Redacted_Use_of_Other_than_Full_and_Open_for_JOHN LEWIS ECDIS_Redacted.pdf

PDF 148 KB Posted

Attached to
USNS JOHN LEWIS ECDIS Troubleshoot
Solicitation number
N4044325Q0050
Issued by

About this file

This document is a Justification for Other Than Full and Open Competition (JOFOC) memorandum for a sole-source procurement with Raytheon to troubleshoot and service the Electronic Chart Display and Information System (ECDIS) for the USNS JOHN LEWIS. The justification cites critical ship equipment as the primary reason for limiting competition, indicating that the ECDIS is essential equipment where failure could pose a hazard to the ship, crew, or environment. The procurement is under the simplified acquisition threshold and will be conducted with Raytheon as the sole source vendor, with the intended use being to troubleshoot and service the ECDIS system.

The document emphasizes the critical nature of the equipment by checking boxes for both "Critical Ship Equipment" and "Form, Fit, and Function" categories, suggesting the replacement or service parts must be directly compatible with existing ship systems. While specific dollar value and precise performance dates are redacted, the document is dated 6MAR25 and appears to be part of an urgent repair or maintenance requirement for the USNS JOHN LEWIS, processed through the Department of the Navy's Military Sealift Command.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 Ver 2.0 (01 June 2018)

Date ___: ______________

MEMORANDUM

Subj: USE OF OTHER THAN FULL AND OPEN COMPETITION FOR AN ACQUISITION UNDER

THE SIMPLIFIED ACQUISITION THRESHOLD

Ref: (a) PR Number(s): ______

I. BACKGROUND:

1. In considering the references, FAR 13.106-1(b)(1)(i) states for purchases not exceeding the simplified acquisition threshold, Contacting Officers may solicit from one source if the Contracting Officer determines that, under the circumstances of the contract action, only one source is reasonably available (e.g., urgency, exclusive licensing, brand-name, or industrial mobilization).

2. As required by FAR 13.106-3(b)(3)(i), this memorandum explains the absence of competition for this acquisition because only one source will be solicited for this requirement (or for a portion of the requirement) and the requirement is not expected to exceed the simplified acquisition threshold.

II. DESCRIPTION OF ITEM OR SERVICE:

1. Provide a description of the item or service required, to include

a) the name of the required source or brand name

b) the required delivery date/period of performance and

c) its intended use.

2. List the source(s) or known vendor(s) who are able to provide the above described item or service.

III. THE DETERMINATION FOR USE OF OTHER THAN FULL AND OPEN COMPETITION IS BASED

ON THE FOLLOWING (select all that apply):

A. _____ Only one responsible source (select all that apply):

6MAR25

Raytheon

Troubleshoot and service ECDIS

Raytheon

2 Ver 2.0 (01 June 2018)

1. _____ RESTRICTIVE RIGHTS: the source has established proprietary rights, limited rights in data, patent rights, copyrights, or secret processes in the item or service.

a. Explain what is subject to the restrictive rights.

b. If drawings are included, who is identified as “owning” the drawings.

2. _____ EXCLUSIVE LICENSING AGREEMENTS: The item or service is only available from the Original Equipment Manufacturer (OEM), or there is ONLY ONE authorized distributor or technical representative for the OEM.

a. Identify the OEM and explain the circumstances surrounding why the item or service is only available from the OEM.

b. Identify the distributor / authorized technical representative for the item or service.

Provide evidence of the exclusive licensing agreement as an attachment to this document.

(NOTE: If there is more than one distributor / authorized technical representative, then use Part B – Brand Name.)

3. _____ OTHER REASON:

a. _____ CRITICAL SHIP EQUIPMENT: The required item is critical ship equipment, the failure of which poses a hazard to the ship, the crew or the environment.

i. SMS Procedure Number: _________

b. _____ STANDARDIZATION / BRAND NAME: Per MSCs standardization initiative, only the specified make/model of the equipment/parts will satisfy the Government’s needs for additional units or replacement items.

i. Identify Make / Model Number(s): ___________________

ii. Identify other vessels with this Make / Model:

c. _____ FORM, FIT, AND FUNCTION: Item is direct replacement parts / components for existing equipment and must be compatible in terms of form, fit, and function with existing equipment / configurations.

X

X

3 Ver 2.0 (01 June 2018)

i. Identify Make / Model of existing equipment:

ii. Describe how the equipment must be compatible with the existing configuration.

d. _____ OTHER:

4. _____ UNUSUAL AND COMPELLING URGENCY: The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits. Urgent requirements are supplies or services that will result in work stoppage, or are mission critical and the routine processing time would injure the Government. The determination that the procurement for the above is an urgent and compelling requirement is based on the following:

a. Date on which the requirement was identified: ______________________________

b. Required delivery date / Period of Performance: _____________________________

c. If the difference between a. and b. is more than one week, explain the delay in submitting t he requirement.

d. Estimated production lead time: ______________________________

e. Explanation of why delivery / commencement of services by the date required is needed: (explain the impact to the mission, any special circumstances or conditions, etc.)

f. CASREP Number: _________________________________________

IV. ANTICIPATED DOLLAR VALUE OF PROCURMENT: __________

4 Ver 2.0 (01 June 2018)

V. CERTIFICATIONS AND APPROVALS:

Technical / Requirement Certification: I certify that the facts and representation under my cognizance which are included in this justification are complete and accurate to the best of my knowledge and belief.

File details come from the government source that posted it. Updated .