USNS YUKON (T-AO 202)

AUXILIARY MACHINERY

ITEM NO. 502

CATEGORY “A”

No.1 and 2 PTO, No. 3 SSDG, and SYN COMP Bearing Inspection (011-0043)

1.0 ABSTRACT:

1.1 Provide the services of a RENK Bearing Field Service Technician to inspect ten (10) bearings associated with No.1 and 2 PTO’s, NO. 3 SSDG and SYNC Compensators.

2.0 REFERENCE/ENCLOSURES:

2.1 References

2.1.1 NAVSEA Tech Manual T9311-A9-MMC-020, "PTO Generator." (Available Onboard)

3.0 ITEM LOCATION/DESCRIPTION/QUANTITYU

3.1 Location:

3.1.1 Main Engine Room (5-60-0), 25-ft flat lower engine room.

3.1.2 Generator Flat

3.2 Description/Quantity:

3.2.1 Four (4) PTO Generator Bearings (No.1 and 2)

3.2.2 Two (2) SSDG Bearings (No. 3)

3.2.3 Four (4) Sync Compensator Bearings

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES:

4.1 Government Furnished Equipment: None

4.2 Government Furnished Material: None

4.3 Government Furnished Services:

4.3.1 RENK Tech Rep

5.0 NOTES:

5.1 The contractor and all subcontractors, regardless of tier must consult the General Technical Requirements (GTR’s) to determine applicability to this work item. In performance of this work item the contractor and all subcontractors must comply with the requirements of all applicable GTR’s including but not limited to GTR nos. 1-7, 22, 23, 25 and 29.

5.2 The contractor and all subcontractors regardless of tier are advised to review all other work items in this specification, including but not limited to work item 201, to determine their effect on the work required under this work item. Many of the definitions relating to performance of this work item are found in item No. 001.

6.0 QUALITY ASSURANCE REQUIREMENTS:

6.1 All work shall be performed to the satisfaction of the attending ABS Surveyor, Port Engineer, Chief Engineer and the manufacturer’s technical service representative.

7.0 STATEMENT OF WORK REQUIRED:

7.1 Provide an OEM tech rep to oversee the removal, inspection, reinstallation and testing of all bearings listed in para 3.2.

7.2 Gov’t will provide all labor, material and equipment to rig, unrig, stage, un-stage, remove and replace all parts and interference's necessary to accomplish this work item.

7.3 Replace forward and aft seals on each bearing.

7.4 Upon completion of all work manufacturer’s rep shall submit a completion report stating conditions “as found” and “as released.” Report shall include all measurements taken and a listing of all parts/components replaced.

7.5 Inspection/Testing

7.5.1 In the presence of the MSCREP and the Chief Engineer conduct a full and complete operational test of all equipment associated with the bearing inspection.

7.6 Manufacturer’s Rep:

7.6.1 Mr. Peter Horsord

RENK Corporation 304 Tucapau Road, Duncan SC 29334 Tel: 864-433-0069

7.7 Preparation of Drawing: None

8.0 GENERAL REQUIREMENTS:

8.1 None additional