N4044325Q0015 SSJ_Redacted.pdf
PDF 237 KB Posted
- Attached to
- Notice of Intent to Sole Source
- Solicitation number
- Not on record
About this file
This document appears to be a Justification and Approval (J&A) for a sole source procurement. It indicates that the Government intends to award a sole source contract to Everett Ship Repair LLC for the repair of the STBD FR 04 aboard USNS MILLINOCKET, as the ship is currently located in their shipyard. The J&A states that this is an urgent and compelling requirement, with a specific required delivery date. It also notes that this is part of the Military Sealift Command's standardization initiative, and that the specified item/repair is a critical ship equipment. The anticipated dollar value of the procurement is included, but no other pricing details are provided. There are no indications of set-asides or the involvement of any other federal agencies besides the Military Sealift Command.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2 Ver 2.0 (01 June 2018)
b. If drawings are included, who is identified as “owning” the drawings.
2. _____ EXCLUSIVE LICENSING AGREEMENTS: The item or service is only available from the Original Equipment Manufacturer (OEM), or there is ONLY ONE authorized distributor or technical representative for the OEM.
a. Identify the OEM and explain the circumstances surrounding why the item or service is only available from the OEM.
b. Identify the distributor / authorized technical representative for the item or service.
Provide evidence of the exclusive licensing agreement as an attachment to this document.
(NOTE: If there is more than one distributor / authorized technical representative, then use Part B – Brand Name.)
3. _____ OTHER REASON:
a. _____ CRITICAL SHIP EQUIPMENT: The required item is critical ship equipment, the failure of which poses a hazard to the ship, the crew or the environment.
i. SMS Procedure Number: ___________________________
b. _____ STANDARDIZATION / BRAND NAME: Per MSCs standardization initiative, only the specified make/model of the equipment/parts will satisfy the Government’s needs for additional units or replacement items.
i. Identify Make / Model Number(s): ___________________
ii. Identify other vessels with this Make / Model:
c. _____ FORM, FIT, AND FUNCTION: Item is direct replacement parts / components for existing equipment and must be compatible in terms of form, fit, and function with existing equipment / configurations.
i. Identify Make / Model of existing equipment:
3 Ver 2.0 (01 June 2018)
ii. Describe how the equipment must be compatible with the existing configuration.
d. _____ OTHER:
4. _____ UNUSUAL AND COMPELLING URGENCY: The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits. Urgent requirements are supplies or services that will result in work stoppage, or are mission critical and the routine processing time would injure the Government. The determination that the procurement for the above is an urgent and compelling requirement is based on the following:
a. Date on which the requirement was identified: ______________________________
b. Required delivery date / Period of Performance: _____________________________
c. If the difference between a. and b. is more than one week, explain the delay in submitting t he requirement.
d. Estimated production lead time: ______________________________
e. Explanation of why delivery / commencement of services by the date required is needed: (explain the impact to the mission, any special circumstances or conditions, etc.)
f. CASREP Number: _________________________________________
IV. ANTICIPATED DOLLAR VALUE OF PROCURMENT: _
4 Ver 2.0 (01 June 2018)
V. CERTIFICATIONS AND APPROVALS:
Technical / Requirement Certification: I certify that the facts and representation under my cognizance which are included in this justification are complete and accurate to the best of my knowledge and belief.
File details come from the government source that posted it. Updated .