About this file

This submittal register outlines 693 submittal items required for a project providing electrical component updates and minor building repairs at a naval shipyard. Key submittals include: preconstruction plans for accident prevention, scheduling, and waste management; shop drawings for electrical components, structural upgrades, and monorail systems; product data sheets for materials, equipment, and coatings; testing reports for electrical systems and structures; and certificates of compliance for qualified personnel, training programs, and component certifications. The register groups submittals by specification section and type, identifies required paragraphs, and includes fields for review actions and status to facilitate tracking throughout the project.

View the file

Other files for this federal contract opportunity

Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(a) (b) (c) (e)

Line Activity # Transmittal # Specification Section SD # Submittal Description Item Submitted Paragraph #

1 01 11 00 1 Preconstruction Submittals Salvage Plan 1.5

2 01 14 00.00 22 1 Preconstruction Submittals List of Contact Personnel 1.4.1

3 01 20 00.00 22 1 Preconstruction Submittals Schedule of Prices 1.3

4 01 30 00.00 22 1 Preconstruction Submittals NAVFAC Red Zone Checklist 1.6

5 01 30 00.00 22 1 Preconstruction Submittals NAVFAC PWD ME Follow-on Services List 1.6

6 01 31 23.13 22 1 Preconstruction Submittals List of Contractor's Personnel 1.4.2

7 01 32 16.00 20 1 Preconstruction Submittals Construction Schedule 1.2

8 01 32 16.00 20 7 Certificates Monthly Updates 1.4

9 01 33 00 1 Preconstruction Submittals Submittal Register 1.7

10 01 33 10.05 20 1 Preconstruction Submittals Consolidated RFP Documents 2.1

11 01 33 10.05 20 1 Preconstruction Submittals Submittal Register 1.5.5

12 01 33 10.05 20 5 Design Data Design Drawings 1.7

13 01 33 10.05 20 5 Design Data Specifications 1.9

14 01 33 10.05 20 5 Design Data Design Analysis 1.8

15 01 33 10.05 20 5 Design Data Design Submittals 2.2

16 01 33 10.05 20 11 Closeout Submittals Record Documents 1.8

17 01 33 10.05 20 11 Closeout Submittals DD Form 1354 1.8

18 01 35 26.00 22 1 Preconstruction Submittals Accident Prevention Plan (APP) 1.7

19 01 35 26.00 22 6 Test Reports Monthly Exposure Reports 1.4

20 01 35 26.00 22 6 Test Reports Notifications and Reports 1.12

21 01 35 26.00 22 6 Test Reports Accident Reports 1.12.2

(d)

TITLE: Submittal Register

JOB NAME: RM 16-1224 Repairs to Substation 7

LOCATION:

CONTRACT NO:

CONTRACTOR:

22 01 35 26.00 22 6 Test Reports LHE Inspection Reports 1.12.3

23 01 35 26.00 22 7 Certificates Crane Operators/Riggers 1.6.1.5

24 01 35 26.00 22 7 Certificates Standard Lift Plan 1.7.2.2

25 01 35 26.00 22 7 Certificates Critical Lift Plan 1.7.2.3

26 01 35 26.00 22 7 Certificates Naval Architecture Analysis 1.7.2.3

27 01 35 26.00 22 7 Certificates Activity Hazard Analysis (AHA) 1.8

28 01 35 26.00 22 7 Certificates Confined Space Entry Permit 1.9.1

29 01 35 26.00 22 7 Certificates Hot Work Permit 1.9.1

30 01 35 26.00 22 7 Certificates Certificate of Compliance 1.12.4

31 01 35 26.00 22 7 Certificates Barge Mounted Mobile Cranes 1.7.2.3

32 01 35 26.00 22 7 Certificates License Certificates 1.14

33 01 35 26.00 22 7 Certificates Radiography Operation Planning Work Sheet 1.14.1

34 01 45 00.10 22 1 Preconstruction Submittals QC Plan 1.6

35 01 50 00.00 22 1 Preconstruction Submittals Construction site plan 1.4

36 01 50 00.00 22 1 Preconstruction Submittals Traffic control plan 3.2.1

37 01 50 00.00 22 6 Test Reports Backflow Preventer Tests 2.2.5

38 01 50 00.00 22 7 Certificates Backflow Tester 1.5.1

39 01 50 00.00 22 7 Certificates Backflow Preventers 1.5

40 01 57 19.00 22 1 Preconstruction Submittals Preconstruction Survey 1.5.1

41 01 57 19.00 22 1 Preconstruction Submittals Solid Waste Management Plan 3.4

42 01 57 19.00 22 1 Preconstruction Submittals Regulatory Notifications 1.5.2

43 01 57 19.00 22 1 Preconstruction Submittals Environmental Management Plan (EMP) 3.1

44 01 57 19.00 22 1 Preconstruction Submittals Dirt and Dust Control Plan 3.14.1

45 01 57 19.00 22 1 Preconstruction Submittals Contractor Hazardous Material Inventory Log 3.6

46 01 57 19.00 22 1 Preconstruction Submittals Storm Water Management/Erosion and

Sedimentation Control Plan 3.2.1

47 01 74 19.00 22 1 Preconstruction Submittals Waste Management Plan 1.3

48 01 74 19.00 22 11 Closeout Submittals Records 1.4

49 01 78 00.00 22 3 Product Data As-Built Record of Equipment and Materials 1.3.2

50 01 78 00.00 22 3 Product Data Warranty Management Plan 1.7.1

51 01 78 00.00 22 3 Product Data Warranty Tags 1.7.4

52 01 78 00.00 22 3 Product Data Final Cleaning

53 01 78 00.00 22 3 Product Data Spare Parts Data 1.4

54 01 78 00.00 22 8 Manufacturer’s Instructions Preventative Maintenance 1.5

55 01 78 00.00 22 8 Manufacturer’s Instructions Condition Monitoring (Predictive Testing) 1.5

56 01 78 00.00 22 8 Manufacturer’s Instructions Inspection 1.5

57 01 78 00.00 22 8 Manufacturer’s Instructions Instructions 1.7.1

58 01 78 00.00 22 10 Operation and Maintenance Data Operation and Maintenance Manuals 1.9

59 01 78 00.00 22 11 Closeout Submittals Record Drawings 1.3.1

60 01 78 00.00 22 11 Closeout Submittals Certification of EPA Designated Items 1.6

61 01 78 00.00 22 11 Closeout Submittals Certification of EPA Designated Items 1.6

62 01 78 00.00 22 11 Closeout Submittals Red Zone Documents 1.3.6

63 01 78 23 10 Operation and Maintenance Data O&M Database

64 01 78 23 10 Operation and Maintenance Data Training Plan 3.1.1

65 01 78 23 10 Operation and Maintenance Data Training Outline 3.1.3

66 01 78 23 10 Operation and Maintenance Data Training Content 3.1.2

67 01 78 23 11 Closeout Submittals Training Video Recording 3.1.4

68 01 78 23 11 Closeout Submittals Validation of Training Completion 3.1.6

69 01 78 24.00 22 11 Closeout Submittals eOMSI, Progress Submittal 1.4.1

70 01 78 24.00 22 11 Closeout Submittals eOMSI, Prefinal Submittal 1.4.2

71 01 78 24.00 22 11 Closeout Submittals eOMSI, Final Submittal 1.4.3

72 01 86 26.07 40 1 Preconstruction Submittals Quality Control Plan 1.3

73 01 86 26.07 40 1 Preconstruction Submittals Material, Equipment, and Fixture Lists 2.2

74 01 86 26.07 40 2 Shop Drawings Connection Diagrams 3.2

75 01 86 26.07 40 2 Shop Drawings Fabrication Drawings 2.2.1

76 01 86 26.07 40 2 Shop Drawings Installation Drawings 3.2

77 01 86 26.07 40 3 Product Data Manufacturer's Catalog Data 2.2.1

78 01 86 26.07 40 3 Product Data Equipment Foundation Data 2.2.1

79 01 86 26.07 40 3 Product Data Specific Equipment Data 2.2.3

80 01 86 26.07 40 3 Product Data Spare Parts List 2.2.4

81 01 86 26.07 40 3 Product Data Warranty 1.4

82 01 86 26.07 40 5 Design Data Design Analysis and Calculations 2.1.1

83 01 86 26.07 40 6 Test Reports SF6 Gas Test 3.3.1

84 01 86 26.07 40 6 Test Reports SF6 Gas Leakage Test 3.3.1

85 01 86 26.07 40 6 Test Reports Air Compressor Performance Test 3.3.1

86 01 86 26.07 40 6 Test Reports Automatic Transfer Test

87 01 86 26.07 40 6 Test Reports Battery Impedance Test 3.3.1

88 01 86 26.07 40 6 Test Reports Breaker Timing Test 3.3.1

89 01 86 26.07 40 6 Test Reports Capacitor Bank Acceptance Test

90 01 86 26.07 40 6 Test Reports Capacitor Discharge Test

91 01 86 26.07 40 6 Test Reports Contact Resistance Test 3.3.1

92 01 86 26.07 40 6 Test Reports Continuity Test 3.3.1

93 01 86 26.07 40 6 Test Reports Fall of Potential Test 3.3.1

94 01 86 26.07 40 6 Test Reports General Battery Test

95 01 86 26.07 40 6 Test Reports General Charger Test

96 01 86 26.07 40 6 Test Reports High Voltage Test 3.3.1

97 01 86 26.07 40 6 Test Reports Infrared Thermography Test 3.3.1

98 01 86 26.07 40 6 Test Reports Insulation Oil Test 3.3.1

99 01 86 26.07 40 6 Test Reports Insulation Resistance Test 3.3.1

100 01 86 26.07 40 6 Test Reports Overpotential Test 3.3.1

101 01 86 26.07 40 6 Test Reports Point to Point Test 3.3.1

102 01 86 26.07 40 6 Test Reports Power Factor Test 3.3.1

103 01 86 26.07 40 6 Test Reports Turns Ratio Test 3.3.1

104 01 86 26.07 40 6 Test Reports Ultrasonic (Airborne)Test 3.3.1

105 01 86 26.07 40 6 Test Reports Vacuum Bottle Integrity Test 3.3.1

106 01 86 26.07 40 6 Test Reports Visual Inspection 3.1

107 01 86 26.07 40 7 Certificates Certificates 2.2.2

108 01 86 26.07 40 8 Manufacturer’s Instructions Manufacturer's Instructions 3.2

109 01 86 26.07 40 10 Operation and Maintenance Data Operations and Maintenance Manuals 3.4

110 01 86 26.07 40 11 Closeout Submittals Acceptance Documentation 3.5

111 01 86 26.07 40 11 Closeout Submittals Record Drawings 3.5

112 01 86 26.07 40 11 Closeout Submittals Baseline Data Report 3.3.2

113 02 32 00 2 Shop Drawings Drilling Log 3.7

114 02 32 00 3 Product Data Permits, Certifications, and Licenses 1.5

115 02 32 00 3 Product Data Schedule of Drilling, Sampling, and Testing 1.3.7.1

116 02 41 00 1 Preconstruction Submittals Demolition Plan 1.2.2

117 02 41 00 1 Preconstruction Submittals Deconstruction Plan

118 02 41 00 1 Preconstruction Submittals Existing Conditions 1.1

119 02 41 00 7 Certificates Notification 1.6

120 02 41 00 11 Closeout Submittals Receipts 3.3.5

121 02 42 91 1 Preconstruction Submittals Work Plan 1.2

122 02 81 00 3 Product Data Packaging Notifications 2.1.1

123 02 81 00 3 Product Data Hazardous Waste Management Plan 3.1

124 02 81 00 3 Product Data Onsite Hazardous Waste Management 3.2

125 02 81 00 3 Product Data Notices of Non-Compliance and Notices of

Violation 3.3

126 02 81 00 6 Test Reports Recordkeeping 3.7

127 02 81 00 6 Test Reports Exception Report 3.7

128 02 81 00 6 Test Reports Spill Response 3.8

129 02 81 00 7 Certificates Transportation and Disposal Coordinator 1.4.1

130 02 81 00 7 Certificates Training 1.4.2

131 02 81 00 7 Certificates Certification 1.4.3

132 02 81 00 7 Certificates Shipping Documents and Packagings

Certification 3.3.3

133 02 81 00 7 Certificates Security Plan 3.3.4

134 02 81 00 7 Certificates Certificates of Disposal 3.3.5

135 02 81 00 7 Certificates Waste Minimization 3.6

136 02 82 00.00 22 3 Product Data Amended Water 1.2.2

137 02 82 00.00 22 3 Product Data Safety Data Sheets (SDS) for All Materials 1.3.9

138 02 82 00.00 22 3 Product Data Encapsulants 2.1

139 02 82 00.00 22 3 Product Data Respirators 3.1.2.1

140 02 82 00.00 22 3 Product Data Local Exhaust Equipment 3.1.7

141 02 82 00.00 22 3 Product Data Pressure Differential Automatic Recording

Instrument 3.1.7

142 02 82 00.00 22 3 Product Data Vacuums 3.1.8

143 02 82 00.00 22 3 Product Data Glovebags 3.1.10

144 02 82 00.00 22 6 Test Reports Air Sampling Results 1.5.5

145 02 82 00.00 22 6 Test Reports Pressure Differential Recordings for Local

Exhaust System 1.5.6

146 02 82 00.00 22 6 Test Reports Clearance Sampling 3.2.12.5

147 02 82 00.00 22 6 Test Reports Asbestos Disposal Quantity Report 3.3.3.2

148 02 82 00.00 22 7 Certificates Employee Training 1.3.4

149 02 82 00.00 22 7 Certificates Notifications 1.3.5

150 02 82 00.00 22 7 Certificates Respiratory Protection Program 1.3.7

151 02 82 00.00 22 7 Certificates Asbestos Hazard Abatement Plan 1.3.10

152 02 82 00.00 22 7 Certificates Testing Laboratory 1.3.11

153 02 82 00.00 22 7 Certificates Medical Certification 1.3.14

154 02 82 00.00 22 7 Certificates Private Qualified Person Documentation 1.5.1

155 02 82 00.00 22 7 Certificates Competent Person 1.5.2

156 02 82 00.00 22 7 Certificates Worker's License 1.5.3

157 02 82 00.00 22 7 Certificates Contractor's License 1.5.4

158 02 82 00.00 22 7 Certificates Federal, State or Local Citations on Previous

Projects 1.5.7

159 02 82 00.00 22 7 Certificates Encapsulants 2.1

160 02 82 00.00 22 7 Certificates Equipment Used to Contain Airborne Asbestos

Fibers 3.1

161 02 82 00.00 22 7 Certificates Water Filtration Equipment 3.1.3.3

162 02 82 00.00 22 7 Certificates Vacuums 3.1.8

163 02 82 00.00 22 7 Certificates Ventilation Systems 3.1.8

164 02 82 00.00 22 11 Closeout Submittals Permits 1.3.5

165 02 82 00.00 22 11 Closeout Submittals Licenses 1.3.5

166 02 82 00.00 22 11 Closeout Submittals Notifications 1.3.5

167 02 82 00.00 22 11 Closeout Submittals Respirator Program Records 1.3.7.1

168 02 82 00.00 22 11 Closeout Submittals Rental Equipment 1.7.1

169 02 83 00 1 Preconstruction Submittals Competent Person 1.5.1.1

170 02 83 00 1 Preconstruction Submittals Training Certification 1.5.1.2

171 02 83 00 1 Preconstruction Submittals Occupational and Environmental Assessment

Data Report 1.5.2.3

172 02 83 00 1 Preconstruction Submittals Medical Examinations 1.5.2.4

173 02 83 00 1 Preconstruction Submittals Lead, Cadmium, Chromium Waste Management

Plan 1.5.2.8

174 02 83 00 1 Preconstruction Submittals Licenses, Permits and Notifications 1.5.4

175 02 83 00 1 Preconstruction Submittals Occupant Protection Plan 1.5.5

176 02 83 00 1 Preconstruction Submittals Lead, Cadmium, Chromium Compliance Plan 1.5.2.2

177 02 83 00 1 Preconstruction Submittals Lead, Cadmium, Chromium Compliance Plan 3.1.1.5

178 02 83 00 1 Preconstruction Submittals Initial Sample Results

179 02 83 00 1 Preconstruction Submittals Written Evidence of TSD Approval 3.5.2.1

180 02 83 00 3 Product Data Respirators 1.6.1

181 02 83 00 3 Product Data Vacuum Filters 1.6.4

182 02 83 00 3 Product Data Negative Air Pressure System 1.6.7

183 02 83 00 3 Product Data Materials and Equipment 2.1

184 02 83 00 3 Product Data Expendable Supplies 2.1.1

185 02 83 00 3 Product Data Local Exhaust Equipment 3.1.1.4

186 02 83 00 3 Product Data Pressure Differential Automatic Recording

Instrument 3.1.1.4

187 02 83 00 3 Product Data Pressure Differential Log 3.1.1.5

188 02 83 00 6 Test Reports Sampling and Analysis 1.3.3

189 02 83 00 6 Test Reports Occupational and Environmental Assessment

Data Report 1.5.2.3

190 02 83 00 6 Test Reports Sampling Results 1.5.2.3

191 02 83 00 6 Test Reports Pressure Differential Recordings For Local

Exhaust System 1.5.3

192 02 83 00 7 Certificates Testing Laboratory 1.5.1.3

193 02 83 00 7 Certificates Third Party Consultant Qualifications

194 02 83 00 7 Certificates Occupant Notification 3.1.1.1

195 02 83 00 7 Certificates Notification of the Commencement of LBP Hazard

Abatement 3.1.1.1

196 02 83 00 7 Certificates Clearance Certification 3.5.1.1

197 02 83 00 11 Closeout Submittals Hazardous Waste Manifest 3.5.2.1

198 02 83 00 11 Closeout Submittals Turn-In Documents or Weight Tickets

199 02 83 00.00 22 1 Preconstruction Submittals Competent Person 1.5.1.1

200 02 83 00.00 22 1 Preconstruction Submittals Training Certification 1.5.1.2

201 02 83 00.00 22 1 Preconstruction Submittals Occupational and Environmental Assessment

Data Report 1.5.2.3

202 02 83 00.00 22 1 Preconstruction Submittals Medical Examinations 1.5.2.4

203 02 83 00.00 22 1 Preconstruction Submittals Lead, Cadmium, and Chromium Waste

Management Plan 1.5.2.8

204 02 83 00.00 22 1 Preconstruction Submittals Licenses, Permits and Notifications 1.5.4

205 02 83 00.00 22 1 Preconstruction Submittals Lead, Cadmium, and Chromium Compliance Plan 1.5.2.2

206 02 83 00.00 22 1 Preconstruction Submittals Initial Sample Results 3.4.1.1

207 02 83 00.00 22 3 Product Data Respirators 1.6.1

208 02 83 00.00 22 3 Product Data Vacuum Filters 1.6.4

209 02 83 00.00 22 3 Product Data Negative Air Pressure System 1.6.7

210 02 83 00.00 22 3 Product Data Materials and Equipment 2.1

211 02 83 00.00 22 3 Product Data Expendable Supplies 2.1.1

212 02 83 00.00 22 3 Product Data Local Exhaust Equipment 3.1.1.3

213 02 83 00.00 22 3 Product Data Pressure Differential Automatic Recording

Instrument 3.1.1.3

214 02 83 00.00 22 3 Product Data Pressure Differential Log 3.1.1.4

215 02 83 00.00 22 6 Test Reports Sampling and Analysis 1.3.3

216 02 83 00.00 22 6 Test Reports Occupational and Environmental Assessment

Data Report 1.5.2.3

217 02 83 00.00 22 6 Test Reports Sampling Results 1.5.2.3

218 02 83 00.00 22 6 Test Reports Pressure Differential Recordings For Local

Exhaust System 1.5.3

219 02 83 00.00 22 7 Certificates Testing Laboratory 1.5.1.3

220 02 83 00.00 22 7 Certificates Third Party Consultant Qualifications 1.5.1.4

221 02 83 00.00 22 7 Certificates Notification of the Commencement of Hazard

Abatement

222 02 83 00.00 22 7 Certificates Clearance Certification 3.5.1.1

223 02 83 00.00 22 11 Closeout Submittals Turn-In Documents or Weight Tickets 3.5.2.1

224 02 84 33 7 Certificates Training certification 1.7.1

225 02 84 33 7 Certificates Qualifications of CIH 1.7.2

226 02 84 33 7 Certificates PCB removal work plan 1.7.3

227 02 84 33 7 Certificates PCB disposal plan 1.7.4

228 02 84 33 7 Certificates Notification 1.7.5

229 02 84 33 7 Certificates Transporter certification 3.8

230 02 84 33 7 Certificates Certification of Decontamination 3.5.4

231 02 84 33 7 Certificates Post cleanup sampling 3.5.5

232 02 84 33 7 Certificates Certificate of disposal 3.8.1

233 03 01 00 1 Preconstruction Submittals Qualifications 1.5.3

234 03 01 00 1 Preconstruction Submittals Work Plan 1.5.4

235 03 01 00 1 Preconstruction Submittals Work Plan 1.6.1

236 03 01 00 1 Preconstruction Submittals Quality Control Plan 1.5.2

237 03 01 00 3 Product Data Conventional Concrete 2.5

238 03 01 00 3 Product Data Polymers 2.6

239 03 01 00 3 Product Data Miscellaneous Materials And Equipment 2.7

240 03 01 00 4 Samples Reinforcement And Reinforcement Supports 2.4

241 03 01 00 4 Samples Polymers 2.6

242 03 01 00 4 Samples Miscellaneous Materials And Equipment 2.7

243 03 01 00 5 Design Data Formwork And Shoring 3.1.3

244 03 01 00 5 Design Data Repair Procedures 1.5.1

245 03 01 00 5 Design Data Mixture Proportioning 2.8

246 03 01 00 6 Test Reports Mixture Proportioning 2.8

247 03 01 00 6 Test Reports Quality Control 3.1.5

248 03 01 00 6 Test Reports Quality Control 3.2.3

249 03 01 00 6 Test Reports Quality Control 3.3.3

250 03 01 00 6 Test Reports Quality Control 3.4.3

251 03 01 00 6 Test Reports Quality Control 3.5.3

252 03 01 00 6 Test Reports Tolerence Report 1.6.2

253 03 01 00 6 Test Reports Reinforcement And Reinforcement Supports 2.4

254 03 01 00 6 Test Reports Conventional Concrete 2.5

255 03 01 00 6 Test Reports Polymers 2.6

256 03 01 00 6 Test Reports Miscellaneous Materials And Equipment 2.7

257 03 01 00 7 Certificates Qualifications 1.5.3

258 03 01 00 7 Certificates Reinforcement And Reinforcement Supports 2.4

259 03 01 00 7 Certificates Conventional Concrete 2.5

260 03 01 00 7 Certificates Polymers 2.6

261 03 01 00 8 Manufacturer’s Instructions Equipment For Concrete Preparation 2.2

262 03 01 00 8 Manufacturer’s Instructions Conventional Concrete 2.5

263 03 01 00 8 Manufacturer’s Instructions Polymers 2.6

264 03 01 00 8 Manufacturer’s Instructions Miscellaneous Materials And Equipment 2.7

265 03 30 00 1 Preconstruction Submittals Concrete Curing Plan 1.6.3.1

266 03 30 00 1 Preconstruction Submittals Quality Control Plan 1.6.6

267 03 30 00 1 Preconstruction Submittals Quality Control Personnel Certifications 1.6.7

268 03 30 00 1 Preconstruction Submittals Quality Control Organizational Chart 1.6.7

269 03 30 00 1 Preconstruction Submittals Laboratory Accreditation 1.6.9

270 03 30 00 1 Preconstruction Submittals Form Removal Schedule

271 03 30 00 1 Preconstruction Submittals Maturity Method Data 3.3.9

272 03 30 00 2 Shop Drawings Formwork

273 03 30 00 2 Shop Drawings Reinforcing Steel 1.6.2.1

274 03 30 00 3 Product Data Joint Sealants 2.4.3

275 03 30 00 3 Product Data Joint Filler

276 03 30 00 3 Product Data Formwork Materials 2.1

277 03 30 00 3 Product Data Recycled Aggregate Materials 2.3.3.2

278 03 30 00 3 Product Data Cementitious Materials 2.3.1

279 03 30 00 3 Product Data Vapor Retarder and Vapor Barrier

280 03 30 00 3 Product Data Concrete Curing Materials 2.4.1

281 03 30 00 3 Product Data Reinforcement 2.6

282 03 30 00 3 Product Data Liquid Chemical Floor Hardeners and Sealers

283 03 30 00 3 Product Data Admixtures 2.3.4

284 03 30 00 3 Product Data Reinforcing Fibers

285 03 30 00 3 Product Data Mechanical Reinforcing Bar Connectors 2.6.2

286 03 30 00 3 Product Data Waterstops

287 03 30 00 3 Product Data Local/Regional Materials

288 03 30 00 3 Product Data Biodegradable Form Release Agent 2.2.2

289 03 30 00 3 Product Data Pumping Concrete

290 03 30 00 3 Product Data Finishing Plan 1.6.3.2

291 03 30 00 3 Product Data Nonshrink Grout 2.4.2

292 03 30 00 4 Samples Slab Finish Sample

293 03 30 00 4 Samples Surface Finish Samples

294 03 30 00 5 Design Data Concrete Mix Design 1.6.1.1

295 03 30 00 6 Test Reports Concrete Mix Design 1.6.1.1

296 03 30 00 6 Test Reports Fly Ash

297 03 30 00 6 Test Reports Pozzolan

298 03 30 00 6 Test Reports Slag Cement

299 03 30 00 6 Test Reports Aggregates 1.6.4.1

300 03 30 00 6 Test Reports Fiber-Reinforced Concrete 1.6.4.2

301 03 30 00 6 Test Reports Tolerance Report 3.8.2.1

302 03 30 00 6 Test Reports Compressive Strength Tests 3.12.2.3

303 03 30 00 6 Test Reports Unit Weight of Structural Concrete 3.12.2.5

304 03 30 00 6 Test Reports Chloride Ion Concentration 3.12.2.6

305 03 30 00 6 Test Reports Air Content 3.12.2.4

306 03 30 00 6 Test Reports Slump Tests 3.12.2.1

307 03 30 00 6 Test Reports Water 2.3.2

308 03 30 00 7 Certificates Reinforcing Bars 2.6.1

309 03 30 00 7 Certificates Welder Qualifications 1.8

310 03 30 00 7 Certificates Silica Fume Manufacturer's Representative

311 03 30 00 7 Certificates VOC Content for Form Release Agents, Curing

Compounds, and Concrete Penetrating Sealers 1.6.3.3

312 03 30 00 7 Certificates Safety Data Sheets 1.6.3.4

313 03 30 00 7 Certificates Forest Stewardship Council (FSC) Certification

314 03 30 00 7 Certificates Field Testing Technician and Testing Agency 1.6.7.2

315 03 30 00 8 Manufacturer’s Instructions Liquid Chemical Floor Hardeners and Sealers

316 03 30 00 8 Manufacturer’s Instructions Joint Sealants 2.4.3

317 03 30 00 8 Manufacturer’s Instructions Curing Compound 2.4.1

318 03 45 33 2 Shop Drawings Drawings of Precast Members 2.1.1.2

319 03 45 33 2 Shop Drawings Drawings of Precast Prestressed Concrete

Members

320 03 45 33 3 Product Data Inserts 2.2.8.1

321 03 45 33 3 Product Data Bearing Pads 2.2.9

322 03 45 33 4 Samples Surface Finish 2.3.9

323 03 45 33 5 Design Data Design Calculations 2.1.1.2

324 03 45 33 5 Design Data Concrete Mix Design 1.4.3

325 03 45 33 6 Test Reports Concrete Mix Design 1.4.3

326 03 45 33 6 Test Reports Fly Ash

327 03 45 33 6 Test Reports Pozzolan

328 03 45 33 6 Test Reports Aggregates 2.2.4

329 03 45 33 6 Test Reports Concrete and Aggregate Quality Control Testing

330 03 45 33 6 Test Reports Water 2.2.3

331 03 45 33 7 Certificates Quality Control Procedures 2.3

332 03 45 33 7 Certificates Construction Records

333 03 45 33 7 Certificates Erector's Post Audit Declaration

334 03 45 33 11 Closeout Submittals Batch Ticket 1.4.4

335 03 45 33 11 Closeout Submittals Recycled Content for Fly Ash and Pozzolan 2.2.1

336 03 45 33 11 Closeout Submittals Recycled Content for Ground Iron Blast-Furnace

Slag 2.2.1

337 03 45 33 11 Closeout Submittals Recycled Content for Silica Fume 2.2.1

338 04 03 00 1 Preconstruction Submittals Quality Control Plan 1.5.1

339 04 03 00 1 Preconstruction Submittals Project Training Program 1.5.1

340 04 03 00 1 Preconstruction Submittals Qualifications 1.5.2

341 04 03 00 2 Shop Drawings Photographic Documentation 1.5.5

342 04 03 00 2 Shop Drawings Structural Upgrades 3.5.1

343 04 03 00 3 Product Data Qualifications 1.5.2

344 04 03 00 3 Product Data Cleaning and Restoration Methods 1.5.6

345 04 03 00 3 Product Data Cleaning Materials 2.1

346 04 03 00 3 Product Data Biocides 2.1.4

347 04 03 00 3 Product Data Replacement Mortar And Stucco 2.2.2.2

348 04 03 00 3 Product Data Mortar Mix 2.4

349 04 03 00 3 Product Data Water Repellents Infiltration 3.4.8.3

350 04 03 00 3 Product Data Stone Consolidants 3.4.8.4

351 04 03 00 4 Samples Mock-ups 1.5.7.1

352 04 03 00 5 Design Data Structural Upgrades 3.5.1

353 04 03 00 6 Test Reports Testing and Matching 2.2.2.1

354 04 03 00 6 Test Reports Existing Sealants for Asbestos and PCBs

355 04 03 00 7 Certificates Repair Materials 2.2

356 05 50 13 2 Shop Drawings Structural Steel Door Frames

357 05 50 13 2 Shop Drawings Cover Plates and Frames 2.4

358 05 50 13 2 Shop Drawings Expansion Joint Covers

359 05 50 13 2 Shop Drawings Floor Gratings

360 05 50 13 2 Shop Drawings Roof Walkways

361 05 50 13 2 Shop Drawings Bollards/Pipe Guards

362 05 50 13 2 Shop Drawings Wheel Guards

363 05 50 13 2 Shop Drawings Window and Door Guards

364 05 50 13 2 Shop Drawings Angles and Plates 2.5

365 05 50 13 2 Shop Drawings Roof Hatches

366 05 50 13 3 Product Data Corner Guards 2.3

367 05 50 13 3 Product Data Cover Plates and Frames 2.4

368 05 50 13 3 Product Data Expansion Joint Covers

369 05 50 13 3 Product Data Floor Gratings

370 05 50 13 3 Product Data Roof Walkways

371 05 50 13 3 Product Data Structural Steel Door Frames

372 05 50 13 3 Product Data Wheel Guards

373 05 50 13 3 Product Data Window and Door Guards

374 05 50 13 3 Product Data Roof Hatches

375 05 50 13 3 Product Data Downspout Terminations

376 05 50 13 3 Product Data Recycled Content

377 05 50 13 4 Samples Expansion Joint Covers

378 05 50 13 4 Samples Certificates of Compliance

379 07 60 00 2 Shop Drawings Exposed Sheet Metal 2.2.1

380 07 60 00 2 Shop Drawings Gutters 3.1.11

381 07 60 00 2 Shop Drawings Downspouts 3.1.12

382 07 60 00 2 Shop Drawings Expansion Joints 3.1.19

383 07 60 00 2 Shop Drawings Gravel Stops and fascia 2.2.1

384 07 60 00 2 Shop Drawings Splash Pans 3.1.16

385 07 60 00 2 Shop Drawings Flashing for Roof Drains 3.1.13

386 07 60 00 2 Shop Drawings Base Flashing

387 07 60 00 2 Shop Drawings Counterflashing

388 07 60 00 2 Shop Drawings Flashing at Roof Penetrations and Equipment

Supports

389 07 60 00 2 Shop Drawings Reglets 2.2.14

390 07 60 00 2 Shop Drawings Scuppers 3.1.14

391 07 60 00 2 Shop Drawings Copings

392 07 60 00 2 Shop Drawings Drip Edges 3.1.10

393 07 60 00 2 Shop Drawings Conductor Heads 3.1.15

394 07 60 00 2 Shop Drawings Open Valley Flashing

395 07 60 00 2 Shop Drawings Eave Flashing 3.1.17

396 07 60 00 2 Shop Drawings Recycled Content 2.1

397 07 60 00 3 Product Data Cool Roof

398 07 60 00 4 Samples Finish Samples 1.4.2

399 07 60 00 8 Manufacturer’s Instructions Instructions for Installation 1.4.3

400 07 60 00 8 Manufacturer’s Instructions Quality Control Plan

401 07 60 00 10 Operation and Maintenance Data Cleaning and Maintenance 1.4.3

402 07 84 00 2 Shop Drawings Firestopping System 2.1

403 07 84 00 3 Product Data Firestopping Materials 2.2

404 07 84 00 6 Test Reports Inspection 3.3

405 07 84 00 7 Certificates Inspector Qualifications 1.5.2

406 07 84 00 7 Certificates Firestopping Materials 2.2

407 07 84 00 7 Certificates Installer Qualifications 1.5.1

408 08 01 52 2 Shop Drawings Shop Drawings 1.5

409 08 01 52 3 Product Data Hardware 2.4

410 08 01 52 3 Product Data Weatherstripping 3.2.10

411 08 01 52 3 Product Data Qualifications 1.5

412 08 01 52 4 Samples Hardware 2.4

413 08 01 52 4 Samples Moldings 3.2.10

414 08 01 52 4 Samples Weatherstripping 3.2.10

415 08 01 52 11 Closeout Submittals LEED Documentation

416 08 11 13 2 Shop Drawings Doors 2.1

417 08 11 13 2 Shop Drawings Doors 2.1

418 08 11 13 2 Shop Drawings Recycled Content for Steel Door Product 2.1

419 08 11 13 2 Shop Drawings Frames 2.6

420 08 11 13 2 Shop Drawings Frames 2.6

421 08 11 13 2 Shop Drawings Recycled Content for Steel Frame Product 2.6

422 08 11 13 2 Shop Drawings Accessories 2.4

423 08 11 13 2 Shop Drawings Weatherstripping 2.8

424 08 11 13 3 Product Data Doors 2.1

425 08 11 13 3 Product Data Frames 2.6

426 08 11 13 3 Product Data Accessories 2.4

427 08 11 13 3 Product Data Weatherstripping 2.8

428 08 14 00 2 Shop Drawings Doors 2.1

429 08 14 00 3 Product Data Doors 2.1

430 08 14 00 3 Product Data Accessories 2.2

431 08 14 00 3 Product Data Water-resistant Sealer 2.3.6

432 08 14 00 3 Product Data Warranty 1.5

433 08 14 00 3 Product Data Fire Resistance Rating 2.1.3

434 08 14 00 6 Test Reports Cycle-Slam 2.4

435 08 14 00 6 Test Reports Hinge Loading Resistance 2.4

436 08 14 00 7 Certificates Certificates of Grade 1.3.1

437 08 14 00 11 Closeout Submittals Warranty 1.5

438 08 71 00 2 Shop Drawings Manufacturer's Detail Drawings 1.3

439 08 71 00 2 Shop Drawings Verification of Existing Conditions 1.3

440 08 71 00 2 Shop Drawings Hardware Schedule 1.5

441 08 71 00 2 Shop Drawings Keying System 2.3.5

442 08 71 00 3 Product Data Hardware Items 2.3

443 08 71 00 8 Manufacturer’s Instructions Installation 3.1

444 08 71 00 10 Operation and Maintenance Data Hardware Schedule 1.5

445 08 71 00 11 Closeout Submittals Key Bitting 1.6.1

446 08 81 00 3 Product Data Insulating Glass 2.3

447 08 81 00 3 Product Data Plastic Glazing

448 08 81 00 3 Product Data Glazing Accessories 1.3

449 08 81 00 3 Product Data Sealants 2.4.3.1

450 08 81 00 3 Product Data Joint Backer 2.4.4

451 08 81 00 4 Samples Insulating Glass 2.3

452 08 81 00 4 Samples Plastic Sheet 3.2.7

453 08 81 00 4 Samples Glazing Compound 2.4.2

454 08 81 00 4 Samples Tape 2.4.6

455 08 81 00 4 Samples Sealing Tapes 2.4.6

456 08 81 00 7 Certificates Insulating Glass 2.3

457 08 81 00 7 Certificates Plastic Glazing

458 08 81 00 8 Manufacturer’s Instructions Setting and Sealing Materials 2.4

459 08 81 00 8 Manufacturer’s Instructions Glass Setting 3.2

460 08 81 00 11 Closeout Submittals Insulated Glass Units 1.7.1

461 09 01 90.50 3 Product Data Work Plan 1.2

462 09 01 90.50 3 Product Data Materials 1.2

463 09 01 90.50 3 Product Data Qualifications 1.4.4

464 09 01 90.50 7 Certificates Work Plan 1.2

465 09 90 00 2 Shop Drawings Piping Identification 3.11

466 09 90 00 3 Product Data Coating 2.1

467 09 90 00 3 Product Data Sealant 3.3.5

468 09 90 00 4 Samples Color 1.11

469 09 90 00 4 Samples Textured Wall Coating System

470 09 90 00 7 Certificates Applicator's Qualifications 1.4

471 09 90 00 7 Certificates Qualification Testing 1.5.1.2

472 09 90 00 7 Certificates Indoor Air Quality for Paints and Primers 2.1

473 09 90 00 7 Certificates Indoor Air Quality for Consolidated Latex Paints 2.1

474 09 90 00 8 Manufacturer’s Instructions Application Instructions 3.4.1

475 09 90 00 8 Manufacturer’s Instructions Mixing 3.7.2

476 09 90 00 8 Manufacturer’s Instructions Manufacturer's Safety Data Sheets 1.8.2

477 09 90 00 10 Operation and Maintenance Data Coatings 2.1

478 23 82 46.00 40 2 Shop Drawings Fabrication Drawings 1.2.1

479 23 82 46.00 40 3 Product Data Performance Data 2.1

480 23 82 46.00 40 3 Product Data Electric Unit Heaters 2.1

481 23 82 46.00 40 3 Product Data Heating Element 2.2.1

482 23 82 46.00 40 3 Product Data Controls 2.2.2

483 23 82 46.00 40 3 Product Data Casings 3.1.1

484 23 82 46.00 40 3 Product Data Propellers and Motors 2.2.3

485 23 82 46.00 40 8 Manufacturer’s Instructions Manufacturer's Instructions 1.2.1

486 26 05 33 2 Shop Drawings 600 V Power Connection Station 2.1

487 26 05 33 3 Product Data 600 V Single Pole Connectors 2.3

488 26 05 33 6 Test Reports Paint Coating System

489 26 05 33 6 Test Reports 600 V Single Pole Connector Continuity Tests

490 26 05 33 6 Test Reports 600 V Single Pole Insulation Resistance Test

491 26 05 33 10 Operation and Maintenance Data 600 V Power Connection Station 2.1

492 26 08 00 6 Test Reports Acceptance tests and inspections 3.1

493 26 08 00 7 Certificates Qualifications 1.4.1

494 26 08 00 7 Certificates Acceptance test and inspections procedure 1.4.3

495 26 12 19.10 2 Shop Drawings Pad-mounted Transformer Drawings 1.5.1

496 26 12 19.10 3 Product Data Pad-mounted Transformers

497 26 12 19.10 6 Test Reports Acceptance Checks and Tests 3.6.1

498 26 12 19.10 7 Certificates Transformer Efficiencies

499 26 12 19.10 9 Manufacturer’s Field Reports Transformer Test Schedule 2.2.1

500 26 12 19.10 9 Manufacturer’s Field Reports Design Tests 2.2.2

501 26 12 19.10 9 Manufacturer’s Field Reports Routine and Other Tests 2.2.3

502 26 12 19.10 10 Operation and Maintenance Data Transformer(s) 1.6.1

503 26 12 19.10 10 Operation and Maintenance Data Transformer(s) 2.1

504 26 13 00 2 Shop Drawings Switchgear Drawings 1.5.1

505 26 13 00 3 Product Data Electronic Overcurrent Control Curves 1.5.3

506 26 13 00 3 Product Data SF6/High-Firepoint Fluid Insulated Pad-mounted

Switchgear 1.6.1

507 26 13 00 3 Product Data SF6/High-Firepoint Fluid Insulated Pad-mounted

Switchgear 2.1

508 26 13 00 3 Product Data Insulated High-Voltage Connectors 2.2

509 26 13 00 3 Product Data Surge Arresters

510 26 13 00 6 Test Reports Acceptance Checks and Tests 3.4.1

511 26 13 00 7 Certificates Paint Coating System 1.5.2

512 26 13 00 7 Certificates Cybersecurity 1.7

513 26 13 00 9 Manufacturer’s Field Reports Switchgear design and production tests 2.3.1

514 26 13 00 10 Operation and Maintenance Data SF6/High-Firepoint Fluid Insulated Pad-mounted

Switchgear 1.6.1

515 26 13 00 10 Operation and Maintenance Data SF6/High-Firepoint Fluid Insulated Pad-mounted

Switchgear 2.1

516 26 20 00 2 Shop Drawings Panelboards 2.15

517 26 20 00 2 Shop Drawings Transformers 2.19

518 26 20 00 2 Shop Drawings Busway 2.4

519 26 20 00 2 Shop Drawings Cable Trays 2.5

520 26 20 00 2 Shop Drawings Motor Control Centers

521 26 20 00 2 Shop Drawings Wireways 2.31

522 26 20 00 2 Shop Drawings Marking Strips 3.1.14.1

523 26 20 00 3 Product Data Receptacles 2.14

524 26 20 00 3 Product Data Circuit Breakers 2.15.3

525 26 20 00 3 Product Data Circuit Breakers 2.16.2

526 26 20 00 3 Product Data Switches 2.12

527 26 20 00 3 Product Data Transformers 2.19

528 26 20 00 3 Product Data Enclosed Circuit Breakers 2.17

529 26 20 00 3 Product Data Motor Controllers 2.21

530 26 20 00 3 Product Data Metering

531 26 20 00 3 Product Data CATV Outlets

532 26 20 00 3 Product Data Grounding Busbar

533 26 20 00 3 Product Data Surge Protective Devices 2.32

534 26 20 00 6 Test Reports 600-volt Wiring Test 3.5.2

535 26 20 00 6 Test Reports Grounding System Test 3.5.6

536 26 20 00 6 Test Reports Transformer Tests 3.5.3

537 26 20 00 6 Test Reports Ground-fault Receptacle Test 3.5.4

538 26 20 00 6 Test Reports Arc-fault Receptacle Test 3.5.5

539 26 20 00 7 Certificates Fuses 2.13

540 26 20 00 9 Manufacturer’s Field Reports Transformer Factory Tests 2.34.1

541 26 20 00 10 Operation and Maintenance Data Electrical Systems 1.5.1

542 26 20 00 10 Operation and Maintenance Data Metering

543 26 24 13 2 Shop Drawings Switchboard Drawings 1.5.2

544 26 24 13 3 Product Data Switchboard 2.2

545 26 24 13 6 Test Reports Switchboard Design Tests 2.5.2

546 26 24 13 6 Test Reports Switchboard Production Tests 2.5.3

547 26 24 13 6 Test Reports Acceptance Checks and Tests 3.5.1

548 26 24 13 7 Certificates Cybersecurity Equipment Certification 2.5.4

549 26 24 13 7 Certificates Cybersecurity Installation Certification 3.5.1.7

550 26 24 13 10 Operation and Maintenance Data Switchboard Operation and Maintenance 1.6.1

551 26 24 13 11 Closeout Submittals Assembled Operation and Maintenance Manuals 1.6.2

552 26 24 13 11 Closeout Submittals Equipment Test Schedule 2.5.1

553 26 24 13 11 Closeout Submittals Request for Settings 3.5

554 26 24 13 11 Closeout Submittals Required Settings

555 26 24 13 11 Closeout Submittals Service Entrance Available Fault Current Label 2.7

556 26 27 13.10 30 3 Product Data Power Meters 2.1

557 26 27 13.10 30 3 Product Data Current 2.1.3

558 26 27 13.10 30 3 Product Data Potential Transformer 2.1.2

559 26 27 13.10 30 3 Product Data Communications Module 2.2.2

560 26 27 13.10 30 3 Product Data Protocol Modules 1.6.1

561 26 27 13.10 30 3 Product Data Data Recorder 1.6.2

562 26 27 13.10 30 3 Product Data Modem 1.6.2

563 26 27 13.10 30 6 Test Reports Acceptance Checks and Tests 3.3.1

564 26 27 13.10 30 10 Operation and Maintenance Data Power Meters 2.1

565 26 27 13.10 30 10 Operation and Maintenance Data Communications Module 2.2.2

566 26 27 13.10 30 10 Operation and Maintenance Data Protocol Modules 1.6.1

567 26 27 13.10 30 10 Operation and Maintenance Data Data Recorder 1.6.2

568 26 27 13.10 30 10 Operation and Maintenance Data Modem 1.6.2

569 26 27 13.10 30 11 Closeout Submittals System Function Verification 3.3.2

570 26 41 00 2 Shop Drawings Overall lightning protection system 1.4.1.1

571 26 41 00 2 Shop Drawings Each major component 1.4.1.2

572 26 41 00 2 Shop Drawings G Visual impact description; G

573 26 41 00 6 Test Reports Lightning Protection and Grounding System Test

Plan 1.4.3

574 26 41 00 6 Test Reports Lightning Protection and Grounding System Test 3.5.1

575 26 41 00 7 Certificates Lightning Protection System Installers

Documentation 1.2.3

576 26 41 00 7 Certificates Component UL Listed and Labeled 1.4.2

577 26 41 00 7 Certificates Lightning protection system inspection certificate 1.4.4

578 26 41 00 7 Certificates Roof manufacturer's warranty 3.1.1

579 31 00 00 1 Preconstruction Submittals Shoring

580 31 00 00 1 Preconstruction Submittals Dewatering Work Plan

581 31 00 00 1 Preconstruction Submittals Blasting

582 31 00 00 3 Product Data Utilization of Excavated Materials 3.5

583 31 00 00 3 Product Data Rock Excavation 1.6.1.2

584 31 00 00 3 Product Data Opening of any Excavation or Borrow Pit

585 31 00 00 3 Product Data Shoulder Construction

586 31 00 00 6 Test Reports Testing

587 31 00 00 6 Test Reports Borrow Site Testing

588 31 00 00 7 Certificates Testing

589 31 23 00.00 22 1 Preconstruction Submittals Shoring and Sheeting Plan 3.1.1

590 31 23 00.00 22 1 Preconstruction Submittals Dewatering Work Plan 1.7.2

591 31 23 00.00 22 1 Preconstruction Submittals Excavation and Trenching Plan 1.7.1

592 31 23 00.00 22 1 Preconstruction Submittals Excess Soil Disposal & Soil Sampling Plan 1.7.4

593 31 23 00.00 22 1 Preconstruction Submittals Archeologists Qualifications 1.7.5

594 31 23 00.00 22 6 Test Reports Pervious Granular Fill 3.12.2.3

595 31 23 00.00 22 6 Test Reports Borrow Materials 2.3

596 31 23 00.00 22 6 Test Reports Fill and backfill 3.12.2.1

597 31 23 00.00 22 6 Test Reports Select material 3.12.2.2

598 31 23 00.00 22 6 Test Reports Density tests 3.12.2.4

599 31 23 00.00 22 6 Test Reports Moisture Content Tests

600 31 32 23 3 Product Data Drilling Equipment 3.1.2

601 31 32 23 3 Product Data Grouting Equipment 3.1.3

602 31 32 23 3 Product Data Grout Plant 3.1.3

603 31 60 00 3 Product Data Tools 3.2.1.1

604 32 12 16 3 Product Data Mix Design 2.4

605 32 12 16 3 Product Data Quality Control 3.1

606 32 12 16 3 Product Data Material Acceptance 3.11

607 32 12 16 3 Product Data Percent Payment 1.1.3

608 32 12 16 4 Samples Asphalt Cement Binder 2.3

609 32 12 16 4 Samples Aggregates 2.2

610 32 12 16 6 Test Reports Aggregates 2.2

611 32 12 16 6 Test Reports QC Monitoring 3.10.3.10

612 32 12 16 7 Certificates Asphalt Cement Binder 2.3

613 32 12 16 7 Certificates Testing Laboratory 3.6

614 32 31 13 2 Shop Drawings Fence Assembly 2.1

615 32 31 13 2 Shop Drawings Location of Gate, Corner, End, and Pull Posts 3.2.2.1

616 32 31 13 2 Shop Drawings Gate Assembly 2.1

617 32 31 13 2 Shop Drawings Gate Hardware and Accessories 2.2.15

618 32 31 13 2 Shop Drawings Erection/Installation Drawings Part 3

619 32 31 13 3 Product Data Fence Assembly 2.1

620 32 31 13 3 Product Data Gate Assembly 2.1

621 32 31 13 3 Product Data Gate Hardware and Accessories 2.2.15

622 32 31 13 3 Product Data Zinc Coating 2.3.1

623 32 31 13 3 Product Data PVC Coating

624 32 31 13 3 Product Data Aluminum Alloy Coating

625 32 31 13 3 Product Data Fabric 2.2.1

626 32 31 13 3 Product Data Stretcher Bars 2.2.10

627 32 31 13 3 Product Data Concrete 2.3.3

628 32 31 13 4 Samples Fabric 2.2.1

629 32 31 13 4 Samples Posts 2.2.2

630 32 31 13 4 Samples Braces 2.2.2

631 32 31 13 4 Samples Line Posts 2.2.3

632 32 31 13 4 Samples Sleeves 2.2.5

633 32 31 13 4 Samples Top Rail 2.2.6

634 32 31 13 4 Samples Bottom Rail 2.2.8

635 32 31 13 4 Samples Tension Wire 2.3.2

636 32 31 13 4 Samples Stretcher Bars 2.2.10

637 32 31 13 4 Samples Gate Posts 2.2.13

638 32 31 13 4 Samples Gate Hardware and Accessories 2.2.15

639 32 31 13 4 Samples Padlocks 2.2.18

640 32 31 13 4 Samples Wire Ties 2.2.17

641 32 31 13 7 Certificates Certificates of Compliance 1.3.1

642 32 31 13 8 Manufacturer’s Instructions Fence Assembly 2.1

643 32 31 13 8 Manufacturer’s Instructions Gate Assembly 2.1

644 32 31 13 8 Manufacturer’s Instructions Hardware Assembly 2.1

645 32 31 13 8 Manufacturer’s Instructions Accessories 2.1

646 32 31 13 11 Closeout Submittals Recycled Material Content 3.3

647 33 71 02 2 Shop Drawings Precast underground structures 1.5.1

648 33 71 02 3 Product Data Medium voltage cable 2.5

649 33 71 02 3 Product Data Medium voltage cable joints 2.7

650 33 71 02 3 Product Data Medium voltage cable terminations 2.6

651 33 71 02 3 Product Data Live end caps

652 33 71 02 3 Product Data Precast concrete structures 2.12.2.1

653 33 71 02 3 Product Data Sealing Material 2.12.2.4

654 33 71 02 3 Product Data Pulling-In Irons 3.4.3

655 33 71 02 3 Product Data Manhole frames and covers 2.12.3

656 33 71 02 3 Product Data Handhole frames and covers

657 33 71 02 3 Product Data Composite/fiberglass handholes

658 33 71 02 3 Product Data Cable supports 2.13

659 33 71 02 6 Test Reports Medium voltage cable qualification and production tests 2.15.2

660 33 71 02 6 Test Reports Field Acceptance Checks and Tests 3.18.1

661 33 71 02 6 Test Reports Arc-proofing test 2.15.1

662 33 71 02 7 Certificates Cable splicer/terminator 1.5.2

663 33 71 02 7 Certificates Cable Installer Qualifications 1.5.3

664 41 22 23.19 2 Shop Drawings Monorail system 1.2.1.1

665 41 22 23.19 2 Shop Drawings Complete schematic wiring diagram with description of operation 1.2.1

666 41 22 23.19 3 Product Data Monorail Track System 2.3

667 41 22 23.19 3 Product Data Manual Hoist 1.2

668 41 22 23.19 3 Product Data Trolley 1.4.1

669 41 22 23.19 3 Product Data Pendant Pushbutton Station 2.7

670 41 22 23.19 3 Product Data Hook Proof Test 1.4.1

671 41 22 23.19 3 Product Data Festoon System

672 41 22 23.19 3 Product Data Runway Electrification System

673 41 22 23.19 3 Product Data Variable Frequency Drives

674 41 22 23.19 3 Product Data Bumpers

675 41 22 23.19 3 Product Data End Stops

676 41 22 23.19 3 Product Data Manufacturer's Published Tables 2.3.3

677 41 22 23.19 5 Design Data Structural Design calculations

678 41 22 23.19 5 Design Data Structural and Load Capacity calculations 2.2.3

679 41 22 23.19 6 Test Reports 125 percent Rated Load test

680 41 22 23.19 6 Test Reports No-Load Test

681 41 22 23.19 6 Test Reports Post-Erection Inspection 3.3.1

682 41 22 23.19 6 Test Reports Operational Tests 3.3.2

683 41 22 23.19 6 Test Reports Rated Load Speed Test

684 41 22 23.19 6 Test Reports Load Chain Proof Test 1.4.1

685 41 22 23.19 6 Test Reports Hook NDT Report 2.10.1

686 41 22 23.19 6 Test Reports Hook Tram Measurement

687 41 22 23.19 7 Certificates Compliance with all listed Standards 1.4.1

688 41 22 23.19 7 Certificates Semi-Annual Overload/Safe for Testing 1.4.1

689 41 22 23.19 7 Certificates Brake Settings 1.4.1

690 41 22 23.19 7 Certificates Runway Straightness/Levelness 1.4.1

691 41 22 23.19 7 Certificates Loss of Power Test 1.4.1

692 41 22 23.19 7 Certificates Hook Proof Test 1.4.1

693 41 22 23.19 10 Operation and Maintenance Data Monorail with hoist system, all components, Data

Package 3 1.6