This document is an Amendment of Solicitation/Modification of Contract for the N4008025R9500 Multiple Award Construction Contract (MACC). Amendment 0006 adds several key updates, including:

  1. New attachments for the Pre-Proposal Conference, including a presentation and attendee log, a revised Price Proposal Form (Attachment H), and Price Performance Information (PPI) Responses. The amendment updates Section 00 21 00 - Instructions to Proposers by revising the list of attachments and provides clarifications on various technical details such as door schedules, painting specifications, site surcharge requirements, and small business participation. Notable confirmations include allowing 11x17 pages for the Critical Path Method Schedule, clarifying that Sustainable Third Party Certification documentation is excluded from page counts, and confirming that the construction duration of 801 days accounts for a 3-month waiting period after full height surcharge placement.

View the file

Other files

File Type Posted
N4008025R9500-0041.pdf PDF
N4008025R9500-0040.pdf PDF
ATT H P-691 PRICE PROPOSAL FORM (REVISED 04202026).pdf PDF
N4008025R9500-0039.pdf PDF
N4008025R9500-0038.pdf PDF
N4008025R9500-0037.pdf PDF
N4008025R9500-0036.pdf PDF
N4008025R9500-0035.pdf PDF
N4008025R9500-0034.pdf PDF
N4008025R9500-0033.pdf PDF
N4008025R9500-0032.pdf PDF
N4008025R9500-0031.pdf PDF
N4008025R9500-0030.pdf PDF
N4008025R9500-0029.pdf PDF
N4008025R9500-0028.pdf PDF
N4008025R9500-0027.pdf PDF
N4008025R9500-0026.pdf PDF
N4008025R9500-0025.pdf PDF
N4008025R9500-0024.pdf PDF
N4008025R9500-0023.pdf PDF
N4008025R9500-0022.pdf PDF
N4008025R9500-0021.pdf PDF
N4008025R9500-0020.pdf PDF
N4008025R9500-0019.pdf PDF
AMENDMENT 0017 SF30 CONTINUATION PAGE.pdf PDF
N4008025R9500-0018.pdf PDF
N4008025R9500-0017.pdf PDF
N4008025R9500-0016.pdf PDF
AMENDMENT 0016 SF30 CONTINUATION PAGE.pdf PDF
ATT H P-691 PRICE PROPOSAL FORM (REV05132025).pdf PDF
N4008025R9500-0015.pdf PDF
ATT H P-691 PRICE PROPOSAL FORM (REV05092025).pdf PDF
N4008025R9500-0014.pdf PDF
ATT O Signage Guidelines from IAP.pdf PDF
N4008025R9500-0013.pdf PDF
N4008025R9500-0011.pdf PDF
N4008025R9500-0012.pdf PDF
Revision to Spec 08 44 00.pdf PDF
Revision to Sheet AE415.pdf PDF
Revision to Spec 23 05 93.pdf PDF
Revision to Spec 27 41 00.pdf PDF
Revision to Spec 09 65 00.pdf PDF
Revision to Sheet AE617.pdf PDF
Revision to SheetAE601.pdf PDF
N4008025R9500-0010.pdf PDF
Revision to Spec 31 05 19.13.pdf PDF
ATT_E___Small_Business_Subcontracting_Plan.docx DOCX document
ATT_D___Past_Performance_Questionnaire.docx DOCX document
Revision to Spec 32 12 15.13.pdf PDF
ATT A - PIEE Vendor Registration Instructions.pdf PDF
Show 40 more

Latest 50 of 85 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

N40080-25-R-9500- Design-Build (DB)/Design-Bid-Build (DBB) Indefinite-Delivery/Indefinite-Quantity (IDIQ) Multiple Aw ard Construction Contract (MACC) for Large Scale U.S. Military Projects, Locations in Washington D.C., Maryland, and Virginia

PLEASE SEE SF30 BLOCK 14 CONTINUATION PAGE

1. CONTRACT ID CODE PAGE OF PAGES

J 1 9

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 10-Apr-2025

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N4008025R9500

X 9B. DATED (SEE ITEM 11)

13-Mar-2025

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

10-Apr-2025

CODE

COMNAVFACSYSCOM WASHINGTON

1314 HARWOOD ST

WASHINGTON DC 20374

N40080 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008025R9500

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

The purpose of this amendment is to:

1. Provide Preproposal Conference and Site Visit Detail (Separate Attachments):

Attachment M Pre-Proposal Conference Presentation Attachment N Pre-Proposal Conference and Site visit Attendee Log

2. Provide revised ATT H - Price Proposal Form

3. Provide PPI Responses

1-2. Revised Solicitation:

Section 00 21 00 – INSTRUCTIONS TO PROPOSERS

TO: Revise Section 6: ATTACHMENTS:

Attachment A PIEE Vendor Registration Instructions

Attachment B PPI Log Attachment C Construction and Design Experience Project Data Sheet

Attachment D Past Performance Questionnaire (REVISED 04022025) Attachment E Small Business Subcontracting Plan

Attachment F Historical SB Utilization Attachment G Small Business Participation Commitment Document

Attachment H P-691 Price Proposal Form (REV04102025) Attachment I P-691 Specifications

Attachment J P-691 Drawings Attachment K SECNAV5512 Access Form Attachment L N4008025JA009 (Redacted) Attachment M Preproposal Conference and Site Visit Presentation Attachment N Preproposal Conference and P691 Site Visit Attendee Log

2. PPI responses:

Reference Inquiry Government Response

# Page Section Para

50 GC104 General Note 7 on Sheet GC104 states

Confirmed.

that "Estimated 3 Month waiting period after full height surcharge placement" Please confirm that the 801 day construction duration is based on this 3 month waiting period and that in the event the waiting period exceeds three months, the construction duration will be increased accordingly.

60 AE414 B1, B3 The door schedule on AE601 states there is on access panel located in A23F.

Detail B3/AE414 shows that a 2'x2' access door at the top of the stairs, noted by item H. The top of the stairs on detail B1 show this as door F16A. Detail A3/AE415 shows another access door underneath of the stairs. Please confirm the access door is beneath the stairs and the door at the top of the stairs is to be F16A. If so, please add this additional access panel to the door schedule on AE601.

Bid per RFP.

Elevation A3/AE414 shows door F16A at top of stairs. Section A3/AE415 shows access door beneath stairs.

61 E-111C Confirm furniture whips and final connection to furniture by Owner's Furniture Vendor.

Bid per RFP;

Furniture systems final connections are to be made by contractor.

62 14 09 97 13.27 3.2 Section 09 97 13.27-

3.2 and AE615 indicate that the exposed steel in the hangar bays is to be coated with the 3 coat shop applied high perfornace paint system. It also says to coat all other expsed ferrous metal per

Bid per RFP. The hangar bay steel roof joists are considered "secondary members per AE614 note "c".

The steel deck in the hangar bay is allowed ot be coated with the

099000. We believe that is interpreted to mean that the joists and deck at the main hangar roof are to follow 099000-

3.13.2.3 and receive an Alkyd Primer per MPI 76, and may be field painted ILO shop coated for the intermediate and finish coats of paint. Please confirm.

field applied primer / paint as specified per 09

90 00 - PAINTS

AND

COATINGS.

64 P-101A typ; P-502 The emergency eyewash station (see P-101A; P-502) do not appear to have any floor drainage in the event of use. Is the intent that they drain into the ILDFA area, or is there floor drains that are not shown and will be required?

Please clarify.

Bid per RFP. No additional floor drains are required. ESEW is to spill on the floor and said spill to be collected/squeege d into adjacent drain in ILDFA system.

67 AE121A -

AE121F

Architectural roof plans (e.g. AE121A) note 5 call for Fall Protection system to continue to structure.

Please provide details for structural attachments at relevant conditinos (at beams, at joints, in between beams or joists).

Bid per RFP; see detail C1/AE124.

71 GC104 Per drawing GC104 wick drains and surcharge must be placed in the designated areas and monitored for 3 months. The detail on this sheet shows wick drains, a 12" drainage layer and 5' of surcharge material.

This detail shows the top of the drainage layer to be finished elevation. Is finished elevation, as shown on this drawing, intended to be proposed grade

Confirmed;

Finished elevation in this detail is top of proposed grade.

or subgrade? For example, within the hangar FFE is 47.00', is the finished floor referneced on GC104 at elevation 47' or would it be slab subgrade (bottom of slab aggregate base)?

72 AE101F CORR F17 on AE101F has a ramp in

it. There are no wall railings at the ramp.

Please confirm that none are required.

Confirmed, no handrails are required.

76 02 82 00 02 83 00 02 84 33 02 85 00

The project manual includes specifications for the removal/remediation of asbestos, lead, PCBs, and Mold, presumably present in the buildings to be demolished. There are no Hazmat Surveys, or other documents included that indicate the locations and bid quantities of each to be removed. Please provide the hazmat surveys and/ or reports with this information.

Refer to Appendices A-D in the provided Specifications for hazmat surveys.

77 GC104 The General Notes and Surcharge Detail on drawing GC104 require a 5ft earth surcharge over a 12" drainage layer for an estimated 3 month waiting period over the entire building footprint and a majority of the airfield pavement area. Per Note 1 under the Surcharge Detail, "Contractor's Geotechnical Engineer to confirm design and extent of surcharging to mitigate underlying compressible soil layers". Please confirm that bids are to be

Confirmed. Bid per RFP.

based on the General Notes and Detail per GC104 and that after award, the Contractor is to retain he services of a Geotechnical Engineer to confirm the design and extent of surcharging.

78 CD101 For the fire suppression line that crosses Millstone Road and continues north to its tie in point please confirm all tree removal, asphalt sawcutting and patching on CD101 will be performed under ASUS's contract with the government.

Confirmed. Bid per RFP.

81 CU104,CU105 Please confirm the 2" sanitary sewer force main w/ 8" casing under the concrete apron is to be by the contractor and not by

ASUS.

Confirmed, work referenced is to be completed by contractor as per

RFP.

126 The RFP states " Offeror shall submit a narrative detailing the first task order seed project requirements solution. The narrative should describe how the Offeror intends to successfully complete the seed project. The narrative plan shall not exceed three pages. Information beyond the four-page limit will not be considered." Please confirm a 4-page narrative is allowed for the schedule narrative.

Bid per Amendment 0005, “Four pages”

145 17 Factor 3: Past Performance: (i) Solicitation Submittal Requirements

In reference to PPI 95 response included in Amendment 0005, please confirm whether the completed CPAR can be a completed interim (i.e.

Bid per RFP, "If there is not a completed

CPARS

evaluation then submit Past Performance not in draft form from the client) CPAR, or if completed is referring to a final CPAR for a project.

Questionnaires (Attachment B) for each project included in Factor 2 for both Construction Experience and Design Experience."

146 17 Factor 3: Past Performance: (i) Solicitation Submittal Requirements

In reference to PPI 98 response included in Amendment 0005, please clarify the response.

“Confirmed” makes it appear as though past PPQ can be provided, but the “shall not incorporate by reference” makes it appear as though submissions should not include PPQs from other submissions.

Please clarify.

Bid per RFP, Offerors shall not incorporate by reference, but are not prohibited from including the entirety of the previously completed PPQ

147 General How can an Offeror identify themselves as a Small Business to ensure all reviewing parties acknowledge business status, and understand some requirements (Attachment F submission) do not apply to Small Busiesses?

Bid per RFP, "SAM

Registration Offeror shall ensure current registration on the SAM Website, www.sam.gov, including Annual Representations and Certifications are complete and updated for this procurement."

148 10 of 96 - Solicitation

Page 10 of 96 of the Solicitation states that based on FAR 19.7, all other than Small Businesses shall submit a Small Business Subcontracting Plan (SBSP, Attachment E).

For Small Businesses that are not required to submit an SBSP, should offeror submit a blank Attachement E

Bid per RFP.

or submit no Attachement E.

149 Solicitation Are we able to use reduced font in graphics so long as it is legible?

Bid per Amendment 0004, "10-point Times New Roman"

150 Amendment 1 and

Confirm the period of performance - Amendment 1 (page 30 of 32) 52.211-10 calls for 802 CD - Amendment 3 (page 2 and 3 of 9) states 801 CD - please clarify period of performance.

Bid per Amendment 0003.

151 RFP 15/96 (2) Design Experience

This section requires that the offeror provide applicable documentation on projects that were validated and/or certified through a Sustainable Third Party Certification program. Please confirm that this documentation is excluded from maximum page counts.

Confirmed.

152 RFP 22/96 Factor 6 Technical Solution

(i) 2. Critical Path Method Schedule

Please confirm that the CPM Schedule is excluded from the maximum page count for the Factor 6 Technical Solution.

Confirmed.

153 RFP 11/96 Non-Price Proposal Factors

(i) Solicitation Submittal Requirements

This section indicates that text pages are limited to 8 1/2 x 11 format. Please confirm that 11 x 17 pages may be used for the CPM Schedule.

Confirmed.

154 RFP 11/96 Non-Price Proposal Factors

(i) Solicitation Submittal Requirements

Please confirm that 11 x 17 pages used for the MACC Program Organizational Chart only counts as a single page toward the maximum page counts for their relevant sections, if it is not excluded.

Bid per RFP, "Information beyond the five-page limit will not be considered, with the exception of an organizational chart which is not included in the page limitation."

168 PPI 9 PPI 9 - Please confirm the PLA is deleted from the Contract Requirements per PPI

Confirmed.