Attachment B - 7-20-2020 Site Visit Sheet.pdf
PDF 364 KB Posted
- Attached to
- Repairs to Substation 7 Federal contract opportunity
- Solicitation number
- N4008520B2556
About this file
This document contains a site visit sign-in sheet from a pre-bid meeting for a federal contract opportunity to perform repairs to Substation 7 at the Portsmouth Naval Shipyard in Kittery, Maine. Representatives from several construction and engineering firms attended the site walk, including P&S Construction, Inc., CCI, Shapleigh Construction, Bourassa Construction, CHASCO, Envirovantage, and GVC. The related federal contract opportunity was solicitation number N4008520B2556 from the Department of the Navy Naval Facilities Engineering Command to update several electrical components in Substation 7 and make minor repairs to Building 165 for approximately $2 million. Attendance at the pre-bid site visit was mandatory for firms interested in bidding on the contract work.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Opening Results.pdf | ||
| Attachment E _ ES101_RFC_REVB_MH Stamped (002).pdf | ||
| Attachment F _ Substation 7_Specifications_TOC_REVB.pdf | ||
| Amendment 0002.pdf | ||
| Attachment I _ PPI Responses (2).pdf | ||
| Attachment H _ Cover Sheet_RFC_REVB.pdf | ||
| Attachment G _ Substation 7_Specifications_33 71 02_REVB.pdf | ||
| Attachment D - Revised Bid Form.pdf | ||
| Attachment A - PPI Responses.pdf | ||
| Attachment C - Credere Associates Hazardous Materials Survey 10-23-19.pdf | ||
| Amendment 001 N4008520B2556.pdf | ||
| Attach 1 Bid Form.pdf | ||
| Attach 7_B165 Mitigation Requirements.pdf | ||
| Base Access Pass Registration 5512.pdf | ||
| Attach 6_ISRL.pdf | ||
| Attach 5 eOMSI.pdf | ||
| Attach 3 Submittal Reg.pdf | ||
| Attach 2 Specifications.pdf | ||
| Attach 4 Drawings.pdf | ||
| DBIDS Access Request From 5500.docx | DOCX document | |
| Scope of Work.pdf | ||
| Solicitation N4008520B2556.pdf |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
20 July 2020
Public Works Department, Maine
SITE WALK SIGN-IN SHEET – Substation 7 Repairs
NAME/TITLE ORGANIZATION SIGNATURE
Keith Wyeth/ Design Manager PWD Maine ATTENDED
Brady Hammond / Contract Specialist
PWD Maine ATTENDED
Aaron Belanger/ET PWD Maine ATTENDED
Dawn Dearborn Tantara Corporation DID NOT ATTEND
Christopher Pereira Tantara Corporation DID NOT ATTEND
Chris Kacandes Nadiad ATTENDED
James Pencavage Benaka, Inc. ATTENDED
Terrence Conroy Millstone Masonry ATTENDED
Mark Brockelman Brookstone Builders ATTENDED
Mel Porter CCI ATTENDED
Ralph Snow CCI ATTENDED
Jeff Eaton CCI ATTENDED
Steve Jennison CCI ATTENDED
Alan Mercier RPF Environmental DID NOT ATTEND
Jeff Verreault CCB DID NOT ATTEND
Ken Heidebrink CCB ATTENDED
Jim Casey Yates ATTENDED
Noah McDaniel Shapleigh Construction ATTENDED
Glen Rogers Shapleigh Construction DID NOT ATTEND
Peter Hayden Bourassa Construction ATTENDED
Tim Collins Bourassa Construction ATTENDED
Greg Morneault CHASCO DID NOT ATTEND
John Iafolla CHASCO DID NOT ATTEND
Paras A Patel P&S Construction, Inc. ATTENDED
Harsh J Patel P&S Construction, Inc. DID NOT ATTEND
Dhawak K Patel P&S Construction, Inc. DID NOT ATTEND
Scott Sansoucie Envirovantage ATTENDED
Mike Valenti Sr. GVC ATTENDED
Mike Valenti Jr. GVC ATTENDED
File details come from the government source that posted it. Updated .