible for all travel associated with preventative maintenance. Contractor is responsible for providing service technicians that are able to meet the badging and security requirements of Norfolk Naval Shipyard/NOB.

5. Contractor shall post contact information for service/repair of equipment directly on the rental equipment. Contact information must be packaged to withstand being located in an outdoor environment.

6. The contractor shall dispatch a representative in response to a service request to repair and/or replace an air compressor/air dryer within six (6) hours of notification by NNSY at no additional charge regardless if request is placed during normal business hours. Contractor is responsible for travel associated with repair of equipment. Contractor is responsible for providing service technicians that are able to meet the badging and security requirements of Norfolk Naval Shipyard/NOB.

7. Provide all parts requiring repair or replacement under circumstances of normal equipment wear and tear at no additional charge.

8. When the equipment is required to be removed to the contractor's facility for repair or replacement, the contractor shall be responsible for loss or damage from the time it leaves the government site until it is returned to the government.

9. Clean the unit(s) prior to delivery to the following requirements:

a. Unit(s) shall be cleaned to a degree of cleanliness that results in a surface free of grease, oil, flux, scale, dirt loose particles and any other matter foreign to the base metal. Adherent light superficial rust on steel surfaces, caused by short time exposure to the atmosphere, is acceptable.

b. For uncoated surfaces: Adherent corrosion products typical on surfaces of the type material being considered (e. g. flash rust on steel) are acceptable. Loose corrosion products are not acceptable and must be removed.

10. "Per FAR 22.102-1(a) entitled "Safety", Contractors are hereby informed that their employees or representatives present on property under Norfolk Naval Shipyard cognizance must follow Federal and State OSHA requirements and Norfolk Naval Shipyard OSHE Program Manual, NAVSHIPYDNORINST P5090.2 requirements or safety requirements for site specific location of the contract.

a. Contractors and Non-NNSY Government Agencies (NNGAs) are hereby informed that their employees or representatives present on property under Norfolk Naval Shipyard (NNSY) cognizance must adhere to Federal OSHA requirements for hazardous energy control IAW 29 CFR 1915.89 and must follow Hazardous Energy Control (HEC) procedures as identified in NAVSEA’s Occupational Safety, Health, and Environment Corporate Manual (OSHECM) Chapter 250 (latest revision), when performing work under NNSY contract. All HEC work to be performed by Contractors and NNGAs requires that NNSY Technical Points of Contact (TPOCs) and/or Contracting Officer’s Representatives (CORs) be notified of the HEC scope of work prior to starting work. Any changes or deviations in the initial scope of HEC work requires the NNSY TPOCs and/or CORs be informed of the change/deviation. Appendix 250.B-1 through B-3 of OSHECM Chapter 250 for multiple employer work identifies when Contractors and NNGAs are required to assign their Lockout/Tags-Plus Coordinator (LOTC) to coordinate HEC work with the cognizant NNSY LOTC. HEC locks shall be provided by the contractor or NNGA for their employees use. The HEC locks shall have red bodies with name labels or name tags affixed, identifying who installed the HEC lock(s) and a point of contact telephone number. HEC lock name lables and tags must be made of materials that will hold up to the environment to which they are exposed. HEC tags used for Tags-Plus HEC work shall be provided by the cognizant NNSY LOTC to the contractor or NNGA for their use if machinery, equipment, or systems (MES) cannot be locked out. OSHECM Chapter 250 Tags-Plus procedures will be strictly followed.

b. Contractors and NNGA’s may obtain electronic copies of OSHECM Chapter 250 (latest revision) and access the OSHA 1915.89 web site by using the following link to NNSY’s public access web site:

http://www.navsea.navy.mil/shipyards/norfolk/default.aspx

c. Names and contact information for NNSY LOTCs and/or the Facility Custodian will be provided by NNSY TPOC and/or CORs set forth elsewhere in this award document.”

GOVERNMENT RESPONSIBILITY:

1. Provide operators.

2. Perform basic maintenance.

a.

Monitor all gauges

3. Equipment movements within the shipyard/NOB.

4. Lost items and equipment damage beyond normal wear and tear.

OPTIONS:

1. Provide options to allow the Government to continue rental of the Grade “D” Compressor and Regenerative Air Dryer, with associated components, in one month increments. The Government reserves the right to extend the rental period for an additional six (6) months in 30 day increments. Rental extensions may terminate the rental of one or more units based on use by the Government. This charge will be prorated.

NOTES:

1. The units will be exposed to everyday weather, and saltwater air. It is the contractor's responsibility to provide any protective coverings for the units.

2. The government reserves the right to return one or all units at any time prior to the expiration of the rental period. The contractor agrees to prorate costs for the time the units are in use by NNSY only. The government agrees to give the contractor twenty-four (24) hours notice for return of units prior to expiration of rental period.

Requirement for Lifting of Equipment

1. The equipment shall be outfitted with suitable attachments for overhead lifting.

1.1 For multiple point lifts each lifting attachment shall be capable of supporting one half the gross weight of the equipment with a design factor of five to one based on ultimate strength.

1.2 For multiple point lifts each lifting attachment shall be designed to accept a standard anchor shackle (Federal Specification RR-C-271D, type IVA) which is capable of supporting one half the gross weight of the equipment. For single point lifts the lifting attachment shall e designed to accept a standard anchor shackle (Federal Specification RR-C-271D, type IVA) which is capable of supporting the gross weight of the equipment.

1.3 Design of the lifting attachments shall be such that the attachments and shackles are not side loaded more than 10 degree out of the plane. Lifting attachments shall be located such that the lifting slings do not contact the equipment, or alternatively a spreader beam certified to NAVFAC P-307 shall be provided. Whenever practical, the lifting attachments shall be located above the center of gravity, and such that the lifting slings do not contact the equipment housings.

1.4 Each lifting attachment shall be conspicuously marked in a contrasting color “Lift Here”. Letters shall have a minimum height of 1”.

2. The equipment shall be marked in a prominent location with the gross weight. Sand hoppers, tubs, or other containers that may contain material shall be marked with the empty and full weight (or alternatively the empty weight and working load limit). Marking shall be upper case letters of a contrasting color, with a minimum height of 1”. Marking shall include the units (i.e. “pounds”, “long tons”, etc.).

3. The equipment shall be provided with a lifting sketch/ rigging diagram that meets the requirements of enclosure (1).

3.1 The lifting sketch shall detail any specific requirements and / or configurations that must be meet prior to lifting (i.e. “engage swing lock”, Tilt mast back fully”, “Rotate lifting basket over side”, “Utilize 10’ minimum length slings”, Spreader beam required”, etc.

3.2 The lifting sketch shall include the locations of the center of gravity of the equipment (full fuel, hydraulic tanks, etc.), equipment model/manufacturer, and gross weight.

3.3 A copy of the lifting sketch shall be permanently posted on the equipment, and a copy shall be forwarded to code 714 (396-3345, 3346).

4. If specialized handling gear other than shackles, standard slings, or chain falls (i.e. spreader beams, special lift rigs, etc.), is required, the contractor shall furnish it. This handling gear shall be provided certified in accordance with NAVFAC P-307, with written documentation of proof testing

Rigging Sketch Requirements Rigging sketches, as a minimum, shall identify the following:

1. The Weight of the load.

2. The location of the center of gravity.

3. The minimum crane capacity.

4. The minimum capacity/ length of slings.

5. The minimum capacity of other standard rigging gear.

6. The attachment (lifting) points for the load.

(a) The attachment points for multiple leg lifts shall be sized such that each attachment point can support half the load’s weight at the anticipated lift angle.

(b) The attachment point for single leg lifts shall be sized such that the attachment point can support the entire load’s weight.

7. Limitations on allowable orientation for any parts making up the lifting assembly.

8. For single leg vertical lifts using twisted rope (wire or synthetic), two parallel ropes each capable of supporting the entire load alone shall be required unless a method is used to prevent unlaying the rope.

9. A minimum D/d ratio of one shall be required where wire rope slings pass over any object, or in the eyes of wire rope slings. A minimum D/d ratio of two shall be required where synthetic rope slings pass over any object, or in the eyes of synthetic rope slings.

(a) “D” represents the diameter of the object the sling passes over.

(b) “d” represents the diameter of the sling.

(c) Table 14-3 of NAVFAC P-307 lists efficiency factors at various D/d ratios.

10. Components in each handling assembly shall be sized based on the worst case distribution of loads.

11. When non-standard gear is required (i.e. round stock lifting bars) written instructions shall be provided that ensure:

(a) The proper material is being used.

(b) The item is certified IAW NAVFAC P-307.

Any special requirements or dimensions are followed to ensure that engineering assumptions are met (i.e. eccentricity).

ADDITIONAL INFORMATION

Homeland Security Presidential Directive (HSPD)-12, requires government agencies to develop and implement Federal security standards for Federal employees and contractors. The Deputy Secretary of Defense Directive-Type Memorandum (DTM) 08-006 – “DoD Implementation of Homeland Security Presidential Directive – 12 (HSPD-12)” dated November 26, 2008 (or its subsequent DoD instruction) directs implementation of HSPD-12. This clause is in accordance with HSPD-12 and its implementing directives.

APPLICABILITY

This clause applies to contractor employees requiring physical access to any area of a federally controlled base, facility or activity and/or requiring access to a DoN or DoD computer/network/system to perform certain unclassified sensitive duties. This clause also applies to contractor employees who access Privacy Act and Protected Health Information, provide support associated with fiduciary duties, or perform duties that have been identified by DON as National Security Position, as advised by the command security manager. It is the responsibility of the responsible security officer of the command/facility where the work is performed to ensure compliance.

Each contractor employee providing services at a Navy Command under this contract is required to obtain a Department of Defense Common Access Card (DoD CAC). Additionally, depending on the level of computer/network access, the contract employee will require a successful investigation as detailed below.

ACCESS TO FEDERAL FACILITIES

Per HSPD-12 and implementing guidance, all contractor employees working at a federally controlled base, facility or activity under this clause will require a DoD CAC. When access to a base, facility or activity is required contractor employees shall in-process with the Navy Command’s Security Manager upon arrival to the Navy Command and shall out-process prior to their departure at the completion of the individual’s performance under the contract.

ACCESS TO DOD IT SYSTEMS

In accordance with SECNAV M-5510.30, contractor employees who require access to DoN or DoD networks are categorized as IT-I, IT-II, or IT-III. The IT-II level, defined in detail in SECNAV M-5510.30, includes positions which require access to information protected under the Privacy Act, to include Protected Health Information (PHI). All contractor employees under this contract who require access to Privacy Act protected information are therefore categorized no lower than IT-II. IT Levels are determined by the requiring activity’s Command Information Assurance Manager. Contractor employees requiring privileged or IT-I level access, (when specified by the terms of the contract) require a Single Scope Background Investigation (SSBI) which is a higher level investigation than the National Agency Check with Law and Credit (NACLC) described below. Due to the privileged system access, a SSBI suitable for High Risk public trusts positions is required. Individuals who have access to system control, monitoring, or administration functions (e.g. system administrator, database administrator) require training and certification to Information Assurance Technical Level 1, and must be trained and certified on the Operating System or Computing Environment they are required to maintain.

Access to sensitive IT systems is contingent upon a favorably adjudicated background investigation. When access to IT systems is required for performance of the contractor employee’s duties, such employees shall in-process with the Navy Command’s Security Manager and Information Assurance Manager upon arrival to the Navy command and shall out-process prior to their departure at the completion of the individual’s performance under the contract. Completion and approval of a System Authorization Access Request Navy (SAAR-N) form is required for all individuals accessing Navy Information Technology resources. The decision to authorize access to a government IT system/network is inherently governmental. The contractor supervisor is not authorized to sign the SAAR-N; therefore, the government employee with knowledge of the system/network access required or the COR shall sign the SAAR-N as the “supervisor”.

The SAAR-N shall be forwarded to the Navy Command’s Security Manager at least 30 days prior to the individual’s start date. Failure to provide the required documentation at least 30 days prior to the individual’s start date may result in delaying the individual’s start date.

When required to maintain access to required IT systems or networks, the contractor shall ensure that all employees requiring access complete annual Information Assurance (IA) training, and maintain a current requisite background investigation. The Contractor’s Security Representative shall contact the Command Security Manager for guidance when reinvestigations are required.

INTERIM ACCESS

The Navy Command's Security Manager may authorize issuance of a DoD CAC and interim access to a DoN or DoD unclassified computer/network upon a favorable review of the investigative questionnaire and advance favorable fingerprint results. When the results of the investigation are received and a favorable determination is not made, the contractor employee working on the contract under interim access will be denied access to the computer network and this denial will not relieve the contractor of his/her responsibility to perform.

DENIAL OR TERMINATION OF ACCESS

The potential consequences of any requirement under this clause including denial or termination of physical or system access in no way relieves the contractor from the requirement to execute performance under the contract within the timeframes specified in the contract. Contractors shall plan ahead in processing their employees and subcontractor employees. The contractor shall insert this clause in all subcontracts when the subcontractor is permitted to have unclassified access to a federally controlled facility, federally-controlled information system/network and/or to government information, meaning information not authorized for public release.

CONTRACTOR’S SECURITY REPRESENTATIVE

The contractor shall designate an employee to serve as the Contractor’s Security Representative. Within three work days after contract award, the contractor shall provide to the requiring activity’s Security Manager and the Contracting Officer, in writing, the name, title, address and phone number for the Contractor’s Security Representative. The Contractor’s Security Representative shall be the primary point of contact on any security matter. The Contractor’s Security Representative shall not be replaced or removed without prior notice to the Contracting Officer and Command Security Manager.

BACKGROUND INVESTIGATION REQUIREMENTS AND SECURITY APPROVAL PROCESS FOR CONTRACTORS ASSIGNED TO NATIONAL SECURITY POSITIONS OR PERFORMING SENSITIVE DUTIES

Navy security policy requires that all positions be given a sensitivity value based on level of risk factors to ensure appropriate protective measures are applied. Navy recognizes contractor employees under this contract as Non-Critical Sensitive [ADP/IT-II] when the contract scope of work require physical access to a federally controlled base, facility or activity and/or requiring access to a DoD computer/network, to perform unclassified sensitive duties. This designation is also applied to contractor employees who access Privacy Act and Protected Health Information (PHI), provide support associated with fiduciary duties, or perform duties that have been identified by DON as National Security Positions. At a minimum, each contractor employee must be a US citizen and have a favorably completed NACLC to obtain a favorable determination for assignment to a non-critical sensitive or IT-II position. The NACLC consists of a standard NAC and a FBI fingerprint check plus law enforcement checks and credit check. Each contractor employee filling a non-critical sensitive or IT-II position is required to complete:

· SF-86 Questionnaire for National Security Positions (or equivalent OPM investigative product)

· Two FD-258 Applicant Fingerprint Cards (or an electronic fingerprint submission)

· Original Signed Release Statements

Failure to provide the required documentation at least 30 days prior to the individual’s start date shall result in delaying the individual’s start date. Background investigations shall be reinitiated as required to ensure investigations remain current (not older than 10 years) throughout the contract performance period. The Contractor’s Security Representative shall contact the Command Security Manager for guidance when reinvestigations are required.

Regardless of their duties or IT access requirements ALL contractor employees shall in-process with the Navy Command’s Security Manager upon arrival to the Navy command and shall out-process prior to their departure at the completion of the individual’s performance under the contract. Employees requiring IT access shall also check-in and check-out with the Navy Command’s Information Assurance Manager. Completion and approval of a System Authorization Access Request Navy (SAAR-N) form is required for all individuals accessing Navy Information Technology resources. The SAAR-N shall be forwarded to the Navy Command’s Security Manager at least 30 days prior to the individual’s start date. Failure to provide the required documentation at least 30 days prior to the individual’s start date shall result in delaying the individual’s start date.

The contractor shall ensure that each contract employee requiring access to IT systems or networks complete annual Information Assurance (IA) training, and maintain a current requisite background investigation. Contractor employees shall accurately complete the required investigative forms prior to submission to the Navy Command Security Manager. The Navy Command’s Security Manager will review the submitted documentation for completeness prior to submitting it to the Office of Personnel Management (OPM). Suitability/security issues identified by the Navy may render the contractor employee ineligible for the assignment. An unfavorable determination made by the Navy is final (subject to SF-86 appeal procedures) and such a determination does not relieve the contractor from meeting any contractual obligation under the contract. The Navy Command’s Security Manager will forward the required forms to OPM for processing. Once the investigation is complete, the results will be forwarded by OPM to the DON Central Adjudication Facility (CAF) for a determination.

If the contractor employee already possesses a current favorably adjudicated investigation, the contractor shall submit a Visit Authorization Request (VAR) via the Joint Personnel Adjudication System (JPAS) or a hard copy VAR directly from the contractor’s Security Representative. Although the contractor will take JPAS “Owning” role over the contractor employee, the Navy Command will take JPAS "Servicing" role over the contractor employee during the hiring process and for the duration of assignment under that contract. The contractor shall include the IT Position Category per SECNAV M-5510.30 for each employee designated on a VAR. The VAR requires annual renewal for the duration of the employee’s performance under the contract.

BACKGROUND INVESTIGATION REQUIREMENTS AND SECURITY APPROVAL PROCESS FOR CONTRACTORS ASSIGNED TO OR PERFORMING NON-SENSITIVE DUTIES

Contractor employee whose work is unclassified and non-sensitive (e.g., performing certain duties such as lawn maintenance, vendor services, etc ...) and who require physical access to publicly accessible areas to perform those duties shall meet the following minimum requirements:

· Must be either a US citizen or a US permanent resident with a minimum of 3 years legal residency in the United States (as required by The Deputy Secretary of Defense DTM 08-006 or its subsequent DoD instruction) and

· Must have a favorably completed National Agency Check with Written Inquiries (NACI) including a FBI fingerprint check prior to installation access.

To be considered for a favorable trustworthiness determination, the Contractor’s Security Representative must submit for all employees each of the following:

· SF-85 Questionnaire for Non-Sensitive Positions

· Two FD-258 Applicant Fingerprint Cards (or an electronic fingerprint submission)

· Original Signed Release Statements

The contractor shall ensure each individual employee has a current favorably completed National Agency Check with Written Inquiries (NACI) or ensure successful FBI fingerprint results have been gained and investigation has been processed with OPM

Failure to provide the required documentation at least 30 days prior to the individual’s start date may result in delaying the individual’s start date.